
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
II- Diagnostic procedures
To respect the safety and usage instructions, please refer to the user manuals which refer to the
fertiliser distributor and electronic console

NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
Wiring presentation: XT100/130/160 VISION DPB
Connection plan: XT100/130/160 VISION DPB
Intermediate wiring: XT100/130/160 VISION DPB
Wiring presentation: XT100/130/160 VISION DPB + WEIGHING OPTION
Connection plan: XT100/130/160 VISION DPB + WEIGHING OPTION
Intermediate wiring: XT100/130/160 VISION DPB + WEIGHING OPTION
Wiring presentation: XT 100/130 ECONOV
Connection plan: XT 100/130 ECONOV
Intermediate wiring: XT 100/130 ECONOV
Manual control: XT ECONOV
Connection to the MATRIX PRO guide bars
Wiring presentation: XT 100/130 ECONOV + WEIGHING OPTION
Connection plan: XT 100/130 ECONOV + WEIGHING OPTION
Intermediate wiring: XT 100/130 ECONOV + WEIGHING OPTION
Manual control: XT ECONOV
Connection to the MATRIX PRO guide bars
Wiring presentation: XT 160 H / 210 H / 240 H DS2
Connection plan: XT 160H / 210H / 240H DS2
Intermediate wiring: XT 160H / 210H / 240H DS2
Wiring presentation: XT 160/210/240 H RD1
Connection plan: XT 160H/210H/240H RD1
Connection plan: JOYSTICK - RD1
Wiring presentation: XT 160/210/240 H RD2
Connection plan: XT 160/210/240 H RD2
Intermediate wiring: XT 160/210/240 H RD2
Connection plan: JOYSTICK – RD2
Wiring presentation: XT 160/210/240 H RD3
Connection plan: XT 160/210/240 H RD3
Intermediate wiring: XT 160/210/240 H RD3
Connection plan: JOYSTICK - RD3
RD1 – RD2 boom valve actuators
ECONOV actuators on spouts
Boom auger rotation sensor
Replacement of a weighing sensor
Retrieving the Vision DPB Polyvrac console data
Vision XT Polyvrac console data form
Performing a console RESET
Configuring the Vision XT Polyvrac console
Dose modulation - Recommendation card

WIRING PRESENTATION:
XT100/130/160 VISION DPB
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION

WIRING PRESENTATION:
XT100/130/160 VISION DPB
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
Vision PSI XT Polyvrac console
Console power supply cable
40 A battery direct power supply cable
Cable: 51000270
40 A fuse 52570120
DPB XT Polyvrac connection unit
300 mm gate electric actuators
Model: LA 36 -1203000P00AA
Actuator: 59000643
Power cable: 51000240
Signal cable: 51000250
Inductive sensor - Forward speed
TRIBORD 3D electric actuator – 50 mm

CONNECTION PLAN:
XT100/130/160 VISION DPB
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
* ACTUATOR COLOUR CORRESPONDENCE
TRIBORD

INTERMEDIATE WIRING:
XT100/130/160 VISION DPB
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
①
MALE 7-PIN PLUG
NOT USED
③
MALE 5-PIN PLUG
NOT USED
②
FEMALE 24-PIN PLUG
(SPREADER)
Left flow rate actuator signal
Right flow rate actuator signal
Left - flow rate actuator
Left + flow rate actuator
Right - flow rate actuator
Right + flow rate actuator

WIRING PRESENTATION:
XT100/130/160 VISION DPB + WEIGHING OPTION
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION

WIRING PRESENTATION:
XT100/130/160 VISION DPB + WEIGHING OPTION
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
Vision PSI XT Polyvrac console
Console power supply cable
40 A battery direct power supply cable
Cable: 51000270
40 A fuse 52570120
DPB XT Polyvrac connection unit
300 mm gate electric actuators
Model: LA 36 -1203000P00AA
Actuator: 59000643
Power cable: 51000240
Signal cable: 51000250
Inductive sensor - Forward speed
TRIBORD 3D electric actuator – 50 mm
Weighing extensiometer sensors (2 sensors)

CONNECTION PLAN:
XT100/130/160 VISION DPB + WEIGHING
OPTION
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
* ACTUATOR COLOUR CORRESPONDENCE
TRIBORD

INTERMEDIATE WIRING:
XT100/130/160 VISION DPB + WEIGHING
OPTION
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
①
MALE 7-PIN PLUG
NOT USED
③
MALE 5-PIN PLUG
NOT USED
②
FEMALE 24-PIN PLUG
(SPREADER)
Left flow rate actuator signal
Right flow rate actuator signal
Left - flow rate actuator
Left + flow rate actuator
Right - flow rate actuator
Right + flow rate actuator

WIRING PRESENTATION:
XT 100/130 ECONOV
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION

WIRING PRESENTATION:
XT 100/130 ECONOV
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
Vision PSI XT Polyvrac console
Console power supply cable
40 A battery direct power supply cable
Cable: 51000270
40 A fuse 52570120
DPB XT Polyvrac connection unit
250 mm gate electric actuators
Model: LA 36 -1202500P00AA
Actuator: 59000703
Power cable: 51000240
Signal cable: 51000250
Inductive sensor - Forward speed
TRIBORD 3D electric actuator – 50 mm
ECONOV spout actuators – 130 mm
Section management (Smartboom)

CONNECTION PLAN:
XT 100/130 ECONOV
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
* ACTUATOR COLOUR CORRESPONDENCE
TRIBORD / ECONOV

INTERMEDIATE WIRING:
XT 100/130 ECONOV
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
①
MALE 7-PIN PLUG
(SECTION MANAGEMENT)
③
MALE 5-PIN PLUG
(MANUAL CONTROL)
②
FEMALE 24-PIN PLUG
(Spreader)
Left flow rate actuator signal
Right flow rate actuator signal
Left - flow rate actuator
Left + flow rate actuator
Right - flow rate actuator
Right + flow rate actuator

MANUAL CONTROL:
XT ECONOV
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
Operation:
The command sends the CAN VISION console a 0V signal to open each hatch manually.
When auto mode is activated, the command sends 0V to terminal No. 3. In this case, the hatch command order
will come from the section disconnection.

CONNECTION TO THE MATRIX PRO
GUIDE BARS
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
1- The forward movement speed and GPS position
information is sent from the Matrix Pro 840 GS guide bar
by the RS 232 plug present on the Smart boom . The
port at the top of the Vision console is used. The Vision
console must be configured.
2- The six spreading layer sections (Econov) are managed
automatically by the 7-pin plug on the Smartboom
connected to the intermediate wiring .
The guide bar must be configured, refer to the user
manual.

CONNECTION TO THE MATRIX PRO
GUIDE BARS
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
3- Configuring the VISION II console
Use the key to access the SETUP menu.
Then select 4 – General PF setup with the
number pad.
Select 6 – Ports setup with the number pad.
On the upper Port, select with the "GPS
Only" keys and validate with .
Press ESC.
In the General PF setup menu, select 5- GPS
Baudrate with the number pad
Select 19200 with and validate with

CONNECTION TO THE MATRIX PRO
GUIDE BARS
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
4- Validate the forward movement speed
In the REG menu select
Select with the
keys and validate with .
There is no speed calibration (over 100m) to be made. The
speed is automatically correct.
5- The GPS reception may be checked:
In the INFO menu, press then
Smart boom connection plan:

WIRING PRESENTATION:
XT 100/130 ECONOV+ WEIGHING OPTION
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION

WIRING PRESENTATION:
XT 100/130 ECONOV+ WEIGHING OPTION
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
Vision PSI XT Polyvrac console
Console power supply cable
40 A battery direct power supply cable
Cable: 51000270
40 A fuse 52570120
DPB XT Polyvrac connection unit
250 mm gate electric actuators
Model: LA 36 -1202500P00AA
Actuator: 59000703
Power cable: 51000240
Signal cable: 51000250
Inductive sensor - Forward speed
TRIBORD 3D electric actuator – 50 mm
Weighing extensiometer sensors (2
sensors)
ECONOV spout actuators – 130 mm
Section management (Smartboom)

CONNECTION PLAN:
XT 100/130 ECONOV+ WEIGHING OPTION
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
* ACTUATOR COLOUR CORRESPONDENCE
TRIBORD / ECONOV

INTERMEDIATE WIRING:
XT 100/130 ECONOV+ WEIGHING OPTION
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
①
MALE 7-PIN PLUG
(SECTION MANAGEMENT)
③
MALE 5-PIN PLUG
(MANUAL CONTROL)
②
FEMALE 24-PIN PLUG
(SPREADER)
Left flow rate actuator signal
Right flow rate actuator signal
Left - flow rate actuator
Left + flow rate actuator
Right - flow rate actuator
Right + flow rate actuator

MANUAL CONTROL:
XT ECONOV
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
Operation:
The command sends the CAN VISION console a 0V signal to open each hatch manually.
When auto mode is activated, the command sends 0V to terminal No. 3. In this case, the hatch command order
will come from the section disconnection.

CONNECTION TO THE MATRIX PRO
GUIDE BARS
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
1- The forward movement speed and GPS position
information is sent from the Matrix Pro 840 GS guide bar
by the RS 232 plug present on the Smart boom . The
port at the top of the Vision console is used. The Vision
console must be configured.
2- The six spreading layer sections (Econov) are managed
automatically by the 7-pin plug on the Smartboom
connected to the intermediate wiring .
The guide bar must be configured, refer to the user
manual.

CONNECTION TO THE MATRIX PRO
GUIDE BARS
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
3- Configuring the VISION II console
Use the key to access the SETUP menu.
Then select 4 – General PF setup with the
number pad.
Select 6 – Ports setup with the number pad.
On the upper Port, select with the "GPS
Only" keys and validate with .
Press ESC.
In the General PF setup menu, select 5- GPS
Baudrate with the number pad
Select 19200 with and validate with

CONNECTION TO THE MATRIX PRO
GUIDE BARS
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
4- Validate the forward movement speed
In the REG menu select
Select with the
keys and validate with .
There is no speed calibration (over 100m) to be made. The
speed is automatically correct.
5- The GPS reception may be checked:
In the INFO menu, press then
Smart boom connection plan:

WIRING PRESENTATION:
XT 160 H / 210 H / 240 H DS2
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION

WIRING PRESENTATION:
XT 160 H / 210 H / 240 H DS2
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
Vision PSI XT Polyvrac console
Console power supply cable
51000290 XT intermediate wiring
40 A battery direct power supply cable
Cable: 51000270
40 A fuse 52570120
DPB XT Polyvrac connection unit
300 mm gate electric actuators
Model: LA 36 -1203000P00AA
Actuator: 59000643
Power cable: 51000240
Signal cable: 51000250
Inductive sensor - Forward speed
TRIBORD 3D electric actuator – 50 mm
29020120 CAN connection unit
Weighing extensiometer sensors (2 sensors on single axle /
3 sensors on double axle)
Disk rotation rate inductive sensor

CONNECTION PLAN:
XT 160H / 210H / 240H DS2
NAME: TRAINING DEPARTMENT
REFERENCE: TECHNICIAN’S OPERATING MANUAL POLYVRAC XT VISION
* ACTUATOR COLOUR CORRESPONDENCE
TRIBORD