Friedrich PDH07K3SG User Manual

0 (0)

Installation and Operation Manual

PTAC

Packaged Terminal Air

Conditioners & Heat Pumps

ZoneAire®

Table of Contents

Congratulations····················································································································································· 3 General Instructions··············································································································································· 3 General Specifications············································································································································ 4 Installation Checklist···············································································································································4 PTAC Installation Recommendations························································································································· 5 Wall Sleeve Installation Instructions (PDXWSA)··········································································································· 6 Alternate Wall Instalations······································································································································· 7 One-Piece Deep Wall Sleeve Installation (PDXWSEXT)································································································ 9 PXDR10 Drain Kit Installation Instructions (optional for new construction)········································································ 10 PXGA Standard Grille Insta lation Instructions··········································································································· 12 Chassis Install Preparation····································································································································16 Chassis Installation·············································································································································· 18 Friedrich PTAC Digital Control and Unit Features······································································································· 19 System Configuration··········································································································································· 21 Digital Control User Input Configuration···················································································································· 22 Digital Control Operation······································································································································· 23 Remote Control Thermostat Installation···················································································································· 24 Remote Thermostat and Low Voltage Control Connections Remote Thermostat······························································· 24 Final Inspection & Start-up Checklist························································································································ 26 Basic Troubleshooting·········································································································································· 27 Accessories························································································································································ 29

NOTE:

All PTAC 7K,9K,12K units come with a standard 3.6KW electric heater (20A power cord).All PTAC 15K units come with a standard 5KW electric heater(30A power cord) .

2

Congratulations

Thank you for your decision to purchase Friedrich. Your new Friedrich has been carefully engineered and manufactured to give you many years of dependable, efficient operation, maintaining a comfortable temperature and humidity level. Many extra features have been built into your unit to assure quiet operation, the greatest circulation of cool, dry air, and the most economic operation.

General Instructions

This Installation and Operation Manual has been designed to insure maximum satisfaction in the performance of your unit. For years of trouble-free service, please follow the installation instructions closely. We cannot overemphasize the importance of proper installation.

WARNING

Refrigeration system under high pressure

Do not puncture, heat, expose to flame or incinerate.

Only certified refrigeration technicians should service this equipment.

R410A systems operate at higher pressures than R22 equipment. Appropriate safe service and handling practices must be used.

Only use gauge sets designed for use with

R410A. Do not use standard R22 gauge sets.

Here are some suggestions to help you use your new Friedrich most efficiently:

1.Carefully read and follow the installation instructions.

2.Make sure the unit is the right capacity for the area being cooled.

An undersized unit makes the unit work too hard, using more electricity than needed and increases wear. An oversized unit will cycle on and off too rapidly, and therefore cannot control humidity as well.

3.Clean the filter frequently (See Routine Maintenance, Page 26).

4.Do not block the air flow to and from the unit.

5.A dirty filter or improperly set controls can affect the cooling ability of the unit.

6.If cooling is weak and you have verified that the filter is clean

and the controls are properly set, the unit may need service and you should call your Friedrich service provider to check the unit.

7.Keep blinds, shades and drapes closed on the sunny side of the room being cooled to reduce radiant heat.

8.Proper insulation helps your unit maintain the desired inside temperature.

9.Whenever possible, shade south and west facing windows.

10.Keep window coverings away from the unit to provide free air flow.

WARNING

Read Installation Operation Manual

Please read this manual thoroughly prior to equipment installation or operation.

It is the installer’s responsibility to properly apply and install the equipment. Installation must be in conformance with the NFPA 70 -2008 National Electric Code or current edition, International Mechanic Code 2009 or current edition and any other applicable local or national codes.

Failure to do so can result in property damage, personal injury or death.

Your safety and the safety of others are very important.

We have provided many important safety messages in this manual and on your appliance. Always read and obey all safety messages.

This is a safety Alert symbol.

This symbol alerts you to potential hazards that can kill or hurt you and others. All safety messages will follow the safety alert symbol with the word “WARNING” or “CAUTION”. These words mean:

WARNING

CAUTION

Indicates a hazard which, if not avoided, can result in severe personal injury or death and damage to product or other property.

Indicates a hazard which, if not avoided, can result in personal injury and damage to product or other property.

All safety messages will tell you what the potential hazard is, tell you how to reduce the chance of injury, and tell you what will happen if the instructions are not followed.

NOTICE

Indicates property damage can occur if instructions are not followed.

3

GeneralSpecifications

Typical Unit Components and Dimensions

WALL SLEEVE

OUTDOOR GRILLE

DISCHARGE GRILLE

FILTERS

PDXWS Wall Sleeve

 

Dimensions: 16" H x 42" W x

 

13-¾" D

 

Front Cover Dimensions:

 

16" H x 42" W x 7-¾" D

 

Cut-Out Dimensions:

 

16-¼" x 42-¼"

 

CHASSIS

RETURN AIR GRILLE

FRONT COVER

 

MODEL NUMBER

Series

PZ = Friedrich Digital PTAC

System

E = Cooling with electric heat

H = Heat Pump with Auxiliary Heat

Nominal Capacity

 

 

07 = 7,000

Btuh

12 = 12,000

Btuh

09 = 9,000

Btuh

15 = 15,000

Btuh

Voltage

K = 230/208V - 1 Ph. - 60 Hz.

R = 265V - 1 Ph. - 60 Hz.

InstallationChecklist

Inspect all components and accessories for damage before and after installation.

Remove the cardboard wall sleeve support and grill weatherboard.

Check for proper wall sleeve installation in accordance with the wall sleeve installation instructions.

Check for a subbase kit or other means of structural support which is required for ALL installations projecting more than 8" into room.

Install the recommended Condensate Drain Kits for complete condensate removal.

3 B

Engineering Digit

Design Series

Chassis

S = Standard

Nominal Heater Size (230V or 265V)

3 = 3 KW

5.0 kw only available on 15,000 BTU models

Ensure that the chassis is installed in a 16" high x 42” wide wall sleeve that is no deeper than 13 ¾".A baffle kit is required if the sleeve exceeds that depth.

Ensure that chassis and chassis front cover are installed and secured properly.

Ensure that drapes, bed, bedspread, furniture, etc.DO NOT block either return or discharge air grilles.

Inspect the condenser air inlet and outlet for any obstructions

(shrubbery, etc ).

Ensure that 'reset' button is pressed on LCD device (only on cord connected models).

4

PTACInstallationRecommendations

For proper PTAC unit performance and maximum operating life refer to the minimum installation clearances below:

Figure 1

PTAC units should be installed no closer than 12" apart when two units are side by side. If three or more PTAC units are to operate next to one another allow a minimum of 36" between units Also, a vertical clearance of 60" should be maintained between units installed. In the interior of the room the unit should be located a minimum of 1/4" from the floor and a minimum of 36" from the ceiling.

THREE OR MORE PTACs

ADJACENT 36" MINIMUM

TYPICAL

WINDOW

36"

60"

TWO ADJACENT PTACs

12" MINIMUM

 

60" VERTICAL

 

MINIMUM

GROUND FLOOR PTACs

BETWEEN

6" MINIMUM FROM GRADE

PTACs

 

12"

6"

VIEW: OUTSIDE BUILDING ELEVATION

FRP001

For PTACs on the ground floor or anytime obstructions are present, use the following guidelines:

Figure 2

 

For minor obs tr uc ti on s

 

such as lamp poles or small

 

shrubbery a clearance of

 

12" from the outdoor louver

 

should be maintained.

For major obstructions such as a solid fence, wall or other heat rejecting device like a condensing unit, a minimum distance of 36" should be kept.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TYPICAL BUILDING ( PLAN VIEW )

 

 

 

 

 

 

 

 

 

 

 

 

 

36"

 

 

 

 

 

 

 

 

36"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PTAC

 

 

 

 

 

 

 

 

 

PTAC

 

 

 

 

 

PTAC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12" MINIMUM, MINOR

 

 

 

 

 

 

 

 

 

 

12"

 

 

SHRUB

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POLE

 

 

36"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OBSTRUCTIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

36" MIMUMUM, MAJOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OBSTRUCTIONS

 

 

 

 

 

 

 

 

 

FENCE OR WALL

 

 

CONDENSING UNIT

FRP002

The above suggestions are for reference only and do not represent all possible installations. Please contact Friedrich for information regarding affects of other installation arrangements. By following these simple recommendations you can be confident that your Friedrich PTAC will provide years of worry free operation.

5

Wall Sleeve Installation Instructions (PDXWSA)

NOTE: Insure

that

the

unit is

only

installed in

a

wall

structurally adequate to support the unit including the

sleeve, chassis and

accessories

If the

sleeve

projects

more

than 8" into

the

room, a subbase or other means of support MUST

be used.

Please

read these

instructions

completely

before

attempting

installation.

 

 

 

WARNING

Falling Object Hazard

Not following Installation Instructions for mounting your air conditioner can result in property damage, injury, or death.

NOTICE

DO NOT allow any pitch toward the inside.

Flashing on all 4 sides of the opening is recommended.

Potential property damage can occur if instructions are not followed.

For Deep WallInstallation (Greater than 13 1/4")

See Page 9

The following instructions apply ONLY to walls less than 13 ¼" in depth.

1.The PXDR10 Drain Kit,(optional for new construction) see page

10 if applicable, must be installed before the wall sleeve is installed into the wall.

2.The External Drain (for new construction or unit replacement) see page 11 if applicable, must be installed before the wall sleeve is installed into the wall.

Figure 3

Typical Wall Sleeve Installation

3.From inside the building, position the wall sleeve in the opening and push it into the wall until it protrudes at least ¼” on the outside(See Figure 9, Page 8).

4.Position the wall sleeve with a slight tilt towards the outside to facilitate condensate drainage.It should be level side-to-side and the front should be ¼ bubble higher than the back.

ELECTRICAL

RECEPTACLE

 

42-¼"

16-¼"

 

 

LINTEL TO SUPPORT

60"

 

MIN.

 

 

 

MAX.

 

MASONRYWALLS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20"

MAX.

 

 

SMOOTH SIDE OF SCREW

 

 

 

 

13-¾"

 

CLIP FACING INTO ROOM

 

 

 

 

 

INSULATION

ELECTRICAL

 

 

 

 

 

 

 

 

RECEPTACLE

 

 

 

 

 

 

 

 

 

 

 

WALL OPENING

WALL SLEEVE

INSULATION

NOTE: All 230/208V units are manufactured with a 60” power cord and all 265V units with a 18” power cord.

FRP003

6

Friedrich PDH07K3SG User Manual

AlternateWall Instalations

Figure 4

Figure 6

Panel Wall

CurtainWall

WALL OR

1/4" MIN

WINDOW

PROJECTION

CASE FLANGE (BY OTHERS)

OPTIONAL SUBBASE

OPTIONAL SUBBASE

 

LEVELING SCREW

 

 

LEVELING SCREW

FRP004

 

FRP006

Figure 5

Figure 7

 

Frame and Brick Veneer

Block and Brick Veneer

 

1/4" MIN

 

1/4" MIN

PROJECTION

 

PROJECTION

WOOD FRAME

CONCRETE LINTEL

 

 

 

STEEL

 

STEEL

 

LINTEL

LINTEL

 

 

13-3/4" MIN.

 

 

11" MIN.

 

WITHOUT SUBBASE

 

 

WITH SUBBASE

 

 

OPTIONAL SUBBASE

RECEPTACLE

 

LEVELING SCREW

FINISHED FLOOR

POWER SUPPLY CONDUIT

(SUPPLIED BY INSTALLER)

 

FRP005

 

FRP007

NOTE: Follow all wall system manufacturer installation instructions. For sunrooms and modular buildings, adhere to their installation instructions for supporting and sealing sleeve to their frames. All wall and window/wall installations must provide for proper drainage. In applications where the drain holes on the PTAC wall sleeve are not exposed beyond the wall an internal drain system is recommended. It is the installer's responsibility to ensure there is adequate drainage for the PTAC unit.

7

Figure 8

Wall Sleeve Attachment

WALL

SLEEVE

MOUNTING

HOLES

PLASTIC ANCHORS

SCREWS

ALTERNATE FASTENING METHODS (Field Supplied)

 

 

NOTE: The Wall Sleeve must be

 

 

horizontally level (side-to-side)

 

 

and pitched 1/4 bubble to the

 

 

WOOD SCREW

outside when installed in an

opening.

 

 

TOGGLE BOLT

The mounting hole location

EXPANSION

should be approximately 2-4”

ANCHOR BOLT

from the top and bottom of the

 

sleeve.

FRP008

Figure 9

Dimensions

A

¼" MIN.

C

13-¾"

B

WALL

 

A

 

B

C

Dimension*

Allow

Allow

Allow

 

for wall

for floor

for proper

 

finishing

finishing

drainage

 

(Minimum)

Min.

Max. (Front-to-Back)

No Accessories

¼"

¼"

---

---

With Subbase

1-¾"

3-½"

5"

---

With Lateral Duct

¾"

¼"

---

---

 

 

 

 

 

Wall Sleeve Tilt

---

---

---

¼"

 

 

 

 

 

*If more than one accessory is to be used, use the maximum dimension. If the wall thickness is more than 13-¾" - (A+ ¼"), a sleeve extension must be used.

FRP009

8

5.Drill two 3/16" holes through each side of the sleeve approximately

4" from top and 4" from bottom of sleeve. Screw four #10 x 1" screws (included) or appropriate fasteners for your installation, through the holes in the sides of the wall sleeve.

6.Apply sealant around the wall sleeve where it projects through the inside and outside wall surfaces. Apply the sealant to the screw heads or the tops of the fasteners used in Step #5.

Figure 10

MAIN STUDS

Lintel Installation

 

 

JACK STUDS

 

JACK STUDS

MAIN STUDS

7.If the chassis and exterior grille are to be installed later, leave the weatherboard and center support in place, otherwise remove and dispose of them. (See Figure 13, Page 12).

8.Provide a support lintel if the wall sleeve is installed in a concrete or masonry wall (See Figure 10, Page 9).

LINTEL

MOUNTING

SCREW HOLES

NO HOLES IN BOTTOM OF WALL

SLEEVE UNLESS DRAIN KIT IS USED

NOTE: Construct wall opening to comply with all applicable building codes.

FRP010

One-PieceDeep Wall Sleeve Installation (PDXWSEXT)

If the wall is thicker than 13 1/4” a deep wall sleeve or wall sleeve extension

MUST be used. The deep wall sleeve may be special ordered through your Sales Representative.

9

PXDR10DrainKit Installation Instructions(optionalfornew construction)

NOTE:. Determine whether drain will be located within the wall, on the indoor side, or will drain to the exterior of the building. Follow appropriate instructions below depending on your particular type of installation.

InternalDrain

NOTE:. If installing an internal drain, you MUST install a drain kit on the wall sleeve before the wall sleeve is installed.

1.Refer to Figure 11 and locate the drain within the “Preferred”

area of best drainage. Maintain at least a ½” clearance from the embossed area.

2.Using the mounting plate with the ½” hole as a template, mark and drill two, 3/16” mounting holes and a ½” drain hole in the sleeve bottom .

Figure 11

DrainKitLocationandInstallation

OPTIONAL AREA

PREFERRED AREA-

NO FOAM INSULATION

IF THE DRAIN MUST BE

 

LOCATED IN THE OPTIONAL

 

AREA, THE FOAM INSULATION

 

MUST BE CUT AWAY AND

3"

REMOVED TO ALLOW ACCESS

TO THE DRAIN.

 

3.Remove the backing from the gasket and mount it on the flat side of the mounting plate. (See Figure 12, Page 11). Insert the drain tube through the hole in the gasket and mounting plate so the tube flange will be against the wall sleeve.

4.Position the assembly beneath the drilled holes and secure it with #

10-24x ½" machine screws and lock nuts provided . Seal the tops of the screws with silicone caulking.

5.Use ½" ID copper tube, PVC pipe, or vinyl hose (obtained locally) to connect the internal drain tube to the drain system in the building.

6.Referring to Figure 12,Detail A, Page 11,locate and assemble the two cover plates and gaskets over the drain holes at the rear of the wall sleeve.Attach them with the #10 sheet metal screws provided.Make certain that the four overflow slots at the rear of the wall sleeve are not blocked (See drawing of the back of the sleeve Figure 12, Page 11).

7.If a deep wall extension (PDXWSEXT) is used, after installing the field supplied flashing,caulk as required. Be sure to caulk around the flashing and the wall sleeve where the hole was drilled for the drain tube.

SCREW

WALL SLEEVE

GASKET

MOUNTING

PLATE

DRAIN TUBE NUT

SIDE VIEW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FRONT VIEW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FRP011

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PXDR10

QUANTITY

 

 

 

 

 

 

 

 

 

DESCRIPTION

 

 

 

 

 

 

 

 

2

 

 

 

 

 

COVER PLATES

1

 

 

 

 

 

MOUNTING PLATE

1

 

 

 

 

 

DRAIN TUBE

3

 

 

 

 

 

MOUNTING PLATE GASKET

4

 

 

 

 

 

#10 X ½” SHEET METAL SCREWS

2

 

 

 

 

 

#10-24 X ½ ” MACH. SCREWS

2

 

 

 

 

 

#10-24 X ½" LOCKNUTS

10

Loading...
+ 21 hidden pages