Carrier 24ACC630A0030010, 24ACC636A0030010, 24ACC648A0030010, 24ACC642A0030010 Installation Guide

0 (0)
Carrier 24ACC630A0030010, 24ACC636A0030010, 24ACC648A0030010, 24ACC642A0030010 Installation Guide

24ACB3, 24ACC6 24APB6

Single---Stage Performancet Series Air Conditioners with Puronr Refrigerant

1---1/2 To 5 Nominal Tons (Sizes 18 to 60)

Installation Instructions

SAFETY CONSIDERATIONS

Improper installation, adjustment, alteration, service, maintenance, or use can cause explosion, fire, electrical shock, or other conditions which may cause death, personal injury, or property damage. Consult a qualified installer, service agency, or your distributor or branch for information or assistance. The qualified installer or agency must use factory-authorized kits or accessories when modifying this product. Refer to the individual instructions packaged with the kits or accessories when installing.

Follow all safety codes. Wear safety glasses, protective clothing, and work gloves. Use quenching cloth for brazing operations. Have fire extinguisher available. Read these instructions thoroughly and follow all warnings or cautions included in literature and attached to the unit. Consult local building codes and current editions of the National Electrical Code ( NEC ) NFPA 70. In Canada, refer to current editions of the Canadian electrical code CSA 22.1.

Recognize safety information. This is the safety-alert symbol When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury. Understand these signal words; DANGER, WARNING, and CAUTION. These words are used with the safety-alert symbol. DANGER identifies the most serious hazards which will result in severe personal injury or death. WARNING signifies hazards which could result in personal injury or death. CAUTION is used to identify unsafe practices which would result in minor personal injury or product and property damage. NOTE is used to highlight suggestions which will result in enhanced installation, reliability, or operation.

!WARNING

ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in personal injury or death.

Before installing, modifying, or servicing system, main electrical disconnect switch must be in the OFF position. There may be more than 1 disconnect switch. Lock out and tag switch with a suitable warning label.

!WARNING

EXPLOSION HAZARD

Failure to follow this warning could result in death, serious personal injury, and/or property damage.

Never use air or gases containing oxygen for leak testing or operating refrigerant compressors. Pressurized mixtures of air or gases containing oxygen can lead to an explosion.

GENERAL

NOTE: In some cases noise in the living area has been traced to gas pulsations from improper installation of equipment.

1.Locate unit away from windows, patios, decks, etc. where unit operation sound may disturb customer.

2.Ensure that vapor and liquid tube diameters are appropriate for unit capacity.

3.Run refrigerant tubes as directly as possible by avoiding unnecessary turns and bends.

4.Leave some slack between structure and unit to absorb vibration.

5.When passing refrigerant tubes through the wall, seal opening with RTV or other pliable silicon-based caulk. (See Fig. 1.)

6.Avoid direct tubing contact with water pipes, duct work, floor joists, wall studs, floors, and walls.

7.Do not suspend refrigerant tubing from joists and studs with a rigid wire or strap which comes in direct contact with tubing. (See Fig. 1.)

8.Ensure that tubing insulation is pliable and completely surrounds vapor tube.

9.When necessary, use hanger straps which are 1 in. (25.4 mm) wide and conform to shape of tubing insulation. (See Fig. 1.)

10.Isolate hanger straps from insulation by using metal sleeves bent to conform to shape of insulation.

NOTE:Avoid contact between tubing and structure

OUTDOOR WALL INDOOR WALL

CAULK

LIQUID TUBE

 

INSULATION

VAPOR TUBE

 

THROUGH THE WALL

 

 

JOIST

HANGER STRAP

 

(AROUND VAPOR

INSULATION

TUBE ONLY)

VAPOR TUBE

 

1” (25.4 mm) MIN.

LIQUID TUBE

SUSPENSION

 

A94026

Fig. 1 - Piping Installation

For proper unit operation, check refrigerant charge using charging information located on control box cover and/or in the Check Charge section of this instruction.

IMPORTANT: Maximum liquid-line size is 3/8-in. OD for all residential applications including long line. Refer to Residential Piping and Longline Guideline for further information.

IMPORTANT: Always install the factory-supplied liquid-line filter drier. If replacing the filter drier, refer to Product Data Digest for appropriate part number. Obtain replacement filter driers from your distributor or branch.

INSTALLATION

IMPORTANT: Effective January 1, 2015, all split system and packaged air conditioners must be installed pursuant to applicable regional efficiency standards issued by the Department of Energy.

!CAUTION

CUT HAZARD

Failure to follow this caution may result in personal injury.

Sheet metal parts may have sharp edges or burrs. Use care and wear appropriate protective clothing and gloves when handling parts.

Check Equipment and Job Site

UNPACK UNIT

Move to final location. Remove carton taking care not to damage unit.

Inspect Equipment

File claim with shipping company prior to installation if shipment is damaged or incomplete. Locate unit rating plate on unit corner panel. It contains information needed to properly install unit. Check rating plate to be sure unit matches job specifications.

Install on a Solid, Level Mounting Pad

If conditions or local codes require the unit be attached to pad, tie down bolts should be used and fastened through knockouts provided in unit base pan. Refer to unit mounting pattern in Fig. 2 to determine base pan size and knockout hole location.

For hurricane tie downs, contact local distributor for details and PE (Professional Engineer) certification, if required by local authorities.

On rooftop applications, mount on level platform or frame. Place unit above a load-bearing wall and isolate unit and tubing set from structure. Arrange supporting members to adequately support unit and minimize transmission of vibration to building. Consult local codes governing rooftop applications.

Roof mounted units exposed to winds may require wind baffles. Consult the Application Guideline and Service Manual - Residential Split System Air Conditioners and Heat Pumps for wind baffle construction.

NOTE: Unit must be level to within 2_ ( 3/8 in./ft.) per compressor manufacturer specifications.

Clearance Requirements

When installing, allow sufficient space for airflow clearance, wiring, refrigerant piping, and service. Allow 24 in. (609.6 mm) clearance to service end of unit and 48 in. (1219.2 mm) (above unit. For proper airflow, a 6-in. (152.4 mm) clearance on 1 side of unit and 12-in. (304.8 mm) on all remaining sides must be maintained. Maintain a distance of 24 in. (609.6 mm) between units. Position so water, snow, or ice from roof or eaves cannot fall directly on unit.

On rooftop applications, locate unit at least 6 in. (152.4 mm) above roof surface.

Operating Ambient

The minimum outdoor operating ambient in cooling mode without accessory is 55_F (12.78_C). The maximum outdoor operating ambient in cooling mode is 125_F (51.7_C) for non-13 SEER models and 115_F (46.11_C) for 13 SEER models.

Make Piping Connections

!WARNING

PERSONAL INJURY AND ENVIRONMENTAL HAZARD

Failure to follow this warning could result in personal injury or death.

Relieve pressure and recover all refrigerant before system repair or final unit disposal. Use all service ports and open all flow-control devices, including solenoid valves.

Federal regulations require that you do not vent refrigerant to the atmosphere. Recover during system repair or final unit disposal.

!CAUTION

UNIT DAMAGE HAZARD

Failure to follow this caution may result in equipment damage or improper operation.

If ANY refrigerant tubing is buried, provide a 6-in. vertical rise at service valve. Refrigerant tubing lengths up to 36-in. may be buried without further special consideration. Do not bury lines more than 36-in. (914.4 mm).

3/8---in. (9.53 mm) Dia. Tiedown Knockouts in Basepan(2) Places

View From Top

UNIT BASE PAN

TIEDOWN KNOCKOUT LOCATIONS in. (mm)

Dimension in. (mm)

A

B

C

23---1/2 X 23---1/2

7---13/16 (198.4)

4–7/16 (112.7)

18–1/16 (458.8)

(596.9 X 596.9)

 

 

 

26 X 26

9–1/8 (231.8)

4–7/16 (112.7)

21–1/4 (539.8)

(660.4 X 660.4)

 

 

 

31–1/2 X 31–1/2

9–1/8 (231.8)

6–9/16 (166.7)

24–11/16 (627.1)

(800.1 X 800.1)

 

 

 

35 X 35

9–1/8 (231.8)

6–9/16 (166.7)

28–7/16 (722.3)

(889 X 889)

 

 

 

 

 

 

A05177

Fig. 2 - Tiedown Knockout Locations

Outdoor units may be connected to indoor section using accessory tubing package or field-supplied refrigerant grade tubing of correct size and condition. Rated tubing diameters shown in Table 1 are recommended up to 80 ft. (24.38 m). See Product Data for acceptable alternate vapor diameters and associated capacity losses. For tubing requirements beyond 80 ft. (24.38 m), substantial capacity and performance losses can occur. Following the recommendations in the Longline Guideline will reduce these losses. Refer to Table 1 for field tubing diameters. Refer to Table 5 for accessory requirements.

2

There are no buried-line applications greater than 36-in. (914.4 mm) allowed.

If refrigerant tubes or indoor coil are exposed to atmosphere, they must be evacuated to 500 microns to eliminate contamination and moisture in the system.

Outdoor Unit Connected to Factory Approved Indoor Unit

Outdoor unit contains correct system refrigerant charge for operation with factory approved AHRI rated indoor unit when connected by 15 ft. (4.57 m) of field-supplied or factory-accessory tubing, and factory supplied filter drier. Check refrigerant charge for maximum efficiency.

Refrigerant Tubing Connection Outdoor

Connect vapor and liquid tubes to fittings on vapor and liquid service valves (see Table 1). Use refrigerant grade tubing

Sweat Connection

!CAUTION

UNIT DAMAGE HAZARD

Failure to follow this caution may result in equipment damage or improper operation.

Service valves must be wrapped in a heat-sinking material such as a wet cloth while brazing.

Use refrigeration grade tubing. Service valves are closed from factory and ready for brazing. After wrapping service valve with a wet cloth, braze sweat connections using industry accepted methods and materials. Consult local code requirements. Refrigerant tubing and indoor coil are now ready for leak testing. This check should include all field and factory joints.

Table 1 – Refrigerant Connections and Recommended Liquid

and Vapor Tube Diameters (In.)

24ACB

 

LIQUID

RATED VAPOR

 

up to 80 ft. (24.38 m)*

UNIT SIZE

 

Connection

Connection

Tube

 

& Tube

 

Diameter

Diameter

 

Diameter

 

 

 

18, 24

3/8

3/4

3/4

30, 36

3/8

3/4

3/4

42, 48

3/8

7/8

7/8

60

3/8

7/8

1---1/8

 

 

 

 

24ACC, 24APB

 

 

LIQUID

RATED VAPOR

 

up to 80 ft. (24.38 m)*

UNIT SIZE

 

Connection

Connection

Tube

 

& Tube

 

Diameter

Diameter

 

Diameter

 

 

 

18, 24, 30

3/8

3/4

3/4

36, 42, 48

3/8

7/8

7/8

60

3/8

7/8

1---1/8

*Units are rated with 25 ft. (7.6 m) of lineset. See Product Data sheet for performance data when using different size and length linesets.

Notes:

1.Do not apply capillary tube to these units.

2.For Tubing Set lengths between 80 and 200 ft. (24.38 and 60.96 m) horizontal or 35 ft. (10.7 m) vertical differential 250 ft. (76.2 m) Total Equivalent Length), refer to the Residential Piping and Longline Guide line--- Air Conditioners and Heat Pumps using Puron refrigerant.

3.For alternate liquid line options on 18---42 size units, see Product Data or Residential Piping and Application Guideline

Install Liquid-Line Filter Drier Indoor

!CAUTION

UNIT DAMAGE HAZARD

Failure to follow this caution may result in equipment damage or improper operation.

1. Installation of filter drier in liquid line is required.

2. Filter drier must be wrapped in a heat-sinking material such as a wet cloth while brazing.

Refer to Fig. 3 and install filter drier as follows:

1.Braze 5-in. liquid tube to the indoor coil.

2.Wrap filter drier with damp cloth.

3.Braze filter drier to above 5-in. (127 mm) liquid tube. Flow arrow must point towards indoor coil.

4.Connect and braze liquid refrigerant tube to the filter drier.

A05178

Fig. 3 - Liquid Line Filter Drier

Evacuate Refrigerant Tubing and Indoor Coil

!CAUTION

UNIT DAMAGE HAZARD

Failure to follow this caution may result in equipment damage or improper operation.

Never use the system compressor as a vacuum pump.

Refrigerant tubes and indoor coil should be evacuated using the recommended deep vacuum method of 500 microns. The alternate triple evacuation method may be used (see triple evacuation procedure in service manual). Always break a vacuum with dry nitrogen.

Deep Vacuum Method

The deep vacuum method requires a vacuum pump capable of pulling a vacuum of 500 microns and a vacuum gage capable of accurately measuring this vacuum depth. The deep vacuum method is the most positive way of assuring a system is free of air and liquid water. A tight dry system will hold a vacuum of 1000 microns after approximately 7 minutes. See Fig. 4.

 

5000

 

 

 

 

 

 

 

 

4500

 

 

 

 

 

 

 

 

4000

 

 

 

 

 

LEAK IN

 

3500

 

 

 

 

 

MICRONS

 

 

 

 

 

SYSTEM

3000

 

 

 

 

 

 

 

 

 

 

 

 

2500

 

 

 

 

 

 

 

2000

 

 

 

 

 

 

 

 

 

 

 

 

 

VACUUM TIGHT

 

1500

 

 

 

 

 

 

 

 

 

 

 

TOO WET

 

1000

 

 

 

 

 

 

 

 

 

 

 

TIGHT

 

500

 

 

 

 

 

 

 

 

 

 

 

DRY SYSTEM

 

 

 

 

 

 

 

 

0

1

2

3

4

5

6

7

 

 

 

 

MINUTES

 

 

 

A95424

Fig. 4 - Deep Vacuum Graph

3

Loading...
+ 7 hidden pages