Miele G 7824 D AP, G 7824 EL AP Installation diagram

0 (0)
Miele G 7824 D AP, G 7824 EL AP Installation diagram

Installationsplan / Installation plan

Installatietekening

Plano de instalación

Asennusohje

CDNEN

Plan d`installation

Plano de instalação

Installasjonsplan

Pianta di installazione

Σχέδιο εγκατάστασης

Installationsplan

 

G 7824 D/EL AP (drain pumps)

Materialnummer

/

Mat.-no.:

9406940

Änderungsstand

/

Version:

00

Datum Zeichnung

/

Drawing date:

01.07.2010

Datum Legende

/

Legend date:

01.07.2010

Installationsplan G 7824 D/EL AP

 

Stand: 01.07.2010

Seite 1

Technical Datasheet

 

 

 

 

 

 

 

Washer-disinfector:

G 7824 AP

Heating:

Steam/Electric (D/EL)

 

 

 

Legend:

Circled, bold-type abbreviations:

 

Connection required

 

Abbreviations surrounded by broken circle:

 

Connection optional or required, depending on model

EN

Notes on supply connections:

Cold, hot and demineralised water, high-pressure steam, condensate and compressed air supplies can be routed through the ceiling or, alternatively, through the floor. A combination of the two is possible.

When installing a run of several washer-disinfectors, drain hoses can be passed through a made-to-measure floor tray to a central drain.

 

Electrical

1. Voltage

 

V/Hz

3N AC 400-415/50

 

connection

Rated load

 

kW

10.2

 

 

 

 

 

Fuse rating

 

A

3 x 16

 

 

Connection cable, min. cross-sectional area

 

mm²

5 x 2.5

 

 

Connector terminal cross-section

 

mm²

4

 

 

Connection cable, min. length

 

 

 

 

 

From top edge of MAV panelling if supply lines

 

m

4.0

 

 

pass through ceiling

 

 

 

 

 

Above finished floor if supply lines pass through

 

m

1.5

 

 

floor

 

 

 

 

 

 

 

 

 

 

 

Plug and socket connection recommended to

 

 

 

 

 

facilitate accessibility for electrical safety tests.

 

 

 

 

 

Socket must be accessible after installation.

 

 

 

 

 

Protect supply lead against thermal exposure.

 

 

 

 

 

Observe correct phase sequence (clockwise).

 

 

 

 

 

Maximum permitted mains voltage variation: +/- 10%

 

 

 

 

 

 

 

 

 

 

 

Connection to electrical supply should be in

 

 

 

 

 

accordance with valid regulations and safety

 

 

 

 

 

standards.

 

 

 

 

 

The use of an earth leakage circuit breaker (ELCB) is

 

 

 

 

 

strongly recommended.

 

 

 

 

 

Rated current: In accordance with fuse rating.

 

 

 

 

 

Tripping current: 30 mA.

 

 

 

 

 

 

 

 

 

 

Equipotential

Threaded connection bolt with nut and washer fitted

 

M

8x1

 

bond and earth

on machine. Size:

 

 

 

 

conductor

Equipotential bond and earth conductor must be

 

 

 

 

 

 

 

 

 

 

connected!

 

 

 

 

 

 

 

 

 

Installationsplan G 7824 D/EL AP

 

Stand: 01.07.2010

Seite 2

Country variations:

 

 

2.

Voltage

V/Hz

 

3 AC 230/50

 

 

 

Rated load

kW

 

10.2

 

 

 

 

Fuse rating

A

 

3 x 30

 

 

 

Connection cable, min. cross-sectional area

mm²

 

4 x 4

 

 

 

 

 

 

 

 

 

 

 

 

3.

Voltage

 

V/Hz

 

 

3 AC 208/60

 

 

 

 

Rated load

 

kW

 

 

10.2

 

 

 

 

 

 

 

 

 

 

 

Fuse rating

A

 

3 x 30

 

 

 

Connection cable, min. cross-sectional area

AWG

 

4 x 10

 

 

 

 

 

 

 

 

 

 

Network / Printer

The following interfaces for transferring or printing process

 

 

 

 

 

 

 

connection

data are available on the machine:

 

 

 

 

 

 

 

 

Serial interface:

 

 

 

 

 

 

 

 

 

Connection cable length including RS232 plug (supplied

 

m

 

5.0

 

 

 

 

as standard)

 

 

 

 

 

 

 

 

 

An RS232 connection socket above the machine must be

 

 

 

 

 

 

 

 

 

provided on site.

 

 

 

 

 

 

 

 

Connection / Installation must be carried out in accordance

 

 

 

 

 

 

 

 

with IEC 60950.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Connection

Potential-free contacts (NO contacts):

 

 

 

Max. contact load:

 

 

module

A maximum of 9 contacts are available, possible assignment:

 

 

 

 

 

 

output signals

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TA OPERATION

Contact closed during drying block

 

V/A/Hz

 

200-240/1/50-60

 

 

PRG RUNNING

Contact closed during washing, drying and cool-down

 

V/A/Hz

 

200-240/1/50-60

 

 

OPERATION

Contact closed while machine is running

 

V/A/Hz

 

200-240/1/50-60

 

 

FAULT

Contact closed when fault occurs

 

V/A/Hz

 

200-240/1/50-60

 

 

PRG END

Contact closed between end of programme and door opening

 

V/A/Hz

 

200-240/1/50-60

 

 

PAUSE w. WASH

Contact closed during 'Pause with wash action' stage

 

V/A/Hz

 

200-240/1/50-60

 

 

DRAIN STD

Contact closed during drainage

 

V/A/Hz

 

200-240/1/50-60

 

 

DRAIN RECY.

Contact closed during drainage (water recycling drain pump)

 

V/A/Hz

 

200-240/1/50-60

 

 

COLD

Contact closed during cold water intake

 

V/A/Hz

 

200-240/1/50-60

 

 

HOT

Contact closed during hot water intake

 

V/A/Hz

 

200-240/1/50-60

 

 

DEMIN. COLD

Contact closed during cold demineralised water intake

 

V/A/Hz

 

200-240/1/50-60

 

 

DEMIN. HOT

Contact closed during hot demineralised water intake

 

V/A/Hz

 

200-240/1/50-60

 

 

DOS1-EXT

Control signal for external dispenser pump 1

 

V/A/Hz

 

200-240/1/50-60

 

 

DOS2-EXT

Control signal for external dispenser pump 2

 

V/A/Hz

 

200-240/1/50-60

 

 

DOS3-EXT

Control signal for external dispenser pump 3

 

V/A/Hz

 

200-240/1/50-60

 

 

DOS4-EXT

Control signal for external dispenser pump 4

 

V/A/Hz

 

200-240/1/50-60

 

 

 

 

 

 

 

 

 

 

 

 

Module input

 

 

 

 

 

 

Control voltage

 

 

signals

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SLA HZG

Peak-load negotiation - Heating

 

V/Hz

 

200-240/50-60

 

 

DOS-EXT

Fill level of external dispenser canister

 

V/Hz

 

200-240/50-60

 

 

MEDIUM

Medium dispensing active, signal for flow and volume control

 

V/Hz

 

200-240/50-60

 

 

 

 

 

 

 

 

 

 

Cold water

Max. temperature

 

°C

 

20

 

 

 

Max. water hardness

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G 7824

gr/gal

 

4

 

 

 

 

G 7824 WES (with water softener)

 

gr/gal

 

 

60

 

 

 

Min. flow pressure

 

kPa (psi)

 

200 (29)

 

 

 

Max. pressure

 

kPa (psi)

 

1000 (145)

 

 

 

Throughput

 

l/min

 

15

 

 

 

On-site connection thread according to DIN 44 991

 

Inch

 

 

3/4" external thread

 

 

 

 

 

 

 

 

 

(11.5 NH)

 

 

 

 

 

 

 

 

 

 

 

Installationsplan G 7824 D/EL AP

 

Stand: 01.07.2010

Seite 3

 

Hot water

Max. temperature

°C

60

 

 

Max. water hardness

 

 

 

 

 

 

 

 

G 7824

gr/gal

4

 

 

G 7824 WES (with water softener)

gr/gal

60

 

 

Min. flow pressure

kPa (psi)

200 (29)

 

 

Max. pressure

kPa (psi)

1000 (145)

 

 

Throughput

l/min

15

 

 

On-site connection thread according to DIN 44 991

Inch

3/4" external thread

 

 

 

 

(11.5 NH)

 

 

 

 

 

 

Final rinse water

Water quality defined by cleaning requirements, e.g. reverse

 

 

 

 

osmosis, demineralised water, ultra-purified water, etc.

 

 

 

 

Max. temperature

°C

60

 

 

Max. conductivity (e.g. for surgical instruments)

µS/cm

15

 

 

Min. flow pressure

kPa (psi)

200 (29)

 

 

Max. pressure

kPa (psi)

1000 (145)

 

 

Throughput

l/min

15

 

 

On-site connection thread according to DIN 44 991

Inch

3/4" external thread

 

 

 

 

(USA: 11.5 NH)

 

 

 

 

 

 

Heating steam

Steam pressure

kPa (psi)

250-600 (37-87)

 

 

Boiling point

°C

139-165

 

 

Rated capacity

kg/h(lb/h)

50 (110)

 

 

On-site connection thread according to ISO 228-1.

Inch

1/2" ext. thread

 

 

A dirt trap and condensate drain is to be provided on site

 

 

 

 

directly upstream from the steam connection on the machine.

 

 

 

 

The steam generator should be operated in accordance with

 

 

 

 

applicable regulations.

 

 

 

 

The steam condensate should comply with applicable

 

 

 

 

standards for sterilizing. The controlled use of volatile

 

 

 

 

treatment chemicals may result in higher pH values and

 

 

 

 

electrical conductivity values which are permissible but must

 

 

 

 

be discussed with manufacturers beforehand.

 

 

 

 

 

 

 

 

Condensate

On-site connection thread according to ISO 228-1

Inch

1/2" ext. thread

 

 

 

 

 

 

Compressed air

Capacity Qn

m³/h

0.12

 

 

 

(ft³/min)

(0.0706)

 

 

Supply pressure

kPa (psi)

600-1,200 (88-174)

 

 

Connection thread (on site)

Inch

1/2" int. thread

 

 

 

 

 

 

Cooling circuit

Steam condenser (DK, optional) can be connected to a

 

 

 

feed line

cooling circuit. In the absence of such a cooling circuit, the

 

 

 

(optional)

steam condenser should be connected to cold water:

 

 

 

 

Temperature of cooling circuit feed line

°C

6

 

 

Max. cooling capacity

kW

3.5 (11,942)

 

 

 

(Btu/h)

 

 

 

Max. pressure – Cooling circuit

kPa (psi)

800 (116)

 

 

Pressure loss – Steam condenser

kPa (psi)

30-50 (4.3-7.2)

 

 

Cooling circuit volume flow

l/min

>4.0

 

 

Hose connector – Steam condenser (ext. dia. × l)

mm

14 x 25

 

 

Faucet and supply line filter to be provided on site!

 

 

 

 

Electrically operated shut-off valves required to control

 

 

 

 

cooling circuit.

 

 

 

 

A connection hose with an internal diameter of 14 mm and a

 

 

 

 

length of 1.50 m from the ceiling should be provided on site.

 

 

 

 

 

 

 

Installationsplan G 7824 D/EL AP

 

Stand: 01.07.2010

Seite 4

 

Cooling circuit

Necessary to connect steam condenser to cooling circuit

 

 

 

return pipe

 

 

 

 

(optional)

 

 

 

 

 

Hose connector – Steam condenser (ext. dia. × l)

mm

14 x 25

 

 

Faucet to be provided on site!

 

 

 

 

A connection hose with an internal diameter of 14 mm and a

 

 

 

 

length of 1.50 m from the ceiling should be provided on site.

 

 

 

 

 

 

 

 

Waste water

Max. temperature

°C

93

 

 

Connection for two drain pumps

DN

50

 

 

Max. head height

m

3.0

 

 

Max. peak delivery

l/min

100

 

 

Drain hoses 2x (int. dia. x wall thickness x l) supplied

mm

22 x 6 x 1500

 

 

2 hose sleeves to be provided on site (ext. dia. x l)

mm

22 x 30

 

 

Connection for steam condenser drain hose (optional), only

DN

50

 

 

required if a steam condenser is connected to cold water

 

 

 

 

supply:

 

 

 

 

Max. head height

m

3.0

 

 

Max. delivery

l/min

6

 

 

Drain hose (Int. dia. × wall thickness × l)

mm

14 x 3 x 2500

 

 

hose sleeve to be provided on site (ext. dia. x l)

mm

14 x 30

 

 

Connection for condensate drain hose:

DN

50

 

 

Max. head height

m

3.0

 

 

Max. delivery

l/min

1

 

 

Drain hose (Int. dia. × wall thickness × l)

mm

6 x 2 x 2500

 

 

hose sleeve to be provided on site (ext. dia. x l)

mm

6 x 20

 

 

Min. diameter of main drain pipe

DN

100

 

 

Installation of odour trap recommended.

 

 

 

 

 

 

 

 

Ports for drain

Port diameter

mm

36

 

hoses

Holes must be drilled in the designated areas/points to suit

 

 

 

 

on-site conditions before installing the machine.

 

 

 

 

 

 

 

Installationsplan G 7824 D/EL AP

 

Stand: 01.07.2010

Seite 5

 

Vented

Machine-side connection (ext. dia. × wall thickness)

mm

100 x 1.25

 

 

Air extracted from the 'unclean' side of the operation should

 

 

 

 

be replenished by ensuring sufficient air intake.

 

 

 

 

I. Vent direct to atmosphere. Vent multiple washer-

 

 

 

 

disinfectors individually (do not use manifold):

 

 

 

 

Vent air throughput

m³/h

125

 

 

 

(ft³/min)

(73.6)

 

 

Temperature - Mean value / peak max.

°C

70/95

 

 

Relative humidity - Mean value / peak max.

%

80/100

 

 

Max. permissible pressure loss in vent duct

Pa (psi)

350 (0.05)

 

 

II. Vent to atmosphere via steam condenser. Vent multiple

 

 

 

 

washer-disinfectors individually (do not use manifold):

 

 

 

 

Vent air throughput

m³/h

125

 

 

 

(ft³/min)

(73.6)

 

 

Temperature - Mean value / peak max.

°C

28/32

 

 

Relative humidity - Mean value / peak max.

%

<70/100

 

 

Max. permissible pressure loss in vent duct

Pa (psi)

150 (0.02)

 

 

III. Connection without steam condenser to external fan-

 

 

 

 

assisted vent:

 

 

 

 

Min. throughput capacity of on-site vent in washing cycle

m³/h

50

 

 

 

(ft³/min)

(29.4)

 

 

Min. throughput capacity of on-site vent in drying cycle

m³/h

150

 

 

 

(ft³/min)

(88.3)

 

 

Temperature - Mean value / peak max.

°C

70/95

 

 

Relative humidity - Mean value / peak max.

%

80/100

 

 

IV. Connection with steam condenser to external fan-assisted

 

 

 

 

vent:

 

 

 

 

Min. throughput capacity of on-site vent in washing cycle

m³/h

50

 

 

 

(ft³/min)

(29.4)

 

 

Min. throughput capacity of on-site vent in drying cycle

m³/h

150

 

 

 

(ft³/min)

(88.3)

 

 

Temperature - Mean value / peak max.

°C

28/32

 

 

Relative humidity - Mean value / peak max.

%

<70/100

 

 

Prevent condensate backflow into washer-disinfector. Pitch

 

 

 

 

vent ducting and discharge condensate at lowest point.

 

 

 

 

 

 

 

 

Machine feet

Height-adjustable

mm

10

 

 

Foot diameter

mm

25

 

 

 

 

 

 

Floor bolts

Parts supplied with floor tray

 

 

 

 

Adhesive anchors (4 off)

mm

M 8 x 150

 

 

Hole diameter

mm

8

 

 

 

 

 

 

Heat dissipation

Unclean side

kW

0.5

 

to room

 

(Btu/h)

(1706)

 

 

Clean side

kW

0.5

 

 

Load on removal

(Btu/h)

(1706)

 

 

kW

0.5

 

 

 

(Btu/h)

(1706)

 

 

 

 

 

 

Machine data

Height incl. floor tray and lid

mm

1544

 

 

Height incl. floor tray and top-box panelling

mm

1928

 

 

Width

mm

900

 

 

Depth

mm

768

 

 

Net weight

kg

370

 

 

Dynamic floor load

N

~4910

 

 

Knocked down width incl. pallet

mm

1020

 

 

Knocked down height incl. pallet

mm

1600

 

 

 

 

 

Installation should only be carried out by authorised fitters in accordance with valid regulations!

Observe installation instructions when installing machine! All rights reserved! Dimensions in mm

Installationsplan G 7824 D/EL AP

 

Stand: 01.07.2010

Seite 6

Notes on supply connections:

Cold, hot and demineralised water, high-pressure steam, condensate and compressed air supplies can be routed through the ceiling or, alternatively, through the floor. A combination of the two is possible. Cooling circuit feed and return pipes for steam condenser (optional) through ceiling only. Easily accessible central faucet and main switch recommended.

Waste water connection:

The on-site drain pipe serving the machine drain hose should be located at the side of the machine. Service ports in the machine casing can be made on site for connection to on-site utilities. Drain hoses are of a sufficient length to extend to the ports and should be extended outside the machine casing. Ports should be 36 mm in diameter. Two grommets, Mat. no. 2723340, required to provide antiscuffing hose protection.

Two blind stoppers, Mat. no. 27119630, are required to provide anti-scuffing protection for condensate and steam condenser hoses. Blind stoppers should be cut open on site.

When installing a run of several washer-disinfectors, drain hoses can be passed through a made-to- measure floor tray to a central drain. Connection to a common drain pipe above the machines is also possible. This option requires the use of a strain-relief bush for the drain hoses. If a steam condenser is supplied from a potable water supply, the machine should be connected to the drainage system using the non-return device provided. The max. head height of the pumps should should be taken into consideration!

All drain hoses from washer-disinfectors should be connected to the on-site drain pipe using pressuretight connections.

Electrical connection:

Electrical supply lines can be routed through floor or ceiling. Min. cable length of 1500 mm above finished floor surface required with access through floor. Min. cable length of 4000 mm from top edge of top-box panelling required with access through ceiling.

Standard installation, chemical supply connections:

Install supply lines vertically from ceiling, adjust and locate. All pipework, including insulation, fittings and valves with taps should be located within the designated area (520 mm × 130 mm). No part of the installation should extend beyond this area.

Hot, cold and demineralised water lines, high-pressure steam and condensate lines end with a ¾" ext. thread and compressed air lines with a ½" int. thread 2160 mm above finished floor.

Miele recommends the installation of a non-return valve directly below the condensate trap in order to prevent water hammer.

If washer-disinfector is installed with a steam condenser, install cooling circuit feed and return pipes vertically from ceiling and secure. The cooling circuit feed and return pipes connect to the machine in the installation area via a hose sleeve at the same height as the water intake connections. The cooling circuit feed and return pipes are connected to the steam condenser with a hose provided on site (interior diameter 14 mm/nominal pressure 800 kPa). The connection hoses should end approx. 1.5 m below the ceiling.

In the absence of cooling circuit, connect steam condenser to cold water.

Easily accessible central faucet and main switch recommended.

Installationsplan G 7824 D/EL AP

 

Stand: 01.07.2010

Seite 7