Elkay ECP81B Installation Manual

0 (0)
Elkay ECP81B Installation  Manual

ECP8*1B

Installation / Care / Use Manual

Refrigeration Package

INSTALLATION

1.Insure proper ventilation. In fully recessed drinking fountains be sure condenser faces louver panel and is within 1/2" (13 mm) of louver panel when panel is in place.

2.Water inlet is 3/8" (10 mm) O.D. unplated tube . Contractor to supply connections as required.

3.Connecting lines to be made of unplated copper. Thoroughly flush all lines to remove all foreign matter before connecting to cooler.

4.Connect cooler to building supply with a shut-off valve and install a 3/8" (10 mm) unplated water line between the valve and cooler. Remove burrs from outside of water line. Insert water line into bulkhead union until it reaches a positive stop, approximately 3/4" (19 mm).

NOTE: DO NOT SOLDER TUBES INSERTED INTO THE STRAINER AS DAMAGE TO THE O-RINGS MAY RESULT. 5. Electrical: Make sure power supply is identical in voltage, cycle, and phase to that specified on cooler serial

plate. Never wire the compressor directly to the power supply.

IMPORTANT! INSTALLER PLEASE NOTE:

The grounding of electrical equipment such as telephone, computers, etc., to water lines is a common procedure. This grounding may be in the building, or may occur away from the building. This grounding can cause electrical feedback into a water chiller, creating an electrolysis which causes a metallic taste or an increase in the metal content of the water. This condition is avoidable by using the proper materials indicated below. Drain fittings which are provided by the installer should be plastic to electrically isolate the chiller from the building plumbing system.

START-UP

1.Open supply line valve.

2.Purge all air from all water lines by operating bubbler valve of fountain to which cooler is connected. A steady stream flow assures that all air is removed.

3.Rotate fan blade to assure proper clearance and free action.

4.Connect to proper electrical power.

TROUBLE SHOOTING & MAINTENANCE

Temperature Control: Factory-set for 50°F water (± 5°) under normal conditions. For colder water, adjust screw on item no. 5.

Ventilation: Cabinet louvers and condenser fins should be periodically cleaned with a brush, air hose, or vacuum cleaner. Excess dirt or poor ventilation can cause no cold water and compressor cycling on the overload protector.

Lubrication: Motors are lifetime lubricated.

Actuation of Quick Connect Water Fittings: Cooler is provided with lead-free connectors which utilize an o-ring seal. To remove tubing from the fittings, relieve water pressure, push in on gray collar while pulling on the tubing. To insert tubing, push tube straight into fitting until it reaches a positive stop, approximately 3/4”.

WIRING DIAGRAM

 

 

 

 

OPERATION OF QUICK CONNECT FITTINGS

 

SIMPLY PUSH IN

TUBE IS SECURED

PUSH IN COLLET

 

TUBE TO ATTACH

IN POSITION

TO RELEASE TUBE

 

 

 

PUSHING TUBE IN BEFORE

 

 

 

PULLING IT OUT HELPS TO

 

 

 

RELEASE TUBE

 

 

 

 

97454C (Rev. C - 8/00)

Loading...
+ 1 hidden pages