Installation Guide SMT 2200/3000 VA
Input/Output Hardwire Kit
Safety
Adhere to all national and local electrical codes. A certified electrician must perform all electrical connections.
1.Disconnect equipment connected to the UPS.
2.Press the OFF button located on the front of the UPS.
3.Disconnect the batteries in the UPS.
4.Disconnect the UPS from utility power.
NOTE: When removing the panels from the UPS, note which cable is connected to the AC input. There are two 4-pin connectors on the UPS and they are not interchangeable.
Inventory
Note: The illustrations in this document may differ slightly from the actual hardware.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Terminal block |
4 grounding screws |
8 screws |
2 wire nuts |
||||||||||
Terminal block label |
|
secure input, output, and |
|
||||||||||
2 screws secure the |
|
blank panels to the UPS |
|
||||||||||
terminal block to the UPS |
|
|
|
Input panel
Output panel
Blank panel
Installation
Note: It is recommended that the input and output cables be connected to the terminal block prior to installing the terminal block in the UPS.
Remove the five screws that secure the factory installed PDU panels to the UPS.
Save the screws.
Disconnect the PDU input and output cables as shown in the diagram.
AC Input Connector
su0669b
Secure the replacement input and output panels (supplied), to the UPS. Secure the panels with four of the screws removed from the factory installed PDU panel.
Install appropriate strain relief clamps (not supplied), to the input and output panels as shown in the diagram.
su0670a
2 |
Hardwire Kit SMT2200/3000 VA 100/120/230 VAC Tower |