E, S and A series VTPs in wet pit and suction barrel designs
ranging in sizes from 50 mm (6 in.) to 1300 mm (52 in.) with
a single or multiple stages. (This manual does not cover
VTPs fitted with thrust bearing assemblies and VTPs built
for cryogenic service).
PCN=71569224 02-15(F), Based on VTP-QS-0896 Original
Instructions
Installation
Operation
Maintenance
These instructions must be read prior to installing,
operating, using and maintaining this equipment
Page 2
VERTICAL TURBINE PUMPS (VTPS) CENTRIFUGAL PUMPS ENGLISH 71569224 – 02-15
CONTENTS
PAGE
1
INTRODUCTION AND SAFETY ....................... 4
1.1 General ............................................................ 4
1.2 CE Marking and Approvals .............................. 4
piping due t
which could
occur if ther
the pump is
Bursting of li
must be avo
and ancillar
Where ther
barrier fluid
monitored.
If leakage o
hazard, inst
1.6.4.7
RISK OF E
The respon
instruction
To avoid po
maintenanc
materials us
P
The p
void entrap
M
COR
VOID POT
venting sp
vent a poten
coupling gua
potential ha
rating a spar
nded.
ectrostatic ch
a dry cloth;
plications th
h 94/9/EC.
tained.
equirement
base plate
ic componen
plate they
venting lea
mp must onl
as been app
istance.
ent of liquid
closing of su
ause danger
is heat input
tationary or r
quid containi
ided by drain
systems.
is the poten
r external fl
liquid to atm
ll a liquid de
intenance t
ECT MAINT
ENTIAL HA
PLOSION
ibility for co
is with the
ential explos
, the tools, c
d must not
rks
ial hazard fr
d must be n
ard from ran
, the base pl
rge: do not r
nsure cloth is
coupling mu
orrect coupli
for metallic
ts are fitted
ust be indivi
kage
be used to
oved to hav
in the pump
tion and disc
us excessiv
o the liquid.
nning.
g parts due
ing or protec
ial hazard of
sh, the fluid
sphere can
ection devic
avoid the
NANCE IS
ARDS WHIC
pliance wi
lant operato
on hazards
eaning and
ive rise to s
m mechanic
n-sparking.
om induced
te must be
b non-metall
damp.
t be selecte
g alignment
umps on
n a non-
ually earthe
handle liquid
the correct
nd associate
harge valves,
pressures to
his can occ
to freezing
ing the pum
a loss of a s
ust be
result in a
.
azard
EQUIRED
H GIVE A
h maintenan
.
uring
ainting
arking or
l
c
.
r if
al
O
e
adver
is a ri
must
It is re
sched
1.7.1
For d
Confo
these
1.7.2
Oil lub
For p
condit
these
are in
been
shoul
Instru
ttenti
to the
guida
and w
This i
ely affect th
k from such
e conducted
ommended
le is adopte
S1.7
afety La
Nameplat
tails of nam
mity, or sep
User Instruct
Safety lab
ricated units
S1.8
pecific
rformance p
ons. When t
o be incorpo
luded here.
upplied sep
be obtained
tions if requi
N1.9
oise Lev
on must be
noise, and lo
ce to person
en noise ex
typically 80
ambient co
ools or mate
in a safe are
that a maint
. (See secti
els Sum
plate, see th
rate docum
ons.
ls
only:
achine Pe
rameters se
he contract r
rated into Us
Where perfo
rately to the
and retaine
ed.
l
iven to the e
al legislatio
nel on noise
osure reduc
o 85 dBA.
ditions. Wh
ials, mainte
a.
nance plan
on 6, Mainte
ary
Declaration
ntation inclu
rformanc
section 1.5
quirement s
er Instruction
mance data
purchaser th
with these
posure of p
will define
limitation is r
ion is mand
re there
ance
nd
ance.)
of
ed with
Duty
ecifies
s these
has
se
ser
rsonnel
hen
quired,
tory.
Page 8 of 7
flows
rve.com
Page 9
6
p
n
e
o
d
p
f
a
n
u
c
e
i
v
m
l
e
a
c
n
o
a
e
d
o
e
o
t
e
VERTIC
A
t
f
o
o
r
t
a
l
t
a
e
p
w
.
c
p
w
s
e
a
s
a
s
y
E
x
y
n
e
e
n
u
k
f
l
e
o
d
a
d
w
w
r
e
e
d
(
u
t
u
e
o
s
r
i
e
e
r
T
e
n
a
h
s
n
d
s
o
h
e
n
I
r
S
E12
223344455
S
e
i
e
m
e
s
d
e
M
r
s
M
0180
s
0180
s
0180
s
0
0
s
0180
s
0180
s
0180
s
0180
s
0
s
0180
s
0180
s
0
s
0
s
m
o
a
a
w
S
u
s
A
P
s
e
a
i
a
p
s
4
e
H
A
n
A
-
s
0
0
0
2
2
2
4
4
4
8
8
8
0
0
0
2
2
2
5
5
5
0
0
0
8
8
.
8
8
.
.
7
.
8
.
7
e
5
e
d
n
-
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
The usual a
the noise or
emitted sou
limiting nois
however if n
attention is
indication of
take the ap
Pump noise
operational
acoustic ch
values give
cannot be g
Similarly the
motor” noise
and high effi
the pump. N
show an incr
If a pump un
your own dri
table should
obtained fro
noise specia
the values.
It is recomm
the prescrib
should be m
The values
(3.3 ft) from
over a refle
For estimati
add 17 dBA
Th
extracted fr
data/catalog
motor noise
are not guar
depending u
The combin
could excee
adding mot
total noise l
values listed
combined n
Actual on-si
recommend
accordingly.
proach is to
to enclose th
d. You may
level when
noise requi
rawn to the
equipment n
ropriate acti
level is depe
actors, flow
racteristics o
are subject
aranteed.
motor noise
is that typical
iency motors
ote that a mo
ased noise
t only has be
er then the “
be combined
the supplier
ist if assistan
ended that w
d limit, then
ade.
re in sound
the machine,
ting plane”.
g sound po
to the sound
e noise level
m typical mo
ue to provid
values at no
nteed. The
pon the test
d noise leve
the values
rs with simil
vel. Therefo
above is req
ise levels of
e noise mea
d and safet
control the e
e machine to
have alread
he equipme
ements wer
ollowing tabl
ise level so
n in your pla
dent on a n
ate, pipewor
the building
o a 3 dBA to
ssumed in th
y expected fr
when on loa
or driven by
t some spee
n purchased
ump only” no
ith the level
Consult Flo
e is required
here exposu
site noise m
ressure lev
for “free fiel
er level LWA
pressure val
shown in ta
or manufact
the average
load for refer
values could
nd surround
of the pump
hown. It is t
r noise level
re, the dB co
uired to obta
motor and th
Immediately
checked ag
documents
been no da
or damage
Flowserve a
of receipt of
accepted.
Check any
accessories
separately
walls of the
Each produ
this number
always quot
as when ord
Han
2.2
Boxes, crat
using fork lif
size and co
SPORT A
ignment
after receipt
inst the deli
or its comple
age in trans
ust be repo
d received i
the equipme
rates, boxes
or spare par
ith the equip
ox or equip
t has a uniq
corresponds
this numbe
ering spare
ling
s, pallets or
vehicles or
struction.
D STOR
eceipt an
of the equip
ery and ship
eness and t
ortation. A
ted immedia
writing with
t. Later clai
and wrappin
s which may
ent or attac
ent.
e serial num
with that adv
in correspo
arts or furth
artons may
lings depen
GE
unpackin
ent it must
ing
at there has
y shortage a
ely to
n one month
s cannot be
s for any
be packed
hed to side
er. Check t
ised and
dence as w
r accessorie
e unloaded
ent on their
g
e
at
ll
.
d
of the
disch
secur
the c
throu
2.3.2
Cast d
recom
that h
are at
of the
Do
discharge he
rge heads u
d by slings t
mpletely as
h this flang
Lifting of t
pump atta
ischarge he
mended to b
ad size (ref
ached as sh
sling from th
" L "
ot use the li
ad while liftin
less the dis
prevent ov
embled pu
e.
ype-W cast
hed
ds with pum
lifted by usi
r to the table
wn maintain
shaft end a
30
ting pins at t
g unassembl
harge head i
rturning. Ne
p with eye
ischarge h
attached ar
ng pins suita
shown). Th
ng minimum
shown in th
mm (12 in.)
e base
ed cast
er lift
olts
ad with
le with
slings
length
detail.
IN.
Lifti
2.3
Equip
lifted by me
must carry
regulations.
Before liftin
manufactur
2.3.1
Lifti
(he
Lift the unas
not attached
the flange m
shaft into pl
g
ent in exce
hanical mea
ut lifting, in a
the driver al
r’s instructio
ng of W-typ
d only-pum
sembled cas
) by installin
ounting hole
ce.
CAST HEAD
UNASSEMBLE
E BOLTS
E
s of 25Kg (5
s. Fully trai
cordance wi
ne, refer to
s.
cast disch
not attach
discharge h
eyebolts as
. Lower the
lbs) should
ed personn
th local
he
rge head
d)
ads (pump
shown using
head over
PIN
CAST
e
WITH P
l
TTAC
PIN
EAD
UMP
ED
“L”
2.3.3
If the
head
in the
metho
with o
Cast hea
100
(4)
25
in
ia.
(1)
1220
L
(48)
is approximate
Lifting of
or without
ump is suppl
se 2 point or
etails provid
is applicabl
without the
s with dischar
150
(6)
32
1.25)
1370
(54)
ength
200
(8)
32
(1.25)
1370
(54)
abricated di
the pump
ied with a fab
3 point meth
d in 2.3.3.1
to the lifting
ump.
e size mm (in.
250
(10)
32
(1.25)
1520
(60)
charge hea
ricated disch
d of lifting a
2.3.3.2. Th
of discharge
00
2)
8
(
.5)
1
20
(
0)
ds with
rge
shown
is
heads
Page 10 of
6
flows
rve.com
Page 11
7
w
e
0
2
0
h
s
VERTIC
A
n
,
a
d
<
t
d
F
T
E
t
(
m
c
L
R
T
F
m
W
N
T
g
0
I
p
n
s
o
x
p
u
n
e
ohe
s
As
M
b
s
i
t
p
i
e
y
h
m
S
b
e
m
n
d
f
b
e
w
4
e
n
p
b
h
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
2.3.3.1
T
h
wi
"L"
Fabric
Pin
Dia.
Weight <23
2.3.3.2
T
di
wi
o point lifti
ad types TF
hout pump
ted heads with
1
0-200
(4-8)
3
(1.25)
0 (5000)
ree point lif
charge hea
hout pump
of fabrica
UF & HFH
attached)
FABRICATED
2 POINT LIFTI
ischarge size m
250-600
(10-24)
38 (1.50)
4500 (10000)
ing of fabri
of type HF
attached)
ed dischar
with or
ITH
G
50
m (2in.) HOLE
(in.)
<6800 (1500
ated
(with or
700-900
(28-36)
44 (1.75)
e
2.3.4
Clam
for lifti
sump/
Lifting of
the bowl as
g and lower
uction barre
owl assem
embly and c
ng the asse
l.
ly only
nter the lifti
bly into the
g hook
a) L
e
a
b) B
a
n
c) C
d) In
e)
wer the bowl
tensions res
propriate su
ild the very f
d lower the
xt column se
ntinue to bui
ad assembl
tall the disc
semble the
assembly u
on the foun
ports).
rst section o
ntire assem
ction.
ld until it is r
.
arge head.
otor.
til the clamp
ation (use
the column
ly to assem
ady for disc
iping,
le the
arge
Example:
Lifting of bo
l assembly
)
Page 11 of
6
H
L STYLE FAB
WI
H 3 POINT LI
ICATED
TING
flows
rve.com
Page 12
7
Lifti
e
p
e
b
s
s
f
s
r
t
m
o
A
n
r
h
t
r
o
l
s
m
t
t
a
E
a
g
r
.
u
u
o
s
e
e
o
T
e
I
M
4
e
2.3.5
Suction barr
supplied se
sump first. I
suction barr
the suction
barrel for in
prevent the
movement.
Example: Li
VERTIC
ng of suctio
l (also refer
arately and
nstall eyebol
l and attach
arrel to a ve
tallation. Pr
uction barre
ting of suctio
L TURBIN
barrel
ed as ‘Can’)
as to be inst
s on the flan
slings and st
tical position
vide hand s
from swayin
barrel
PUMPS (V
is always
lled into the
e of the
aps to bring
Move the
pport to
g during
PS) CENTR
IFUGAL PU
PS ENGLISH 7156922
– 02-15
SUCTION BARREL (CAN)
Lifti
2.3.6
If the pump i
adequately
places befo
and moved
shown. Sa
pulled out fr
ng of fully a
s fully asse
trapped and
e it can be lif
o the installa
e rules are
m the sump
sembled p
bled, it has t
supported at
ed from the
ion site. Se
pplicable wh
and moved t
location.
Page 12 of
6
mps
be
least two
hipping crat
details
n the pump
another
is
flows
rve.com
Page 13
VERTICAL TURBINE PUMPS (VTPS) CENTRIFUGAL PUMPS ENGLISH 71569224 – 02-15
Pump must be supported
at least two places
when lifted.
Do not use chains
to wrap around.
Two (2)
cranes are
required
Examples shown here are for illustration only. See section 2.3 1~2.3.6 for specific lifting
instructions based on design variations. The pumps vary in weight, length and physical appearances from the
types shown here.
Therefore, before lifting is attempted, exercise caution to prevent any injuries or loss of life.
Pump must be supported at
least two places when lifted.
Do not use chains to wrap around.
Page 13 of 76 flowserve.com
Page 14
7
a
a
c
e
n
d
p
t
a
a
a
s
d
"
e
e
w
s
o
t
c
s
m
g
h
r
y
A
f
l
d
m
t
t
a
t
a
VERTIC
A
p
i
c
m
e
r
v
t
a
n
R
a
l
s
a
s
e
s
u
t
o
o
w
l
a
s
o
c
r
o
h
o
E
e
i
t
T
n
a
o
t
h
s
s
s
t
r
p
m
b
n
d
e
t
a
r
r
t
o
d
o
e
d
e
T
p
s
n
n
t
e
t
a
o
h
e
m
e
I
n
t
D
d
e
n
m
a
a
s
h
e
c
a
s
a
n
d
M
m
v
e
e
s
e
t
a
r
t
r
c
s
p
y
S
s
q
e
d
i
d
s
m
u
p
s
n
n
a
4
e
e
,
p
h
v
p
y
o
e
c
e
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
Stor
2.4
location aw
connection
foreign mat
at frequent i
bearings an
2.4.1
Ins
a) Inspect
on the v
necessa
b) Inspect
connecti
covers
deposits
c) If neces
as note
shipped
securely
d) Exercis
Contain
coated
coating,
element
2.4.2
Sh
Follow the s
storage spa
excess moi
corrosive fu
Driver stora
manufacture
2.4.3
Lon
If a situation
than 6 mont
storage inst
ge
Store the
y from vibrat
overs in pla
rial out of pu
tervals to pr
the seal fac
ection befo
he preservati
rious parts.
ry.
ll covers ove
ons. If found
nd inspect in
of foreign m
ary, clean a
above to res
condition.
.
caution with
rs are not le
ith a residua
which will wa
.
rt term stor
eps given in
e so that the
ture, extrem
es, or other
e instruction
r’s User Instr
g term or ex
arises for a l
s) please c
uctions and
ump in a cl
on. Leave p
e to keep dir
p casing.
vent brinelli
es, if fitted, fr
e storage
e coating/p
Touch up the
r pump openi
damaged, re
eriors of the
terials or wa
d preserve t
tore the part
eplace cover
pumps expo
k proof. Par
amount of p
h away if ex
ge (up to 6
ection 2.4.1.
unit will not
weather co
harmful con
: Check driv
ctions
ended stor
ng-term sto
ntact Flowse
arranty rela
an, dry
ping
and other
urn the pum
g of the
om sticking.
inted surface
areas, If
ngs and pipi
ove the
pening for a
er.
e interior par
to the "as
and fasten
ed to weath
s may be
otective
osed to
onths)
Select a
e subjected
ditions,
itions.
r
ge
age, ( more
ve for speci
ed informati
g
y
s
r.
o
l
n.
perso
specifi
regula
3
Shoul
Flows
serial
is sta
disch
separ
reque
both t
numb
VTPs,
(b) su
built w
applic
wells,
applic
and le
shaft
al protective
cations must
tions at all ti
ESCRIPTI
questions a
rve pump di
umber to b
ped on a m
rge head as
te nameplat
ting informa
e driver seri
r for Flowse
C3.1
onfigura
are enginee
tion barrel (
ith customer
tions such a
storm water
tions. The
gth, whethe
esigns and t
equipment i
be in accord
es.
ON
rise concerni
ision will re
of assistanc
tal nameplat
embly. The
attached to
ion on the dr
l number an
ve represent
ion
ed pumps a
an) type pu
specific feat
s water pum
ervice, indu
umps vary i
r it is an ope
pe of disch
used. The s
ance with th
ng the pump
uire the com
. The serial
e affixed to t
driver will ha
it. If you are
ver, please
the pump s
ative.
:(a) Wet pit t
ps. Most pu
res and for
ing stations,
trial and cry
size, impell
shaft or en
rge head us
afety
current
lete
number
e
e a
rovide
erial
pe and
mps are
deep
genic
r types
losed
d.
Rec
2.5
t the end o
parts, the re
recycled or
acceptable
product con
environmen
of in accord
includes the
or other utili
toxic fluids
Page 14 of
cling and
the service
evant materi
isposed of u
ains substan
, these shoul
nce with cur
liquids and
ies.
Ma
ke sure that
re disposed
6
ethod and l
End of Pr
ife of the pro
ls and parts
ing an envir
cal regulatio
es which ar
d be remove
ent regulatio
r gases in th
azardous su
f safely and
duct Life
uct or its
should be
nmentally
s. If the
harmful to t
and dispos
ns. This also
"seal syste
bstances or
that the corr
e
d
ct
"
flows
rve.com
Page 15
7
m
3.1.1
A
E
R
A
B
A
A
T
I
T
p
m
N
m
n
s
t
o
s
m
c
e
M
a
A
A
m
t
t
c
m
5
o
t
c
o
S
T
o
n
t
G
S
i
l
5
s
w
g
o
4
e
A
n
K
&
o
1
e
s
n
w
i
r
a
Su
VERTIC
p and deep
L TURBIN
well VTP
PUMPS (V
PS) CENTR
3.1.2
IFUGAL PU
Suction b
PS ENGLI
rrel (Can) V
H 7156922
P
– 02-15
DRIVER
DISCHA
HEAD
SSEM
COLUMN
SSEMBLY
BOWL
SSEMBLY
GE
DRIVER
LY
DISCHARGE
HEAD
SSEMBLY
COLUMN
SSEMBLY
BOWL
SSEMBLY
SUCTION
BARREL
(CAN)
3.1.3
The V
are ty
asse
EM, E
The i
desig
detail
(6 in)
terms
inche
Most com
P configura
ical for varie
bly types su
, EP, EQ, S
peller model
ated separat
) and the pu
o 1300 mm (
of nominal b
.
on VTP m
ions shown i
y of VTP mo
h as EB, E
K, SL, SN,
s in each of t
ely (see sect
p sizes cou
2 in.). The
wl diameter
dels
sec 3.1.1 a
dels with the
, EH, EJ, E
P, SR, ST,
hese pumps
on 3.2 for m
d vary from
ize express
and is alway
d 3.1.2
bowl
, EL,
AV.
are
re
50mm
d is in
in
ts will not req
ases, the bo
the dischar
have single
uire a colum
l assembly
e head. Ve
r multiple st
s
tical
ges.
asse
conne
turbin
Some uni
bly. In such
ted directly t
pumps can
Page 15 of
6
flows
rve.com
Page 16
7
e
a
t
w
w
p
A
E
,
d
e
n
c
a
c
a
8
m
g
c
-
d
r
d
e
s
a
VERTIC
A
m
s
e
n
n
S
o
d
c
2
a
e
b
e
t
w
v
v
E
e
e
r
E
o
a
o
…
b
c
g
a
s
g
T
s
s
I
1
a
F(Ty
F
M
h
s
a
y
s
t
S
h
e
p
t
e
4
e
u
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
Nom
3.2
The pump si
the namepl
attached to
nclature
ze/ serial nu
te typically a
he discharg
3.2.1
Bo
l assembly
Nominal Bo
l Diameter-i
Impeller Ty
=Axial, E=
e (A or E or
nclosed, S=
Bowl Model
B,J,K,H,L,M
Types
N,P,Q,R,T,V
Impeller Mo
L, M, H, Y…
el Designati
..
No. of Stag
The typical
to the VTP
actual pump
nameplate.
nameplate
s
omenclature
onfiguration
size and ser
The driver wi
ttached it.
Dis
3.2.2
Consists of
Examples:
harge head
lphanumeri
W16, 10HF
10 HF20
No
inal driver b
Dischar
e head type
Nominal dis
harge diam
W = Cast head
HF = Fabricate
TF & LF = Fab
UF = Fabricate
HFL = Fabricat
HFH = Fabricat
for horizontal a
head for abov
icated heads wi
head for belo
d head for abo
ed head for abo
Please see
and identific
ection 3.2.2.
tion.
ber will be
below: Th
head assem
omenclatu
12
ches
)
Semi-open
….
n
above is the
escription. I
ial number fr
ll have a sep
nomenclatu
code as foll
0, 6TF16,…
se diameter
(see details
ter in inches
ove the ground
the ground dis
h base flange
ground dischar
e ground disch
e the ground di
1 for dischar
ngraved on
nameplate i
bly.
e
J H-3
general guid
dentify the
m the pump
rate
re
ws.
.
in inches
elow)
discharge
harge
e
rge - Low H.P
charge -High H
e head type
e
.P.
3.2.2.
Typic
a) W
b) H
c) T
Types of
l discharge
type cast di
type fabric
pically with
type fabrica
discharge
ead types. D
charge head
ted discharg
quare base
ed discharg
eads
etails (a) thr
head
plate)
head
(g).
Page 16 of
6
flows
rve.com
Page 17
7
f
l
A
a
e
VERTIC
A
f
s
u
u
s
d
E
e
m
d
a
T
I
F
1
o
u
e
e
e
A
e
s
a
o
o
c
d
o
o
r
c
a
s
m
s
M
c
h
a
g
d
c
e
s
m
m
v
e
i
e
t
u
d
s
S
r
s
a
y
a
c
t
d
h
b
v
h
e
c
e
e
m
e
4
e
t
h
h
e
u
o
t
t
a
s
o
n
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
d) LF type
(Typical
lso av
e) UF type
abricated di
y with a circ
ilable with s
fabricated di
charge head
lar base plat
ction barrel
charge hea
- ANSI type.
ounting)
g) H
3.2.2.
and c
config
pleas
or ord
H type fabri
The disc
(a) thru (g)
upling arran
ration of the
refer to the
r specific se
ated discha
arge heads
re for illustr
ements var
pump that h
rawings sup
tionals from
ge head
hown in sec
tion only. T
. For the act
s been purc
plied with th
Flowserve.
ion
e shaft
ual
hased,
pump
f) HFL typ
fabricated
ischarge he
d
D3.3
esign of
Please r
numb
3.3.1
motor
manu
categ
a) H
throug
conne
of the
b) S
and pr
type d
conne
3.3.2
(See
The di
asse
in mo
r equivalent
vari
ty of drivers
are most co
l, all types of
ries.
llow shaft dri
h a tube in th
ted to the dr
river.
lid shaft driv
ojects below
iver requires
ting to the p
lso section 3.
charge hea
bly as well a
t cases.
Drivers
Discharge
Major Par
fer to appen
ay be used,
mon. For t
drivers can
ers: where t
center of th
ver by a clut
rs: where th
he driver-mo
an adjustabl
mp.
Head Asse
2.2.1)
supports th
supplying a
s
ix for Europ
however, ele
e purposes
e grouped in
e head shaf
rotor and is
h assembly
rotor shaft i
unting base.
coupling for
bly
driver and b
discharge co
mp part
ctric
f this
o two
extends
t the top
solid
This
wl
nection
Page 17 of
6
flows
rve.com
Page 18
7
A
e
b
e
b
c
u
a
e
h
y
c
d
s
d
u
a
o
VERTIC
A
e
y
b
n
b
u
m
e
f
u
h
o
o
E
d
e
m
o
d
m
c
c
s
y
a
0
h
g
e
a
z
i
d
T
t
h
n
n
e
I
e
c
n
o
e
e
e
c
n
e
a
s
e
o
M
m
i
r
m
e
e
r
i
p
d
s
n
n
a
r
a
R
S
d
a
e
m
p
s
o
a
h
w
e
e
e
4
e
m
d
r
y
c
e
y
o
o
a
[
a
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
shaft seali
discharge h
liquid cham
The shaft s
seal assem
or a tube-pa
Col
3.3.3
The column
connects th
and carries t
Houses and
bearings. T
a) flanged
ng arrangem
ad to seal th
er.
al will usuall
ly or stuffing
king box wit
mn assem
ssembly co
bowl assem
e pumped fl
supports the
pical column
olumn asse
nt is locate
e shaft at its
be either a
box with an
an enclose
ly
sists of colu
ly to the dis
id to the dis
haft and ma
assemblies
bly
in the
xit from the
echanical
pen lineshaf
lineshaft.
n pipe, whic
harge head
harge head.
contain
re:
See s
exact
size a
specifi
ctional draw
olumn asse
d configurat
c order requi
ings supplie
bly details
on vary dep
rements and
with the pu
s per the or
nding upon t
application c
p for
er. The
he
iteria.
3.3.4
The b
mount
motor.
vanes
requir
part d
Bowl asse
wl assembly
d on the pu
Impellers ar
and are gen
ments. See
tails.
mblies
consists of i
p shaft cou
cast wheel
rally coated t
section 8.0 f
pellers rigidl
led to an ele
with multipl
o meet the h
r cross secti
tric
diffuser
draulic
nal and
3.3.5
VTPs
foreig
strain
applic
are fa
attach
are pr
attach
Suction st
an also be f
particles fro
rs and the m
tion. Exam
tened [422]
d using clip
vided with i
it to the mai
rainers
tted with str
m entering t
esh size dep
les are sho
irectly to th
[421]. Con
ternal or ext
assembly.
iners [316] t
e pump. The
ends on the
n below. Str
suction bell
shaped str
rnal threads
prevent
type of
iners
55] or
iners
to
a)
Slip-on str
iner
b) threade
mm (4~14 in
The column
a) Open lin
pumped
b) Enclose
tube aro
fluid to l
The shafts
stud design
column ass
.) sizes only.
upports sha
eshaft constr
to lubricate t
lineshaft c
und the lines
bricate the li
re threaded
r clamp ring
mbly: from 1
t assembly, t
ction utilizin
e lineshaft b
Or
nstruction h
haft and utili
neshaft bear
r key couple
design.
0 mm~355
at is either
the fluid bei
arings.
s an enclosi
es oil or oth
ngs.
with thrust
b)
Clip-on st
SUCTION
CAP SC
STRAIN
ainer
BELL (55)
CLIP
(421)
EW (422)
ER (316)
c)
Cone (thre
ded) straine
r
g
g
r
Page 18 of
6
flows
rve.com
Page 19
7
s
e
u
e
e
t
c
i
f
n
s
g
VERTIC
A
e
o
e
t
c
d
o
h
2
i
i
r
E
s
d
c
a
q
p
n
x
e
g
x
w
T
h
d
e
s
o
s
w
b
I
1
y
a
o
1
s
C
5
C
M
s
g
p
W
S
g
h
r
s
4
e
g
e
a
n
R
G
G
XSTU
N
)
)
)
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
d) Bolt on
3.3.6
Imp
VTP’s are s
impeller typ
capacity typ
VTP applica
to match ea
finish to ach
are dynamic
shaft by a ta
Stu
3.3.7
Some VTPs
cases, stuffi
working pre
stuffing box
3.3.7.2
Hi
This type of
packing with
trainer
llers
pplied with
s. Impellers
designed f
ions. Impell
h order and
eve hydrauli
ally balance
pered lock c
fing box
are fitted wit
g boxes are
sures up to
ser Instruct
h pressure
packing box
two lantern
nclosed, or
are low, me
r maximum
rs are cast
o provide re
characterist
and held in
llet or split ri
stuffing bo
normally ad
0.7 bar (300
ons for speci
stuffin
bo
s fitted on to
ings and allo
emi open
ium and hig
overage of a
nd machine
uired surfac
ics. Impeller
osition on th
g and key.
es. In such
quate for
psi). Refer t
fications.
an open line
s grease lu
3.3.7.
This t
linesh
used
3.2.2.
(17) PA
ll
e
(13) PA
haft for pres
rication.
Low pre
pe of packin
ft for pressu
nly on W-ty
to see for
KING GLAND
(354) STUD
(35
) HEX NUT
KING SET
sures up to 2
sure stuffin
box is fitted
res less than
e discharge
type discha
0 bar (300 p
box
on to an op
6.5 bar (100
eads (see S
ge head det
SLI
HE
O-RI
STUFFIN
PRESSU
REDUCIN
BUSHING
i) uses six ri
n
psi) and
ection
il).
GER (3 46
D (326A
NUT (327A)
NG (347)
BOX (83)
E
(117
gs of
Page 19 of
6
flows
rve.com
Page 20
7
x
e
c
l
VERTIC
A
s
s
f
w
E
n
e
n
T
s
h
I
n
M
5
e
S
s
a
4
e
d
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
3.3.7.4
E
In cases wh
pressure stu
tra high pre
re the press
ffing box is u
sure stuffi
res are exp
ed.
box
cted to cros
20 bar (300
psi) up to 6
bar (1000 p
i), extra high
-
3.3.8 Me
VTP’s can a
the time of c
hanical sha
so be fitted
ontract.
t seal
ith a mecha
ical seal. T
e requireme
t to fit the m
chanical se
l to be provi
ed at
Page 20 of
6
flows
rve.com
Page 21
7
Acc
A
o
s
g
a
e
d
b
m
w
g
a
a
A
m
y
p
x
a
m
o
w
o
e
o
u
t
p
p
F
n
o
A
d
n
e
a
e
d
m
e
a
e
c
d
e
o
n
c
.
o
o
p
h
h
n
e
u
o
E
f
i
e
n
y
o
r
+
0
m
o
e
u
o
c
o
e
a
t
o
l
v
h
e
r
a
p
T
a
s
n
n
r
e
I
u
t
o
t
s
a
o
hup
h
hwil
han
p
s
nagclu
nag
s
c
e
c
p
p
d
o
M
o
e
t
a
a
a
s
k
y
d
a
p
n
a
l
d
t
a
d
A
E
Alwa
e
S
e
t
h
p
y
p
m
w
s
e
s
a
q
l
c
h
k
z
r
m
a
o
e
u
B
m
p
4
e
a
m
h
a
m
u
e
m
l
t
m
o
h
e
e
d
n
m
a
e
3.3.8
ccessories
customer.
Perf
3.4
This product
specification
The followin
help with the
temperature,
data. If requi
application c
Op
3.4.1
Pumped liqui
limits*
Maximum am
temperature*
Maximum pu
*Subject to
Special desi
pumps oper
limits. Cont
available for
4 INST
Equip
must compl
regulations.
otentially e
Loc
4.1
When equip
months, a c
accordance
located to all
maintenanc
lifting and sh
supply of liq
arrangemen
4.1.1
Ins
Six months
Flowserve P
employed to
and the facili
noticed, the
may require
equipment i
some comp
VERTIC
essories
may be fitte
rmance a
has been sel
of the purch
data is includ
installation. It
materials and
ed, a definitiv
n be obtaine
rating limits
temperature
ient
p speed
ritten agree
ns and mat
ting above
ct Flowserv
your specifi
LLATION
ent operate
with the rel
See section
plosive atm
tion
ent has bee
mplete inspe
ith section 2
w room for a
and inspecti
uld be as cl
id to be pum
drawing for t
ection prior
rior to the sc
mp Division
conduct an i
ty. If any det
lowserve P
a partial or c
cluding resto
nents.
L TURBIN
when speci
d Operat
cted to meet
se order. S
ed as additio
is typical and
seal type ma
statement f
from Flowse
5 ºC (40 ºF) to
Up to +40 ºC (1
refer to the na
ent from Fl
rials may be
nd below th
for upgrade
application.
in hazardo
vant explosi
1.6.4, Produ
spheres.
in storage f
tion should b
4.3. The pum
ccess, ventila
n with ample
se as practic
ed. Refer to
e pump set.
to installati
eduled insta
representati
spection of t
rioration of
mp Division
mplete dism
ration and re
PUMPS (V
ied by the
on Limits
the
e section 1.5.
al information
factors such
influence thi
r your particul
ve.
80 ºC (176 ºF)
4 ºF)
eplate
wserve.
available for
se specified
options
s locations
n protection
ts used in
r greater tha
conducted i
p should be
tion,
headroom fo
ble to the
he general
n
lation date, a
e is to be
e equipment
quipment is
epresentativ
ntling of the
lacement of
PS) CENTR
The p
ventila
headr
practic
Refer
to
dimen
s
4.2.1
ar
The fo
actual
a) M
b) C
c) C
d) C
e) C
three
should
neces
O
O
6
male
shaft
avoid
conne
impro
to the
pump
depen
vibrati
IFUGAL PU
P4.2
reparati
mp should b
ion, mainten
om for lifting
able to the su
o the general
ions and det
General in
llowing chec
installation.
ke sure that
p
wer supply s
eck the sum
.
eck the liqui
eck the inst
ll safely hand
eck all pum
y shipping a
laces when
be attempte
ary for a suc
hollow shaf
ainst the sh
tch
solid shaft
ainst the cou
haft threads
onnection.
d.
ting driver to
er motor dire
ump.
F4.3
oundatio
units to their
ds on the siz
n limitations
PS ENGLI
n
located to al
nce and insp
nd should b
pply of liquid
arrangement
ils.
stallation c
s should be
motor name
stem match
p depth and
level in the
llation equip
le the pump
connection
d handling r
Alw
ys support
ifting or inst
without ade
cessful instal
drivers, che
ft size, whic
rivers, chec
pling bore si
pp
ly thread lub
only at the ti
xcess lubric
ys check m
pump. Res
ction can ca
n/Anchor
The
re are many
foundations.
of the pum
. Non-compl
H 7156922
low room for
ection with a
as close as
o be pumped
drawing for t
eck-list
made before
late ratings
correctly.
ump length
sump.
ent to be s
eight and si
(bolts, nuts
lated proble
hafting in at
lling. No ins
uate equip
ation.
k the clutch
must go thr
the motor s
e
icant sparing
e of making
nt should b
tor rotation b
rve rotation
se extensive
olts
ethods of i
The correct
unit, its loc
iance with th
– 02-15
ccess,
ple
.
e pump
starting
nd the
atch-
re that it
ze.
tc) for
s.
east
allation
ent
size
ugh the
aft size
ly to
up
fore
ue to
damage
stalling
ethod
tion and
Page 21 of
6
flows
rve.com
Page 22
7
c
r
e
u
l
m
v
a
t
s
m
m
A
n
f
a
n
t
e
c
A
I
T
T
VERTIC
A
p
w
s
a
l
e
f
e
s
s
n
t
u
m
a
a
m
E
c
t
h
t
d
f
n
v
e
d
d
s
d
c
u
y
u
A
N
T
r
c
d
h
o
g
I
x
u
d
m
o
m
o
l
y
e
o
d
n
L
i
s
7
h
a
d
c
a
S
D
2
M
y
m
c
d
g
i
a
e
n
3
m
s
c
e
o
b
a
t
h
c
3
e
u
E
S
r
n
w
7
m
e
t
h
0
t
n
p
o
t
e
i
t
e
6
m
o
e
f
m
7
e
4
e
h
p
o
t
u
0
t
b
e
g
n
s
t
n
u
0
o
d
n
e
n
o
0
i
t
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
provision of
lead to failu
outside the t
The foundati
rigid support
expected str
Concrete fo
installed in s
holes in the
below. Slee
moldable m
When a suc
type "TF" di
provide per
motor.
base, they
to grouting.
lways shim
the leveling
done otherw
the structura
separation o
recommend
industry sta
Detail of a
MOUNTING PL
FOUNDA
NON-BOND
MOLDABLE MA
4.3.1
Lev
dis
orrect found
e of the pum
erms of the
on must con
to the discha
sses that m
ndations sho
eeves that al
ounting plat
e should be
terial after sl
ion barrel is
charge head,
anent, rigid
If leveling
ust be backe
near founda
uts. Now tig
se there is a
l natural freq
the base fro
All found
tions should
dards.
ypical found
TE
ION
NG
ERIAL
ling of pu
harge head
ation and ins
and, as su
arranty.
ist of materia
rge head and
y be encoun
uld have anc
ow alignmen
as illustrate
illed with no
eve is set in
upplied as in
the suction
upport for th
uts are use
off as far a
ion bolts and
ten the foun
risk of signifi
ency that co
the grout.
tion / anchor
be verified b
tion bolt, gro
ps mounted
flange
tallation may
h, would be
that will affo
will absorb
ered in servi
or bolts
and have
in the detail
-bonding
place.
the case of t
essel must
pump and
to level the
possible pri
then back off
ation bolts.
antly lowerin
ld result in
bolt
prevailing
ted.
NCHOR BOLT
UT
GROUT
on the
If
d
e.
e
r
E
DI
HEA
37
373
The p
aligne
asse
precisi
the m
flange
0.16
the gr
Check
is still
torque
record
friendl
requir
4.3.2
The s
aligne
by usi
level.
mount
needs
using
least
Reche
after t
install
pit an
the sol
Check
respe
in./ft)
should
ample of a t
CHARGE
FLANGE
CONCRET
mp assembl
with the an
bly is levele
on machinist
tor mountin
mounting su
m/m (0.002
ut to set for
to make sur
evel to withi
the nuts [37
ed for future
Directly
for service.
s re-leveling
Leveling o
soleplate
leplate [23] i
with the an
g a master l
evels should
ng surfaces.
to be leveled
hims and gr
2~80 hours
ck the solepl
e grout is se
tion. Lower t
align the dis
eplate bolts[
to make sur
t to the solep
nd final torq
be recorded
pical discha
ounting fla
y [101] is lo
hor bolts [3
by using a
's level. Lev
flange. The
rface needs
n./ft) using s
t least 72~8
that the mo
0.16 mm/m
]. The leveli
reference.
ounted pum
Re-installati
and re-grou
f pumps mo
first lowered
hor bolts. Th
vel or a prec
be taken on
The soleplat
to within 0.1
ut. Allow the
efore the pu
te mounting
and then pr
e pump ass
harge head
72].
that the pu
late to within
e the nuts [3
for future ref
ge head wit
ge
ered into the
2]. The pum
aster level
ls should be
discharge he
o be leveled
ims and gro
hours.
or mounting
(0.002 in./ft)
g data is to
s are not us
on of these p
ing.
unted on a
into the pit a
soleplate is
sion machini
he equipme
mounting s
mm/m (0.0
grout to set f
p is installe
surface level
ceed with th
mbly [101] i
lange bolt h
p is still level
0.16 mm/m (
3]. The level
rence.
the
101
pit and
r a
aken on
ad
to within
t. Allow
flange
and final
e
r
umps
routed
d
leveled
t's
t
rface
2 in./ft)
r at
.
ess
pump
to the
les to
with
.002
ng data
Page 22 of
6
flows
rve.com
Page 23
7
p
e
e
a
e
(
s
a
h
0
e
a
a
a
VERTIC
A
m
m
s
w
h
e
s
n
u
s
c
e
a
o
t
g
q
o
E
s
d
e
e
a
r
m
w
e
s
r
T
e
e
o
e
h
o
p
I
o
o
i
n
r
a
a
s
e
u
A
t
e
e
m
a
c
p
0
i
m
e
A
a
u
d
e
e
M
o
s
e
u
t
e
a
o
d
e
a
u
o
n
u
a
d
w
g
w
m
u
e
c
S
h
s
d
s
c
o
q
u
t
h
t
o
n
s
u
o
o
d
v
4
e
a
u
e
i
b
d
s
0
l
s
u
e
e
v
m
3
e
t
t
h
o
o
s
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
Exam
4.3.3
Lev
The suction
and aligned
flange is lev
precision m
the equipm
flange moun
0.16 mm/m
the grout to
pump is inst
surface leve
proceed wit
assembly [1
discharge h
[372].
Check to m
respect to th
(0.002 in./ft)
leveling dat
Example of
le of pump
ling of pu
barrel [315] i
ith the anc
led by using
chinist's lev
nt mounting
ting surface
0.002 in./ft)
et for at lea
lled. Reche
lness after th
the pump in
1] into the b
ad flange b
ke sure that
e barrel flan
and final tor
is to be rec
pump install
ounted on a
ps with the
first lowere
or bolts. The
a master lev
l. Levels sho
urfaces. Th
eeds to be l
sing shims
t 72~80 hou
k the barrel
grout is set
stallation. Lo
rrel and alig
lt holes to th
he pump is
e to within 0.
ue the nuts [
rded for futu
ed with a suc
soleplate
uction barr
into the pit
suction barr
el or a
uld be taken
suction barr
veled to wit
nd grout. All
s before the
ounting
and then
er the pum
n the
flange bolts
till level with
16 mm/m
373]. The
e reference.
tion barrel.
l
in
w
l
n
l
4.3.4
The s
and al
suctio
ancho
solepl
using
Level
surfac
needs
in./ft)
llow
the pu
surfac
proce
asse
disch
[372].
Che
res
(0.
level
Exa
Leveling o
mounted
leplate [23] i
igned with th
barrel [315]
bolts. Torq
te. The suc
master lev
should be t
s. The sucti
to be levele
sing shims
he grout to s
mp is install
levelness
d with the p
bly [101] int
rge head fla
k to make s
ect to the b
02 in./ft) an
ng data is to
ple of pump
f pumps wit
n a soleplat
first lowere
anchor bolt
into the pit a
e nuts to se
ion barrel fla
l or a precisi
ken on the e
n barrel flan
to within 0.1
and grout
et for at leas
d. Recheck t
fter the grou
mp installati
the barrel a
ge bolt hole
re that the p
rrel flange to
final torque
be recorded
ith a suction
soleplate
suction b
e
onto the fo
. Then, low
nd aligned w
ure suction
nge is levele
n machinist'
uipment mo
ge mounting
6 mm/m (0.
nder the so
72~80 hour
e barrel mo
is set and th
n. Lower th
d align the
to the flang
mp is still le
within 0.16
the nuts [37
for future ref
barrel moun
rrel
ndation
r
ith the
arrel to
by
level.
unting
surface
02
eplate.
before
nting
en
pump
bolts
el with
m/m
]. The
rence.
ed on a
Page 23 of
6
G4.4
routing
Wher
applicable,
fter
dding pipe
the co
shoul
engin
Flows
pling align
then be gro
ering practic
rve service
rout in the f
ork connecti
ent, the mou
ted in accor
e. If in any d
enter for ad
undation bol
ns and re-c
nting plate/s
ance with g
oubt, please
ice.
flows
s.
ecking
leplate
od
contact
rve.com
Page 24
7
o
n
n
t
VERTIC
A
o
p
a
e
e
u
h
E
e
a
m
b
v
d
e
T
n
y
I
s
e
o
e
a
s
a
i
e
1
t
2
e
wlow
w
watt
p
m
ewrwr
o
h
e
k
3
e
h
u
a
e
e
M
d
4
g
a
n
e
o
t
m
a
A
a
s
k
m
d
s
h
g
a
p
l
s
n
d
S
y
t
a
u
g
a
d
t
e
o
o
t
3
e
c
b
o
&
s
m
d
e
e
a
o
in
a
u
u
s
d
h
4
e
y
p
e
n
m
e
u
t
t
t
r
p
m
fo
e
h
o
e
e
m
a
e
c
g
e
a
e
h
c
p
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
Grouting pr
unit and fou
running equi
Care should
contact with
plate, suctio
tightened af
vides solid c
dation that
pment and d
be taken to
grout betwe
can and fo
Foundatio
er the grout
ntact betwe
revents later
mpens reso
nsure maxi
n the pump
ndation (no
n bolts shoul
as been cur
n the pump
l movement
ant vibratio
um surface
ase, sole
oids).
only be full
d.
of
s.
L4.5
Motor
It is th
the m
detail
piping
separ
pump
separ
and al
Flows
4.5.1
4.5.1.
See lif
4.5.1.
The fo
requir
a) T
b) T
c) T
d) Pi
co
m
e) G
cl
f) T
st
ifting an
may be sup
responsibili
tor is assem
d in section
and the pum
tely or as ful
size and wei
tely, it is the
ign the pump
rve’s install
Installatio
unassemb
Lifting
ing methods
Equipm
installati
llowing list co
d for installa
o (2) mobile
ering the pu
o (2) steel cl
o (2) sets of
aching to the
e clamp for l
lumn pipe.
(3/4 in.) di
neral purpo
enches, soc
enches, wire
th.
read sealing
el and light
Assembl
plied separa
ty of the inst
bled to the p
.5. Dischar
p assembly
ly assemble
ht. If the par
customer’s r
with driver t
tion instructi
of pumps
led
in section 2.
nt and tools
n of unass
vers the prin
ion.
cranes capa
mp and/or m
mps of suita
chain tongs
pump and m
ifting bowl as
pproximately
meter rope
e hand tools,
et set, screw
brush, scrap
compound d
achinery oil.
ely from the
ller to ensur
mp and alig
e head colu
re supplied
depending
s are shippe
sponsibility
the satisfac
ns.
hat are ship
.
required fo
mbled pum
ipal tools/ite
le of hoisting
tor.
ble size.
cable sling
otor lifting ey
sembly and t
4.5 m (15 ft)
ay be requir
pipe wrench
rivers, Allen
r and fine e
signed for st
umps.
that
ed as
n
ither
pon the
d
o install
ion of
ped
s
s
and
r
s.
e
of 19
d.
s, end
ery
inless
Page 24 of
6
inside
individ
and s
4.5.1.
a) Cl
ot
b) Fl
w
c) R
su
d) Cl
eq
Parts an
shipping con
ual package
ids for attac
Uncratin
pump
an the parts
er foreign m
sh the pum
ter. Clean a
move any ru
rfaces with fi
an all threa
uipment.
accessories
tainers or att
. Inspect all
ed parts bef
and clean
of any dirt, p
tter.
inside and o
l machined s
t spots foun
e emery clot
ed connectio
may be plac
ched to skid
containers,
re discardin
of unass
cking materi
tside with cl
rfaces.
on the mac
.
ns and any a
flows
d
s in
rates
.
mbled
al and
an
ined
cessory
rve.com
Page 25
7
f
.
s
n
o
f
h
s
n
d
p
n
o
e
o
m
z
h
y
2
h
m
n
t
c
s
p
n
n
u
u
a
o
VERTIC
A
w
b
s
f
h
h
a
e
w
t
s
n
m
d
n
t
o
e
a
m
d
e
d
d
e
y
s
m
e
E
d
t
a
u
u
n
m
v
t
s
c
a
o
a
b
t
a
l
w
s
m
e
e
a
d
e
w
v
T
f
y
e
m
o
e
s
)
n
m
u
n
I
e
g
s
n
Att
f
i
o
e
bbe
s
e
d
g
5
n
e
g
e
e
s
t
Att
n
f
b
3ins
a
n
s
u
M
d
o
d
p
d
g
e
a
r
r
n
a
o
e
g
t
n
a
F
e
i
d
o
-
s
d
g
e
a
g
e
c
o
n
v
S
o
p
p
e
e
n
f
o
s
n
s
o
s
d
s
4
r
s
d
o
o
p
-
c
n
e
e
s
m
e
W
c
e
.
a
4
e
o
a
g
y
a
d
e
m
b
w
o
p
h
e
o
e
o
m
a
s
a
m
a
c
s
s
a
e
W
n
e
a
m
e
o
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
should be le
straightness
t in the crate
4.5.1.4
In
as
a) Sump a
of all lo
b) Check a
c) Do not li
pump s
se debris be
ll bolts for tig
t or handle t
aft.
d) When in
mm (6 i
fastene
shipping
vertical
the bowl
.) or 203 mm
to the wood
until the bo
osition. This
s or bending
e) If a strai
assembl
f) Position
y using faste
lifting equip
foundati
g) If a bas
per m (0
plate is use
.002 in. per ft
in place.
h) Check f
that nu
r axial cleara
ber for future
in a hori
or pull t
i) Carefull
assembl
e pump shaf
lift the sucti
y with suitabl
section
j) Lower t
Set cla
bowls o
assembl
the shaf
k) Proceed
e bowl asse
p or holding
a flat surfac
y and reduce
.
to install the
specific
4.5.1.5
In
Choose one
installation
configuratio
of the followi
rocedure tha
that has be
4.5.1.5.1
I
l
P
mp head ma
housing inst
prevent dam
housing bef
age, we reco
re putting th
Lineshaft
talling the
embly
d piping sho
talling bowl
er is to be u
n opening.
ontal positio
.4 for lifting
olumn pipe
tallation of
stallation of
brication
lled. For ea
hen shippe
o avoid dam
owl and col
uld be thoro
ore starting i
tness.
e bowl asse
ssemblies in
(8 in.), leave
n skid that is
l assembly is
will help pre
he shaft.
ed, attach it
ers as nece
ent so it will
, level the pl
and then gr
nce or endpl
reference (w
you should
indicating ax
n barrel and
straps or cl
nd safety ru
bly into the
evice that is
. This is to
possibility of
column asse
rawings).
ischarge h
ng discharg
t is appropri
n purchase
discharge h
be shipped
e of assembl
mend remo
head on the
separately
ge or loss o
mn
ghly cleaned
stallation.
bly by the
sizes of 152
bowl securel
attached for
raised to a
ent breaking
o the bowl
sary..
enter over th
te to 0.16 m
ut and anch
y and record
hile bowls ar
e able to pu
ial clearance
he bowl
mps (See
es).
ell or sump.
attached to
tabilize bowl
cross threadi
bly (refer to
ad
head type
te to the pu
ad with prod
ith the seali
y and to
ing the
pump.
mps supplie
For pu
ece headsha
one-pi
sealin
For pu
(head
solid s
skippi
a)
b) Li
c) If
housing) pr
mps supplie
haft couples
haft drivers,
g step (a).
ach the hea
co
upling and ti
t discharge h
int
o place (See
lift
ng methods
n
t to bend the
nge and bea
fla
of
head. (Note
b
aring retaine
aseplate is
tween the pu
pu
r
h
.
di
See s
shaft
levelin
4.5.1.
mp. The sh
charge head
ction 4.4.4 f
rivers and s
details
.2
Installa
enclosi
Pump he
housin
g installed.
preve
t damage, w
housin
g before putt
with hollow
ft (headshaft
ceed to ste
with a two-
above the s
roceed to st
shaft to the li
hten (left ha
ad over sha
section 2.3 f
nd safety in
shaft. Faste
ing retainer, i
that W head
at the top c
ot included u
mp and foun
ft must be ce
.
r coupling in
ction 4.2.1~
ion of discha
g tube
d may be sh
or ease of a
recommen
ng the head
shaft drivers
couples bel
(a).
iece headsh
aling housin
p (b) directl
neshaft with
d threads).
t and lower c
r recommen
tructions). B
the top colu
f supplied to
do not have
lumn flange).
se shims or
ation to level
ntered in the
tallation on s
.2.4 for pum
ge head wit
ipped with th
sembly and t
removing th
n the pump.
and a
w
ft
) or
arefully
ed
sure
n
ottom
a
edges
the
lid
the
sealing
and a
w
ps
ft
haft
tep (a).
n
ds).
losing
ection
afety
ft.
nt ring if
ot have
).
nd
ust be
p
ct
g
g
For pu
one-pi
sealin
suppli
coupl
driver
a) At
co
b)
e
c) Li
tu
2.
F
su
a
d) U
fo
ce
mps supplie
ece headsha
housing) pr
d with a two
s above the
, proceed to
ach the hea
upling and ti
ach the top
closing tube
t the dischar
e then lower
for recomm
tructions). B
sten the top
pplied to bott
alignment ri
e shims or w
ndation to le
ntered in the
with hollow
ft (headshaft
ceed to ste
piece heads
ealing housi
step (b) dire
shaft to the li
hten (left ha
nclosing tub
nd tighten (l
e head over
carefully into
nded lifting
e sure, not to
olumn flang
m of head. (
g at the top
edges betwe
vel the pump
discharge he
shaft drivers
couples bel
(a). For pu
haft (headsh
ng) or solid s
tly skipping
neshaft with
d threads).
to the colu
ft hand thre
haft and en
place ( See
ethods and
bend the sh
and alignm
heads do
olumn flang
n the pump
The shaft
d.
Page 25 of
6
flows
rve.com
Page 26
7
4
a
a
y
f
q
s
e
i
e
y
e
e
s
r
a
A
p
a
a
o
y
t
n
r
e
l
u
l
e
VERTIC
A
p
4
u
c
d
a
u
h
P
,
o
m
t
h
t
x
n
s
a
a
c
s
m
d
e
u
a
n
E
o
o
r
i
m
n
o
m
s
s
d
u
g
i
s
e
d
s
s
u
m
m
c
d
T
h
r
g
e
e
d
y
o
I
4
s
0
e
o
a
a
p
e
w
a
a
d
h
sbo
f
othethe
ainc(le
a
p
d
n
s
o
u
s
e
q
h
n
s
M
g
e
~
p
m
u
v
w
s
n
T
i
y
o
o
f
h
d
e
s
o
e
s
m
r
g
p
S
p
c
m
l
g
d
r
b
a
n
u
s
i
e
a
s
s
a
t
i
a
c
c
r
4
e
m
m
t
e
e
c
m
e
h
a
e
a
m
e
o
t
e
n
a
d
t
e
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
See section
shaft drivers
leveling det
4.5.2
Inst
full
4.5.2.1
Li
See lifting m
4.5.2.2
E
in
a) Mobile c
entire w
b)
Cable sl
lifting ey
c)
Ordinar
wrench
wrench
cloth.
d)
Thread
connecti
Th
vibration is f
straightened
and great c
lways sup
lifting or inst
inside shippi
individual p
Inspect all c
parts before
Lifting heav
appropriate
4.5.2.3
U
as
a) Clean th
other fo
b) Flush th
water.
c) Clean al
spots fo
emery cl
d) Clean al
equipm
.4.4 for cou
and section
ils.
llation of p
assembled
ting
ethods in se
uipment an
tallation of
rane capable
ight of the p
ngs for attac
s.
hand tools:
s, socket set,
s, wire brush
ealing comp
on and light
e single mos
om a bent s
to stringent
re must be e
ort shafting i
lling.
Parts and
ng container
ckages.
ntainers, cr
discarding.
objects is d
ools and pro
crating and
embled pu
e parts of all
eign matter.
pump insid
machined s
nd on the m
oth.
threaded co
nt.
ling installati
.2.1~4.2.4 f
mps that a
tion 2.3.
tools requ
fully asse
of hoisting a
mp and mot
ing to the pu
ipe wrenche
screwdriver
scraper and
und designe
achinery oil.
common ca
aft. Shaftin
olerances pr
ercised in it
at least thr
accessories
, or attache
tes and skid
ngerous. U
edures is m
cleaning of
p
irt, packing
and outside
rfaces. Re
chined surfa
nections an
n on solid
r pump
e shipped
red for
bled pump
d lowering t
r.
p and moto
, end
, Allen
fine emery
for type of
se of pump
is
or to shippin
handling.
e places wh
may be plac
to skids in
for attache
e of
st.
a full
aterial and
with clean
ove any rust
es with fine
any access
e
n
d
ry
4.5.2.
If a ba
m (0.0
Installin
e plate is us
02 in. per ft),
the fully as
d, level the
grout and an
sembled pu
late to 0.16
hor in place.
p
m per
See s
ctions 4.2.1
4.2.4 for pu
p leveling de
ails.
Positi
found
n lifting equi
tion opening.
ment so it wi
l center over
the
Su
thorou
install
ghly cleaned
tion.
p and pipin
of all loose
should be
ebris before
starting
Set u
center
the bo
Lower
the cl
on a fl
and re
installation
ed directly o
l assembly
the bowl as
mps or holdi
t surface.
duce possibil
nit so that th
er the well o
and suction
embly into th
g device th
his is to stabi
ity of cross th
e lifting cabl
sump. Car
arrel with a
e well or su
t is attached
lize bowl ass
reading the s
will be
fully lift
lamp.
p. Set
to bowls
mbly
aft.
a) W
hen installing
pu
mp assembl
fa
tened to the
wl assembly
b) Li
us
c) P
t the pump to
ed, attach it t
sition pump
discharge o
n lower onto
d) If
stuffing box
luded, attac
ft hand threa
e) If
mechanical
s point per th
thi
152 mm (6 i
, leave the p
wooden skid
is raised to a
a vertical po
the bowl as
ver sump or
f the pump w
the base. L
and a hollow
the head sh
s).
seal is includ
e attached in
.) or 203 mm
mp securely
(as shipped)
vertical positi
ition. If a str
sembly.
suction barre
th external pi
vel the entir
shaft driver
ft to the pu
ed, install th
tructions.
(8 in.)
until the
on
iner is
l. Align
ping
pump.
re
p shaft
seal at
If the
proce
sectio
ump include
ure as listed
2.3)
a suction b
below. (See
rrel (can), f
lifting instruc
llow the
ions in
a) In
b) If
c) L
d) C
e) In
tall the sucti
m
unting flang
fo
ndation.
oleplate is u
so
leplate and
so
leplate.
vel the solep
re
uired.
eck to ensu
a
d other forei
tall the pum
n barrel firs
and bolts d
sed, mount
ount the su
late & the su
e suction ba
n material.
.
and grout th
rectly to the
nd grout the
tion barrel o
tion barrel fl
rel is free of
to the
nge as
ebris
Page 26 of
6
flows
rve.com
Page 27
7
a
t
e
t
A
c
s
s
s
o
u
t
h
p
a
c
n
c
e
t
e
e
t
p
e
e
d
a
e
n
VERTIC
A
o
c
l
e
e
t
e
b
m
o
m
n
a
P
d
n
a
s
n
s
s
u
f
e
t
o
h
h
x
s
u
h
w
r
r
n
p
h
e
E
s
v
i
h
a
m
k
v
p
s
l
e
y
e
l
t
s
r
d
m
a
e
e
m
h
o
k
t
e
o
m
T
s
f
o
i
d
g
m
o
.
a
o
g
s
f
f
s
I
f
h
a
s
e
n
e
s
d
g
u
s
v
u
o
o
M
e
k
o
r
f
e
s
n
g
a
.
a
A
S
e
v
f
e
o
f
g
i
s
i
,
s
l
O
Y
A
D
S
R
A
A
4
e
e
h
v
k
o
s
g
a
b
0
7
.
N
T
T
N
A
A
T
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
Inst
4.5.3
driv
If t
shaft driver,
arrangemen
is applicabl
the coupling
adjusting nu
ll burrs, ni
mating part
installation.
rust may re
4.5.3.1
In
c
a) The key
be a sn
sliding fi
[42].
b) The key
pump s
half cou
c) Side cle
checked
WA/PA
(0.003 i
a sliding
clearan
It may b
proper fi
d) Insert th
coupling
The key
e) Lubricat
with ligh
flange u
f) Lubricat
thread it
with mal
shaft an
g) Uncrate
shaft.
llation of c
ers.
he pump pur
one of the fo
between th
. Choose th
arrangemen
Clean thr
. Check for
ks and rust
of flanged c
Failure to re
ult in misalig
tallation of
upling WA/
[46A] for the
g or tight fit i
in the keyse
with pin [46]
aft keyseat a
ling [44] key
rance of key
with a feeler
oupling sho
.) for a snug
fit. These ar
es. Closer fi
necessary t
.
key [46] wit
[44] putting t
should not e
pump coupl
oil and slide
. Slide it pa
adjusting n
onto pump s
register do
top of nut a
and lift driver
uplings on
hased is ha
lowing coupl
driver and t
procedure
required.
ads on pu
urrs and nic
ust be remo
upling and
ove all burr
ment causin
djustable f
A.
river shaft k
the shaft ke
t of the driv
hould be a s
d a snug or
eat.
in keyseats
gauge. Clea
ld not excee
it or 0.127m
maximum
s are preferr
file-dress k
pin into pu
e pin in the
tend below c
ing half and
it onto pump
t threads.
t [66A] with li
aft [12A] (lef
n. Thread it
e even.
to allow acc
olid shaft
ing a solid
ng
e pump sha
ppropriate t
p shaft and
s.
ed from all
ump before
, nicks and
g pump to fa
anged
yseat shoul
seat, and a
r half couplin
iding fit in
ight fit in pu
should be
ance for
0.076 mm
(0.005 in) f
llowable
d, if possible
ys to obtain
p half of
ole in keyse
upling.
ey assembly
shaft [12A] w
ht oil and
hand thread
on until top o
ss to drive
t
on
l.
p
r
t.
ith
)
i) C
rin
p
j) In
ke
th
k) Lu
o
th
l) In
sli
m) Ti
Co
3,
Torque
stress l
etc.). F
n) Pr
eck the fit of
gs [312A] in
ragraph (a) r
tall straight
y must be ab
split thrust r
bricate drive
to driver sha
top of the k
tall split thru
e the coupli
hten the cou
Couplin
pling
ize
1
& 2
4 & 5
6
alues are for st
bricant (such as,
r stainless steel
oceed with th
the straight k
their respecti
garding fit o
ey into keys
ve the top o
ings.
half couplin
t. Slide botto
yseat for spl
t rings into ci
g down over
pling bolts a
bolts tighten
Fl
nge diameter
mm (in.)
112 & 137
(4.4 & 5.4)
6, 188, & 213
15
.1, 7.4, & 8.4)
(6
251
(9.9)
ndard fasteners
graphite and oil
bolts, multiply li
e driver insta
MOTOR
(42) DRI
(46A) D
(312A)
(66A) A
(44) DRI
(364) C
(46) KE
y and split t
e keyseats.
the straight
at. The bott
circular key
lightly and sl
m of couplin
t thrust rings.
rcular keyse
them.
follows.
ng torques
Torque
121.5 (1
237.0 (2
424.0 (3
lubricated with a
moly-disulphite,
ted torques by 0
lation.
SHAFT
VER COUPLI
H
LF
IVE KEY
PLIT THRUS
RING
JUSTING NU
VEN COUPLI
H
LF
P SCREW
ASSEMBLY
(In·l
rust
(Refer to
ey).
m of the
eat for
ide it
above
t and
N·M
)
75)
100)
50)
high
white lead
80.
G
G
capable of c
before proc
could cause
The drive
rrying the e
eding to ste
damage to t
must be set
tire weight o
(h). Failure
e motor or l
h) Clean a
d check driv
r shaft. Re
Page 27 of
6
on supports
the driver
of supports
ss of life.
ove any burr
(12A) T
P SHAFT
.
TYPE W
/PA COUPLI
NG DETAIL
flows
rve.com
Page 28
7
s
o
e
e
T
E
VERTIC
A
a
/
c
h
s
p
a
e
C
4
M((
(
E
l
s
e
n
t
D
H
4
S
C
U
C
E
T
e
n
]
t
I
3
w
1
scir
a
ithe
e
64.5
M
o
r
o
y
p
f
n
e
h
/
S
d
e
a
r
2
m
t
g
u
a
L
O
H
S
C
4
e
n
i
e
o
s
L
P
U
N
U
P
W
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
4.5.3.2
In
c
Follow proc
4.5.4.1.
c) Bolt spa
using th
[364]. T
down.
torques
d) Proceed
tallation of
upling WSA
dure from (a
er [314] to t
short set of
he male regi
ighten all ca
s listed in 4.
with the driv
djustable f
PSA.
thru (l) as li
e driver half
socket head
ter should b
screws eve
5.4.1 under i
r installation.
OTOR SHA
42) DRIVER
(
HALF
46A) DRIVE
(
312A) SPLIT
RIN
314) SPAC
anged spac
ted in sectio
coupling [42
cap screws
pointing
ly to the bol
em (m).
FT
COUPLING
KEY
THRUST
G
R
r
4.5.3.
Follo
4.5.4.
Installati
coupling
procedure f
.
n of non-a
WNA/PNA.
om (a) thru (
ustable fla
) as listed in
ed
section
f) In
g) Sl
h) S
i) Pr
tall one set
cular keywa
h
lf of the cou
de driver hal
same man
co
upling.
t the spacer
the coupling
of
[3
4] evenly to
.4.1 under it
oceed with t
f split thrust
in pump sh
ling [44] ove
coupling [4
er as the pu
ring [314] be
together. Ti
the bolt torq
em (m).
e driver inst
rings [312A]
ft. Pull up th
the split key
] onto driver
p half of th
ween the tw
hten all cap
es as listed i
llation.
n to the
e pump
s.
shaft in
halves
crews
n
MOT
R SHAFT
(42) D
(363)
RIVER COU
HALF
EX NUT
LING
364) CAP S
(
363) HEX N
(
44) DRIVEN
HALF
(
364) CAP S
(
6) KEY AS
(
12A) TOP S
REW
T
COUPLING
REW
EMBLY
AFT
(46A)
DRIVE KEY
(312A
(314)
(312A
(44) D
(364)
(46) K
(12A)
) SPLIT THR
RING
PACER RI
) SPLIT THR
RING
RIVEN COU
HALF
AP SCRE
EY ASSEMB
TOP SHAFT
ST
G
ST
LING
LY
TYPE-WNA
PNA COUP
ING DETAI
S
TYP
- WSA/PSA
OUPLING
EATILS
Page 28 of
6
flows
rve.com
Page 29
7
a
s
c
r
a
A
c
s
r
c
g
e
d
m
g
a
e
o
e
h
f
o
m
d
m
o
E
o
o
l
"
o
o
u
g
VERTIC
A
r
m
n
l
o
e
f
h
g
r
a
m
m
a
e
g
u
s
s
d
i
n
E
W
c
a
t
s
u
o
g
E
o
u
h
g
n
t
s
t
g
e
o
o
c
s
u
c
o
h
O
o
i
a
t
n
t
e
a
h
a
e
t
T
o
f
m
o
d
h
e
t
e
y
n
e
h
I
h
q
omo
a
a
e
s
e
o
haglaran
s
2
u
e
a
ean
o
emo
e
o
e
o
otha
e
o
O
M
k
d
o
m
3
a
a
i
o
j
s
e
o
t
o
o
v
s
R
e
s
E
S
e
h
o
d
4
u
e
s
h
f
r
v
p
e
o
d
h
a
A
4
e
u
i
e
l
h
d
a
h
s
w
h
f
a
e
n
e
e
r
e
0
A
N
3
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
Inst
4.5.4
Dr
ivers will co
solid shaft a
Choose the
following pa
connected c
lways che
pump.
4.5.4.1
a) Clean d
In
iver mountin
and che
mountin
b) Remove
driver clutch.
c) See (j) r
bushing,
d) Lift drive
if required.
r and clean
burrs an
e) Center
mountin
Electric
position.
Gear Dr
ives - rotate i
position.
f) Lower c
female r
register
g) Bolt driv
h) Check t
manual
lubricati
direction
s.
i) Electric
this time
. Make certa
remove
"bump"
check r
tation. DRIV
COUNT
top end
rotation
two line
a two ph
ase motor, in
phase
j) Some m
otors will be
bushing
the bott
point. S
guide b
ship the
guide bushin
mountin
llation of d
specified o
orrect instal
agraphs.
Reverse r
n cause ext
k rotation be
tallation of
k for burrs o
face. Oil lig
garding inst
nicks.
otor over pu
holes.
motors - rot
refully into pl
gister on th
n the pump.
r to dischar
e driver man
or special in
n instruction
otors shoul
. Make elect
otor (mome
RCLOCKf motor. To
n a three-ph
eads. To ch
or "steady b
m of the mot
me motor m
shing before
.
ivers
e with either
the order/c
ation proced
tation with t
nsive dama
ore connecti
ollow shaf
flange on di
nicks on the
htly.
llation of mo
ounting flan
p and rotat
te junction b
nput shaft int
ace making
driver mates
e head.
facturer's in
tructions incl
and follow a
be checked
n the driver
rical connecti
tarily start, t
R MUST R
ISE when lo
hange the d
se motor, in
nge directio
erchange th
upplied with
shing" whic
r to stabilize
nufacturers
shipping whil
with instruc
hollow shaft
ntract.
re from the
e pump sha
e to the pu
g driver to
driver
charge head
register and
or guide
e, checking f
to align
x into desire
desired
ertain that t
over the mal
truction
ding
ll "startup"
for rotation a
lutch has be
ns and
en stop) to
TATE
king down at
rection of
erchange an
of rotation o
leads of eith
"lower guid
is installed a
the shaft at t
mount this
others will
ions for field
t
p.
e
n
er
t
is
k) C
r
eck the pac
re
uired, if so,
m
unted or not
tor instructio
l) C
m) Cl
n) In
o) T
refully install
th
t it fits down
an threads
nu
t. Lubricate
sh
aft.
tall gib key [
b
a sliding fit
D
not force.
read adjustin
ainst clutch.
ger head sh
d all others a
nu
t further at th
in
tructions in s
ing slip to se
etermine if t
and proceed
n manual.
drive clutch
properly.
n top of hea
ale threads
35] in clutch
nd may requi
g nut down o
(Threads on
ft adjusting n
re right hand
s time. See i
ection 5.3.
if a guide b
e bushing is
accordingly.
n driver mak
shaft and h
lightly. Instal
and shaft. T
re filing and
n shaft until it
3 mm (1.68
ts are left-h
d). Do not t
mpeller adju
shing is
already
Refer to
ng sure
ad shaft
head
is must
ressing.
bears
in.) and
nded
read
ting
D SHAFT (1
(334)
LOCK SCR
W
r
UPLING
C
HEA
HE
D SHAFT
DRIVER
GIB KEY(
)
UT (66)
35)
4.5.4.
half of
the co
Installati
acking
Wh
coupling ont
pling touch
n of solid
crews
n lowering t
pump, do n
he driver hal
haft driver
e motor and
ot let pump
of the coupl
ithout
driver
alf of
ing.
Befor
are no
withou
bumping m
t touching an
t rotating the
tor make su
d that the dri
pump
e coupling h
er can rotat
lves
freely,
Driver
circul
half coupling
r key will not
must be in
come out.
roper positio
so the
a) Cl
b) C
c) L
d) B
an driver m
d check for b
m
unting face.
nter motor o
unting holes
El
ctric motor
p
sition.
G
ar Drives:
p
sition.
wer driver ca
t the female
th
male regist
lt driver to di
unting flang
urrs or nicks
Oil lightly.
er pump an
.
: Rotate jun
otate input s
refully into pl
register on th
r on the pum
charge head
on discharg
n the regist
rotate to alig
ction box into
haft into desi
ce making c
e driver mate
p.
.
head
r and
n
desired
ed
rtain
s over
Page 29 of
6
flows
rve.com
Page 30
7
n
o
d
m
E
o
o
l
h
e
o
s
jac
r
c
g
m
g
p
r
r
r
g
r
h
d
n
h
e
m
n
o
d
e
m
o
E
VERTIC
A
c
c
w
d
r
t
U
I
c
a
e
m
s
s
g
g
u
o
y
n
t
a
r
e
r
a
a
e
9
e
n
c
n
w
d
t
e
V
W
o
o
h
E
c
a
f
o
p
k
i
a
t
n
e
n
d
i
e
e
n
M
m
e
o
h
r
p
e
0
o
a
u
c
"
i
t
O
o
d
n
T
f
t
y
n
h
3
d
d
e
a
e
d
s
e
.
n
a
a
n
I
t
t
e
e
o
d
t
d
s
m
Allmacle
x
rrec
A
p
n
c
A
y
d
e
t
s
e
a
M
o
d
h
x
a
d
u
d
r
d
m
o
m
s
n
t
j
u
t
m
A
e
t
d
z
n
S
t
m
t
p
e
u
g
f
e
n
a
a
t
o
p
e
c
t
e
a
a
w
a
z
o
p
4
e
t
s
c
f
m
n
t
h
s
h
t
e
e
d
a
o
n
c
t
t
o
y
t
n
e
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
e) Check d
special i
instructi
f) Electric
this time
motor (
rotation.
COUNT
top end
rotation
two line
a two-p
phase.
g) See imp
before b
coupling
4.5.4.3
a) Clean d
b) Center
c) Lower d
d) Check d
e) Electric
In
and che
mountin
mountin
Electric
desired
Gear D
position.
indicato
couplin
position
indicato
jackscre
motor s
this rea
values.
and usi
half of t
T.I.R. re
(0.002in
jack scr
Once all
tighten
in readi
special i
instructi
this tim
"bump"
check r
COUNT
top end
rotation
river manufa
structions in
ns and follo
rivers shoul
. Make elect
omentarily s
DRIVER M
RCLOCKW
f motor. To
n a three-ph
eads. To ch
ase motor, in
ller adjustm
lting the pu
together.
tallation of
king screw
iver mountin
k for burrs o
face. Oil li
otor over p
holes.
motors: R
osition.
ives: Rotate
iver carefull
base on the
. Set the ind
the dial to ze
is in direct li
ws. Record
aft and indic
ing being ca
Take the diff
g the jacksc
e difference.
ding is a m
.). Then rep
ws located
readings ar
otor bolts a
gs.
river manufa
nstructions i
ns and follo
rivers shoul
. Make elec
otor (mom
tation. DRI
R-CLOCK
f motor. To
n a three-p
turer's instru
luding lubric
all "startup"
be checked
ical connecti
art, then sto
ST ROTATE
SE when loo
hange the d
se motor, in
nge directio
terchange th
nt instructio
p and driver
olid shaft
flange on d
r nicks on th
htly.
mp and rotat
tate junction
input shaft i
into place.
O.D. of the
icator on the
ro being car
e with one
his reading t
tor 180 deg
eful to note
rence of the
ews move th
Repeat this
ximum of 0.
at this step f
0 degrees to
within 0.051
d check for
turer's instr
cluding lubri
all "startup
be checked
rical connect
ntarily start,
ER MUST R
ISE when lo
change the
ase motor, i
tions for
tion
instructions.
or rotation a
ns "bump"
) to check
ing down at
rection of
erchange an
of rotation o
leads of eit
s (section 5.
half of the
river with
scharge hea
register an
to align
box into
to desired
ount the di
otor half
pump shaft,
ful that the
f the
en rotate th
ees. Recor
lus or minus
two reading
motor onestep until th
51mm
r the set of
the first set.
mm (0.002in
ny moveme
ctions for
ation
instructions.
for rotation
ons and
hen stop) to
TATE
king down
irection of
terchange a
er
)
l
),
t
tw
o line leads.
a
wo-phase m
ei
her phase.
f) S
4.6.1
have t
shoul
opera
involvi
the un
tempe
imme
4.6.2
To en
very i
a)
b) E
c)
4.6.3
electri
t
factor
been
If nec
pump
t
the di
adjust
driver
y
e impeller a
b
fore bolting t
co
upling togeth
I4.6
nitial Alig
be aligned
be correcte
ing temperat
ng high liqui
it should be
rature, shut
iately.
ure proper al
portant.
machined
ting flanges
an and free
terior strain
pu
mp. The mo
fo
cing the pipi
ommended
in
the piping ad
ll
threads sho
re
aired if nece
co
nnections wi
a
ti-galling co
ally and the
gh the pump
lthou
it is most lik
isturbed duri
ssary, align
to the motor.
charge head
d in the hori
and shaft ce
Thermal e
Preparatio
lignment
Do not a
er.
nment
The
at ambient te
un at the act
n before ali
ignment the
of pump and
hat flexible c
ssary. Lubri
methods
re pump and
Ensu
half coupling
The
ely that this
ng transport
he motor to t
. The motor
To change d
tor, intercha
justment ins
e pump and
pansion
pump and
to allow for
re. In pum
temperatur
own and the
ating surfac
f burrs and
ust not be tr
t common c
g to mate wi
acent to the
ld be check
h a suitable
pound).
alignment M
will have be
d shims bet
ontal directi
ters. When
irection of ro
nge the lead
ructions (se
driver half o
otor will nor
mperature a
hermal expa
installations
s greater tha
al operating
alignment c
nment
ollowing item
s (such as t
motor) must
icks.
nsmitted to
use of troubl
h the pump.
nnectors be
ump.
d for damag
ate all threa
hread lubric
driver are is
s are discon
UST be che
n aligned at
lignment will
tion or handl
he pump, no
een the mot
ssembly ma
n to line up
rovided, alig
ation on
of
tion 5.3
the
ally
d
nsion at
n 300°F,
ecked
are
e
be
he
is
It is
installed
and
ed
nt (an
lated
ected.
ked.
the
have
ing.
the
r and
be
he
ment
Page 30 of
6
flows
rve.com
Page 31
7
u
5
e
v
e
g
w
g
o
e
e
r
t
f
x
i
o
n
VERTIC
A
o
n
a
g
o
r
p
r
e
y
t
w
r
s
e
m
a
w
c
E
m
i
e
u
n
p
n
i
c
a
P
T
l
e
r
n
n
s
t
I
u
eme
hnerun
e
v
p
m
e
c
n
a
h
e
w
s
a
a
n
M
c
m
g
u
n
n
m
e
e
a
t
v
d
e
o
e
o
n
d
e
e
h
u
S
A
o
r
e
n
n
d
e
d
e
s
g
e
h
N
o
4
e
u
a
b
d
r
g
e
T
a
j
m
u
h
e
d
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
screws sho
in its final ali
See section
solid shaft.
B
coupling hal
can rotate fr
half couplin
circular key
4.6.4
An
before the c
supply to th
final alignm
a)
b)
c)
a) Angula
intersec
shafts.
b) Axial O
of one o
thermal
c) Parallel
The ma
on the s
instructi
For coupling
as shown in
angular alig
ld be used t
gned positio
.3.2.1 for fin
fore bumpin
es are not t
ely without
must be in
ill not come
ular and pa
Check th
upling is full
driver to be
nt is comple
Axial offset
Offset: The
halfway bet
fset: Anothe
r both of the
xpansion.
Offset: The
imum allow
ze of couplin
n manual of
s with narro
the detail to
ment.
locate the
.
l coupling al
motor mak
uching and t
otating the p
roper positio
out.
allel misalig
direction of
connected.
connected o
e.
median lines
een the end
offset is the
hafts. A typ
edian lines
ble parallel o
g and is indi
manufacture
flanges use
heck both p
otor assemb
gnment for
sure that th
at the drive
mp. Driver
so the
nment
ump rotatio
The power
ly after the
Angular of fset
arallel offse
of shaft
s of the two
displaceme
cal example
run parallel.
ffset depend
ated in the
r of coupling.
a dial indicat
rallel and
y
t
is
or
a) P
ca
th
us
ca
b) W
magn
may o
If the
be rec
align
servic
P4.7
conne
enteri
install
from t
4.7.1
In ord
noise i
pipe
pump
Typic
m/s (6
disch
Take i
higher
Pa
mps with thi
n be aligned
outside dia
asuring the
ing feeler ga
lipers.
hen the elect
cessary to e
on its mag
Refer to the
If th
tic center th
erload the p
ump is hand
hecked in w
ent of the un
hours.
iping
Pro
tions to pre
g the pump
tion. Ensur
e pump bef
Pipe work
r to minimiz
n the pipe w
ork that is o
suction and
lly, main pip
ft/sec) on th
rge.
to account t
than the req
rallel
ngular
k flanged n
by using a st
eters of the
ap between
ges, measu
ric motor has
sure that th
etic centerli
otor User I
motor does
resultant a
ump thrust b
ling hot liqui
rm condition
it shall be ch
ective cover
ent foreign p
uring transp
that these c
re connectin
velocities
friction loss
rk it is good
e or two size
ischarge.
velocities s
suction and
he available
ired NPSH
n-spacer co
raight-edge
coupling hu
the machine
ing wedge o
sleeve beari
motor is ali
e.
structions fo
not run in its
ditional axial
aring.
, the alignm
of the unit.
cked again
are fitted to
articles or ob
ortation and
overs are re
pipes.
s and hydra
practice to c
s larger than
ould not exc
3 m/s (9 ft/s
PSH that m
f the pump.
plings
cross
s and
faces
ngs, it is
ned to
r details.
force
nt must
he
fter 200
the pipe
jects
oved
lic
oose
the
eed 2
c) on
ust be
Page 31 of
6
flows
rve.com
Page 32
7
x
VTP
e
VERTIC
A
e
s
m
m
d
n
p
x
E
s
n
e
d
y
h
e
r
e
o
N
T
o
p
I
e
u
odu
E
e
a
M
o
e
p
h
e
D
S
e
n
a
r
G
4
e
e
s
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
piping.
Ma
4.7.2
Maximum fo
flanges vary
minimize th
excessive, c
couplings, vi
casing. The
followed.
a) Prevent
Never us
imum force
pump flang
rces and mo
with the pu
se forces an
ause misalig
bration and
following poi
excessive e
the pump a
and mome
es (See tabl
ents allowe
p size and t
moments t
ment, hot b
ossible failu
nts should b
ternal pipe l
a support fo
ts allowed
4.6.2.1)
on the pum
pe. To
at may, if
arings, worn
e of the pum
strictly
ad.
r
p
b) N
c) D
n
before
provid
of haz
ver draw pip
p
mp flange c
not mount
e to internal
fla
nge.
use.
nsure that t
d to flush th
rdous liquid
ing into plac
nnections.
xpansion joi
ressure, act
Ens
ure piping an
e piping arr
e pump befo
pumps.
ISCHAR
by applying
ts so that th
s on the pum
d fittings are
ngement ha
e removal in
E
force to
ir force,
p
flushed
been
cases
Page 32 of
6
SUCTIO
flows
rve.com
Page 33
7
a
rMom
M
M
M
MMM
M
M
M
MMM
c
d
n
e
VERTIC
A
m
T
T
l
w
u
E
a
0
3
7
4
6
3
7
7
4
7
0
6
4
0
7
4
7
0
6
4
0
R
R
t
T
ts
(
(
2
(
(
1
0
(
(
3
(
4
(
2
(
2
1
1
3
(
4
(
2
(
2
1
1
R
R
m
c
I
n
a
2
0
3
4
2
3
2
3
4
2
3
2
t
M
)
0
0
9
0
0
6
3
5
0
9
0
0
7
3
5
w
S
(
(
(
(
(
(
(
(
(
(
(
(
h
4
e
r
e
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
4.7.2.1
T
Head
Type
TF
Fo
W
HF
&
LF
(1)
UF
Units: For
1. Forces an
head.
Loads show
required or t
ble of maxi
ces &
ents
Fx
Fy
Fz
x
y
z
Fx
Fy
Fz
x
y
z
Fx
Fy
Fz
x
y
z
Fx
Fy
100
(4)
0.53
(120)
0.67
(150)
0.45
(100)
0.50
(370)
0.26
(190)
0.37
(275)
1.07
(240)
1.34
(300)
0.89
(200)
1.00
(740)
0.51
(380)
0.75
(550)
1.07
(240)
1.34
(300)
0.89
(200)
1.00
(740)
0.51
(380)
0.75
(550)
CON
Fz
x
CON
y
z
e (F) in kN (
moments sho
are maxim
mperatures
um forces
150
0.80
(180)
1.00
(225)
0.67
(150)
0.75
(550)
0.39
(285)
0.57
(425)
1.60
(360)
2.00
(450)
1.36
(300)
1.49
(1100)
0.77
(570)
1.15
(850)
1.60
(360)
2.00
(450)
1.34
(300)
1.49
(1100)
0.77
(570)
1.15
(850)
ACT FLOWSE
ACT FLOWSE
(6)
20
(8)
1.1
(255
1.4
(330
0.9
(210
1.0
(780
0.5
(390
0.7
(570
2.2
(510
2.9
(660
1.8
(420
2.11
(156
1.0
(780
1.5
(114
2.2
(510
2.9
(660
1.8
(420
2.11
(156
1.0
(780
1.5
(114
bf); Momen
n for TF head a
m allowable
are higher th
nd momen
255
(10)
) 1.47
(330)
) 1.83
(410)
) 1.22
(275)
) 1.37
(1015) (
) 0.67
(495)
) 1.04
(770)
) 2.94
(660)
) 3.65
(820)
) 2.45
(550)
2.75
)
(2030) 3(
) 1.34
(990) (
2.09
)
(1540) 2(
) 2.94
(660)
) 3.65
(820)
) 2.45
(550)
2.75
)
(2030) 3(
) 1.34
(990) (
2.09
)
(1540) 2(
VE CUSTOME
VE CUSTOME
s (M) in kN
re for the discha
for standard
an ambient
allowed o
Discharge He
305
12)
1.67
375)
.00
450)
1.34
300)
1.52
125)
.74
550)
1.15
850)
.34
750)
.00
900)
.67
600)
.05
250)
1.49
100)
.30
700)
.34
750)
.00
900)
.67
600)
.05
250)
1.49
100)
.30
700)
355
(14)
1.78
(400)
2.23
(500)
1.45
(325)
1.59
(1175)
0.78
(575)
1.18
(875)
3.56
(800)
4.45
(1000)
2.89
(650)
3.18
(2350)
1.56
(1150)
2.37
(1750)
3.56
(800)
4.45
(1000)
2.89
(650)
3.18
(2350)
1.56
(1150)
2.37
(1750)
SERVICE
SERVICE
(lbf·ft)
rge flange. For
onstruction.
VTP pump
d Size mm(in.
400
(16)
4.23
(950)
5.12
(1150)
3.34
(750)
3.66
(2700)
1.83
(1350)
2.71
(2000)
4.23
(950)
5.12
(1150)
3.34
(750)
3.66
(2700)
1.83
(1350)
2.71
(2000)
46
(18
4.9
(110
5.7
(130
4.0
(90
4.0
(300
2.0
(150
3.0
(225
4.9
(110
5.7
(130
4.0
(90
4.0
(300
2.0
(150
3.0
(225
he suction flang
Contact Flo
flanges
)
508
)
(20)
5.34
0)
(1200)
6.23
0)
(1400)
4.45
)
(1000)
4.47
0)
(3300)
2.51
0)
(1850)
3.39
0)
(2500)
5.34
0)
(1200)
6.23
0)
(1400)
4.45
)
(1000)
4.47
0)
(3300)
2.51
0)
(1850)
3.39
0)
(2500)
e, use the value
serve if hig
610
(24)
6.01
1350)
7.12
1600)
4.90
1100)
5.42
4000)
2.71
2000)
4.07
3000)
6.00
1350)
7.12
1600)
4.90
1100)
5.42
4000)
2.71
2000)
4.07
3000)
760
(30)
7.12
(1600)
8.46
(1900)
5.56
(1250)
6.50
(4800)
3.25
(2400)
4.88
(3600)
7.12
(1600)
8.46
(1900)
5.56
(1250)
6.50
(4800)
3.25
(2400)
4.88
(3600)
s for the next la
er values ar
915
(36)
8.46
(1900)
9.79
(2200)
6.23
(1400)
7.60
(5600)
3.80
(2800)
5.70
(4200)
ge size
Page 33 of
6
flows
rve.com
Page 34
7
Au
x
r
e
s
u
d
n
s
s
e
u
A
a
r
s
o
a
A
c
t
d
a
m
w
d
d
g
A
g
g
w
w
g
e
y
a
h
)
w
t
d
p
,
c
s
o
g
n
n
c
n
i
t
y
7
a
q
h
d
n
y
E
e
n
a
h
t
p
h
s
i
g
t
e
o
g
f
e
e
m
e
e
r
d
a
s
q
s
e
T
o
u
A
r
a
n
n
N
n
o
I
o
e
d
c
n
t
e
e
A
e
s
l
e
e
e
A
c
a
l
m
P
T
m
i
e
t
u
d
d
e
n
n
a
g
m
m
v
g
o
M
c
m
e
t
r
e
a
w
e
c
s
i
t
p
a
e
o
n
n
i
e
c
t
u
c
p
u
p
c
v
v
g
m
g
S
y
e
u
w
i
o
o
e
p
s
e
h
n
u
t
e
y
e
y
l
e
n
o
h
a
u
a
m
a
4
e
a
m
e
o
k
g
e
o
r
s
e
a
z
n
e
e
y
p
m
a
l
s
e
t
e
t
4.7.3
4.7.3.1
Normal pum
through a s
the suction/
4.7.3.2
The pumpe
gland packi
of the pump
separate flu
cases. The
selected ba
parameters.
In some spe
exceeds 6.5
recommend
4.7.3.3
into the suct
source requi
high temper
oxidizing flui
clean liquid i
pressure is
available to
rotation bef
4.7.4
shaft severa
If pipe strain
4.8
by a qualifie
local nation
DIRECTIVE
compliance
requirement
DIRECTIVE
wiring up an
must be pai
during wirin
electromagn
electromagn
D
P
P
uxiliary pip
Fin
fter conne
Elec
It is i
It is im
VERTIC
iliary piping
ains
p leaks and
parate pipin
ump.
mps fitted
liquid is allo
g at dischar
or re-circulat
h supply ma
piping plans
ed on the ap
cial cases w
bar (100 psi
d.
mps fitted
ing to circula
ion is require
rements for
ture service
ds, a special
nto the seal
equired and
uit the speci
See secti
re connectin
l checks
ting the pipi
l times by ha
exists, corre
rical Con
Electrical c
Electrician
l and interna
portant to be
on potentiall
ith IEC600
for making e
portant to be
on electrom
installing e
to ensure t
/installation
etic emissio
etic immunit
L TURBIN
land leakag
arrangeme
ith gland p
ed to flow t
e pressure a
d back into
be required
nd flush su
plication and
ere the disc
a special flu
ith mechan
e the flushin
. In case of
ump applica
contaminat
piping plan t
hamber with
everal pipin
ic pump app
n 5.4 for Dir
motor to th
g to the pum
d to ensure
t piping.
ections
onnections
n accordanc
ional regulat
aware of th
explosive a
9-14 is an a
ectrical conn
aware of the
gnetic comp
uipment on
at the techni
o not increa
s or decreas
of the equip
PUMPS (V
to be draine
t or back int
cking
rough the
nd drained o
he suction.
in some
ply are to be
operating
arge pressu
hing plan is
cal seals
liquid back
external cle
ions such as
d fluids,
carry the
adequate
plans are
lication.
ction of
power supp
, rotate the
no pipe strai
ust be made
with releva
ions.
EUROPEA
eas where
ditional
ections.
EUROPEAN
tibility when
ite. Attentio
ues used
e
the
ent, wiring
PS) CENTR
any c
Flows
d
accor
instru
box) i
curren
The id
ensur
t
be fitt
If not
contro
suppli
e
For el
see th
before
n
fter
sever
and al
align
strain.
4.10
ly.
recom
potent
liquid.
.
If ther
pump
minim
shoul
liquid
t
If ther
can all
power
preve
releva
If leak
sealin
recom
syste
To p re
bearin
vibrati
r
IFUGAL PU
nnected devi
rve for advi
ance with th
tions (norma
cluding any
t and other p
ntification n
the power s
device to pr
d.
upplied pre-
ller/starter el
d within the
ctrical detail
separate w
connecting t
F4.9
inal Shaf
onnecting pi
l times by h
parts are fr
ent, as previ
If pipe strai
rotectio
he following
mended part
ially explosiv
If in doubt,
is any possi
o run agains
m continuo
be installed
oes not rise
are any cir
ow the pum
monitor sho
t it from bein
t if the pum
ge of produ
system can
mended that
is installed.
ent excessi
s, it is reco
n monitorin
The
See
PS ENGLI
ces. If in an
e.
otor must b
motor man
lly supplied
emperature,
otective dev
meplate sh
upply is appr
ovide emerg
ired to the
ctrical detail
controller/sta
on pump s
ring diagram
section 5.4,
he motor to t
Alignme
ing to the p
nd to ensure
e. Recheck
usly describ
exists, corr
Systems
protection s
cularly if the
area or is h
onsult Flows
bility of the s
t a closed va
s safe flow a
to ensure th
to an unsafe
umstances i
to run dry, o
ld be fitted t
g started. T
is handling
t from the p
cause a haz
an appropria
e surface te
mended tha
is done on
H 7156922
doubt cont
wired up in
facturer's
ithin the ter
earth leakag
ces as appr
uld be chec
priate.
ncy stoppin
ump unit, th
will also be
rter.
ts with contr
.
Direction of
e electrical
t Check
mp, rotate th
there is no b
he coupling
ed, to ensur
ct piping.
stems are
pump is inst
andling a ha
rve.
stem allowi
lve or below
protection d
temperatur
level.
which the s
r start up em
stop the pu
is is particul
flammable
mp or its as
rd it is
te leakage d
peratures a
t temperatur
regular basi
– 02-15
ct
inal
,
priate.
ed to
must
llers
otation
upply.
e shaft
inding
no pipe
lled in a
ardous
g the
vice
of the
stem
ty, a
p or
rly
iquid.
ociated
tection
the
and/or
s.
Page 34 of
6
flows
rve.com
Page 35
7
M
R
c
e
s
e
w
s
n
a
d
p
e
r
n
h
g
e
m
a
h
r
w
s
n
v
c
t
s
c
s
h
a
o
VERTIC
A
N
e
e
o
w
n
h
s
d
u
p
o
d
m
e
h
o
m
g
u
l
h
t
n
r
m
t
o
d
c
E
U
O
o
e
n
c
a
d
p
a
e
e
s
e
m
a
c
p
w
c
o
u
e
T
u
f
s
w
o
s
)
r
e
a
w
o
f
I
f
t
n
e
c
k
c
g
d
o
a
c
h
t
e
o
A
e
h
e
1
A
f
e
b
t
2
e
e
c
f
e
m
M
t
f
f
o
a
g
f
o
d
e
k
w
d
s
r
c
e
o
a
u
f
u
c
o
o
y
a
y
p
(
e
e
n
a
g
e
s
r
o
S
c
o
a
s
u
n
s
m
s
r
w
t
c
i
o
h
d
o
i
h
m
y
e
)
a
p
g
n
f
v
p
4
e
a
o
o
a
e
n
p
u
s
e
w
p
r
e
i
e
a
5
a
v
5
r
p
e
f
n
p
p
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
5 COM
OPE
by fully quali
safety while
Pre-
5.1
The gland is
to be in plac
Mechanical
and pressur
a) Pumps
bearing
avoid ru
perform
attache
b) For can
complet
procedu
dependi
c) Check t
(Couplin
clockwis
d) The pu
correct
e) Check t
sys., lub
f) All pipe
auxiliary
and mu
of all co
suction
shall be
g) Turn the
a lever,
rotor mu
resistan
bearing
h) Check t
to the m
precauti
fied personn
pump commi
must be fille
to the pump
o check the f
and seals.
ISSIONIN
ATION A
These op
ommissi
to be filled
. Flush pipi
eals to be c
.
ith the enclo
ning dry and
nce of the p
umps check
filling of the
e can take fr
g on the kin
e direction of
spacer dis
when view
p rotor and t
xial position.
e readiness
ication syste
ork, includin
pipe work, m
t be absolute
nections of t
alve must be
losed or par
pump by ha
t turn unifor
e may be fel
e readiness
nual for the
ns are in pla
G, START
D SHUTD
rations must
l. Turn off p
ssioning is in
ning Proc
ith grease a
g to be che
ecked for le
ing tubes an
with the pro
to guarantee
mp. A separ
(see detail in
all vent conn
ump. The v
m 10 minute
of fluid .
rotation of th
antled). Sho
d from the dri
e shaft seal
f all auxiliary
etc.,) for st
the internal
st be conne
y tight. Chec
e auxiliary pi
open, the dis
ially open as
d, if required
ee rotation of
ly and noisel
due to the fri
f the driver f
river to be s
e to energiz
P,
WN
be carried o
wer supply
progress.
dure
d flush suppl
ked for leak
ks, flush flo
oil-lubed
er lubricant t
acceptable
te oil tank is
ection 5.2.2
ctions for
nting
up to 2 hou
pump
uld be count
ver end.
ust be in
systems (se
rtup.
and the
ted correctly
k the tightnes
e work. The
charge valve
required.
ith the help
the rotor. Th
essly. Some
tion in the
r startup. Re
re that all
the motor.
or
y
.
.
s,
r
l
s
e
t
f
er
P5.2
Other
seal a
requir
the su
repac
hydro
Teflon
bearin
longer
flushe
agent.
for sh
thorou
be in
instru
5.2.1
Open l
fluid w
below
pre or
that th
flush fl
ll op
more t
be ad
5.2.1.
llow
minut
pre-lu
(15 ft)
The fit
head.
5.2.1.
In gen
provid
conne
with a
liquid
ump Lub
han the stuf
d/or linesha
further peri
tion bearing
ed when req
arbons or h
suction bear
s packed. I
storage peri
and cleane
It is not nec
rt or long-ter
ghly with the
Re-chec
ccordance
tions supplie
Open line
ineshaft bea
ere the stati
the discharg
post-lubricati
gland or se
ow.
n lineshaft p
an 9 m (30
quately pre-l
Pre-lubri
lush water t
s for pumps
e duration b
additional sh
ings for pre-l
pical
T
exampl
ral all W typ
d with a sta
tion. Fabric
special pipin
low onto the
ricants
ing box lubri
t lubrication,
dic lubricati
on the bowl
uired. Pump
ve carbon, r
ings do not h
the pump w
d, the beari
by using a
ssary to re
m storage a
lubrication oi
ing the moto
ith the motor
d separately
haft lubrica
ings are lubri
water level
head and wi
n. Care is t
l is supplied
mps where t
t) below the
bricated bef
ation durat
flow down t
over 9 m (30
at least 15
aft length be
ube are prov
re-lube pip
s (a) thru (d
e cast disch
dard size pi
ted dischar
arrangeme
shaft.
ation, mech
the pump wil
n. On water
ssembly sh
that pump
bber, epoxy
ave the sucti
ill be started
gs should b
uitable clea
ove the oil s
this will mix
l.
lubrication
manufactur
ith the pum
ion
ated by the
s less than 9
ll usually not
be taken to
with the requ
e static wat
ischarge he
re starting th
on
e shaft for 4
ft) and incre
inutes for e
ond 20 m (6
ided at the di
connection
rge heads a
e fitting for
e heads are
t to allow pr
nical
l not
pumps,
uld be
or
n
fter a
first
ing
rayed
up
hould
r’s user
p.
umped
m (30 ft)
equire
nsure
red
r level is
d should
e pump.
se the
ery 5 m
ft).
scharge
e
re-lube
fitted
-lube
Page 35 of
6
reliabl
lubrica
syste
It is the r
pre-lube sy
tion. Flowse
s or access
sponsibility o
tem to achie
ve will not su
ries with the
the user to i
e the pump
pply these ty
ump.
flows
stall a
re-
es of
rve.com
Page 36
VERTICAL TURBINE PUMPS (VTPS) CENTRIFUGAL PUMPS ENGLISH 71569224 – 02-15
Examples of typical pre-lube methods used in the industry are as follows.
Example (a)
PIPING MUST BE
MINIMUM LENGTH AS
GATE VALVE SHOULD
MAX. DISCHARGE
1" MIN PIPE
PRESSURE
TANK
Pre-lubrication recommended tank volume for pumps started at rated RPM’s for all cases of pre-lubrication
methods suggested in this section
GATE VALVE SHOULD WITHSTAND
MAX. DISCHARGE PRESSURE
PIPING MUST BE KEPT TO
MINIMUM LENGTH AS POSSIBLE
Page 37
Example (c)
LUBRICATION
VERTICAL TURBINE PUMPS (VTPS) CENTRIFUGAL PUMPS ENGLISH 71569224 – 02-15
VENT
MAX
LEVEL
TANK
STARTUP
LEVEL
LEVEL
SWITCH
Example (d)
25mm (1in.) PIPE
LUBRICATION
TANK
STARTUP
LEVEL
LINE
FLOAT
LEVEL
VENT
MAX
LEVEL
25mm (1 in.) MIN
PIPE LINE
DRAIN
PLUG
DRAIN
PLUG
SOLENOID GATE VALVE SHOULD
WITHSTAND MAX. DISCHARGE PRESSURE
PIPING MUST BE KEPT TO
MINIMUM LENGTH AS POSSIBLE
LEVEL
GAUGE
PIPING MUST BE KEPT TO
MINIMUM LENGTH AS POSSIBLE
TIME DELAY RELAY
SOLENOID GATE VALVE SHOULD
WITHSTAND MAX. DISCHARGE PRESSURE
Page 37 of 76 flowserve.com
Page 38
7
i
e
l
u
h
f
e
r
S
f
0
m
re
A
a
d
e
o
j
e
e
e
2
c
re
u
A
u
A
T
E
U
VERTIC
A
l
h
p
e
s
e
r
u
m
n
m
s
e
e
w
t
c
y
b
m
m
s
m
s
n
u
e
P
E
b
o
n
i
s
e
r
s
n
c
w
p
w
s
s
a
)
w
a
m
n
b
i
o
9
T
y
s
o
a
s
y
e
e
d
d
s
E
I
j
p
s
b
u
p
a
1
a
e
e
/s
u
o
w
n
o
a
t
i
u
r
m
r
a
m
s
s
M
j
a
q
r
s
r
b
b
d
o
m
a
t
n
h
d
o
l
c
c
e
f
v
u
e
c
b
l
n
n
n
S
v
h
e
m
a
d
e
n
e
e
n
e
n
/
t
e
e
e
o
m
d
n
t
h
h
t
t
x
g
n
n
n
e
.
h
4
e
o
n
t
f
s
r
e
il
s
b
d
c
n
s
g
o
d
n
,
g
l
m
n
e
m
c
t
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
Enc
5.2.2
VTPs with th
dedicated oil
extraneous l
application r
5.2.2.1
Oi
The lubricati
allowed to r
quantity to t
The gravity
utilized syst
The oil rese
must be kep
(about 30 c
adjusted to
per 30 m (1
5 drops per
(77) LUBRIC
(341) SHU
(342) FLOW R
VALVE
(344) L
5.2.2.2
P
s a genera
gravity at le
for the first ti
for a longer
to make sur
consistent f
5.2.2.3
In
Enclosed lin
extraneous l
to the tensio
pressure inj
losed shaft
e enclosed s
supply syste
quid; usually
quirements.
lubricated
ng oil must b
n into the en
oroughly lub
low system i
m for oil.
voir (exampl
t filled with a
t) at the ope
eed a minim
0 ft) of colu
inute total.
NT TANK
OFF VALVE
GULATION
BRICANT SUP
-lubricatio
l rule, the oil
st 45 minute
me or in cas
uration. Ad
that the flo
r subsequen
ection lubri
shaft bearin
iquid (usuall
n nut either
ction syste
ubrication
afting are lu
m or injection
clean water t
umps
available a
closing tube
ricate all line
the most co
shown in d
good quality
ating tempe
m of 3 drop
n length, at
(7
LY
of oil lubri
ust be allo
before the
the pump
quate care
is available
startups.
ated pump
gs are lubric
clean water
y gravity flo
.
ricated by a
lubricated b
meet the
d should be
n sufficient
haft bearing
mmonly
tail below)
light turbine
ature and
per minute
ever less th
) TANK BRACK
ated pump
ed to flow b
ump is start
as turned off
hould be tak
and is
ted by
, which is fe
, or by a
The in
ected lubric
‘off ’
eriods. Ade
make
for su
press
startu
ure that the
sequent sta
re to be adju
.
nt flow is ne
uate care s
flow is availa
tups and op
sted as reco
er stopped f
ould be take
ble and cons
ration. Injec
mended be
r short
to
istent
ion
ore the
5.2.3
.
The fo
linesh
conditi
Enclosed
llowing oils a
ft bearing lu
ons. See ta
haft lubric
e recommen
rication und
les 5.2.3.1 a
nts
ed for enclo
r normal ope
d 5.2.3.2.
ed
ating
It is
il
oils no
t be used.
recommend
d that deterg
nt type
n
5.2.3.
Non-foo
/food grad
lubricant o
ls
Equiv
lent turbine
requir
select
T
(mm
minim
d) with the
d. Oils with
2
ec) to 37 cS
m viscosity i
il (food or no
atching prop
viscosity ra
2
(mm
sec) a
dex of 90 ar
-food grade
rties has to
ge of 30 cSt
40 C (100
recommen
as
e
F) with a
ed.
The p
the lo
housi
5.2.4
The c
glass
opera
d
mixed
the oil
n
water.
due to
result
poor l
ur point of t
est expecte
g during a st
Oil level
rrect oil leve
nd shall be
ion. Periodi
with any con
drain during
After th
circulation o
If the oil le
n higher bea
brication.
e oil must b
temperatur
p of the pu
l is in the mi
hecked whe
ally check if
densed wate
a stop of the
initial start t
the oil throu
el is higher t
ring tempera
in accordan
of the beari
p.
dle of the oil
the pump i
he lubricatin
r. Careful op
pump will sh
e level will
gh the beari
an specified
ures resultin
e with
g
sight
not in
oil is
ening of
w any
ecrease
gs.
, it could
in
Inj
installation.
will vary. No
1.4 bar (10pressure of
ction syste
Injection pre
mally 0.45-0
0 psi) over
lean liquid i
s are design
sure and qu
.90 m3/h (2-4
aximum pu
required.
5.2.2.4
s a genera
least 15~20
the first time
for longer d
Page 38 of
P
p
mps
l rule, the liq
minutes befo
ration.
-lubricatio
or in the ev
6
of injectio
id flow is to
re the pump
nt of pump n
ed for each
ntity of liqui
gpm) at 0.7-
p discharge
lubricated
e started at
s started for
t being in u
e
I5.3
mpeller A
Prope
inside
The i
from d
as to
impeller adj
the bowl ass
pellers must
ragging on th
dversely affe
djustmen
stment positi
mbly for ma
be raised sli
e bowls, but
ct hydraulic p
ons the impe
imum perfor
htly to preve
ot raised too
erformance.
ler
ance.
t them
high so
The i
when
subjec
again
is dow
peller must
tarting impel
ted to suctio
t the shaft te
n when starti
e down agai
er adjustme
pressure, th
ds to raise it
g to adjust t
st the bowl s
t. When pu
pressure a
Make sure
e impellers.
flows
at
ps are
ting
he shaft
rve.com
Page 39
7
n
s
s
e
l
e
e
e
u
T
e
r
o
h
f
s
s
h
h
r
e
p
a
n
t
a
n
a
t
e
L
VERTIC
A
e
e
t
m
d
a
m
n
i
d
c
s
o
m
c
e
e
t
u
a
a
w
E
e
t
e
e
e
t
a
v
a
r
o
w
u
t
o
r
g
d
e
d
m
e
f
h
h
i
F
A
E
T
e
b
g
e
a
t
e
h
h
n
&
I
s
oloc
n
e
r
a
e
1
e
g
e
a
s
t
e
a
2
e
t
m(in
(
1
1
1
1
1
2
2
2
2
M
&
n
a
s
u
a
c
e
h
eenim
(
e
(
e
w
e
y
a
e
m
.
h
S
d
o
a
e
d
b
e
e
o
e
t
m
a
m
c
e
a
m
u
n
8
7
82.5
0
2
4
e
a
4
h
g
e
e
e
0
0
0
0
l
e
o
h
h
n
h
n
0
0
0
0
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
If, after maki
not deliver it
lowered one
adjustment i
On the other
dragging aft
stopped and
impellers wil
increase the
usually be h
sharp rise in
impellers ar
5.3.1
Imp
driv
er
Impeller adj
as follows.
before begin
ning.
a) Install h
b) Install d
iver clutch in
instructi
c) Check s
definite
eel of metal
indicate
correct
d) Thread
threads)
that are
are just
rotate fr
e) Check a
the pum
setting
nd running cl
Detail showi
arrangemen
(334) LOC
K SCREW
COUP
If
pumping co
contact the f
setting.
f) Tighten
recomm
5.3.1.2.
g the impell
rated capac
step at a tim
achieved wi
hand, if the i
r the initial a
the impellers
ard and felt
motor amper
dragging.
ller adjust
stment when
he driver ca
adshaft [10]
n manual an
aft position.
the impeller
tarting positi
eadshaft nut
except 43 m
aving left ha
aised off thei
ely.
separate do
that provid
g head shaf
ING
t any time d
ditions or tot
ctory for rec
he adjusting
nded by Flo
r adjustment
ity, the impell
until the low
hout the imp
pellers app
justment, th
raised one s
load signific
s increased
ge will occu
ent for a h
using hollow
opy will have
f not already
accordance
bolt into pla
Lower shaft
ontacting me
are "on bott
n for impelle
[66] down (ri
(1.7 in.) an
nd threads, u
seat and th
ument that is
s recommen
arance infor
and lock scr
HEAD SHA
HEAD SH
DRIV
GIB
ring the life o
l pump lengt
lculation of t
nut to match
serve. See
the pump do
rs can be
est possible
llers draggin
ar to be
unit should
ep. Draggin
ntly and can
ibration. A
when
llow shaft
shaft drivers
to be remov
in place.
ith the driver
ce.
ntil there is
al. This
m" and in th
adjustment.
ht hand
larger sizes
ntil impellers
shaft will
supplied wit
ed impeller
ation..
w
T (10)
FT NUT (66)
R
KEY(335)
this pump t
changes,
e impeller
mpeller setti
table 5.3.1.1
g.
e
is
d
e
g
g) U
ing the cap s
s
nu
t [66] down
m
tor coupling.
k screw arra
crew provide
lock using l
See the det
gement und
, bolt the he
ck screw [33
ils of head s
r item (h) be
dshaft
] to the
aft and
low.
Alw
tighte
Failur
and d
ing the lock
to do so co
iver.
ys lock hea
crew [334]
ld result in d
shaft nut by
efore startin
amage to th
driver.
pump
h) If
m
mechanical
chanical se
seal is used,
l at this time.
adjust the
5.3.1.
Flows
settin
Impeller
rve recomm
s based on t
clearance s
nds the foll
e pump siz
ttings
wing impelle
s.
r
If the
pump size S
is
Size
6 thru size
12
Siz
14 and
bove.
Shafts e
pump and th
of the
elongation.
for thi
depending u
model
diame
er, impeller
see th
for ex
specifi
documenta
ct impeller s
c pump that
tting for
closed
pellers
3~4 mm
0.13~0.15 in.)
6~7 mm
0.25~0.27 in.)
longate due
impellers
Shaft elong
pon the size,
eight, numb
tion supplied
tting value
ou have pur
Setting for s
open impell
0.25 mm to
(0.010 in. to
0.63 mm to
(0.025 in. to
o the hydrau
ust be comp
tion varies f
shaft length,
er of stages.
along with t
atched for t
hased
mi-
rs
.38 mm
.015 in.)
.76 mm
.030 in.)
ic thrust
nsated
r each
shaft
Please
e pump
e
5.3.1.
Head sh
ft nut adjus
tment
Shaf
25
32 (
38 (
43 (
43 (
50 (
55 (
62 (
68 (
75 (
H
ad
t size
m
.)
1.0) 14
.25)
.50)
.69)
.69)
.94)
.19)
.44)
.69)
.94)
Threa
per ev
25 m
(1 in
lengt
the sh
12
10
ds
ry
.)
of
aft
8
L
One co
turn of n
result in
moveme
1.
(0.0
2.1
(0.0
(0.1
3.1
(0.1
teral adjustme
mm (in.)
plete
t will
shaft
t of
1
0)
1
0)
4
0)
7
0)
Eac
t
face of
ut
.30
(0
.012)
.35
(0
.014)
.40
(0
.016)
.53
(0
.020)
Page 39 of
6
flows
rve.com
Page 40
7
e
u
w
d
n
m
o
u
h
t
s
u
h
h
f
e
c
0
t
c
s
e
n
c
e
L
VERTIC
A
m
s
ju
n
e
n
n
n
m
e
a
t
0
a
)
a
t
s
t
h
t
a
a
o
m
h
h
n
E
h
ge
r
n
l
h
e
c
h
m
e
h
g
e
d
m
w
e
h
A
T
g
d
e
o
m
e
e
g
o
a
S
I
d
t
u
0
)
o
aind
o
o
m
o
o
.
n
omo
o
djac
o
e
a
oun
.
N
M
t
c
e
j
n
i
d
2
1
o
e
o
e
b
t
g
n
p
l
e
d
d
T
s
o
e
S
a
r
n
f
P
u
.
0
n
d
s
e
n
e
e
g
d
0
a
n
m
CBM
4
e
o
f
y
r
a
n
t
d
h
m
b
o
o
h
t
a
p
t
t
h
0
S
W
L
0
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
Imp
5.3.2
driv
Impeller adj
accomplishe
located belo
5.3.2.1
A
a) Assemb
shaft (if
b) Check
c) Check a
impeller
d) Pump t
Mo
disc
Set
the
(Us
disc
disc
sha
Not
indi
at 9
DIAL
INDICATOR #2
MECHANICA
SEAL
Set
and
dire
posi
the
The
Alt
Usi
spa
bor
to th
ller adjust
er
stment when
d in the adju
the driver.
usting ad
le coupling o
ot installed
otor directio
nd write dow
setting for fi
motor align
nt two magn
arge head
he indicator
eal and at 9
ally parallel
arge nozzle
arge) back
t)
and record
ator reading
degrees to
he shaft in t
minimum ind
tions. If the
ion, use sm
haft and se
indicators ca
rnate meth
g an inside
e between t
. Do this bot
e discharge
ent for a so
using solid s
table flanged
stable flan
pump shaft
arlier).
of rotation.
Flowserve
al adjustme
ent and fina
tic indicator
t 90 degrees
ips on the s
degrees to
nd perpendi
push the sh
nd forth (wit
he minimum
. Do the sa
he discharg
DIAL
INDIC
e center of t
icator readin
shaft will not
ll wooden w
l bolts to hol
n now be re
d for pump
icrometer, m
e shaft and t
parallel and
ozzle
lid shaft
aft drivers is
coupling
d couplin
and driver
ecommende
t.
coupling
bases on the
to each othe
aft just abov
ach other.
ular to the
aft (parallel t
out bending
and maximu
e procedur
TOR #1
IF NEEDED
INSERT
PACKING
PIECES/WEDGE
ALL AROUND
TO CENTER
THE SHAFT
e maximum
s both
stay in this
dges betwe
the shaft.
oved
ith packin
asure the
e packing b
perpendicul
Using
meas
within
(For p
step f
he wedges
rements tak
0.10 mm (0.0
umps using
.
enter the sh
n at 180 deg
04 in.) of bei
jackscrews
ft so the
ees to each
g equal
or motor go
ther are
to
e) M
unt the mag
co
upling (a ban
b
se due to lim
icator on the
Sl
wly rotate th
etic base on
d clamp may
ited space).
pump shaft j
e driver shaft
the drive hal
be necessar
osition the ti
st above the
.
to hold
p of the
seal.
MOTOR HALF
COUPLING
SEC
URE WITH TWO BO
TS
r
STUFF
EXTE
ING BOX
SION
RIGID BRACKET
DIAL I NDICATOR
ENTER SHAFT IN
OX USING FOUR
ETAL WEDGES
TUFFING
OOD OR
te and recor
N
is
more than 0.
co
uplings or 0.
co
uplings, unb
dri
ver in the dir
to
within the all
the T.I.R. re
5 mm (0.01
5 mm (0.006
lt the drive a
ction require
wable limits.
ading. If this
in.) for WA
in.) for PA a
d reposition
to reduce t
eading
nd WSA
d PSA
he
e T.I.R.
If a r
gister fit is u
dri
ver will be a
th
usandths of
n
t obtainable t
obtain accep
to
g)
le to be mov
an inch. If e
hen the male
able T.I.R. r
ed for alignm
d only a few
ough move
register can
adings (Go t
ent,
ent is
e filed
step
nment,
f the
e shaft,
he
te the
n
f) O
pumps usin
m
unt the dial i
tor half cou
p
sition the dia
in
icator is in di
kscrews. R
m
tor shaft an
jackscrews
dicator bas
ling. Set the
to zero bein
rect line with
cord this rea
indicator 18
for motor alig
on the O.D.
indicator on t
careful that
one of the
ing then rot
degrees.
R
cord this rea
mi
:
x
r
nus values.
re
dings and u
m
tor one half
til the T.I.R. r
(0
002 in.).
ing being c
ake the diffe
ing the jacks
f the differe
eading is a
reful to note
rence of the
crews move
ce. Repeat t
aximum of 0.
lus or
wo
he
is step
5 mm
Page 40 of
6
flows
rve.com
Page 41
7
l
.
g
g
o
g
m
a
c
b
h
s
b
e
e
c
c
h
d
r
P
g
o
e
d
h
i
VERTIC
A
f
0
k
n
e
e
l
m
w
b
O
h
s
o
s
d
e
t
t
s
e
s
u
d
d
m
e
.
d
n
e
d
e
s
E
j
2
e
n
a
m
h
e
d
e
n
0
c
a
m
n
g
o
M
e
l
b
l
o
a
g
t
T
j
e
r
h
e
g
)
a
d
t
h
e
g
I
d
p
o
q
t
y
G
n
m
e
e
e
s
m
a
u
M
o
d
e
o
t
a
t
c
r
s
u
d
M
a
p
a
n
e
e
S
n
p
e
w
q
m
o
a
w
y
s
d
r
e
y
n
t
r
o
p
4
e
o
e
n
n
n
t
4
y
h
g
t
s
a
m
r
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
Then rep
located 9
readings
motor bo
readings
g) Set the i
adjustin
couplin
along wi
found, c
on the p
couplin
match
impeller
driver h
the mat
the gap
on the n
For pum
h) Using 2
each ot
impeller
gauged
point th
Be sure
i) Measur
coupling
j) Find the
the new
gap and
k) Bolt the
tightenin
l) Remove
magneti
on the s
shaft an
Unless othe
readings are
WA and
PA and
If the readin
specified ab
portion of th
steps (h) an
obtained.
m) If a mec
mechan
eat this step
0 degrees to
are within 0.
ts and chec
mpeller setti
nut and the
. See impell
th the pump.
ump half cou
. On pumps
arks can be
gap until the
lf coupling
On pumps
h marks pro
is set. DO N
ut with the ot
ps with enclo
er, slowly rai
are just lifte
impellers ar
o lift both sid
the resultan
and the adju
difference b
gap. Add thi
reset the adj
g opposite si
wooden we
base on pu
aft just abov
note the T.I
wise specifie
:
WSA couplin
is larger tha
ve, unbolt th
coupling to
(i) until acc
anical seal i
cal seal at thi
ntact Flows
olts of the c
y trying to tu
oupling toge
SA coupling
or the set of
the first set.
5 mm (0.00
for any mov
g gap betwe
driver portio
r setting dat
If this infor
rve. Align t
pling with th
with enclose
ined up by in
marks are in
arks.
ith semi-op
ably will not
T try to alig
er markings
ed impellers
upling, at 18
e pump half
off the seat
rn shaft by h
lifted the pu
es evenly.
gap betwee
ting nut.
tween the ori
difference t
sting nut.
ther and tight
es.
ges, if used.
p and set th
the seal. S
R. reading.
, the allowa
gs 0.10 mm (
s 0.05 mm (0
the allowab
pump and r
ifferent hole
ptable readin
used, adjus
s time.
ackscrews
Once all
in.) tighten
ment in
n the
of the
supplied
ation is not
e match ma
driver half
impellers t
creasing the
line with the
n impellers,
be in line wh
the markin
.
go to step (h
degrees to
oupling until
(This can be
nd. At the
p will turn).
the motor h
inal gap an
the original
en bolts by
ount
tip of indica
owly rotate t
le T.I.R.
0.004 in.)
.002 in.)
e values
tate the driv
nd repeat
s are
the
ks
e
n
.
lf
or
e
r
D5.4
rotatio
pump/
repres
startu
To av
with li
before
out to
rotatio
suppl
G5.5
Faste
to co
When
unscr
fasten
remov
guard
P5.6
pneu
applic
casing
contin
irection
Ens
n as specifie
driver. Pleas
entative, if y
.
id dry runnin
uid or have
the driver is
If m
he site's ele
n should be
phasing ha
uarding
uarding is s
ers for guar
ply with the
releasing gu
wed in an a
rs remain c
d or disturbe
are securely
riming a
Ens
atic, sealant
ble) are con
Ens
are complet
ous duty op
f Rotatio
ure the pum
or as mark
contact Flo
u have any
g the pump
he flexible c
switched on.
intenance
tricity suppl
e-checked a
been altere
pplied fitted
s must rema
achinery Di
rds, the fast
propriate wa
ptive. Whe
d ensure that
refitted prior
d Auxilia
ure electrical
and lubricati
nected and o
ure the inlet
ly full of liqu
ration.
is given the
d on the
serve
uestions bef
ust either b
upling disco
ork has bee
, the directio
above in ca
.
to the pump
in captive in
ective 2006/
ners must b
to ensure t
ever guardin
all the protec
o start-up
y Supplie
, hydraulic,
n systems (
perational.
ipe and pu
id before sta
same
re the
filled
nected
carried
of
se the
set.
he guard
2/EC.
e
at the
is
ive
s
p
ting
Page 41 of
6
flows
rve.com
Page 42
7
Pu
m
g
m
P
m
b
w
e
u
-
h
y
t
e
d
t
o
a
A
e
s
e
s
s
t
d
u
d
c
d
e
f
r
n
v
w
o
E
p
o
a
e
m
o
T
e
F
e
n
o
u
e
T
x
e
o
h
e
e
r
e
I
h
h
hDo
e
h
h
h(co
i
aad
p
l
u
tTo
AllmacleThwitne
xpurespu
e Allreprem
r
n
t
n
men
b
n
cthe
i
e
m
M
o
o
e
t
h
r
n
p
d
)
m
o
r
t
o
p
g
m
f
f
s
t
m
n
o
u
e
r
s
t
s
m
t
p
p
p
u
b
e
t
d
i
a
u
o
S
o
e
v
p
c
o
s
s
e
n
n
n
u
r
h
e
m
g
p
v
n
e
a
g
e
e
r
l
e
n
a
a
4
e
o
e
o
e
h
s
o
h
p
a
h
s
u
t
d
b
c
r
e
h
b
e
a
e
o
a
e
o
h
r
e
c
5.6.1
Minimum su
formation.
st
eye
The submer
the nominal
each pump
adequate N
different fro
Location of t
into account
also equally
distance to
sump floor (
to the Flows
on minimum
before the p
Start
5.7
Pre
5.7.1
Before starti
be made.
a) Rotate t
pump ro
correctl
b) Ensure
lubricat
furnishe
c) Ensure
proper r
from the
VERTIC
p submerg
mergence i
Bo
N
First
ge imp.
location.
ence varies
bowl diamet
odel. The
SH to the fir
the general
he first stage
for minimum
important to
e maintaine
ith or witho
rve supplie
submergen
mp is starte
ing the Pu
starting ch
g the pump
e pump sha
tates freely a
positioned.
hat the elect
d in accorda
with the dri
he electric m
tation. The
driver at the
L TURBIN
nce
required to
l dia
m.
Min. Liq
Min.distanc
from the sump fl
in general fr
r and is alw
ubmergence
t stage imp
rule mention
impeller eye
priming sub
ake note of t
to the sucti
t strainer).
general ass
e or contact
.
mp
cks
the following
t by hand to
nd the impell
ic motor has
ce with the i
er.
otor has bee
pump must b
coupling bef
PUMPS (V
revent vorte
id Lvl.
oor.
m 2 to 3 tim
ys specific t
needed for
ller may be
ed earlier.
to be taken
ergence. It
he minimum
n bell from t
herefore, ref
mbly drawin
lowserve
checks shou
make sure th
rs are
been properl
nstructions
checked fo
e disconnect
re checking.
PS) CENTR
d) C
e) C
f) C
g) C
h) M
i) Al
s
E
is
e
r
g
ld
j) O
e
y
d
IFUGAL PU
T
e electric m
w
en looking d
eck all conn
not overfill
ca
n lead to ove
th
thrust beari
eck that all
eck all foun
eck all boltin
upling bolts,
dr
ver bolts etc
ke sure the
justed and l
se
al spacers a
o
eration.
guards mus
p
mp startup t
ro
ating parts.
ensure pro
im
portant durin
machined
ting faces o
an and free
ese surface
h a scraper,
cessary and
e file
fin
terior strain
mp. The mo
pect is forci
mp. It is rec
co
nnectors be i
th
pump.
threads sho
aired if nec
ove the pa
ar
ange to catc
o
to other part
wi
h a wire bru
e
ds of shafts
re
oved since
ds butting sq
co
nnections wi
ricant (an a
lu
sh
ould be used
pumps equi
flu
id should be
pu
mps under s
a
complished
seal chamb
W
ith pumps no
ch
amber shoul
flu
id to provide
m
chanical se
int
o place. Ins
re
oved prior t
PS ENGLI
tor must rota
own on the t
ctions to th
e grease ca
rheating and
g.
iping conne
ation bolts f
g connection
mechanical
.
echanical s
cked into pla
e in the runn
be secured
prevent po
er alignment
g installation
ating surfac
the pump a
rom burrs a
should be cl
wire brush a
all nicks or b
ust not be t
st common c
g the piping
mmended t
nstalled in th
ld be check
ssary. If filin
t from the pu
h all the filin
of the pum
h and appro
ust be clea
alignment d
uarely. Lubr
h a suitable
proved anti-
on stainless
pped with m
ut into the s
ction pressu
y bleeding al
r and allowi
under suctio
be flushed li
nitial lubricati
l is properly
re that all se
operation.
H 7156922
te counter-cl
p of the driv
driver and c
ity. Over gr
remature fai
tions are tig
r tightness.
s for tightne
eal gland b
eal is properl
ce. Ensure t
ing position
in position pr
sible contact
three items
and they are
s (such as t
d motor) mu
d nicks.
eaned thoro
d emery clo
urrs remove
ansmitted to
ause of trou
to mate with
at flexible
e piping adja
d for damag
g is necessa
mp if possibl
s so they do
. Clean all t
ed cleaning
ed and any
pends on th
icate all thre
pproved thr
alling comp
mating thre
chanical seal
al chamber.
e, this can b
air and vap
g the fluid to
n pressure, t
berally with c
on. Make su
djusted and l
l spacers ar
– 02-15
ckwise
r.
ntrol.
asing
lure of
t.
s
lts,
y
at all
rior to
ior to
with
re very
:
e
t be
ghly
h if
with a
the
le in this
the
ent to
e and
y,
, or
not fall
reads
solvent,
urrs
shaft
ded
ad
und
ds)
s, clean
With
r out of
enter.
e seal
lean
e the
ocked
Page 42 of
6
flows
rve.com
Page 43
7
y
5.7.1.1
d
A s
o
p
o
c
f
b
n
b
T
b
t
r
A
A
a
u
s
c
u
s
v
e
k
a
m
h
o
o
n
E
g
e
e
h
w
e
r
t
N
a
a
r
e
e
g
e
o
S
T
o
j
a
I
n
e
O
d
a
-
l
e
a
l
a
e
t
a
s
e
y
t
o
o
r
0
a
c
a
b
e
c
i
g
e
e
y
y
M
e
a
a
a
h
t
c
n
ft
r
o
u
o
e
t
s
b
u
u
n
u
v
a
t
o
o
a
/
)
0
h
e
n
p
S
a
k
n
t
h
r
o
u
e
u
u
u
p
i
a
c
3
u
f
o
m
t
e
i
s
n
o
e
s
0
o
s
r
a
c
4
e
o
n
w
u
a
t
n
h
b
o
s
o
s
o
/s
3
a
l
p
p
b
a
c
m
m
d
b
T
the mechani
enough liqui
subsequent
having a tw
flanged cou
place prior t
contact with
shown in se
5.7.2
Stu
On the initial
packing not
must be run
and shorteni
The stuffing
operation.
determined
leakage, this
HOT - usuall
adequate.
When adjus
down evenly
reduced as
VERTIC
pical safety
fter initi
cal seal will
will remain
startup lubric
creen guard
-piece head
ling. This s
pump start
rotating part
tion 5.7.1.1.
fing box adj
starting it is
e tightened
in properly to
g of the pac
ox must be
he proper a
y checking t
should be c
y 40 to 60 dr
ing the packi
and in small
equired. The
L TURBIN
uards
IN
l startup, pr
sually not b
in the seal c
ation.
is furnished
haft or an ad
reen must b
p to prevent
. Typical ar
ustment
ery importan
xcessively.
prevent dam
ing life.
llowed to le
ount of leaka
e temperatu
ol or just luk
ps per minut
g gland, brin
steps until th
nuts should
PUMPS (V
G
UARDS
TALLED
-lubrication
required as
amber for
ith all pump
ustable
secured in
possible
angement is
that the
ew packing
ge to the sh
k for proper
ge can be
e of the
warm - NOT
will be
both nuts
leakage is
nly be
PS) CENTR
f
s
ft
tighte
minut
Under
time.
be ad
After
proper
box sh
and re
5.7.3
Open
pump
(50 ft)
lubric
water
disch
before
revers
when
lubric
5.7.4
Enclo
extran
The oi
qualit
opera
drops/
Injecti
Injecti
will va
0.7 to
disch
For re
lubric
see ta
oils ar
should
oxidati
to 37
viscos
bearin
check
requir
suppl
suppl
IFUGAL PU
ed about on
intervals to
proper oper
ccasionally
ed to keep t
dding two or
adjustment
ould be clea
-packed.
Open sha
ineshaft bea
d fluid on sh
long and us
tion. All ope
evel is more
rge head sh
startup. Th
e ratchet on
urning off pu
tion is also n
Enclosed
ed lineshaft
eous liquid (
l reservoir m
of light turbi
ing temperat
minute for e
n systems a
n pressure
y. Usually 0
0.14 bar (10
rge pressure
ommended
tion under n
les 5.2.3.1 a
available, oi
be obtained.
on inhibitors
St (mm
2
sec
ty index of 9
In t
gs, the sourc
d against th
ments for a
pressure or
before pum
PS ENGLI
half turn at
llow the pac
tion, a packi
a new ring of
e box full.
hree rings of
annot be ac
ed completel
t lubrication
ings are lub
rt-coupled
ally do not r
n lineshaft p
than 15 m (5
uld be adeq
se units sho
he driver to
mp. If there
ecessary.
haft lubric
earings are
sually oil or
st be kept fil
e oil (about
re) and adj
ery 30 m (10
re designed
nd quantity
.45 to 0.90
o 20 psi) ov
of clean liqu
ils for enclo
rmal operati
nd 5.2.3.2. If
l with the foll
Turbine typ
dded, visco
at 40 C (10
.
e case of pr
e of product
order. The
external cle
the commen
startup.
H 7156922
time at 20 t
ing to "run-in
g set will last
packing will
packing, or
ieved, the st
y of all old p
before star
icated by the
nits less tha
quire pre- or
mps where t
0 ft) below th
ately pre-lu
ld have a n
revent back
s no NRR, p
tion before
lubricated by
lean water
led with a go
0 cSt (mm
2
sted to feed
0 ft) of colum
or each inst
f lubricating
3
/h (2 to 4 g
r maximum
d is required
ed lineshaft
g conditions,
none of the
wing specifi
oil with rust
ity 30 cSt (m
F) with a
duct-lubricat
upply shoul
e may be
n supply, pa
ement of lu
– 02-15
30
".
a long
eed to
hen
ffing
cking
up
15 m
post-
e static
e
ricated
n-
pin
st-
tart up
an
d
ec) at
n.
llation.
iquid
m) at
ump
.
earing
please
bove
ations
and
2
/sec)
inimum
ed
be
rticular
rication
Page 43 of
6
flows
rve.com
Page 44
7
a
h
s
e
c
r
n
n
h
E
t
h
e
e
a
n
e
d
n
o
h
t
e
a
i
h
e
e
a
p
e
g
VERTIC
A
u
s
h
a
a
n
t
n
i
d
a
b
n
n
e
d
e
t
v
c
o
o
o
a
-
c
e
h
t
o
E
O
o
o
a
e
v
e
o
s
p
e
f
.
3
e
e
h
o
t
r
f
n
n
t
l
b
w
u
a
T
n
e
v
e
f
t
e
.
o
n
e
s
e
n
I
i
a
s
g
e
e
y
y
h
e
a
s
a
v
e
,
s
r
n
s
k
o
e
1
r
5
t
r
M
e
o
h
e
e
n
p
y
p
n
t
u
t
o
o
b
w
d
e
r
a
n
h
c
m
a
c
S
r
t
k
e
o
s
r
a
c
o
a
e
u
t
l
n
o
e
e
s
s
e
u
a
a
a
a
M
r
l
N
4
e
c
e
t
e
b
v
a
u
R
o
g
t
e
s
v
t
e
4
4
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
Initi
5.7.5
l Starting
Ensure fl
heating li
starting t
quid supplie
e pump.
a) If the di
open th
The dis
system
maintai
pump a
b) OPEN a
c) Prime t
operatio
d)
before s
e) Check t
f) Start pr
required
g) Start th
there is
stop the
Trouble
determi
charge line
discharge v
harge valve i
esistance to
pump flow r
d motor coul
ll inlet valves
e pump & ch
n (check the
nsure all ve
arting.
e motor con
-lubrication l
.
pump and o
ny difficulty,
pump imme
Shooting Ch
e the proba
Do not ru
valve closed
h) Open v
is vente
for a period
nt connectio
of all trapp
vents.
caution whe
liquids. Wea
caustic, corr
Do not breat
flames or ho
i) Open th
the unit
j) Check c
connect
If possible, t
approximat
will allow th
parts to "run
on future st
venting an
r protective c
sive, volatil
e toxic vapo
surfaces in
discharge
t its design
mplete pum
ons, or impr
e pump sho
ly one half h
bearings, p
in" and redu
rts.
If abrasiv
upon startu
the pumpag
handling lar
, the pump s
is clean. S
e amounts
shing and/or
are turned
as a valve in
lve closest t
s intended t
the pump. F
tes within th
d result in se
.
ck lubricati
liquid level).
t connection
ections.
quid flow on
bserve the o
excess nois
iately and re
rt (section 7
le cause.
the pump w
onger than
s and ensur
d vapor befo
Observe
or draining
lothing in the
, flammable
rs. Do not all
he vicinity of
alve as desi
onditions.
p and driver
per operatio
ld be left ru
ur on the ini
cking or sea
e the possi
s or debris a
ould be allo
opping the p
f abrasives (
cooling/
N before
it, partially
the pump.
add sufficie
ilure to
limits of th
ere damag
n system in
are closed
pump if
eration. If
or vibration,
er to the
0) to
ith the outlet
0 seconds.
that the uni
re closing th
xtreme
azardous
presence of
r hot liquids
w sparking,
he equipme
ed to operat
or leaks, loo
.
ning for
ial startup, th
s, and other
ility of troubl
re present,
ed to run u
mp when
s is
t
.
t.
is
til
e
somet
pump
allowe
Every
lines,
pump.
bearin
check
requir
suppl
suppl
5.7.6
The c
servic
Lubric
analy
interv
The m
consid
the dri
with th
Flows
bases
5.7.7
Pump
suppo
Machi
are ba
pump
(N) ta
conditi
and re
pump
be tak
5.7.7.
Moto
0.7
7.5
75 to
N = No
imes present
and cause m
d to continu
effort should
ump, etc. s
In t
gs the sourc
d against th
ments for a
pressure or
before pum
Frequenc
aracteristics
will determi
nt and pum
is is useful i
ls.
otor bearing
ered for its l
ver manufac
e pump. If d
rve.
Nev
thickeners
Normal vi
generally fa
t machines
ery standar
sed on thos
Ala
should be b
en on the pu
on. Measuri
cording will
or operating
n at the pu
Typical
for verti
types
rating kW (hp)
-to 7.5 (1-10)
o 75 (10 -100)
750 (100 -1000)
mal; Alarm = N
on initial sta
ore damage
operation.
be made to
that abrasiv
e case of pr
of product
order. The
external cle
the commen
start-up.
of lubricati
of the install
ne the frequ
/motor beari
optimizing l
emperature
brication req
urer’s user i
cuments ar
er mix greas
r additives.
ration level
ll under clas
ithin the Int
and maxim
standards
m and trip v
ased on the
mp in a fully
g vibration
elp to track
onditions.
p/motor inte
llowable fie
al turbines-
Vibration
velocityunfiltered
N
N
N
X1.25; TRIP =
ting) may lo
han the pum
eep abrasiv
s will not en
duct lubricat
upply should
e may be
n supply, pa
ement of lu
n
tion and se
ncy of lubric
ng temperat
bricant chan
imitations sh
uirements.
structions su
not found c
s containing
, alarm and
ification of ri
rnational Ro
m vibration l
lues for insta
ctual measu
commission
t regular inte
ny deteriorat
easurement
face.
d vibration
sump or we
Vibration
mm/sec (in./s
6.1 (0.2
6.1 (0.2
6.1 (0.24)-7.1
X 2.0.
k the
p is
s out of
er the
d
be
rticular
rication
erity of
tion.
re
ge
ould be
efer to
pplied
ntact
different
trip
id
ating
evels
lled
rements
d (new)
rvals
ion in
shall
alues
pit
c) rms
)
)
(0.28)
Page 44 of
6
flows
rve.com
Page 45
7
y
r
W
0
0
l
o
h
u
e
e
w
e
r
V
e
a
o
m
s
VERTIC
A
b
b
Vib
n
;
n
q
r
b
m
p
p
h
P
t
m
e
n
n
N
E
r
u
Vibmmrms
a
o
p
o
u
n
a
a
T
s
l
4
8
t
n
y
t
s
e
I
p
g
g
h
T
p
e
g
i
s
u
g
m
n
u
C
o
t
e
t
a
e
e
b
d
o
o
M
p
s
c
s
e
r
b
a
a
e
m
s
p
g
e
t
h
g
e
p
u
S
k
n
o
z
e
g
o
a
t
e
m
d
-
n
t
m
p
u
t
s
c
a
p
h
4
e
b
n
o
c
h
a
b
s
e
t
s
p
r
s
n
e
e
y
n
f
o
d
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLI
H 7156922
– 02-15
5.7.7.2
T
fo
Motor rating k
0.75-to 7.5
7.5 to 75 (1
75 to 750 (1
750 to 2250 (1
N = Normal; A
5.7.8
Mot
Even thoug
two consec
only after co
of 15 minut
temperature
refer to driv
Flowserve
in any given
If th
starts in any
user instruct
operation.
Ope
5.8
5.8.1
en
Mak
all trapped
hazardous
after the pu
be unneces
DI
SUCTION
SOURCE
pical allowa
vertical tur
(hp)
(1-10)
0-100)
0-1000)
00-3000)
arm = N X 1.25
ve
u
r start/stop
motors are
tive starts, it
asting to rest
s gap), with t
. If more fre
r manufactu
ith details.
The num
time affects
motor is ex
given time,
ions before t
ating the
ing the pu
sure that th
ir to escape,
r hot liquids.
p is fully ve
ary to re-ve
SCHARGE VENT LI
SUCTION VENT LI
le field vib
ines with s
ration
locity-
filtered
N
N
N 5.
N 6.
TRIP = N X 2.0
frequency
ormally suit
is recommen
between sta
he motor initi
uent starting
er’s instructi
er of motor s
otor life.
ected to ex
lease refer t
e pump is p
ump
p
pump is ve
taking due c
Under norm
ted and prim
t the pump.
E
NE
ation value
ction barre
ration
/sec (in./sec)
5.1 (0.20)
5.1 (0.20)
1 (0.20)-6.1(0.2
1 (0.24)-7.1(0.2
.
ble for at lea
ded to restar
ts (minimum
ally at ambie
is necessar
ns or contac
tart and stop
erience multi
the driver’s
t into
ted to enabl
re with the
l conditions
ed, it should
S
EALING LIQUID
st
,
5.8.2
If the
leaka
be fin
after t
Pumps fitt
ump has a
e from the gl
er-tight only.
e stuffing bo
ed with pac
acked gland,
and. Gland
Leakage sh
x is pressuri
ed glands
there must
uts should i
uld take pla
ed.
e some
itially
e soon
)
visible
)
ring to
takes
he gland mu
leakage and
avoid exces
lace, the pa
st be adjuste
concentric a
temperatur
king will be
d evenly to g
lignment of t
. If no leaka
in to overhe
ive
e gland
ge
t.
If over
heating take
stopp
d and allow
When
the pump is
leaka
t
e is taking pl
place, the p
d to cool bef
e-started, ch
ace at the p
ump should
re being re-
eck to ensur
cking gland.
e
tarted.
If hot l
to loo
quids are be
en the gland
ing pumped i
nuts to achi
may be nec
ve leakage.
essary
The p
leaka
at a ti
level,
is req
mp should
e and the gl
e until leak
ormally a mi
ired.
e run for 30
nd nuts tight
ge is reduce
nimum of 40
inutes with
ened by 10 d
to an acce
60 drops pe
teady
egrees
table
minute
gland
ential.
g
t be
te.
on an
Loose
caugh
replac
are must b
operating pu
clothing mu
by the pum
d after the
taken when
p. Safety g
t not be wor
shaft. Shaf
land adjust
adjusting the
loves are es
to avoid bei
guards mus
ent is compl
Nev
er run gland
a shor
t time.
acking dry,
ven for
5.8.3
Mech
initial l
Pumps fitt
nical seals r
eakage will s
ed with mec
quire no adj
top when the
hanical seal
stment. An
seal is run i
slight
.
Befor
possi
clean l
pumping dir
le, to run in t
iquid to safe
y liquids, it i
e pump me
uard the se
advisable, i
hanical seal
l face.
using
ld be
flow for
starte
a peri
Ext
before the
d after the p
rnal flush or
ump is run a
mp has sto
quench shou
nd allowed t
ped.
Page 45 of
6
even f
Nev
r a short tim
er run a mec
e.
anical seal
flows
ry,
rve.com
Page 46
7
Pu
m
p
m
a
r
e
t
t
e
a
t
n
e
A
m
m
t
A
r
y
t
p
h
s
e
o
f
r
t
t
e
s
s
A
o
s
o
s
d
e
a
t
C
f
y
e
t
t
e
d
m
a
o
S
e
p
n
t
c
n
t
E
m
e
s
e
t
a
b
m
u
e
h
e
o
d
h
h
w
t
s
n
a
n
e
r
w
T
n
o
a
n
p
a
a
n
I
e
e
u
b
o
t
g
s
b
e
s
n
b
p
q
e
m
o
A
l
b
u
e
a
A
e
m
u
o
f
n
m
m
m
M
n
r
o
d
r
e
a
s
e
w
s
e
e
n
p
o
e
r
t
e
n
m
v
P
m
m
S
p
H
s
y
o
d
p
o
o
u
S
u
t
r
e
e
s
e
w
a
h
s
b
p
v
a
u
e
e
a
r
a
o
m
T
r
e
f
e
h
i
s
s
4
e
e
)
d
.
s
w
e
n
e
a
s
c
o
g
l
a
o
e
T
e
e
m
e
e
a
5.8.4
If the
explosive at
monitoring
If pump bea
bearings) ar
benchmark
commissioni
temperature
Record
ambient
Estimat
tempera
Set the
and the
and 105
It is importa
keep a clos
fter startup
reaching a
hours. This
constant or
5.8.5
Mul
dditional p
can pump s
idle. Contac
Stop
5.9
a) Close th
runs in t
second
b) Stop th
c) Switch
supplies
especially w
drop below
and flushing
otherwise p
Hydr
5.10
This produc
performanc
however it i
product the
help the use
t the bearing
ing temperat
emperature i
ng stage an
he bearing t
ture (tb)
watch on th
temperature
ocedures m
Flowserve f
e outlet valv
.
pump.
ff flushing an
at a time ap
reezing point
otected.
aulic, me
du
y
has been su
specificatio
understood
e may chang
r decide how
VERTIC
p and moto
umps are w
osphere, te
to be monit
has stabilize
temperature
the likely m
larm at (t+tb
rip at 100 C (220 F)
t, particularl
he tempera
aximum aft
arginally re
iple Can Pu
stems when
ing and
is condition
For prolo
en ambient
arrangemen
L TURBIN
r bearing te
rking in a po
perature or
is recomm
ures (such a
red it is ess
recorded a
after the be
d.
mperature (t
(ta)
ximum ambi
-ta+5) C [(t+
(212 F) for
or grease lu
with grease
bearing te
ure rise sho
r approximat
rise should t
uce with tim
p Operati
y be require
one or more
r details.
hutdown
, but ensure
for no more t
d/or cooling/
ropriate to t
ged shutdo
emperature
, the pump a
s must be dr
hanical a
pplied to me
s of your pu
hat during th
e. The follo
to evaluate t
PUMPS (V
perature
tentially
vibration
nded.
thrust
ntial that a
the
ring
) and the
ent
tb-ta+10) F]
oil lubricatio
rication
lubrication, t
peratures.
ld be gradu
ly 1.5 to 2
en remain
.
n
in multiple
pump remai
that the pum
han a few
eating liquid
e process.
ns and
are likely to
d any coolin
ined or
d electric
t the
chase order,
e life of the
ing notes m
e implicatio
PS) CENTR
of any
Flows
5.10.1
Pump
chang
press
absor
theref
will no
the pu
5.10.2
For a
increa
viscos
absor
reduc
check
if cha
5.10.3
l,
Chang
absor
direct
ratio s
The n
syste
theref
pressu
s
NPSH
within
5.10.4
NPSH
availa
press
NPSH
requir
pressu
import
NPSH
chang
are no
g
perfor
partic
If in d
l
office
margi
5.10.5
Flow
y
maxi
s
perfor
IFUGAL PU
change. If i
rve office.
Specific g
capacity and
with SG, h
re gauge is
ed is also di
re important
t overload th
mp.
Viscosity
iven flow rat
ed viscosity
ity. Also for
ed increase
s with reduc
are made
ges in visco
Pump spe
ing pump sp
ed, NPSHR,
roportion to
uared and p
w duty, how
curve. If inc
re to ensure
re is not exc
> NPSHR, a
ocal require
Net positi
available (N
le in the pu
re, at the pu
required (NP
d in the pum
re, to prevent
nt that NPS
> NPSHR sh
in NPSHA i
t significantl
ance curve
larly if flow h
ubt please c
or advice an
for your ap
Pumped fl
ust not fall
um continuo
ance curve
PS ENGLI
doubt conta
avity (SG)
total head in
wever press
irectly propo
ectly proport
to check tha
pump drive
e the total h
and increas
given flow r
with increa
d viscosity.
ith your near
ity are plann
d
ed effects flo
oise and vibr
ump speed,
wer varies a
ver, will also
easing the s
he maximum
eded, the dri
d that noise
ents and reg
e suction h
SHA) is a m
ped liquid,
p suction b
HR) is a me
ed liquid, ab
the pump fro
A
> NPSHR.
ould be as la
proposed,
eroded. Re
to determine
as changed.
nsult your n
details of t
lication.
w
utside the m
s safe flow
and or data
H 7156922
ct your near
metres (feet
re displaye
rtional to SG
ional to SG.
any change
or over-pre
ad reduces
s with reduc
ate the powe
ed viscosity,
It is importa
est Flowserv
d.
, total head,
tion. Flow v
ead varies a
speed ratio
e dependent
eed, it is imp
pump workin
er is not over
nd vibration
lations.
ad (NPSHA)
asure of the
bove its vap
anch.
sure of the h
ve its vapour
cavitating.
he margin b
ge as possibl
nsure these
er to the pu
exact requir
arest Flows
e minimum
nimum and
hown on the
heet.
– 02-15
st
do not
on a
Power
It is
in SG
surize
ith
d
r
and
t that
office
power
ries in
speed
ubed.
on the
rtant
oaded,
re
head
ur
ad
It is
tween
. If any
margins
p
ments
rve
llowable
pump
Page 46 of
6
flows
rve.com
Page 47
7
6 MAIN
T
e
h
a
o
r
w
e
A
s
d
n
o
o
n
l
n
grea
M
fi
t
e
e
e
y
t
i
u
n
n
A
h
e
s
e
e
c
m
d
m
c
o
o
a
n
a
.
b
e
h
e
n
r
s
s
s
h
E
n
r
e
6
f
h
w
d
s
s
v
e
s
o
g
s
o
r
a
n
s
d
a
g
s
a
a
"
T
e
r
e
.
I
a
h
n
c
c
nmo
o
vthetem
h
hrun
hop
htem
haromo
hne
p
n
y
p
s
efor
nrec
c
M
e
m
e
m
e
c
n
m
o
u
y
e
s
k
w
e
n
a
r
e
n
e
g
c
e
g
f
e
e
n
s
o
S
P
w
t
a
n
u
w
l
e
u
n
t
o
a
a
e
e
n
p
v
e
n
d
a
o
l
a
a
m
4
e
s
s
v
t
e
s
u
m
a
h
f
a
g
h
d
e
m
a
Gen
6.1
It is t
ensure that
assembly w
qualified pe
themselves
manual in d
ny work on
is at a stand
for shutting
described in
Guard faste
dismantling
On completi
must be re-i
Before resta
instructions
up, operatio
Oil and
slippery.
begin and
exterior of
If platforms,
maintenanc
areas wher
carried out.
must not lim
be serviced.
When air or
maintenanc
vicinity must
protection.
Do not spra
Do not direc
Never use a
clothes.
Before work
prevent an
on the starti
"Machine u
VERTIC
ENANCE
ral
e plant oper
ll maintenan
rk is carried
sonnel who
ith the subj
tail. (See al
the machin
till. It is imp
own the ma
section 5.9.
ers must re
f guards as
n of work all
stalled and
rting the ma
isted in secti
and shut d
se leaks m
achine mai
nish by cle
he machine
stairs and gu
, they must
maintenanc
The positioni
it access or
compressed
process, th
be careful a
air or comp
an air or ga
ir or compre
ng on the pu
ncontrolled
g device wit
der repair:
L TURBIN
ator's respon
ce, inspectio
out by autho
ave adequat
ct matter by
o section 1.
must be per
rative that t
hine is follo
ain captive
escribed in
guards and
ade operati
hine, the rel
n 5, Commi
wn must be
make the
tenance mu
ning the gr
ard rails are
e placed for
and inspect
ng of these
inder the lifti
inert gas is u
operator an
d have the
essed inert
jet towards
sed inert ga
p, take me
tart. Put a w
the words:
do not start
PUMPS (V
sibility to
and
ized and
ly familiariz
studying this
.)
ormed when
e procedure
ed, as
uring
ection 5.5
afety device
e again.
vant
sioning, sta
bserved.
round
t always
und and th
equired for
easy access
ion are to be
ccessories
g of the part
ed in the
anyone in t
ppropriate
as on skin.
other people
to clean
sures to
rning board
.
PS) CENTR
With e
open
on the
"Mac
Never
carbo
fumes
d
it
and s
Instru
a) A
b) Gl
s
c) C
t
d) C
e) C
f) C
g) C
to
h) C
to
Our s
preve
conditi
e
identif
If any
action
a) R
b) E
Conta
IFUGAL PU
lectric drive
nd withdraw
fuse box or
ine under r
clean equip
tetrachlorid
when using
M6.2
aintena
It is recom
hedule is ad
tions, to incl
y auxiliary s
nitored, if n
c
rrectly.
and packing
gi
e visible lea
gland follo
perature of
eck for any l
co
rrect functio
ch
ecked regul
eck bearing
show a lub
eck that the
erating rang
eck vibratio
perature at
sa
tisfactory op
eck dirt and
und close cl
tors.
eck couplin
cessary.
ecialist servi
tative maint
on monitorin
the onset o
roblems ar
should tak
fer to sectio
fault diagno
sure equipm
ommendati
t Flowserve
PS ENGLI
quipment, lo
any fuses.
ain switch
pair: do no
ent with infl
. Protect yo
leaning age
ce Sched
ended that a
pted, in line
de the follo
stems instal
cessary, to
must be adj
age and co
er to preven
the packing
eaks from g
ing of the sh
rly.
lubricant lev
icant chang
duty conditio
for the pum
, noise level
the bearings
ration.
dust is remo
earances, b
alignment a
ce personnel
nance recor
for temper
potential pr
found the fo
place:
8, Faults; c
is.
ent complies
ns in this m
if the proble
H 7156922
ck the main
ut a warning
ith the word
connect".
mmable sol
urself agains
ts.
le
maintenanc
with these U
ing:
ed must be
nsure they f
usted correct
centric align
excessive
r follower.
skets and se
ft seal must
l, and if the
is required.
n is in the sa
p.
and surface
to confirm
ed from are
aring housin
d re-align if
can help wit
s and provi
ture and vibr
blems.
lowing sequ
uses and re
with the
nual.
persists.
– 02-15
witch
board
:
ents or
toxic
plan
er
nction
ly to
ent of
ls. The
be
ours
e
s
s and
e
ation to
nce of
edies,
Page 47 of
6
flows
rve.com
Page 48
7
Ro
u
h
n
n
h
t
h
h
n
c
e
n
e
o
u
V
e
s
a
e
r
s
A
i
o
e
a
e
g
c
s
a
s
g
c
t
C
n
o
l
b
d
u
i
o
p
y
s
i
n
E
e
c
n
s
c
t
u
c
c
e
t
o
e
d
o
n
s
u
E
t
e
U
T
e
e
e
g
t
d
o
b
I
a
r
e
n
e
1
e
x
o
n
2
u
r
3
v
e
t
c
r
r
r
n
i
i
e
c
A
a
n
n
M
e
s
a
a
t
s
n
r
n
g
r
v
a
e
l
a
s
o
d
e
t
m
e
v
f
S
t
u
o
r
u
w
g
o
e
g
a
o
g
g
v
e
m
d
a
m
0
s
h
i
s
4
e
m
r
m
g
v
d
s
t
c
o
g
g
h
e
s
h
p
k
r
g
6.2.1
made and t
any deviatio
a) Check o
vibratio
b) Check t
lubrican
that any
operatin
c) Check t
limits.
d) Check t
On grea
hours si
grease
e) Check a
(if fitted)
f) Refer to
equipm
Peri
6.2.2
a)
security
b) Check p
bearing
c) The cou
alignme
equipment f
6.2.3
Re-l
6.2.3.1
In general,
require furth
mechanical
shaft pumps
quantity for
flow at the r
systems.
6.2.3.2
Refer
Instructions
tine inspect
e appropriat
perating beh
and bearing
leaks (static
ny auxiliary
odic inspec
of attachme
ump operati
lubricant sha
pling should
overhaul, en
parts are av
Refer to sec
identificatio
disassembl
the nature o
used. Wher
are involved
to prevent a
Contact Flo
agency for s
6.8.1
Pu
See section
a) Disconn
pipe co
b) Carefull
connect
that wo
c) Make s
to avoid
d) Disconn
& pump
e) Disconn
pipe co
f) Rig the
lifting m
g) Remov
bolting
ues for cou
Flange di
mm (i
111 or
(4.4 or
156, 18
(6.0, 7.4
25
(10.
re for standard f
(such as, graphi
ss steel bolts,
g Impell
ection 5.3 fo
stment.
sembly
r to section 1
he pump.
Befo
sure genuin
ilable.
ional drawin
.
Please take
that there is
the material
ver chemic
, proper safe
y dangers t
serve for gu
pecific safet
p disassem
8 for section
ct all cables
nections to t
remove the
ons and rem
ld interfere
re that all th
any leaks or
ct the coupl
.
ct the sucti
nections to t
otor to a su
chanism in
the motor to
nd remove t
plings scre
meter
n.)
137
5.4)
213
, 8.4)
)
steners lubricat
e and oil, moly-
ultiply listed torq
r Clearan
r specific ins
.6, Safety, b
e dismantlin
Flowserve r
s for part nu
precaution d
no risk of ex
/ tools/ equi
l and hazard
y rules have
human live
idance, or lo
information.
bly instructi
l drawings.
/wires and c
e driver (if p
flush or lubri
ve any ass
ith the dism
valves are
spills.
ng halves [4
n (if used) a
e discharge
table hoist a
eady state.
discharge h
e motor fro
s
Nm
(lbf·ft)
122
(90)
237
(175)
424
(313)
d with a high
sulphite, white l
ues by 0.80.
e
ructions on
fore
the pump f
placement
mbers and
ring
losion due t
ment/ meth
us material
to be followe
or livestock.
al regulatory
ons
oling water
ovided).
ant
ciated piping
ntling.
hut complet
1] (the drive
d discharge
head.
d keep the
ad [304]
the dischar
ad
r
d
ly
e
ad and plac
h
lo
ation.
h) If
he pump is
ca
n) rig the dis
mp assembl
p
a
uitable hoist
arance befo
i) U
j) Li
e eye bolts
th
lifting mech
ting of short
Remove th
head/foun
Lift the enti
the dischar
ting of deep
k) Li
Remove th
or soleplat
Remove st
completely.
while lifting
Lift the pu
column pip
Support th
column pip
Disconnec
Now lift the
flange and
column pip
Remove th
couplings [
column pip
Last step i
it on a safe
f shorter len
harge head
(see sectio
(check the b
e the lifting i
nd hooks as
anism in rea
et pumps
fasteners a
ation/solepla
re pump ass
ge head [30
et pumps
fasteners a
ffing box/M
Protect the
the discharg
p just enou
flange con
entire pum
joint [101]
the dischar
pump again
disconnect t
ing
bearing ret
0] and repe
ing is disass
to lift and re
nd appropri
th (with or w
along with th
2.3 for liftin
uilding heigh
attempted)
necessary a
y state.
t the dischar
te
mbly by cla
] (See sectio
t the foundat
chanical sea
haft against
e head [304]
h to access t
ection
just below t
e head [304]
by using col
e first sectio
iners [307]
t the proces
mbled
move the bo
te
ithout
entire
) using
d get
e
ping at
n 2.3)
on plate
l [349]
damage
he first
e first
and lift
mn pipe
of
nd shaft
until all
l
assembly
See s
inform
6.9
asse
prope
enhan
ction 2.3, 4.
ation.
xaminati
bly to ensur
ly. In particu
ce pump and
.2 and 4.1.3
n of Part
Us
d parts must
the pump w
lar, fault diag
plant reliabil
for related
be inspecte
ll subsequen
nosis is esse
ity.
before
tly run
ntial to
Befor
all bol
faces.
requir
prope
proceeding
s, nuts, thre
Clean up a
Cle
d to guarant
pump opera
ith assembl
ded connect
y burrs with
nliness and
ee ease of r
tion.
y, thoroughl
ons and mat
file or emer
proper lubric
-assembly a
clean
ng
cloth.
tion are
d
Page 51 of
6
flows
rve.com
Page 52
7
Exa
m
h
b
e
u
e
.
d
s
c
s
t
a
t
c
u
m
a
e
a
r
0
u
n
S
A
s
g
s
n
t
e
s
h
g
d
v
e
t
b
a
i
s
C
E
n
a
2
d
h
o
a
k
s
r
a
t
w
n
s
.
v
i
r
o
e
a
T
h
d
v
1
e
I
1
e
g
t
t
e
b
e
e
c
o
n
n
n
n
M
a
a
M
5
.
1(1.
8
.
2(1.
9(1.
5(2.
1
.
8(2.
4(2.
2(3.
8(3.
5(3.
0(3.
2(4.
b
e
e
a
n
v
n
o
f
n
r
r
a
n
r
s
e
S
n
c
a
0
0
5
0
0
0
6
7
1
7
6
7
1
7
6
7
1
7
5
0
0
0
5
0
0
0
0
-
e
c
n
v
e
g
a
f
n
k
s
s
s
s
e
4
e
g
c
n
3
0
5
0
8
0
8
0
3
0
3
0
3
0
3
0
3
0
5
1
8
1
5
1
3
1
5
1
8
1
e
e
s
-
e
a
r
s
e
s
a
s
e
6.9.1
Check the s
Remove all
best correct
The shaft m
(0.005 in.) to
shows the r
straightness
straightened
over a consi
straightened
the crooked
side to defle
shaft has a
that the shaf
always rem
straightened
ROLLER
SHAFT
previously s
shaft be rehas not occ
6.9.2
Exa
Check all be
It is recomm
wear be repl
running clea
more than 5
R
when servici
VERTIC
ination of
afts for strai
urrs or nick
d by replaci
st be straigh
tal indicator r
commended
If the shaft i
or replaced.
erable lengt
by supportin
ection and a
t the shaft in
harp crook (
be replaced
in straight, e
.
DIAL INDI
Even if th
raightened, i
hecked at thi
rred in transi
ination of
rings for tot
nded that all
ced. In add
ance exceed
% should be
bber bearing
g a pump.
L TURBIN
haft/s
htness, pitti
. Shaft dam
g the shaft.
to within 0.1
ading. The
method for c
not straight,
If the deflecti
, the shaft c
on two bloc
pplying pres
the opposite
og-leg), it is
since the sh
en if satisfac
ATOR
shaft is ne
is recomme
s point to en
t or handling
earings
l clearance o
bearings ind
tion, any bea
s "As New" t
replaced (se
should alw
PUMPS (V
g and wear.
ge is usually
7 mm
etail below
ecking shaft
it must be
n is gradual
n usually be
s straddling
ure to the hig
direction. If t
ecommende
ft will not
orily
or has been
ded that the
ure damage
er the shaft.
cating visual
ings whose
lerances by
table 6.8.2.
ys be replac
PS) CENTR
6.9.2.
h
e
Bronz
bearin
can ei
diame
Some
These
outsid
If the
corrod
provid
Repla
into h
tolera
).
pressi
tolera
d
6.9.3
IFUGAL PU
Shaft/be
Shaft
Size
mm
(in.)
25.40
(1.000)
31.75
(1.250)
38.10
(1.500)
42.86
(1.690)
49.21
(1.940)
55.56
(2.190)
61.91
(2.440)
68.26
(2.690)
74.61
(2.940)
82.55
(3.250)
88.90
(3.500)
95.25
(3.750)
101.60
(4.000)
114.30
(4.500) 11 (4
127.00
(5.000)
Di
, epoxy, car
s are press
her be press
er until the w
rubber beari
can be remo
of the beari
earing bore
ed, the part s
a true bore
ement beari
usings so bo
ces. Measu
g and ream
ces.
Inspectio
PS ENGLI
ring cleara
Shaft
meter/Toleran
in Dia- Max Di
mm
(in.)
2
.35
(0
998)
3
.70
248)
3
.05
(1
498)
4
.81
685)
4
.16
935)
5
.51
185)
6
.86
(2
435)
6
.21
685)
7
.56
935)
8
.47
247)
8
.82
497)
9
.17
747)
1
1.58
997)
4.22
.497)
1
6.92
997)
on and hard
d into their r
d out or ma
all is thin eno
gs are the s
ed by prying
g to collaps
f the housin
hould be repl
or the bearin
gs are desig
es will shrin
e the bore of
s necessary
of bowl as
H 7156922
ce
e
25.4
(1.00
)
31.7
(1.25
)
38.1
(1.50
)
42.8
(1.68
)
49.2
(1.93
)
55.5
(2.18
)
61.9
(2.43
)
68.2
(2.68
)
74.6
(2.93
)
82.5
(3.25
)
88.9
(3.50
)
95.2
(3.75
)
101.6
0
(4.00
)
114.3
0
)
(4.50
127.0
0
(5.00
)
backed rubb
spective bor
hined on the
ugh to collap
ap-in or glue
inward on th
it.
is heavily sc
ced or rewo
g.
ed to be pre
to "as new"
bearings aft
to assure "a
embly
Bearin
Clearan
(Max/Mi
mm
(in.)
0.28/0.1
(0.011/0.0
0.35/0.1
(0.012/0.0
0.33/0.1
(0.013/0.0
0.36/0.1
(0.014/0.0
0.38/0.2
(0.015/0.0
0.41/0.2
(0.016/0.0
0.41/0.2
(0.016/0.0
0.43/0.2
(0.017/0.0
0.43/0.2
(0.017/0.0
0.46/0.2
(0.018/0.0
0.48/0.2
(0.019/0.0
0.53/0.3
(0.021/0.0
0.56/0.3
(0.022/0.0
0.58/0.3
(0.023/0.0
0.61/0.3
(0.024/0.0
– 02-15
e
)
5)
6)
7)
7)
8)
9)
9)
9)
9)
0)
1)
2)
3)
4)
5)
r
s. They
inside
e.
in type.
rred or
ked to
sed
r
new"
Page 52 of
6
been i
conditi
bowls
When repai
service for
on or strengt
and bowl thr
ing a bowl a
everal year
h of all parts
ads must b
sembly that
, the physic
such as cap
carefully ch
flows
has
l
crews,
cked.
rve.com
Page 53
7
extreme car
e
s
o
p
r
b
s
m
e
c
b
b
g
e
s
n
s
v
n
d
m
e
a
c
b
e
t
s
c
A
e
k
“
m
o
c
e
y
o
n
d
h
5
g
s
h
e
d
c
s
y
o
e
o
d
g
u
m
y
c
n
a
e
E
w
i
r
s
m
e
p
n
s
s
o
t
w
c
p
e
m
o
m
n
s
r
e
r
m
h
c
e
g
f
T
t
o
o
a
c
I
M
4
e
mating part
The inspecti
requires ex
correctly. It
Flowserve t
bowl assem
6.9.3.1
In
a) Clear all
damage
impeller
VERTIC
When att
must be ta
and ensure
n, disasse
ertise and to
is recommen
ained techni
lies.
pection of
passagewa
from abrasi
that shows s
L TURBIN
mpting to re
en to mainta
as new” tole
bly of bowl a
ls to perfor
ded to seek t
ians to insp
nclosed im
s and check
n or corrosio
igns of exce
PUMPS (V
ork any par
n alignment
ances.
sembly
the job
he services
ct and repair
ellers
for signs of
. Replace
sive wear.
PS) CENTR
,
f
f
n
IFUGAL PU
PS ENGLISH 7156922
– 02-15
b) Check i
new” tol
clearan
shown
should
c) If the ori
impeller
machin
Please note
skills and it i
authorized s
repairs.
See wear ri
6.9.3.2
In
a) Clear all
damage
b) Replace
excessi
are wor
bowl un
correcte
0.79 m
machin
perform
c) The ma
should
repair fa
If the impell
(side opposi
must be che
Please see
chart for en
peller runni
rances liste
es exceed t
y more than
e installed to
inal unit wa
wear rings, t
d off.
that certain r
recommen
ervice center
g tolerance
pection of
passagewa
from abrasi
any impeller
e wear. If th
slightly (gro
er 0.79 mm
by re-facin
(1/32 in.) is
d off without
nce of the p
hining must
e re-faced b
cility or repla
r has a bala
e pumping v
cked.
ection 6.9.4
losed impell
g clearance
in the secti
e maximum
0%, the ne
obtain corre
furnished w
ey may be
pairs may r
ed to contac
before atte
hart in secti
emi-open i
s and check
n or corrosio
, which show
bowl faces
ves in eithe
(1/32 in.)), th
the impelle
the maximu
harm to the
mp.
atch the fa
an authoriz
ed.
ce ring on th
nes) runnin
or wearing ri
rs.
against “as
n 0. If the
olerances
wear rings
t tolerances.
ith bowl and
ressed or
quire specia
t Flowserve
pting any su
n 0.
pellers
for signs of
.
signs of
or impellers
impeller or
y can be
and bowl.
that can be
ydraulic
e angle and
d Flowserve
e topside
clearances
ng tolerance
l
h
Page 53 of
6
flows
rve.com
Page 54
7
a
6.9.4
A
w
aNomm
(
2
(
(
(
(
(
(
9
1
1
1
1
1
1
1
1
1
1
2
2
2
2
2
2
2
E
t
w
n
t
3
0
3
0
3
0
4
0
4
0
4
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
5
0
6
0
6
0
6
0
6
0
6
0
6
0
6
0
6
0
6
0
6
0
T
e
e
a
t
G
5
0
6
0
6
0
6
0
6
0
7
0
7
0
7
0
7
0
8
0
8
0
9
0
9
0
9
0
9
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
2
0
I
B
e
i
.
.
.(0.
.
.
.(0.
.
.
.(0.
.(0.
.(0.
.(0.
.(0.
.(0.
.(0.
.(0.
.(0.
.(0.
.(0.
.
.
.
.
.(0.
.(0.
.
.
.
.
.
.
.(0.
.(0.
M
S
4
e
We
VERTIC
ring ring tol
Bo
di
50
76.
101
127
152
177
203
228
254
279
304
330
355
381
406
431
457
482
508
533
558
584
609
635
660
L TURBIN
erance char
l ring
in
ternal
meter.
minal
(in.)
.8-76.2
2-3)
-101.6
3-4)
.6-127.0
4-5)
.0-152.4
5-6)
.4-177.8
6-7)
.8-203.2
7-8)
.2-228.2
8-9)
.2-254.0
-10)
(
.0-279.4
0-11)
(
.4-304.8
1-12)
(
.8-330.2
2-13)
(
.2-355.6
3-14)
(
.6-381.0
4-15)
(
.0-406.4
5-16)
(
.4-431.8
6-17)
(
.8-457.2
7-18)
(
.2-482.6
8-19)
(
.6-508.0
9-20)
(
.0-533.4
0-21)
(
.4-558.8
1-22)
(
.8-584.2
2-23)
(
.2-609.6
3-24)
(
.6-635.0
(
4-25)
.0-660.4
5-26)
(
.4-685.8
6-27)
(
PUMPS (V
for enclos
Cl
earance betwe
d impeller we
a
S
andard
0.
30/0.229
(0.
13/0.009)
0.
56/0.229
(0.
14/0.009)
0.
81/0.279
(0.
15/0.011)
0.
06/0.305
(0.
16/0.012)
0.
06/0.305
(0.
16/0.012)
0.
32/0.330
(0.
17/0.013)
0.
57/0.356
(0.
18/0.014)
0.
57/0.356
(0.
18/0.014)
0.
57/0.356
(0.
18/0.014)
0.
57/0.356
(0.
18/0.014)
0.
08/0.356
(0.
20/0.014)
0.
08/0.356
(0.
20/0.014)
0.
08/0.356
(0.
20/0.014)
0.
59/0.406
(0.
22/0.016)
0.
59/0.406
(0.
22/0.016)
0.
10/0.457
(0.
24/0.018)
0.
10/0.457
(0.
24/0.018)
0.
10/0.457
(0.
24/0.018)
0.
60/0.508
(0.
26/0.020)
0.
60/0.508
(0.
26/0.020)
0.
60/0.508
(0.
26/0.020)
0.
60/0.508
(0.
26/0.020)
60/0.508
0.
(0.
26/0.020)
0.
60/0.508
(0.
26/0.020)
0.
60/0.508
(0.
26/0.020)
PS) CENTR
d impellers
n bowl
r rings
alled
0.
33/0.432
(0.
21/0.017)
0.
35/0.483
(0.
25/0.019)
0.
35/0.533
(0.
25/0.021)
0.
60/0.559
(0.
26/0.022)
0.
86/0.584
(0.
27/0.023)
0.
11/0.610
(0.
28/0.024)
0.
37/0.635
(0.
29/0.025)
0.
62/0.660
(0.
30/0.026)
0.
88/0.686
(0.
31/0.027)
0.
13/0.711
(0.
32/0.028)
0.
90/0.737
(0.
35/0.029)
0.
14/0.762
(0.
36/0.030)
0.
40/0.788
(0.
37/0.031)
0.
65/0.813
(0.
38/0.032)
0.
90/0.838
(0.
39/0.033)
1.
10/0.864
(0.
40/0.034)
1.
41/0.889
(0.
41/0.035)
1.
70/0.914
(0.
42/0.036)
1.
92/0.934
(0.
43/0.037)
1.1
18/0.965
(0.
44/0.038)
1.1
43/0.990
(0.
45/0.039)
1.1
68/1.020
(0.
46/0.040)
94/1.041
1.1
(0.
47/0.041)
1.
20/1.066
(0.
48/0.042)
1.
44/1.092
(0.
49/0.043)
IFUGAL PU
owl ring
int
rference fit
mm (
n.)
0
101/0.050
(0
004/0.002)
0
127/0.050
005/0.002)
0
152/0.076
(0
006/0.003)
0
178/0.076
007/0.003)
0
178/0.076
(0
007/0.003)
0
203/0.076
008/0.003)
0
254/0.102
010/0.004)
0
254/0.102
010/0.004)
0
254/0.102
010/0.004)
0
280/0.102
011/0.004)
0
280/0.102
011/0.004)
0
305/0.102
012/0.004)
0
305/0.127
012/0.005)
0
305/0.127
012/0.005)
0
305/0.127
012/0.005)
0
305/0.127
012/0.005)
0
330/0.406
(0
013/0.016)
0
330/0.406
(0
013/0.016)
0
356/0.152
014/0.006)
0
356/0.152
014/0.006)
0
356/0.152
(0
014/0.006)
0
381/0.179
(0
015/0.007)
406/0.179
0
(0
016/0.007)
0
406/0.203
016/0.008)
0
406/0.203
016/0.008)
PS ENGLI
Impeller ring
interference fit
0.076/0.025
(0.003/0.001)
0.102/0.025
(0.004/0.001)
0.127/0.038
(0.005/0.002)
0.127/0.038
(0.005/0.002)
0.127/0.038
(0.005/0.002)
0.152/0.051
(0.006/0.002)
0.178/0.051
(0.007/0.002)
0.229/0.051
(0.009/0.002)
0.229/0.076
(0.009/0.003)
0.229/0.076
(0.009/0.003)
0.229/0.076
(0.009/0.003)
0.254/0.102
(0.010/0.004)
0.254/0.102
(0.010/0.004)
0.254/0.102
(0.010/0.004)
0.254/0.102
(0.010/0.004)
0.254/0.102
(0.010/0.004)
0.279/0.127
(0.011/0.005)
0.279/0.127
(0.011/0.005)
0.305/0.127
(0.012/0.005)
0.304/0.127
(0.012/0.005)
0.304/0.127
(0.012/0.005)
0.330/0.152
(0.013/0.006)
0.330/0.152
(0.013/0.006)
0.356/0.179
(0.014/0.007)
0.356/0.179
(0.014/0.007)
H 7156922
– 02-15
Page 54 of
6
flows
rve.com
Page 55
7
e
e
s
n
x
f
y
o
u
m
m
o
VERTIC
A
o
h
m
c
a
s
u
m
e
h
d
e
o
s
E
c
r
s
a
n
o
l
s
h
d
o
e
p
e
y
T
h
n
e
o
I
M
4
e
L TURBIN
PUMPS (V
PS) CENTR
IFUGAL PU
PS ENGLISH 7156922
– 02-15
Ass
6.10
To a ss em bl
drawings.
Th
have order
configuratio
reflect the e
from Flowse
purchase an
It is recomm
technicians
Refer
disassembl
assembly pr
explosion d
equipment/
hazardous
must be foll
lives or lives
agency requ
Screw cap hex/head driver
adapter
Screw cap hex/head driver
stand
Stud threaded throttle
bushing housing
Nut hex throttle bushing
housing
Screw cap hex/head bowl to
discharge case
Nut hex bowl to discharge
case
Screw cap hex/head bowl to
bowl
Screw cap hex/head column
to discharge case
Nut hex column to discharge
case
Screw cap socket/head
flanged coupling
6578.# Threaded plug
4610.# O-ring
6570.# Screw
6570.# Screw
6572.# Stud
6581.# Hexagon nut
6570.# Screw
6581.# Hexagon nut
6570.# Screw
6570.# Screw
6581.# Hexagon nut
6579.# Socket head cap screw
Page 70 of 76 flowserve.com
Page 71
VERTICAL TURBINE PUMPS (VTPS) CENTRIFUGAL PUMPS ENGLISH 71569224 – 02-15
369 Ring flow
370 Sleeve stuffing box 2450 Shaft sleeve
371 Oring stuffing box sleeve 4610.# O-ring
372 Stud threaded barrel 6572.# Stud
373 Nut hex barrel 6581.# Hexagon nut
374 Oring barrel 4610.# O-ring
377
378 Gasket discharge 4590.# Gasket
379
380 Nut hex discharge 6581.# Hexagon nut
381 Screw cap hex/head motor 6570.# Screw
382 Nut hex motor 6581.# Hexagon nut
383 Cap lubricator tank
384 Band lubricator tank
385 Bolt stove f/tank oiler assy.
386 Nut hex f/tank oiler assy. 6581.# Hexagon nut
387
388
389
390 Bearing assembly (ag)
392 Nipple pipe pre-lube
393 Valve gate pre-lube
394 Pin lifting f/head 2923.# Pin
395 Ring retaining f/head
396 Clip safety f/tube nut
397 Screw cap hex/head tube nut 6570.# Screw
399
400
401 Nut hex adapter column 6581.# Hexagon nut
402
403
405 Oring ingerseal 4610.# O-ring
409 Adapter driver f/m head
412 Stud threaded base plate 6572.# Stud
413 Nut hex base plate 6581.# Hexagon nut
414 Plug pipe head pre-lube 6578.# Threaded plug
415
416 Plug pipe head pressure tap 6578.# Threaded plug
Stud threaded submersible
dr. Adapter to suct. Case
Nut hex submersible dr.
Adapter to suct. Case
Key submersible motor
coupling
Thrust stand coupling flg
flexible
Thrust stand screw cap
hex/hd upper/cap
Thrust stand fitng pipe plug
upper/cap
Thrust stand oil/sleeve or
thrust/sleeve
Thrust stand screw cap
hex/hd lower/cap
Thrust stand fitng pipe plug
lower/cap
Thrust stand key thrust
sleeve
Bell suction w/wr & case
suction w/wr
Stud threaded bowl to
bowl/bell
6572.# Stud
6581.# Hexagon nut
6700.# Key
7112 Flexible coupling
6570.# Screw
6578.# Threaded plug
2470 Centring sleeve
6570.# Screw
6578.# Threaded plug
6700.# Key
1310/1130
6572.# Stud
Suction bell / suction
casing
55 Bell, suction
Seal, mech. Stationary/
rotating elements
Page 73 of 76 flowserve.com
Page 74
VERTICAL TURBINE PUMPS (VTPS) CENTRIFUGAL PUMPS ENGLISH 71569224 – 02-15
497 Thrust stand sight glass 8221 Sight glass
498 Thrust stand fitng pipe plug 6578.# Threaded plug
499
500 Thrust stand bearing housing 3200 Bearing housing
501
502
503
504
505 Thrust stand bearing spindle 2471 Bearing adapter sleeve
506 Thrust stand lockwasher 6541 Lock washer
507 Thrust stand locknut 6580 Nut
508 Thrust stand oil impeller 4223 Pumping ring
509
510 Thrust stand seal labyrinth 4305 Shaft seal ring
511
Thrust stand fitng pipe plug
bush redcr
Thrust stand o-ring f/bearing
housing
Thrust stand screw cap
hex/hd dr/stand to brg/hsg
Thrust stand fitng pipe plug
hex/sckt flush seal side
Thrust stand fitng pipe plug
hex/sckt flush seal top
Thrust stand o-ring f/bearing
housing cap
Thrust stand screw cap
sockt/hd adjusting nut
6578.# Threaded plug
4610.# O-ring
6570.# Screw
6578.# Threaded plug
6578.# Threaded plug
4610.# O-ring
6579.# Socket head cap screw
Page 74 of 76 flowserve.com
Page 75
VERTICAL TURBINE PUMPS (VTPS) CENTRIFUGAL PUMPS ENGLISH 71569224 – 02-15
NOTES:
Page 75 of 76 flowserve.com
Page 76
VERTICAL TURBINE PUMPS (VTPS) CENTRIFUGAL PUMPS ENGLISH 71569224 – 02-15
Your Flowserve factory contacts:
Flowserve Pump Division
5310 Taneytown Pike, PO Box 91
Taneytown, MD 21787-0091, USA
Telephone: +1 (410) 756 2602
Customer Service FAX: +1 (410) 756 2615
Parts inquiry/Order PH: +1 (800) 526 3569