
InstructionSheet
InstructionSheet
TANT SAFETY INFORMATION. READ AND FOLLOW ALL SAFETY INSTRUCTIONS. Follow label information
IMPOR
and instructions concerning W
and proper lamping. Do not install in areas subject to combustible vapors or gases. Before wiring to power supply and
during servicing or relamping, turn of
qualified service personnel. Product must be grounded to avoid potential electric shock or other potential hazard.
Product must be mounted in locations and at heights and in a manner consistent with its intended use, and in
compliance with the National Electrical Code and local codes. The use of accessory equipment not recommended by
the manufacturer or installed contrary to instructions may cause an unsafe condition. Do not block light emanating from
product in whole or part, as this may cause an unsafe condition. Do not allow items such as drapes, curtains, screens or
the like to come into contact with the product or to block light from the product, as this may cause an unsafe condition.
INSTALLATION INSTRUCTIONS
CFT857EB, CFT870EB & CFT970EB
Part No. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .155690100
et or Damp Locations, installation near combustible materials, insulation, building materials,
f power at fuse or circuit breaker.
All servicing or relamping must be performed by
www.prescolite.com • Prescolite TollFree Technical Support 1.888.PRS.4TEC • Hours: 8am - 5pm ET
HOUSINGS & REFLECTORS
CAUTION:
MAKE CERTAIN THAT THE POWER IS OFF BEFORE
INST
1.
Bend brackets as shown in Detail”A”. Install the
fixture in the ceiling using mounting channel or
bar
ing brackets. Mount the fixture in the ceiling so
that the weight of the fixture is supported by the
mounting channel or bar and/or hanger wires
secured to the building structure.
orientation for wall wash applications.
Adjust the fixture so the bottom of the plaster
2.
flange aperture is flush with the finished ceiling
line and in aligned with adjacent fixtures. Secure
mounting brackets by tightening wing nut on
either side of the fixture.
3. Determine where the supply wiring conduit will
enter the J-Box and attach it in conformance
with the National Electric Code.
4. Remove J-Box cover plate. Remove appropriate
knockout and assemble appropriate connector
for the supply wire used. Connect ground wires
to green ground leads. Connect white (common)
to white (leads). Connect power supply (line) to
black lead(s). Reinstall J-Box cover.
WARNING: DO NOT pinch wires between JBox/ballast cover and J-Box. Consult a
Qualified Electrician for all other options that
require other wiring configurations.
5. Reflector Installation:
all ceiling installation and finishing work is
complete. With the heatsink and conduit
extending through the plaster flange aperture
insert the ends of the heatsink spring into
reflector neck in alignment with slots, then push
the heatsink down to the desired position. Place
the spring in the upper set of slots for a 70 watt
lamp and the lower set of slots for a 57 watt
lamp.
Note:
housings have only one set of slots.
6. Push reflector up into the plaster flange until the
flange on the reflector is flush against finished
ceiling. Allow the springs to retain the reflector
against the ceiling.
Note: Orientation of reflector for wall wash
applications.
7. Install the proper lamps (by others).
TO REDUCE THE RISK OF ELECTRICAL SHOCK
ALLING OR SERVICING THIS FIXTURE.
, (by others), placed in the adjustable mount-
Note: Housing
Install the reflector after
The reflectors for the 9" CFT970EB
W
Reflector
Reflector
Spring (3)
ing Nut (2)
J-Box/Ballast Cover
Heatsink
Slots
DETAIL “A”
Mounting
Brackets are
Supplied Flat,
Bend Brackets
to align with
marks on
Flange
This end towards
wall for wall
wash application
Plaster
Flange
Kicker Goes
Wall When Using Wall
Wash Reflector.
J-Box
Adjustable
Mounting
Bracket (2)
J-Box Cover
way From
A
TTEMPT T
CAUTION:
101 Corporate Drive • Spartanburg, SC 29303
With representatives of
Copyright 2005, 08/05 revision, All Rights Reserved - Printed in U.S.A.
DO NOT
OPERATION OF THE FIXTURE DEPEND ON THE INTEGRITY OF THE WIRING.
A
O MODIFY
fices in principal cities throughout North
OR REWIRE F
ACT
Wall Wash Reflector
-INSTALLED WIRING ON THE FIXTURE. SAFETY AND PROPER
Y
OR
America.

InstructionSheet
Install the Housing Per Instructions on Page 1
1. Reflector Istallation, 2-Piece Reflector:
the reflector after all ceiling installation and
finishing work is complete. Separate the upper and
lower reflectors by disengaging the two reflect or
clamps. Apply thumb pressure up and outwards to
release the clamps. With the heatsink and conduit
extending through the plaster flange aperture insert
the ends of the heatsink spring into upper reflector
neck in alignment with slots, push the heatsink
down to the desired position. Place the heatsink
spring in the upper set of slots for a 70 watt lamp
and the lower set of slots for a 57 watt lamp.
Note: The reflectors for the 9" CFT970EB housing
have only one set of slots.
2. Install the lamp(s).
3. Re-assemble the upper and lower reflectors with
the reflector clamps.
4. Push the assembled reflector up into the plaster
flange until the flange on the reflector is flush
against the finished ceiling. Allow the three reflector
springs to retain the reflector against the ceiling.
Install
Part No. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .155690100
www.prescolite.com • Prescolite TollFree Technical Support 1.888.PRS.4TEC • Hours: 8am - 5pm ET
Heatsink
Upper
Reflector
Reflector
Clamp (2)
Lower
Reflector
Slots
Lens
Reflector
Spring (3)
101 Corporate Drive • Spartanburg, SC 29303
With representatives of
Copyright 2005, 08/05 revision, All Rights Reserved - Printed in U.S.A.
fices in principal cities throughout North
America.