Sulky VISION 2 WPB User Manual

Vision II WPB
QUICK-START GUIDE
The following instructions are given to enable a quick start of the control box by using the 3 main menus:
MAIN (button ref. 8)
INFORMATION (button ref. 9)
SETTING (button ref. 10)
and for each one their scroll down sub-menus.
For further information, read the user manual
ON
Turn on the power
Ref : 400 363- GB/DIS-00
SETTING MENU “SET”
Select the SET menu and perform in order the following operations
FORWARD SPEED CALIBRATION
NB : Speed calibration is done over a distance of 100 m
• Mark out a distance of 100 m
Position the tractor at the 1st mark
1
0m 100m
2
1. 1.000 m/Pulse
2. 1.000 m/Pulse
3. 2.000 m/Pulse
4. 0.016 m/Pulse
5. NMEA VTG
ESC
M A
I
N
S
E T
Select
3
• Select “calibrate over 100 m”
• Press enter at 1st mark
0m 100m
5
• Speed calibration is complete
• Press
ESC
to exit.
• Select tractor N°1
• Press on
4
• Go forward 100 m
• Press enter at 2nd mark
• Enter again to confi rm
0m 100m
Loading...
+ 4 hidden pages