Sulky VISION 2 WPB User Manual

0 (0)
Sulky VISION 2 WPB User Manual

Vision II WPB Continuous weighing

QUICK-START GUIDE

The following instructions are given to enable a quick start of the control box by using the 3 main menus:

MAIN (button ref. 8)

INFORMATION (button ref. 9)

SETTING (button ref. 10)

and for each one their scroll down sub-menus.

For further information, read the user manual

ON

Turn on the power

Ref : 400 363- GB/DIS-00

SETTING MENU “SET”

Select the SET menu and perform in order the following operations

FORWARD SPEED CALIBRATION

NB : Speed calibration is done over a distance of 100 m

Mark out a distance of 100 m

Position the tractor at the 1st mark

1

2

 

Select

0m

100m

 

 

M

1.

1.000 m/Pulse

A

I

2.

1.000 m/Pulse

N

 

3.

2.000 m/Pulse

 

4.

0.016 m/Pulse

S

5.

NMEA VTG

E

 

 

T

 

ESC

 

Select tractor N°1

Press on

3

4

• Select “calibrate over

• Go forward 100 m

 

100 m”

 

• Press enter at 2nd mark

• Press enter at 1st mark

• Enter again to confirm

0m

100m

0m

100m

5• Speed calibration is complete

• Press ESC to exit.

Loading...
+ 4 hidden pages