Xylem MM 217K User Manual

Series 150S and 157S
(Snap Switch, All Models except 157S-RB-P)
Low Water Cut-Off/Pump Controllers
For Steam Boilers and Other Level Control Applications
Typical Applications: – Primary or secondary pump controller/
low water fuel cut-off
for steam boilers – Motorized valve controller – Low water cut-off – High water cut-off
INSTRUCTION MANUAL
MM-217K
Series 150S
– Alarm actuator
N
UTIO
CA
NING
R
A
W
• Before using this product read and understand instructions.
• Save these instructions for future reference.
• All work must be performed by qualified personnel trained in the proper application, instal-
• To prevent serious burns, the boiler must be cooled to 80˚F (27˚C) and the pressure must be
• This low water cut-off must be installed in series with all other limit and operating controls
• We recommend that secondary (redundant) Low Water Cut-Off controls be installed on all
• To prevent a fire, do not use this low water cut-off to switch currents over 7.4A, 1/3 Hp at
Series 157S
WARNING
!
lation, and maintenance of plumbing, steam, and electrical equipment and/or systems in accordance with all applicable codes and ordinances.
0 psi (0 bar) before servicing.
installed on the boiler. After installation, check for proper operation of all of the limit and operating controls, before leaving the site.
steam boilers with heat input greater than 400,000 BTU/hour or operating above 15 psi of steam pressure. At least two controls should be connected in series with the burner control circuit to provide safety redundancy protection should the boiler experience a low water condition. Moreover, at each annual outage, the low water cut-offs should be dismantled, inspected, cleaned, and checked for proper calibration and performance. To prevent serious personal injury from steam blow down, connect a drain pipe to the control opening to avoid exposure to steam discharge.
120 VAC or 3.7A, 1/3 Hp at 240 VAC, unless a starter or relay is used in conjunction with it.
California Proposition 65 warning! This product contains chemicals known to the state of California to cause cancer and birth defects or other reproductive harm.
Previous controls should never be installed on a new system. Always install new controls on a new boiler or system.
Failure to follow this warning could cause property damage, personal inj ury or death.
!
2
Approximate
Distance Above
Cast Line Differential
Setting In. (mm) In. (mm)
Pump Off
15
/16(24)
5
/16(8)
Pump On
5
/8(16)
Burner On
5
/8(16)
3
/8(16)
Burner Off
1
/4(6.4)
Pump Off 13/8(41)
3
/4(19)
Pump On
5
/8(16)
Burner On
7
/8(22)
7
/8(22)
Burner Off 0 (0)
OPERATION
Maximum Pressure: 150 psi (10.5 kg/cm2)
Settings and Differential Pressures
Values are ± 8” (3.2mm).
Series 150S, 157S
150 psi (10.5 kg/cm
2
) Levels
150 psi (10.5 kg/cm
2
) Levels
0 psi
(0 kg/
cm2)
150 psi
(10.5 kg/
cm2)
Approximate
Distance Above
Cast Line Differential
Setting In. (mm) In. (mm)
Pump Off
15
/16(24)
3
/8(16)
Pump On
9
/16(14)
Burner Off 0 (0) N/A
Pump Off 17/16(37)
3
/4(19)
Pump On
11/16
(17)
Burner Off - 3/8(-16)
N/A
Model 150S-MD, and 157S-MD
0 psi
(0 kg/
cm2)
150 psi
(10.5 kg/
cm
2
)
Pressure
Pressure
BURNER OFF
BURNER ON
7
/8"
DIFFERENTIAL
(22mm)
PUMP
OFF
BURNER
OFF
NORMAL BOILER
WATER LINE
1
3
/8"
DIFFERENTIAL
(35mm)
PUMP OFF PUMP ON
3
/4"
DIFFERENTIAL
(19mm)
PUMP OFF PUMP ON
3
/4"
DIFFERENTIAL
(19mm)
PUMP
OFF
BURNER
OFF
NORMAL BOILER
WATER LINE
1
13
/16"
DIFFERENTIAL
(46mm)
Enclosure rating: NEMA 1 General Purpose
PumpCircuit Rating (Amperes)
Voltage Full Load Locked Rotor Pilot Duty
120 VAC 7.4 44.4
345 VA at
240 VAC 3.7 22.2
120 or 240 VAC
Electrical Ratings
Alarm Circuit Rating
Voltage Amps
120 VAC 1
240 VAC 1/2
Motor Horsepower
Voltage Hp
120 VAC
1/3
240 VAC 1/3
CAUTION:
A more frequent replacement interval may be necessary based on the condition of
the unit at time of inspection. McDonnell Miller s warranty is one (1) year from date of installation or two (2) years from the date of manufacture.
&
'
3
Approximate
Distance Above
Cast Line Differential
Setting In. (mm) In. (mm)
Motorized
15
/16(24)
Valve Closed
5
/16(8)
Motorized
5
/8(16)
Valve Open
Burner On
5
/8(16)
3
/8(16)
Burner Off
1
/4(6.4)
Motorized 13/8(41)
3
/4(19)
Valve Closed Motorized
5
/8(16)
Valve Open
Burner On
7
/8(22)
7
/8(22)
Burner Off 0 (0)
Values are ± 8” (3.2mm).
NOTE: Due to the slower operation of some motorized valves, complete valve opening or closing will occur at slightly different levels than indicated above.
Model 158S
150 psi (10.5 kg/cm
2
) Levels
0 psi
(0 kg/
cm2)
150 psi
(10.5 kg/
cm
2
)
Pressure
Settings and Differential Pressures (continued)
150 psi
(10.5 kg/
cm2)
Approximate
Distance Above
Cast Line Differential
Setting In. (mm) In. (mm)
Pump Off
15
/16(24)
3
/8(16)
Pump On
9
/16(14)
Burner Off 0 (0) N/A
Pump Off 17/16(37)
3
/4(19)
Pump On
11/16
(17)
Burner Off -
3/8
(-16)
N/A
Model 158S-MD
0 psi
(0 kg/
cm2)
Pressure
150 psi (10.5 kg/cm2) Levels
NOTE: Due to the slower operation of some motorized valves, complete valve opening or closing will occur at slightly different levels than indicated above.
BURNER OFF
BURNER ON
7
/8"
DIFFERENTIAL
(22mm)
MOTORIZED
VALV E
CLOSED
BURNER
OFF
NORMAL BOILER
WATER LINE
1
3
/8"
DIFFERENTIAL
(35mm)
MOTORIZED
VALV E
CLOSED
MOTORIZED
VALV E
OPEN
3
/4"
DIFFERENTIAL
(19mm)
MOTORIZED
VALVE
OPEN
CLOSED
3
/4"
DIFFERENTIAL
(19mm)
MOTORIZED
VALV E
CLOSED
BURNER
OFF
NORMAL BOILER
WATER LINE
1
13
/16"
DIFFERENTIAL
(46mm)
4
Values are ± 8” (3.2mm).
150 psi (10.5 kg/cm2) Levels
Approximate
Distance Above
Cast Line Differential
Setting In. (mm) In. (mm)
Pump #1 Off15/16(24)
5
/16(8)
Pump #1 On5/8(16)
Pump #2 Off5/8(16)
3
/8(16)
Pump #2 On1/4(6.4)
Pump #1 Off 13/8(41)
3
/4(19)
Pump #1 On5/8(16)
Pump #2 Off7/8(22)
7
/8(22)
Pump #2 On
0 (0)
Model 159S
0 psi
(0 kg/
cm2)
150 psi
(10.5 kg/
cm
2
)
Pressure
Settings and Differential Pressures (continued)
PUMP #1
OFF
PUMP #1
ON
NORMAL BOILER
WATER LINE
(19mm)
3
/4"
DIFFERENTIAL
PUMP #2 ON AT CAST LINE
7
/8"
DIFFERENTIAL
(22mm)
PUMP #2
ON
PUMP #2
OFF
PUMP #1
OFF
PUMP #2
ON
PUMP #2 ON AT CAST LINE
NORMAL BOILER
WATER LINE
1
3
/8"
DIFFERENTIAL
(35mm)
a. Using a pipe wrench, unscrew the plastic
float blocking plug (A) from the low water cut-off body (B).
5
If the control will be the primary low water fuel cut-off, size the steam (top)
and water (bottom) equalizing pipe lengths so that the horizontal cast line on the body is 1a” (35mm) below the boiler’s normal water level, but not lower than the lowest,
safe permissible water level, as deter­mined by the boiler manufacturer.
OR
If the control will be the secondary low water fuel cut-off, size the steam (top) and
water (bottom) equalizing pipe lengths so that the horizontal cast line on the body is
at or above, the lowest, safe permissible water level, as determined by the boiler manufacturer.
STEP 2 - Installing the Low Water Cut-Off
STEP 1 - Determine the Elevation at Which the Low Water Cut-Off/Pump Controller Must be Installed
INSTALLATION
TOOLS NEEDED:
Two (2) pipe wrenches, one (1) flathead screw driver, and pipe sealing compound.
IMPORTANT: Follow the boiler manufacturer's instructions along with all applicable codes and ordinances for piping, blow down valve and water gauge glass requirements.
13/8"
STEAM EQUALIZING PIPE
VERTICAL EQUALIZING PIPE
BLOW DOWN VALVE
NORMAL BOILER WATER LINE
AS A PRIMARY LOW WATER CUT-OFF/PUMP CONTROLLER
BURNER “CUT-OFF LEVEL” AT CAST LINE
LOWEST PERMISSIBLE WATER LEVEL
(35mm)
WATER
EQUALIZING
PIPE
STEAM EQUALIZING PIPE
VERTICAL EQUALIZING PIPE
BLOW DOWN VALVE
AS A SECONDARY LOW WATER CUT-OFF/PUMP CONTROLLER
BURNER “CUT-OFF LEVEL” AT CAST LINE
LOWEST PERMISSIBLE WATER LEVEL
BURNER OFF
WATER
EQUALIZING
PIPE
Series 150S
(except Model 150S-B)
Models 150S-B Series 157S
B
A
A
B
B
A
b. Install a water gauge glass (J).
Note: Gauge glass and tri-cocks
not included with product.
J
J
H
a. Install a water column (H) (not
included with product) for all models except Series 157S (with integral water column).
Series 157S
All Other Models
6
C
A
A
C
F
G
E
D
c. Mount and pipe the low water cut-off (D) on
a vertical equalizing pipe (E) at the required elevation level, as determined in Step 1.
Install a full ported blow down valve (G) directly below the lower cross of the water equalizing pipe (F).
Note: 1” NPT tappings are provided, with the exception of some 157 and 157S models which are 14” NPT.
b. For Model 150S-B and Series 157S
(For all other models, proceed to Step 3).
Screw the w” NPT steel plug (C) (provided) in tapping (A).
Series 157S
Models 150S-B
STEP 3 - Installing a Water Gauge Glass
(Required on all steam boilers)
The plug must be reinstalled before control is shipped installed on the boiler, and removed when boiler is installed after shipment. Failure to follow this caution may damage float and operating mechanism.
!
CAUTION
STEP 4 - Electrical Wiring
• To prevent a fire, do not use this product to switch currents over 7.4A, 1/3 Hp at 120 VAC or 3.7A, 1/3 Hp at 240 VAC, unless a starter or relay is used in conjunction with it.
• To prevent electrical shock, turn off the electrical power before making electrical connections.
• This low water cut-off must be installed in series with all other limit and operating controls installed on the boiler. After installation, check for proper operation of all of the limit and operating controls, before leaving the site.
• Modification of the switch assembly before or after installation could cause damage to the boiler and/or boiler system.
Failure to follow this warning could cause electrical shock, an explosion and/or a fire, which could result in property damage, personal injury or death.
!
WARNING
Switch Operation
For all Models except 158S and 159S
For Model 158S
Boiler feed pump off,
burner on, alarm off.
Boiler feed pump on,
burner on, alarm off.
Boiler feed pump on,
burner off, alarm on.
1 2 4 5 6 1 2 4 5 6
1 2 4 5 6
Motorized valve closed,
burner on, alarm off.
Motorized valve open,
burner on, alarm off.
Motorized valve open,
burner off, alarm on.
4 5 6
1 2
3
4 5
1 2
3
4 5
1 2
3
6 6
For Model 159S
Pump #1 off, pump #2 off.
Pump #1 on,
pump #2 off.
Pump #1 on, pump #2 on.
1 2 5 6 1 2 5 6
1 2 5 6
K
a. Using a flathead screwdriver, remove the
junction box cover (K).
7
8
b. Following the appropriate wiring diagram, (refer
to page 9) based on your application require­ments, and using BX armored cable or Thinwall electrical metal tubing connector fittings, make electrical connections to the junction box (L).
PUMP SWITCH
PUMP
CIRCUIT
TERMINALS
LOW WATER CUT-OFF AND ALARM SWITCH
ALARM
CIRCUIT
TERMINALS
LOW WATER
CUT-OFF
TERMINALS
L
PUMP #1 SWITCH
PUMP #1 CIRCUIT
TERMINALS
PUMP #2 SWITCH
PUMP #2 CIRCUIT
TERMINALS
L
MOTORIZED VALVE SWITCH
MOTORIZED
VALVE
TERMINALS
LOW WATER CUT-OFF AND ALARM SWITCH
ALARM
CIRCUIT
TERMINALS
LOW WATER
CUT-OFF
TERMINALS
L
1
23456
PUMP SWITCH
PUMP
CIRCUIT
TERMINALS
LOW WATER CUT-OFF AND ALARM SWITCH
ALARM
CIRCUIT
TERMINALS
LOW WATER
CUT-OFF
TERMINALS
L
IMPORTANT: There must be a minimum space of 1/2” (13mm) between connector fittings and electrical live metal parts.
Automatic Reset
(All models except 158S and 159S)
Automatic Reset
Model 158S
Manual Reset
Model 158S-M
Automatic Reset
Model 159S
Manual Reset
(All models except 158S)
Snap Switches (Series 150S and 157S)
MOTORIZED VALVE SWITCH
MOTORIZED
VALVE
TERMINALS
LOW WATER CUT-OFF AND ALARM SWITCH
ALARM
CIRCUIT
TERMINALS
LOW WATER
CUT-OFF
TERMINALS
L
1
23456
9
WIRING DIAGRAMS
For Motorized Valves, refer to the valve manufacturer's wiring instructions.
Low Water Cut-Off Only
1. Main Line Switch - For burner circuits within the switch’s electrical rating.
1. Main Line Switch - For burner circuits within
the switch’s electrical rating.
2. Pilot Switch - To holding coil of a starter when the burner circuit exceeds the switch’s electrical rating.
LINE LOAD
12 456
12 456
ALARM
NEUTRAL
HOT
ALARM
NEUTRAL
HOT
12 456
12 456
SEE PUMP
CONTROL
CIRCUIT
TO NEUTRAL
TO BURNER CONTROL CIRCUIT
HOT
ALARM
12 456
LOAD
LINE (3 PHASE)
SEE PUMP
CONTROL
CIRCUIT
ALARM
OR
OR
OR
Combination Pump Control, Low Water Cut-Off and Alarm
Alarm Circuit Only
1. Low Water Alarm 2. High Water Alarm
2. Pilot Switch - To holding coil of a starter when the burner circuit exceeds the switch’s electrical rating.
Pump Control Only
1. Install a starter or relay in pump control circuit, as shown, to prevent damage to snap switch and help insure proper switch/control operation. Failure to do so may shorten the life of the switch when actual amperage exceeds switch rating.
2. Connect wires from holding coil of pump starter or relay to terminals 1 and 2 as shown.
NOTE: To help insure most effective operation, balance boiler feed pump(s) to deliver required water feeder rate to match boiler steaming requirements.
NOTE: For Model 159S, use terminals 5 and 6 from starter or relay for pump # 2.
LINE
12 456
LOAD
LINE
12 456
LOAD
10
STEP 5 - Testing
OFF
ON
a. Turn on the electric power to the boiler. With the
boiler empty the pump should go on and the burner must remain off.
IMPORTANT: Follow the boiler manufacturer’s start-up and operating instructions along with all applicable codes and ordinances. Note: Water levels stated below are only for 150 psi (10.5 kg/cm
2
) operation.
This control is factory calibrated for specific applications. The following testing procedure is only meant to serve as a verification of proper operating sequence. Dimensions provided are typical for a boiler not being fired and/or not at pressure. Actual operating ranges are shown on page 2 in the "Operation" section.
If the burner comes on, immediately turn the boiler off and make the necessary corrections.
Failure to follow this warning could cause an explosion or fire and result in property damage, personal injury or death.
!
WARNING
M
J
(22mm)
b. The boiler should begin to fill with water.
Watch the gauge glass (J) until the water level reaches approximately d” (22mm) above the horizontal cast line (M) on the low water cut-off.
IMPORTANT: If water does not start filling the boiler, immediately turn off the the boiler and make the necessary corrections.
6. Re-attach the junction box cover (K).
K
Note:
Cover must be installed correctly as shown
7
/8"
11
e.
To prevent serious personal injury from steam pipe blow down, connect a pipe to avoid exposure to steam discharge.
Failure to follow this caution could cause personal injury.
!
CAUTION
INSTALLATION COMPLETE
M
J
(22mm)
c. For automatic reset models only. When the water
level reaches approximately d” (22mm) above the horizontal cast line (lower for MD models) the burner should come on (pump #2 should shut off with Model 159S).
OR
For manual reset models only. When the water
level reaches approximately d” (22mm) above the horizontal cast line press the reset button (N). The burner should then come on.
d. Continue watching the gauge glass (J) to
see that the water continues to rise to approximately 1a” (35mm) (1
7
/16” (37mm)
for MD models) above the horizontal cast line (M). The pump should shut off (the motorized valve should close with Models 158 and 158S, or with Models 159 and 159S, pump #1 should shut off).
N
Snap Switch Models
Blow down the control when the water in the boiler is at its normal level and the burner is on. Follow Blow Down Procedure found in Maintenance Section on the last page of these instructions.
7
/8"
MAINTENANCE
BLOW DOWN PROCEDURE:
SCHEDULE:
Blow down control as follows when boiler is in operation.
• Daily if operating pressure is above 15 psi.
• Weekly if operating pressure is below 15 psi.
NOTE
More frequent blow-down may be necessary due to dirty boiler water and/or local codes.
• Remove head assembly and inspect water side components annually. Replace head
assembly if any of the internal components are worn, corroded or damaged or if control no longer operates properly.
• Inspect the float chamber and equalizing piping annually. Remove all sediment and debris.
NOTE
The control may need to be inspected and cleaned more frequently on systems where there is the potential of excessive scale or sludge build-up. This includes systems:
• With high raw water make-up
• With no condensate return
• With untreated boiler water
• Where significant changes have been made to the boiler-water chemical treatment process
• With oil in the boiler water
CAUTION
!
To prevent serious personal injury from steam pipe blow down, connect a drain pipe to the control opening to avoid exposure to steam discharge.
Failure to follow this caution could cause personal injury.
When blowing down a control at pressure, the blow down valves should be opened slowly. The piping needs to be warmed up and stagnant water in the drain piping needs to be pushed out. Suddenly opening a blow down valve causes steam to condense, which can create water hammer. Damage to components can occur when water hammer occurs due to improper blow down piping. For these reasons, McDonnell & Miller recommends a dual valve blow-down system for each control.
Blow down the control when the water in the boiler is at its normal level and the burner is on.
NOTE: Refer to page 2 for switch operating points.
• Open upper valve (#1)
• Slowly open the lower valve (#2)
• Water in the sight glass should lower.
• As the water in the sight glass lowers, the
pump should turn on.
• As the water continues to lower in the sight
glass, the burner should turn off.
• Slowly close the lower valve (#2).
• Close the upper valve (#1)
• The water level in the sight glass should rise, first
turning on the burner and then turning off the pump.
NOTE: On manual reset models, the reset button
will need to be pressed after the water level has been restored before the burner will operate.
Replace head mechanism every 5 years.
More frequent replacement may be required when severe conditions exist.
Replacement parts are available from your local authorized McDonnell & Miller Distributor.
The use of parts or components other than those manufactured by McDonnell & Miller will void all warranties and may affect the units compliance with listings or regulating agencies.
Xylem Inc.
8200 N. Austin Avenue Morton Grove, Illinois 60053 Phone: (847) 966-3700 Fax: (847) 965-8379 www.xyleminc.com/brands/mcdonnellmiller
McDonnell & Miller is a trademark of Xylem Inc. or one of its subsidiaries.
© 2013 Xylem Inc. MM-217K July 2013 Part No. 210341
NOTE
If this sequence of operation does not occur as described, immediately close all the valves, turn off the boiler and correct the problem. Inspection/cleaning of the float mechanism may be required to determine why the control was not working properly. Retest the control after the problem has been identified and corrected.
Valve #1
Valve #2
Loading...