Technical Bulletin
Identification: |
Y06 |
Bulletin no: |
FRJ2007-03 |
Date: |
21/03/07 |
Issuer: |
C.CHAUSSAT |
Factory: |
FRJ AUBUSSON |
Subject
Model
Problem
Reason
Actions in factory
Actions in field
EMC reinforcement (Electro-Magnetic Conformity).
B3000 (all PNCs)
_
_
Addition of a green/yellow wire between speed controler and motor + addition of a thermoconductive spacer between thermal overload probe and motor windings.
Application date: Year 2007, Week 10 –
-This modification does not bring any PNC modification.
-This modification has not to be done systematically on the machines built before this date. (except in case of operation problems.)
|
POSTAL ADDRESS |
TELEPHONE |
TELEFAX |
ELECTROLUX PROF. SAS |
ZI du mont 23200 AUBUSSON FRANCE |
+33 555832323 |
+33 555832340 |