QRG 2680H Quick Reference Guide
NOTE: Use this as a reference guide. For further details on procedures, see the Operator’s Manual provided with the machine.
Connect Hydraulics
SCV |
Function |
I |
Front Wheel Lift |
II |
Rear Roller Lift |
III |
Main Frame Lift |
IV |
Wings |
V |
Hitch Jack Lift |
VI |
Optional Scraper |
|
|
III
IV
I
II
I
IV
Engine Horsepower Requirements
|
Machine Size |
Tractor Power |
|
16 ft |
220 hp Minimum |
II |
18 ft |
250 hp Minimum |
|
|
|
|
21 ft |
290 hp Minimum |
|
24 ft |
340 hp Minimum |
|
|
|
Engine horsepower requirements may vary depending on soil conditions and digging depth.
IMPORTANT: If proper responses are not observed during folding or unfolding procedure, see Make Proper Hose Connections in the Operator’s Manual.
Unfolding Sequence
1.Remove transport lock pins (A) from the cradles and place in storage location.
2.Extend SCV III until wings clear the cradles.
A
3.Extend SCV IV to unfold the wings.
4.Place both SCV III and SCV IV into the FLOAT position to lower the machine.
Folding Sequence
A.Take SCV III and SCV IV out of the FLOAT position and retract SCV III until wing is perpendicular to the ground.
B.Retract SCV IV to fold wings inward until touching inner edge of cradles.
C.Retract SCV III until resting in cradles.
D.Insert and lock transport pins in place.