Parr Instrument 1271 User Manual

No. 330M
Instructions for Packing and Shipping the A750DD2 Mechanical Assembly for a Parr 1271 Calorimeter
If it becomes necessary to return a Parr 1271 Calorimeter to the factory, the A750DD2 mechanical unit (the tower) must be packed carefully to prevent shipping damage. For best protection, Parr will furnish a heavy-duty shipping carton and a set of foamed plastic “traps” (spacers) which will align and hold the tower firmly in place within the carton. Using these supplies, the shipper should pack the unit as described below.
1. While the calorimeter is still under
2. Shut off the power to the tower and to
3. Shut off the water handling system and
4. Swing the plate at the back of the
power, go into “Program Diagnostics”, Menu 9.7, and select “Head Up”. This will raise the bomb head up into the tower.
the controller and disconnect the power cords. Shut off the oxygen and nitrogen tanks and vent the rinse tank. Disconnect the gas lines from the back of the tower.
prepare to drain the tower. The unit will drain freely when the water lines are removed. To control the drainage, disconnect the water lines from the water handling system and place them in a bucket at a lower level until all the water has drained from the tower; then disconnect the lines from the back of the unit.
workspace upward and hold it up while sliding the foamed plastic trap into the space underneath the plate.
Lift the Back Plate
Insert Trap Under the Plate
5. Tilt and lift the tower and set into the trap which fits the side; then place the matching trap on the other side as shown.
6. Set shipping carton on end next to the tower, then slide the unit into the carton with side traps in place. Close and tape the carton.
7. Attach a readable shipping address and, if shipping to the factory, be sure to show RMA No. (Return Material Authorization Number) provided by Parr.
If an A750DD2 shipping carton and traps are not available, prepare the tower for shipment as described in steps 1-3 and ship it in a sturdy box which will provide 3 or 4 inches clearance at the bottom and top and 6 inches clearance around the sides of the unit. Place the tower in a large plastic bag. Close the bag and set the unit on a 3 or 4 inch layer of plastic peanuts or other dense, shock absorbing material in the bottom of the box. Then fill all remaining space with the packing material. Close the box and mark it as stated above. Apply arrows to identify the top of the shipment and strap the box firmly to a wood pallet, if available.
Attach Top and Bottom Traps
PARR INSTRUMENT COMPANY
211 Fifty-Third Street, Moline, Illinois 61265 USA
309/762-7716 800/872-7720
Fax 309/762-9453
http://www.parrinst.com E-Mail: parr@parrinst.com
Revision 7-29-02
Slide the Unit Into the Carton
Loading...