GE Pedestrian Signals Installation Guide

5 (3)
GE Pedestrian Signals Installation Guide

Installation Instructions

GT1TM LED Pedestrian 16x18’’ Incandescent Look

Signal Modules / PS7-CFF1-46A-J & PS7-CFF1-26A-J

Full Hand/Person Overlay/Countdown

BEFORE YOU BEGIN

Read these instructions completely and carefully.

Prepare Electrical Wiring

Electrical Requirements

Do not use in wet locations

Follow all National Electric Codes (NEC) and local codes.

Installation Steps:

1.Verify input voltage is within specified range on the back of the LED signal module before installation. Failure to do so will cause lamp to fail.

2.Open front cover of (customer supplied) traffic signal housing.

3.Connect the wires to the appropriate terminal block within customer supplied signal housing. (Orange wire (+ for Hand), Blue Wire (+ for Person) and White wire (for the neutral).

4.Close front cover of (customer supplied) traffic signal housing ensuring that the module gasket is tight within the housing.

16 x 18 inch Overlay / Countdown

Risk of Electric Shock

Install unit in enclosure tested to be suitable for wet locations only.

Back of 16 x 18 inch Pedestrian Module

Blue Wire

White Wire

Orange Wire

Voltage Rating

Countdown Option

Jumpers …Page 2 (See next page)

Loading...
+ 1 hidden pages