Xylem MM 231F User Manual

Series 42S
(Snap Switch)
Low Water Cut-Off/Pump Controller
For Steam Boilers
Typical Applications:
– Pump controller/low water fuel cut-off
for steam boilers
– Low water cut-off
INSTRUCTION MANUAL
Series 42S-A
MM-231F
Series 42S
Series 42S-N
WARNING
!
N
TIO
U
A
C
G
NIN
R
A
W
• Save these instructions for future reference
• All work must be performed by qualified personnel trained in the proper application, instal­lation, and maintenance of plumbing, steam, and electrical equipment and/or systems in accordance with all applicable codes and ordinances.
• To prevent serious burns, the boiler must be cooled to 80˚F (27˚C) and the pressure must be 0 psi (0 bar) before servicing.
• To prevent electrical shock, turn off the electrical power before making electrical connections.
• This low water cut-off must be installed in series with all other limit and operating controls installed on the boiler. After installation, check for proper operation of all of the limit and operating controls, before leaving the site.
• We recommend that secondary (redundant) low water cut-off controls be installed on all steam boilers with heat input greater than 400,000 BTU/hour or operating above 15 psi of steam pressure. At least two controls should be connected in series with the burner control circuit to provide safety redundancy protection should the boiler experience a low-water condition. Moreover, at each annual outage, the low water cut-offs should be dismantled, inspected, cleaned, and checked for proper calibration and performance.
• To prevent serious personal injury from steam blow down, connect a drain pipe to the control opening to avoid exposure to steam discharge.
• To prevent a fire, do not use this low water cut-off to switch currents over 7.4A, 1/3 Hp at 120 VAC or 3.7A, 1/3 Hp at 240 VAC, unless a starter or relay is used in conjunction with it.
California Proposition 65 warning! This product contains chemicals known to the
!
state of California to cause cancer and birth defects or other reproductive harm. Previous controls should never be installed on a new system. Always install new
controls on a new boiler or system.
Failure to follow this warning could cause property damage, personal inj ury or death.
Pump Circuit Rating (Amperes)
Voltage Full Load Locked Rotor Pilot Duty
120 VAC 7.4 44.4
345 VA at
240 VAC 3.7 22.2
120 or 240 VAC
Approximate
Distance Above
Cast Line Differential
Setting In. (mm) In. (mm)
Pump Off 13/8(35)
3
/4(19)
Pump On
5
/8(16)
Burner On
7
/8(22)
7
/8(22)
Burner Off 0 (0)
NORMAL BOILER
WATER LINE
BURNER
CUT-OFF LEVEL
AT CAST LINE
7/8" (22 mm)
BURNER ON BURNER OFF
CUT-OFF
LEVEL
NORMAL BOILER
WATER LINE
PUMP
OFF
BURNER
OFF
BURNER
CUT-OFF LEVEL
AT CAST LINE
1 3/8" (35mm)
CUT-OFF
LEVEL
NORMAL BOILER
WATER LINE
CUT-OFF
LEVEL
PUMP OFF PUMP ON
3/4" (19mm)
OPERATION
Maximum Pressure: 50 psi (3.5 kg/cm2) Electrical Ratings
Settings and Differential Pressures
Values are ± 8” (3.2mm).
Series 42S
50 psi
(3.5 kg/
cm2)
Pressure
2
Motor Horsepower
Voltage Hp
120 VAC
1/3
240 VAC 1/3
CAUTION:
A more frequent replacement interval may be necessary based on the condition of the unit at time of inspection. McDonnell Miller s warranty is one (1) year from date of installation or two (2) years from the date of manufacture.
&
'
3
1"
The 42S and 42S-N controls are installed so that the horizontal cast line on the body is 1aa” (35mm) below the boiler’s normal water level, but not
lower than the lowest, safe permissi­ble water level, as determined by the boiler manufacturer.
The 42S-A controls are installed in boil­er’s gauge glass tappings. The horizontal cast line should be approximately 1” (25 mm) above the bottom of the glass. Verify that this level is not below the
lowest, safe permissible water level, as determined by the boiler manufac­turer.
STEP 1 - Determine the Elevation at Which the Low Water Cut-Off/Pump Controller Must be Installed
INSTALLATION –
TOOLS NEEDED:
Two (2) pipe wrenches, one (1) flathead screw driver, and pipe sealing compound.
IMPORTANT: Follow the boiler manufacturer's instructions along with all applicable codes and ordinances for piping, blow down valve and water gauge glass requirements.
13/8"
STEAM EQUALIZING PIPE
VERTICAL EQUALIZING PIPE
BLOW DOWN VALVE
NORMAL BOILER WATER LINE
LOW WATER CUT-OFF/PUMP CONTROLLER
BURNER CUT-OFF LEVEL AT CAST LINE
LOWEST PERMISSIBLE WATER LEVEL
(35mm)
WATER
EQUALIZING
PIPE
STEAM EQUALIZING PIPE
VERTICAL EQUALIZING PIPE
BLOW DOWN VALVE
LOW WATER CUT-OFF/PUMP CONTROLLER
BURNER CUT-OFF LEVEL AT CAST LINE
WATER
EQUALIZING
PIPE
13/8"
NORMAL BOILER WATER LINE
LOWEST PERMISSIBLE WATER LEVEL
(35mm)
Series 42S
Series 42S-N
4
For 42S-A Control
H
INVERTED “Y” CASTING
Note: Reverse union nuts, packing and plug. Tighten top nut securely.
J
H
G
F
J
c. Determine the position of the black ‘Y’ casting (H).
If gauge glass tappings (F) and (G) are less than 10
5
8" (270 mm) apart, install the black ‘Y’ casting (H) as depicted in the diagram to the top right.
OR
If gauge glass tappings (F) and (G) are greater than 10
5
8" (270 mm) apart, invert the black ‘Y’ casting (H) as depicted in the diagram to the bottom right.
OR
If gauge glass tappings (F) and (G) are greater than 14" (356 mm) apart, invert the black ‘Y’ casting (H) as depicted in the diagram to the bottom right and install a longer brass nipple (J).
C
a. Drain the water in the boiler until the level falls below the lower
gauge glass connection (C). Allow the boiler to cool to 80˚F (27 ˚C) and allow the pressure to release to 0 psi (0 bar).
D
E
b. Remove the water glass (D) and gauge glass connections (E)
from the boiler.
STEP 2 - Installation
B
A
a. Using a pipe wrench, unscrew shipping block (A) from
upper 1” NPT tapping (B) of the control body.
5
L
K
f. Reinstall gauge glass and trim to ‘Y’ fittings (K, L).
Note: Make sure gauge glass valves are fully open.
L
K
d. • Install upper ‘Y’ fitting (K) into upper 1/2” NPT
gauge glass tapping on boiler.
• Install lower ‘Y’ fitting (L) into 1/2” NPT gauge glass tapping on boiler.
S
R
P
Q
M
BB
Z
W
T
Y
AA
V
U
X
N
O
e. • Screw reducer bushing (O) and nipple (N) into top 1” NPT
tapping (P).
• Screw reducer bushing (Q), nipple (R) and blow-off valve (S) into bottom 1” NPT tapping (T).
• Screw lower union tailpiece (V) with nut (U) into either 1/2” NPT lower tapping (W, X). Screw 1/2” NPT pipe plug into unused lower tapping.
• Screw upper union tailpiece (Z) with nut (Y) into ‘Y’ casting (M) 1/2” NPT tapping (AA).
• Slide ‘Y’ casting (M) and compression nut (BB) over nipple (N).
• Connect upper and lower union nuts (U, Y) to ‘Y’ fittings (K, L) installed in boiler gauge glass tappings. Note: ‘Y’ fitting (M) will have to be moved up or down nipple (N) to mate union halves.
• Tighten compression nut (BB).
6
For 42S Control
DD
CC
NN
a. Mount and pipe control (CC) on vertical equalizing
pipes (DD) at the required elevation as determined in Step 1.
b. Install a full ported ball valve (NN) directly below the
lower cross of the water (lower) equalizing line.
For 42S-N Control
JJ
EE
HH
GG
FF
NN
a. Install fitting (EE) provided in top 1” NPT tapping.
Orient 1/2” NPT tapping (FF) with 1/2” tapping on control (GG).
b. Mount and pipe control (HH) on vertical equalizing
pipes (JJ) at the required elevation as determined in Step 1.
c. Install gauge glass and other trim such as
pressure gauges or pressure controls following manufacturer’s instructions. Note: These items are not provided and must be purchased separately.
d. Install pipe plugs in all unused tappings on
control body and fittings.
e. Install a full ported ball valve (NN) directly below
the lower cross of the water (lower) equalizing line.
STEP 3 - Electrical Wiring
• To prevent electrical shock, turn off the electrical power before making electrical connections.
• This low water cut-off must be installed in series with all other limit and operating controls installed on the boiler. After installation, check for proper operation of all of the limit and operating controls, before leaving the site.
• Modification of the switch assembly before or after installation could cause damage to the boiler and/or boiler system.
Failure to follow this warning could cause electrical shock, an explosion and/or a fire, which could result in property damage, personal injury or death.
!
WARNING
Switch Operation
Boiler feed pump off,
burner on.
Boiler feed pump on,
burner on.
Boiler feed pump on,
burner off.
7
b. Following the appropriate wiring
diagram, (refer to page 8) based on your application requirements, and using BX armored cable or Thinwall elec­trical metal tubing connector fit­tings, make electrical connec­tions to the junction box (LL).
Note: Follow local codes and stan­dards when selecting the types of electrical fittings and conduit to connect to control.
LL
Snap Switches
(Series 42S)
IMPORTANT: There must be a
minimum space of 1/2” (13mm) between connector fittings and electrical live metal parts.
KK
a. Using a flathead screwdriver, remove the
junction box cover (KK).
1 2 5 6 1 2 5 6
1 2 5 6
WIRING DIAGRAMS
Low Water Cut-Off Only
1. Main Line Switch - For burner circuits within the switch’s electrical rating.
Pump Control Only
1. Install a starter or relay in pump control circuit,
as shown, to prevent damage to snap switch and help insure proper switch/control operation. Failure to do so may shorten the life of the switch when actual amperage exceeds switch rating.
2. Connect wires from holding coil of pump starter
or relay to terminals 1 and 2 as shown.
NOTE: To help insure most effective operation, balance boiler feed pump(s) to deliver required water feed rate to match boiler steaming requirements.
1. Main Line Switch - For burner circuits within
the switch’s electrical rating.
2. Pilot Switch - To holding coil of a starter when the burner circuit exceeds the switch’s electrical rating.
12 56
SEE PUMP
CONTROL
CIRCUIT
TO BURNER CONTROL CIRCUIT
HOT
12 56
LOAD
LINE
SEE PUMP
CONTROL
CIRCUIT
OR
OR
Combination Pump Control, Low Water Cut-Off and Alarm
2. Pilot Switch - To holding coil of a starter when
the burner circuit exceeds the switch’s electrical rating.
8
LINE LOAD
12 56
LINE
12 56
LOAD
LINE
12 56
LOAD
STEP 4 - Testing
a. Turn on the electric power to the boiler. With the boiler empty
the pump should go on and the burner must remain off.
IMPORTANT: Follow the boiler manufacturer’s start-up and operating instructions along with all applicable codes and ordinances.
This control is factory calibrated for specific applica­tions. The following testing procedure is only meant to serve as a verification of proper operating sequence.
Dimensions provided are typical for a boiler not being fired and/or not at pressure. Actual operating ranges are shown on page 2 in the "Operation" section.
OFF
ON
If the burner comes on, immediately turn the boiler off and make the necessary corrections.
Failure to follow this warning could cause an explosion or fire and result in property damage, personal injury or death.
!
WARNING
D
(22mm)
b. The boiler should begin to fill with water.
Watch the gauge glass (D) until the water level reaches approximately d” (22mm) above the horizontal cast line (MM) on the low water cut-off. When the water level reaches approximately d” (22mm) the burner should come on.
IMPORTANT: If water does not start filling the boiler, immediately turn off the the boiler and make the necessary corrections.
9
KK
c. Re-attach the junction box cover (KK).
7
/8"
MM
D
NN
d.
To prevent serious personal injury from steam and hot water during blow-down, connect piping to the discharge side of the blow-down valve to avoid exposure to steam discharge.
Failure to follow this caution could cause personal injury.
!
CAUTION
When the water level is at its normal level and the burner is on, slowly open the blow down valve (NN) until it is fully open. Watch the gauge glass (D) to see that the water level drops. Close the valve after verifying that the pump comes on and the burner shuts off. If this does not occur, immediately shut off the boiler and correct the problem and retest.
INSTALLATION COMPLETE
13/8"
(35 mm)
D
MM
c. Continue watching the gauge glass (D)
to see that the water continues to rise to approximately 1a” (35mm) above the horizontal cast line (MM). The pump should shut off.
10
11
MAINTENANCE
SCHEDULE:
Blow down control as follows when boiler is in operation.
• Daily if operating pressure is above 15 psi.
• Weekly if operating pressure is below 15 psi.
• Remove head assembly and inspect water­side components annually. Replace head
assembly if any of the internal components are worn, corroded or damaged or if control no longer operates properly.
• Inspect the float chamber and equalizing piping annually. Remove all sediment and debris.
Replace head mechanism every 5 years.
More frequent replacement may be required when severe conditions exist.
Replacement parts are available from your local authorized McDonnell & Miller Distributor.
The use of parts or components other than those manufactured by McDonnell & Miller will void all warranties and may affect the units’ compliance with listings or regulating agencies.
BLOW DOWN PROCEDURE:
When blowing down a control at pressure, the blow down valves should be opened slowly. The piping needs to be warmed up and stagnant water in the drain piping needs to be pushed out. Suddenly opening a blow down valve causes steam to condense, which can create water hammer. Damage to components can occur when water hammer occurs due to improper blow down piping.
For these reasons, McDonnell & Miller recommends a dual valve blow-down system for each control.
Blow down the control when the water in the boiler is at its normal level and the burner is on.
NOTE: Refer to page 2 for switch operating points.
• Open upper valve (#1)
• Slowly open the lower valve (#2)
• Water in the sight glass should lower.
• As the water in the sight glass lowers, the pump should turn on.
• As the water continues to lower in the sight glass, the burner should turn off.
• Slowly close the lower valve (#2).
• Close the upper valve (#1)
• The water level in the sight glass should rise, first
turning on the burner and then turning off the pump. NOTE: On manual reset models, the reset button
will need to be pressed after the water level has been restored before the burner will operate.
To prevent serious personal injury from steam pipe blow down, connect a drain pipe to the control opening to avoid exposure to steam discharge.
Failure to follow this caution could cause personal injury.
!
CAUTION
NOTE More frequent blow-down may be necessary due to dirty boiler water and/or local codes.
NOTE
The control may need to be inspected and cleaned more frequently on systems where there is the potential of excessive scale or sludge build-up. This includes systems:
• With high raw water make-up
• With no condensate return
• With untreated boiler water
• Where significant changes have been made to the boiler-water chemical treatment process
• With oil in the boiler water
NOTE
If this sequence of operation does not occur as described, immediately close all valves, turn off the boiler and correct the problem. Inspection/cleaning of the float mechanism may be required to determine why the control was not working properly. Retest the control after the problem has been identified and corrected.
Valve #1
Valve #2
Xylem
1) The tissue in plants that brings water upward from the roots;
2) a leading global water technology company.
We’re 12,000 people unified in a common purpose: creating innovative solutions to meet our world’s water needs. Developing new technologies that will improve the way water is used, conserved, and re-used in the future is central to our work. We move, treat, analyze, and return water to the environment, and we help people use water efficiently, in their homes, buildings, factories and farms. In more than 150 countries, we have strong, long-standing relationships with customers who know us for our powerful combination of leading product brands and applications expertise, backed by a legacy of innovation.
For more information on how Xylem can help you, go to www.xyleminc.com
Xylem Inc.
8200 N. Austin Avenue Morton Grove, Illinois 60053 Phone: (847) 966-3700 Fax: (847) 965-8379 www.xyleminc.com/brands/mcdonnellmiller
McDonnell & Miller is a trademark of Xylem Inc. or one of its subsidiaries.
© 2013 Xylem Inc. MM-231F July 2013 Part No. 246736
Loading...