Prescolite INC800CP User Manual

InstructionSheet
InstructionSheet
Part No. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .124410100
IMPORTANT SAFETY INFORMATION. READ AND FOLLOW ALL SAFETY INSTRUCTIONS. Follow label information and instructions concerning Wet or Damp Locations, installation near combustible materials, insulation, building materials, and proper lamping. Do not install in areas subject to combustible vapors or gases. Before wiring to power supply and during servicing or relamping, turn off power at fuse or circuit breaker. All servicing or relamping must be performed by
qualified service personnel. Product must be grounded to avoid potential electric shock or other potential hazard. Product must be mounted in locations and at heights and in a manner consistent with its intended use, and in compliance with the National Electrical Code and local codes. The use of accessory equipment not recommended by
the manufacturer or installed contrary to instructions may cause an unsafe condition. Do not block light emanating from product in whole or part, as this may cause an unsafe condition. Do not allow items such as drapes, curtains, screens or the like to come into contact with the product or to block light from the product, as this may cause an unsafe condition.
INSTALLATION INSTRUCTIONS
INC600CP / INC800CP
1.
Bend brackets as shown in detail “A”. Install the fixture in the ceiling using mounting channel or bar (by others) placed in the adjustable mounting brackets. Mount the fixture in the ceiling so that the weight of the fixture is supported by the mounting channel or bar and/or hanger wires secured to the building structure.
2. Adjust the fixture so the bottom of the
plaster frame is flush with the ceiling line and in alignment with adjacent fixtures. Secure mounting brackets by tightening wing nuts on either side of the fixture.
3. Remove J-Box cover plate. Remove
appropriate knockout and assemble appropriate connector for the supply wire used. Connect ground wires to green ground leads. Connect white (common) to white (leads). Connect power supply (line) to black lead(s). Reinstall J-Box cover.
WARNING: DO NOT pinch wires between J-Box/ballast cover and J-Box. Consult a Qualified Electrician for all other options that require other wiring configurations.
Install the reflector after all ceiling
4.
installtion and finishing work is com plete. Insert ends of heatsink spring reflector neck in alignment with slots then push heatsink down until desired position is obtained. Push reflector into plaster frame until reflector flange is flush to ceiling.
5. Install the proper lamp (by others).
-
Bend brackets in
ine with marks
l
n flange.
o
DETAIL A
Wing Nut
Box
J
Heat Sink Heat Sink Spring
INC600CP: A-21 use this position INC800CP:
INC600CP: A-19 use this position INC800CP: A-21 use this position
J-Box Covers
Mounting Bracket
Plaster Frame
A-23 use this position
www.prescolite.com • Prescolite TollFree Technical Support 1.888.PRS.4TEC Hours: 8am - 5pm ET
TTEMPT T
CAUTION:
701 Millennium Boulevard • Greenville, SC 29607
With representatives of Copyright 2007, 02/07 revision, All Rights Reserved - Printed in U.S.A.
DO NOT OPERATION OF THE FIXTURE DEPEND ON THE INTEGRITY OF THE WIRING.
A
O MODIFY
fices in principal cities throughout North
OR REWIRE F
ACT
-INST
Y
OR
America.
Reflector
Reflector Flange
ALLED WIRING ON THE FIXTURE. SAFETY AND PROPER
Loading...