Musician’s Guide
(includes PC3K6, PC3K7, and PC3K8)
®
Kurzweil is a registered trademark of Young Chang Co., Ltd. ©2011 All rights reserved. Young Chang®, Kurzweil ®, V. A. S. T. ®, PC3K®, PC3®, PC3LE®, KDFX®, Pitcher®, LaserVerb®, KSP8 ™, K2661™, K2600™, K2500™, and K2000™ are trademarks of Young Chang Co., Ltd. All other products and brand names are trademarks or registered trademarks of their respective companies. Product features and specifications are subject to change without notice.
You may legally print up to two (2) copies of this document for personal use. Commercial use of any copies of this document is prohibited. Young Chang Co. retains ownership of all intellectual property represented by this document.
910523-002 – V2 June 2011
CAUTION |
RISK OF ELECTRIC SHOCK |
DO NOT OPEN |
CAUTION: TO REDUCE THE RISK OF ELECTRIC SHOCK, DO NOT REMOVE THE COVER
NO USER SERVICEABLE PARTS INSIDE
REFER SERVICING TO QUALIFIED SERVICE PERSONNEL
The lightning flash with the arrowhead symbol, within an equilateral triangle, is intended to alert the user to the presence of uninsulated "dangerous voltage" within the product's enclosure that may be of sufficient magnitude to constitute a risk of electric shock to persons.
The exclamation point within an equilateral triangle is intended to alert the user to the presence of important operating and maintenance (servicing) instructions in the literature accompanying the product.
IMPORTANT SAFETY & INSTALLATION INSTRUCTIONS
INSTRUCTIONS PERTAINING TO THE RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSONS
WARNING: When using electric products, basic precautions should always be followed, including the following:
1.Read all of the Safety and Installation Instructions and Explanation of Graphic Symbols before using the product.
2.This product must be grounded. If it should malfunction or break down, grounding provides a path of least resistance for electric current to reduce the risk of electric shock. This product is equipped with a power supply cord having an equipment-grounding conductor and a grounding plug. The plug must be plugged into an appropriate outlet which is properly installed and grounded in accordance with all local codes and ordinances.
DANGER: Improper connection of the equipment-grounding conductor can result in a risk of electric shock. Do not modify the plug provided with the product - if it will not fit the outlet, have a proper outlet installed by a qualified electrician. Do not use an adaptor which defeats the function of the equipment-grounding conductor. If you are in doubt as to whether the product is properly grounded, check with a qualified serviceman or electrician.
3.WARNING: This product is equipped with an AC input voltage selector. The voltage selector has been factory set for the mains supply voltage in the country where this unit was sold. Changing the voltage selector may require the use of a different power supply cord or attachment plug, or both. To reduce the risk of fire or electric shock, refer servicing to qualified maintenance personnel.
4.Do not use this product near water - for example, near a bathtub, washbowl, kitchen sink, in a wet basement, or near a swimming pool, or the like.
5.This product should only be used with a stand or cart that is recommended by the manufacturer.
6.This product, either alone or in combination with an amplifier and speakers or headphones, may be capable of producing sound levels that could cause permanent hearing loss. Do not operate for a long period of time at a high volume level or at a level that is uncomfortable. If you experience any hearing loss or ringing in the ears, you should consult an audiologist.
7.The product should be located so that its location or position does not interfere with its proper ventilation.
8.The product should be located away from heat sources such as radiators, heat registers, or other products that produce heat.
9.The product should be connected to a power supply only of the type described in the operating instructions or as marked on the product.
10.This product may be equipped with a polarized line plug (one blade wider than the other). This is a safety feature. If you are unable to insert the plug into the outlet, contact an electrician to replace your obsolete outlet. Do not defeat the safety purpose of the plug.
11.The power supply cord of the product should be unplugged from the outlet when left unused for a long period of time. When unplugging the power supply cord, do not pull on the cord, but grasp it by the plug.
12.Care should be taken so that objects do not fall and liquids are not spilled into the enclosure through openings.
13.The product should be serviced by qualified service personnel when:
A.The power supply cord or the plug has been damaged;
B.Objects have fallen, or liquid has been spilled into the product;
C.The product has been exposed to rain;
D.The product does not appear to be operating normally or exhibits a marked change in performance;
E.The product has been dropped, or the enclosure damaged.
14.Do not attempt to service the product beyond that described in the user maintenance instructions. All other servicing should be referred to qualified service personnel.
15.WARNING: Do not place objects on the product’s power supply cord, or place the product in a position where anyone could trip over, walk on, or roll anything over cords of any type. Do not allow the product to rest on or be installed over cords of any type. Improper installations of this type create the possibility of a fire hazard and/or personal injury.
RADIO AND TELEVISION INTERFERENCE
WARNING: Changes or modifications to this instrument not expressly approved by Young Chang could void your authority to operate the instrument.
IMPORTANT: When connecting this product to accessories and/or other equipment use only high quality shielded cables.
NOTE: This instrument has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This instrument generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this instrument does cause harmful interference to radio or television reception, which can be determined by turning the instrument off and on, the user is encouraged to try to correct the interference by one or more of the following measures:
•Reorient or relocate the receiving antenna.
•Increase the separation between the instrument and the receiver.
•Connect the instrument into an outlet on a circuit other than the one to which the receiver is connected.
•If necessary consult your dealer or an experienced radio/television technician for additional suggestions.
NOTICE
This apparatus does not exceed the Class B limits for radio noise emissions from digital apparatus set out in the Radio Interference Regulations of the Canadian Department of Communications.
AVIS
Le present appareil numerique n’emet pas de bruits radioelectriques depassant les limites applicables aux appareils numeriques de la class B prescrites dans le Reglement sur le brouillage radioelectrique edicte par le ministere des Communications du Canada.
SAVE THESE INSTRUCTIONS
ii
Important Safety Instructions
1)Read these instructions
2)Keep these instructions.
3)Heed all warnings. 4)Follow all instructions.
5)Do not use this apparatus near water.
6)Clean only with dry cloth.
7)Do not block any of the ventilation openings. Install in accordance with the manufacturer’s instructions.
8)Do not install near any heat sources such as radiators, heat registers, stoves, or other apparatus
(including amplifiers) that produce heat.
9)Do not defeat the safety purpose of the polarized or grounding type plug. A polarized plug has two blades with one wider than the other. A grounding type plug has two blades and a third grounding prong. The wide blade or the third prong are provided for your safety. If the provided plug does not fit into your outlet, consult an electrician for replacement of the obsolete outlet.
10)Protect the power cord from being walked on or pinched, particularly at plugs, convenience receptacles, and the point where they exit from the apparatus.
11)Only use attachments/accessories specified by the manufacturer.
12)Use only with a cart, stand, tripod, bracket, or table specified by the manufacturer, or sold with the apparatus. When a cart is used, use caution when moving the cart/apparatus combination to avoid injury from tip over.
13)Unplug this apparatus during lightning storms or when unused for long periods of time.
14)CAUTION: Danger of explosion if battery is incorrectly replaced. Replace only with the same or equivalent type (CR2032).
15)Refer all servicing to qualified service personnel. Servicing is required when the apparatus has been damaged in any way, such as power supply cord or plug is damaged, liquid has been spilled or objects have fallen into the apparatus, the apparatus has been exposed to rain or moisture, does not operate normally, or has been dropped.
Warning To reduce the risk of fire or electric shock, do not expose this apparatus to rain or mois ture. Do not expose this equipment to dripping or splashing and ensure that no objects filled with liquids, such as vases, are placed on the equipment.
To completely disconnect this equipment from the AC Mains, disconnect the power supply cord plug from the AC receptacle.
iii
Contact the Kurzweil office listed below to locate your local Kurzweil representative.
American Music & Sound
22020 Clarendon St, Suite 305
Woodland Hills, CA 91367
Phone: +1 (800) 431 2609
Fax: +1 (818) 597 0411
Email: info@americanmusicandsound.com
Young Chang Co., Ltd.
9th Floor, Bldg 102, I Park,
Jeongja Dong, Bundang Gu, Seongnam Si, Gyeonggi Do
463 811 South Korea
Phone: +82 (31) 786 7986~7
Fax: +82 (31) 785 2701
www.ycpiano.co.kr
www.youngchang.com
www.kurzweil.com
TECHNICAL SUPPORT
Email: support@kurzweil.com
iv
Kurzweil International Contacts......................................................................................................................................iv
Chapter 1 Introduction |
|
Keeping Current .............................................................................................................................................................. |
1 2 |
Overview of the PC3K..................................................................................................................................................... |
1 2 |
How the PC3K Works ..................................................................................................................................................... |
1 3 |
VAST Synthesis ................................................................................................................................................................ |
1 3 |
KB3 Tone Wheel Emulation ........................................................................................................................................... |
1 3 |
VA 1 Programs ................................................................................................................................................................. |
1 3 |
How to Use This Manual................................................................................................................................................ |
1 4 |
Do I Have Everything?.................................................................................................................................................... |
1 4 |
Boot Loader....................................................................................................................................................................... |
1 4 |
Battery................................................................................................................................................................................ |
1 4 |
Options .............................................................................................................................................................................. |
1 5 |
Sound ROM Expansion Card.................................................................................................................................. |
1 5 |
Pedals.......................................................................................................................................................................... |
1 5 |
Ribbon Controller ..................................................................................................................................................... |
1 5 |
Breath Controller ...................................................................................................................................................... |
1 5 |
USB Storage Device .................................................................................................................................................. |
1 5 |
Make Connections ........................................................................................................................................................... |
2 1 |
Make Music....................................................................................................................................................................... |
2 1 |
Startup—the Details ........................................................................................................................................................ |
2 2 |
Before You Start... ..................................................................................................................................................... |
2 2 |
Connecting the Power Cable (Line Cord) ............................................................................................................. |
2 2 |
Connecting Audio Cables........................................................................................................................................ |
2 2 |
Connecting MIDI ...................................................................................................................................................... |
2 3 |
Pedals.......................................................................................................................................................................... |
2 4 |
Breath.......................................................................................................................................................................... |
2 4 |
Ribbon ........................................................................................................................................................................ |
2 5 |
Switching On the Power .......................................................................................................................................... |
2 5 |
USB Storage Port....................................................................................................................................................... |
2 6 |
USB Computer Port.................................................................................................................................................. |
2 6 |
Setting the Clock ....................................................................................................................................................... |
2 7 |
PC3K Programs................................................................................................................................................................ |
2 7 |
Selecting Programs ................................................................................................................................................... |
2 7 |
Easy Audition............................................................................................................................................................ |
2 7 |
Program Mode Display ........................................................................................................................................... |
2 8 |
VAST Programs......................................................................................................................................................... |
2 8 |
KB3 Programs............................................................................................................................................................ |
2 9 |
Setups ................................................................................................................................................................................ |
2 9 |
Quick Access..................................................................................................................................................................... |
2 9 |
The Other Modes ........................................................................................................................................................... |
2 10 |
TOC-i
Software Upgrades ........................................................................................................................................................ |
2 10 |
Mode Selection ................................................................................................................................................................. |
3 1 |
Mode Buttons ................................................................................................................................................................... |
3 2 |
Bank Buttons..................................................................................................................................................................... |
3 2 |
Sliders ................................................................................................................................................................................ |
3 3 |
Program and Category Buttons ..................................................................................................................................... |
3 4 |
Picking favorites ....................................................................................................................................................... |
3 4 |
Pitch Wheel and Mod Wheel ......................................................................................................................................... |
3 5 |
Navigation ........................................................................................................................................................................ |
3 6 |
The Display................................................................................................................................................................ |
3 6 |
Pages........................................................................................................................................................................... |
3 6 |
The Top Line.............................................................................................................................................................. |
3 6 |
The Bottom Line........................................................................................................................................................ |
3 6 |
The Soft Buttons........................................................................................................................................................ |
3 7 |
The Cursor Buttons .................................................................................................................................................. |
3 7 |
The Chan/Layer Buttons.......................................................................................................................................... |
3 7 |
The Edit Button ......................................................................................................................................................... |
3 8 |
The Exit Button ......................................................................................................................................................... |
3 8 |
Data Entry ......................................................................................................................................................................... |
3 9 |
The Alpha Wheel ...................................................................................................................................................... |
3 9 |
The Plus/Minus Buttons .......................................................................................................................................... |
3 9 |
The Alphanumeric Pad............................................................................................................................................ |
3 9 |
Double Button Presses ........................................................................................................................................... |
3 10 |
Intuitive Data Entry....................................................................................................................................................... |
3 11 |
Changing the Current Layer in Multi Layer Programs .................................................................................... |
3 11 |
Search............................................................................................................................................................................... |
3 12 |
Quick Song Recording and Playback.......................................................................................................................... |
3 12 |
What the Modes Are ....................................................................................................................................................... |
4 1 |
Selecting Modes ............................................................................................................................................................... |
4 1 |
Finding Square One.................................................................................................................................................. |
4 2 |
Using the Modes .............................................................................................................................................................. |
4 2 |
Program Mode .......................................................................................................................................................... |
4 2 |
Setup Mode................................................................................................................................................................ |
4 2 |
Quick Access Mode .................................................................................................................................................. |
4 3 |
Effects Mode.............................................................................................................................................................. |
4 3 |
MIDI Mode ................................................................................................................................................................ |
4 3 |
Master Mode ............................................................................................................................................................. |
4 3 |
Song Mode................................................................................................................................................................. |
4 3 |
Storage Mode ............................................................................................................................................................ |
4 3 |
Introduction to Editing ................................................................................................................................................... |
5 1 |
What’s an Object?...................................................................................................................................................... |
5 1 |
Object Type and ID .......................................................................................................................................................... |
5 2 |
TOC-ii
Saving and Naming......................................................................................................................................................... |
5 3 |
ROM Objects ............................................................................................................................................................. |
5 4 |
Memory Objects........................................................................................................................................................ |
5 4 |
Keyboard Naming .................................................................................................................................................... |
5 5 |
Deleting Objects ............................................................................................................................................................... |
5 6 |
Dependent Objects ................................................................................................................................................... |
5 6 |
Saving and Loading Files—Storage Mode................................................................................................................... |
5 6 |
Special Button Functions ................................................................................................................................................ |
5 7 |
The Program Mode Page ................................................................................................................................................ |
6 1 |
Selecting Programs ................................................................................................................................................... |
6 1 |
The Soft Buttons in Program Mode ....................................................................................................................... |
6 2 |
The Info Box............................................................................................................................................................... |
6 2 |
Controllers Assignments For Factory ROM Programs ....................................................................................... |
6 2 |
Saving Controller Settings in Program Mode ...................................................................................................... |
6 3 |
The Arpeggiator In Program Mode ....................................................................................................................... |
6 3 |
MIDI Channels.......................................................................................................................................................... |
6 3 |
VAST and KB3 Programs................................................................................................................................................ |
6 4 |
VAST Program Structure ................................................................................................................................................ |
6 4 |
KB3 Program Structure ................................................................................................................................................... |
6 6 |
KB3 Mode .................................................................................................................................................................. |
6 6 |
KB3 Effects And Real time Controls...................................................................................................................... |
6 6 |
MIDI Control of KB3 Programs.............................................................................................................................. |
6 8 |
Control Setup.................................................................................................................................................................... |
6 9 |
Control Setup Overview.......................................................................................................................................... |
6 9 |
Control Setup Advanced Features ....................................................................................................................... |
6 10 |
Selecting And Editing The Control Setup........................................................................................................... |
6 10 |
Editing VAST Programs................................................................................................................................................ |
6 12 |
The Soft Buttons in the Program Editor .............................................................................................................. |
6 12 |
The MODE Buttons in the Program Editor......................................................................................................... |
6 13 |
Assigning Program Parameters to Control Sources .......................................................................................... |
6 13 |
The KEYMAP Page........................................................................................................................................................ |
6 14 |
Keymap .................................................................................................................................................................... |
6 14 |
Transpose (Xpose)................................................................................................................................................... |
6 14 |
Key Tracking (KeyTrk)........................................................................................................................................... |
6 14 |
Velocity Tracking (VelTrk)..................................................................................................................................... |
6 15 |
Method (AltMethod).............................................................................................................................................. |
6 15 |
Stereo ........................................................................................................................................................................ |
6 15 |
Timbre Shift ............................................................................................................................................................. |
6 16 |
Playback Mode........................................................................................................................................................ |
6 16 |
Alternative Controller (AltControl) ..................................................................................................................... |
6 16 |
Alternative Switch (AltControl and AltMethod)............................................................................................... |
6 16 |
The LAYER Page ............................................................................................................................................................ |
6 17 |
Low Key (LoKey).................................................................................................................................................... |
6 18 |
High Key (HiKey)................................................................................................................................................... |
6 18 |
Low Velocity (LoVel).............................................................................................................................................. |
6 18 |
High Velocity (HiVel)............................................................................................................................................. |
6 18 |
Pitch Bend Mode (Bend)........................................................................................................................................ |
6 18 |
Trigger (Trig) ........................................................................................................................................................... |
6 18 |
TOC-iii
Delay Control (DlyCtl)........................................................................................................................................... |
6 18 |
Minimum Delay (MinDly), Maximum Delay (MaxDly) .................................................................................. |
6 19 |
Enable ....................................................................................................................................................................... |
6 19 |
Enable Sense (S) ...................................................................................................................................................... |
6 19 |
Opaque..................................................................................................................................................................... |
6 20 |
Sustain Pedal (SusPdl) ........................................................................................................................................... |
6 20 |
Sostenuto Pedal (SosPdl) ....................................................................................................................................... |
6 20 |
Freeze Pedal (FrzPdl) ............................................................................................................................................. |
6 20 |
Ignore Release (IgnRel).......................................................................................................................................... |
6 20 |
Hold Through Attack (ThrAtt) ............................................................................................................................. |
6 21 |
Hold Until Decay (TilDec)..................................................................................................................................... |
6 21 |
The PITCH Page............................................................................................................................................................. |
6 21 |
The AMP Page................................................................................................................................................................ |
6 21 |
The Algorithm (ALG) Page .......................................................................................................................................... |
6 22 |
Algorithm Basics..................................................................................................................................................... |
6 23 |
Common DSP Control Parameters ...................................................................................................................... |
6 24 |
Alt Input for Algorithms (Cascade Mode).......................................................................................................... |
6 27 |
Dynamic VAST........................................................................................................................................................ |
6 28 |
The DSP Control (DSPCTL) Page................................................................................................................................ |
6 29 |
The DSP Modulation (DSPMOD) Page ...................................................................................................................... |
6 30 |
The OUTPUT Page ........................................................................................................................................................ |
6 31 |
Pan ............................................................................................................................................................................ |
6 32 |
Pan Mode ................................................................................................................................................................. |
6 32 |
Output: Pan, Gain, and Mode............................................................................................................................... |
6 33 |
Pan Table .................................................................................................................................................................. |
6 33 |
Crossfade and Crossfade Sense (XFadeSense) ................................................................................................... |
6 33 |
Drum Remap........................................................................................................................................................... |
6 33 |
Exclusive Zone Map............................................................................................................................................... |
6 34 |
The COMMON Page ..................................................................................................................................................... |
6 35 |
Pitch Bend Range Up and Down.......................................................................................................................... |
6 35 |
Monophonic ............................................................................................................................................................ |
6 35 |
Legato Play .............................................................................................................................................................. |
6 36 |
Portamento .............................................................................................................................................................. |
6 36 |
Portamento Rate...................................................................................................................................................... |
6 36 |
Attack Portamento.................................................................................................................................................. |
6 36 |
Mono Sample XFade .............................................................................................................................................. |
6 37 |
Globals...................................................................................................................................................................... |
6 37 |
Output: Gain, Pan, and Pan Mode ....................................................................................................................... |
6 37 |
Demo Song............................................................................................................................................................... |
6 37 |
The LFO Page ................................................................................................................................................................. |
6 38 |
Minimum Rate ........................................................................................................................................................ |
6 39 |
Maximum Rate........................................................................................................................................................ |
6 39 |
Rate Control............................................................................................................................................................. |
6 39 |
LFO Shape................................................................................................................................................................ |
6 39 |
LFO Phase................................................................................................................................................................ |
6 39 |
The ASR Page ................................................................................................................................................................. |
6 40 |
Trigger ...................................................................................................................................................................... |
6 40 |
Mode......................................................................................................................................................................... |
6 40 |
Delay......................................................................................................................................................................... |
6 40 |
Attack ....................................................................................................................................................................... |
6 41 |
Release...................................................................................................................................................................... |
6 41 |
TOC-iv
The Function (FUN) Page ............................................................................................................................................. |
6 41 |
The Amplitude Envelope (AMPENV) Page............................................................................................................... |
6 42 |
Attack Segment Times ........................................................................................................................................... |
6 43 |
Attack Segment Levels........................................................................................................................................... |
6 43 |
Decay Segment........................................................................................................................................................ |
6 43 |
Release Segments.................................................................................................................................................... |
6 43 |
Loop Type ................................................................................................................................................................ |
6 44 |
Number of Loops.................................................................................................................................................... |
6 44 |
The Envelope 2 (ENV2) and Envelope 3 (ENV3) Pages........................................................................................... |
6 44 |
The Envelope Control (ENVCTL) Page...................................................................................................................... |
6 45 |
Adjust ....................................................................................................................................................................... |
6 46 |
Key Tracking............................................................................................................................................................ |
6 46 |
Velocity Tracking .................................................................................................................................................... |
6 46 |
Source, Depth .......................................................................................................................................................... |
6 46 |
Impact....................................................................................................................................................................... |
6 47 |
The Program FX (PROGFX) Page................................................................................................................................ |
6 47 |
Insert......................................................................................................................................................................... |
6 47 |
Aux 1, Aux 2............................................................................................................................................................ |
6 47 |
Output ...................................................................................................................................................................... |
6 48 |
Auxiliary Send Parameters.................................................................................................................................... |
6 48 |
Aux1 Mod, Aux2 Mod ........................................................................................................................................... |
6 49 |
The Layer FX (LYR_FX) Page ....................................................................................................................................... |
6 49 |
The Controllers (CTLS) Page........................................................................................................................................ |
6 50 |
INFO ................................................................................................................................................................................ |
6 51 |
Function Soft Buttons.................................................................................................................................................... |
6 51 |
Set Controllers (SetCtl)........................................................................................................................................... |
6 52 |
New Layer (NewLyr) ............................................................................................................................................. |
6 52 |
Duplicate Layer (DupLyr) ..................................................................................................................................... |
6 52 |
Import Layer (ImpLyr)........................................................................................................................................... |
6 52 |
Delete Layer (DelLyr)............................................................................................................................................. |
6 52 |
Name, Save, Delete................................................................................................................................................. |
6 52 |
Editing VAST Programs With KVA Oscillators......................................................................................................... |
6 53 |
Basic Use of KVA Oscillators ................................................................................................................................ |
6 53 |
Setting KVA Oscillator Type ................................................................................................................................. |
6 54 |
Advanced Use Of KVA Oscillators ...................................................................................................................... |
6 55 |
Editing KB3 Programs................................................................................................................................................... |
6 59 |
KB3 Editor: The Tone Wheels (TONEWL) Page........................................................................................................ |
6 59 |
Upper Tone Wheel Keymap.................................................................................................................................. |
6 59 |
Upper Volume Adjust............................................................................................................................................ |
6 60 |
Number of Tone Wheels ........................................................................................................................................ |
6 60 |
Organ Map............................................................................................................................................................... |
6 60 |
Wheel Volume Map................................................................................................................................................ |
6 60 |
Globals...................................................................................................................................................................... |
6 60 |
Lower Transpose / Upper Transpose ................................................................................................................... |
6 60 |
KB3 Editor: The Drawbars (DRAWBR) Page............................................................................................................. |
6 61 |
Mode......................................................................................................................................................................... |
6 61 |
Steps.......................................................................................................................................................................... |
6 61 |
Volume ..................................................................................................................................................................... |
6 61 |
Tune .......................................................................................................................................................................... |
6 61 |
KB3 Editor: The Set Drawbars (SetDBR) Soft Button ............................................................................................... |
6 62 |
KB3 Editor: The PITCH Page ....................................................................................................................................... |
6 62 |
TOC-v
KB3 Editor: The AMP Page .......................................................................................................................................... |
6 62 |
KB3 Editor: The PERC1 Page ....................................................................................................................................... |
6 63 |
Percussion ................................................................................................................................................................ |
6 63 |
Volume ..................................................................................................................................................................... |
6 63 |
Decay ........................................................................................................................................................................ |
6 63 |
Harmonic ................................................................................................................................................................. |
6 64 |
VelTrack.................................................................................................................................................................... |
6 64 |
LowHarm................................................................................................................................................................. |
6 64 |
HighHarm................................................................................................................................................................ |
6 64 |
StealBar..................................................................................................................................................................... |
6 64 |
KB3 Editor: The PERC2 Page ....................................................................................................................................... |
6 64 |
PercLevel, DecayTime, OrgLevel ......................................................................................................................... |
6 64 |
KB3 Editor: The KEYCLK Page ................................................................................................................................... |
6 65 |
KeyClick................................................................................................................................................................... |
6 65 |
Volume ..................................................................................................................................................................... |
6 65 |
Decay ........................................................................................................................................................................ |
6 65 |
VelTrk ....................................................................................................................................................................... |
6 65 |
Pitch .......................................................................................................................................................................... |
6 66 |
Random.................................................................................................................................................................... |
6 66 |
ReTrigThresh ........................................................................................................................................................... |
6 66 |
Note Attack.............................................................................................................................................................. |
6 66 |
Note Release ............................................................................................................................................................ |
6 66 |
KB3 Editor: The MISC Page.......................................................................................................................................... |
6 67 |
PreampResp............................................................................................................................................................. |
6 67 |
Leakage .................................................................................................................................................................... |
6 67 |
LeakMode ................................................................................................................................................................ |
6 68 |
SpeedCtl ................................................................................................................................................................... |
6 68 |
VibChorCtl............................................................................................................................................................... |
6 68 |
VibChorSel............................................................................................................................................................... |
6 68 |
VolAdjust ................................................................................................................................................................. |
6 68 |
BendRngUp, BendRngDn ..................................................................................................................................... |
6 68 |
Sustain ...................................................................................................................................................................... |
6 68 |
Sostenuto.................................................................................................................................................................. |
6 68 |
LesliePedal............................................................................................................................................................... |
6 68 |
KB3 Editor: The EQ Page .............................................................................................................................................. |
6 69 |
KB3 Editor: The OUTPUT Page ................................................................................................................................... |
6 70 |
Exp Pedal ................................................................................................................................................................. |
6 70 |
KB3 Editor: The Program FX (PROGFX) Page .......................................................................................................... |
6 70 |
KB3 Editor: The LFO, ASR, and FUN Pages.............................................................................................................. |
6 70 |
KB3 Programming Tips ................................................................................................................................................ |
6 71 |
Zone status LEDs in Setup Mode........................................................................................................................... |
7 2 |
Soloing a Zone........................................................................................................................................................... |
7 3 |
The Setup Editor .............................................................................................................................................................. |
7 3 |
The Channel/Program (CH/PROG) Page ..................................................................................................................... |
7 4 |
Program...................................................................................................................................................................... |
7 4 |
Destination................................................................................................................................................................. |
7 5 |
Channel ...................................................................................................................................................................... |
7 5 |
MidiBank.................................................................................................................................................................... |
7 5 |
TOC-vi
MIDI Program (MidiProg) ...................................................................................................................................... |
7 6 |
Status .......................................................................................................................................................................... |
7 6 |
Out .............................................................................................................................................................................. |
7 6 |
Input Channel ........................................................................................................................................................... |
7 6 |
MIDI Bank Mode (BankMode) ............................................................................................................................... |
7 7 |
Entry Program Change (EntryProgChg)............................................................................................................... |
7 8 |
Arpeggiator ............................................................................................................................................................... |
7 8 |
The Key/Velocity (KEY VEL) Page ................................................................................................................................ |
7 9 |
Low Key (LoKey), High Key (HiKey) ................................................................................................................. |
7 10 |
Transpose ................................................................................................................................................................. |
7 10 |
Note Map ................................................................................................................................................................. |
7 10 |
Velocity Scale (VelScale) ........................................................................................................................................ |
7 11 |
Velocity Offset ......................................................................................................................................................... |
7 12 |
Velocity Curve (VelCurve)..................................................................................................................................... |
7 14 |
Low Velocity (LoVel), HighVelocity (HiVel)....................................................................................................... |
7 16 |
The Pan/Volume (PAN/VOL) Page ............................................................................................................................. |
7 17 |
Entry Volume, Exit Volume................................................................................................................................... |
7 17 |
Entry Pan, Exit Pan ................................................................................................................................................. |
7 17 |
The BEND Page.............................................................................................................................................................. |
7 18 |
Bend Range (Semitones) and Bend Range (Cents): Up and Down ................................................................. |
7 18 |
Aux Bend 1 Up and Aux Bend 1 Down .............................................................................................................. |
7 19 |
Aux Bend 2 Range .................................................................................................................................................. |
7 19 |
Controllers ...................................................................................................................................................................... |
7 19 |
Continuous Controllers ......................................................................................................................................... |
7 20 |
Switch Controllers .................................................................................................................................................. |
7 21 |
The Controller Destination List ............................................................................................................................ |
7 21 |
Shift Key Number, Shift Key (ShKeyNum, ShiftKey) ....................................................................................... |
7 26 |
Continuous Controller Parameters ...................................................................................................................... |
7 29 |
Switch Controller Parameters ............................................................................................................................... |
7 30 |
The WHEEL Page........................................................................................................................................................... |
7 32 |
The SLIDER and SLID2 Pages...................................................................................................................................... |
7 33 |
The Continuous Control Pedal (CPEDAL) Page....................................................................................................... |
7 34 |
The Pressure (PRESS) Page........................................................................................................................................... |
7 35 |
The Footswitch Pages (FT SW1, FT SW2, FT SW3) ................................................................................................... |
7 36 |
The Arpeggiator Switch (ARP SW) Page ................................................................................................................... |
7 37 |
The SWITCH Page ......................................................................................................................................................... |
7 38 |
The RIBBON Page.......................................................................................................................................................... |
7 39 |
The Ribbon Configuration (RIBCFG) Page ................................................................................................................ |
7 40 |
Ribbon Configuration ............................................................................................................................................ |
7 40 |
Position Mode (PosMode) ..................................................................................................................................... |
7 41 |
Spring ....................................................................................................................................................................... |
7 41 |
Center ....................................................................................................................................................................... |
7 41 |
The ARPEGGIATOR & ARPEGGIATOR 2 (ARP1, ARP2) Pages........................................................................... |
7 42 |
The ARPEGGIATOR Page..................................................................................................................................... |
7 42 |
The ARPEGGIATOR 2 Page.................................................................................................................................. |
7 49 |
Real time Control of Arpeggiator Parameters ................................................................................................... |
7 53 |
Riffs .................................................................................................................................................................................. |
7 55 |
The RIFF1 Page ....................................................................................................................................................... |
7 55 |
The RIFF2 Page ....................................................................................................................................................... |
7 58 |
Real time Control of Riff Parameters................................................................................................................... |
7 63 |
The FX Pages: FX, AUXFX1, AUXFX2, and MASTFX .............................................................................................. |
7 64 |
TOC-vii
The Programmable Switch Pages: SWPRG1 to SWPRG8 ........................................................................................ |
7 64 |
The COMMON Page ..................................................................................................................................................... |
7 65 |
Tempo....................................................................................................................................................................... |
7 65 |
Clock Source............................................................................................................................................................ |
7 65 |
Aux FX Channel...................................................................................................................................................... |
7 65 |
KB3 Channel............................................................................................................................................................ |
7 66 |
Mutes........................................................................................................................................................................ |
7 66 |
Arpeggiator Global (ArpGlobal) .......................................................................................................................... |
7 66 |
TRIGGER KEYS (KEYTRG).......................................................................................................................................... |
7 67 |
The Utility Soft Buttons................................................................................................................................................. |
7 68 |
Name ........................................................................................................................................................................ |
7 68 |
Save........................................................................................................................................................................... |
7 68 |
Delete........................................................................................................................................................................ |
7 68 |
New Zone (NewZn) ............................................................................................................................................... |
7 68 |
Duplicate Zone (DupZn) ....................................................................................................................................... |
7 68 |
Import Zone (ImpZn)............................................................................................................................................. |
7 68 |
Delete Zone (DelZn)............................................................................................................................................... |
7 68 |
Recording A Setup To Song Mode .............................................................................................................................. |
7 69 |
Soft Buttons In Quick Access Mode....................................................................................................................... |
8 2 |
The QA Editor .................................................................................................................................................................. |
8 2 |
Effects Overview.............................................................................................................................................................. |
9 1 |
Insert Effects .............................................................................................................................................................. |
9 1 |
Aux Effects................................................................................................................................................................. |
9 1 |
Master Effects ............................................................................................................................................................ |
9 2 |
Chains......................................................................................................................................................................... |
9 2 |
Signal Flow ................................................................................................................................................................ |
9 2 |
DSP Units Manage and Distribute Processor Power for Effects...................................................................... |
9 3 |
Aux Override............................................................................................................................................................. |
9 3 |
Effect Mode and the Effects Pages................................................................................................................................. |
9 4 |
The EffectsEnable Page ............................................................................................................................................ |
9 4 |
The Aux 1 Override and Aux 2 Override Pages .................................................................................................. |
9 5 |
The Master Effects Page........................................................................................................................................... |
9 8 |
The Chain Editor.............................................................................................................................................................. |
9 9 |
The MAIN Page ........................................................................................................................................................ |
9 9 |
The MOD Pages ...................................................................................................................................................... |
9 10 |
FXLFO, FXASR, and FXFUN pages ..................................................................................................................... |
9 11 |
INFO ......................................................................................................................................................................... |
9 11 |
Effects Parameters.......................................................................................................................................................... |
9 12 |
General Parameters ................................................................................................................................................ |
9 12 |
Reverbs..................................................................................................................................................................... |
9 13 |
Delays....................................................................................................................................................................... |
9 14 |
Equalizers (EQ) ....................................................................................................................................................... |
9 15 |
Compressors, Expanders, and Gates ................................................................................................................... |
9 16 |
Chorus ...................................................................................................................................................................... |
9 18 |
Flanger...................................................................................................................................................................... |
9 19 |
TOC-viii
Quantize................................................................................................................................................................... |
9 19 |
LaserVerb ................................................................................................................................................................. |
9 19 |
Filters ........................................................................................................................................................................ |
9 20 |
Distortion ................................................................................................................................................................. |
9 21 |
Rotating Speakers ................................................................................................................................................... |
9 22 |
Vibrato/Chorus........................................................................................................................................................ |
9 23 |
Tremolo and AutoPan............................................................................................................................................ |
9 24 |
Pitcher....................................................................................................................................................................... |
9 25 |
Ring Modulation..................................................................................................................................................... |
9 25 |
Stereo Simulation.................................................................................................................................................... |
9 25 |
The TRANSMIT Page.................................................................................................................................................... |
10 1 |
Control Setup .......................................................................................................................................................... |
10 2 |
Destination............................................................................................................................................................... |
10 2 |
Channel .................................................................................................................................................................... |
10 2 |
Transpose ................................................................................................................................................................. |
10 2 |
Velocity Map (Transmit) ........................................................................................................................................ |
10 3 |
Pressure Map (Transmit) ....................................................................................................................................... |
10 4 |
Program Change (ProgChang) ............................................................................................................................. |
10 5 |
Change Setups (ChgSetups).................................................................................................................................. |
10 5 |
The RECEIVE Page ........................................................................................................................................................ |
10 5 |
Basic Channel .......................................................................................................................................................... |
10 6 |
MIDI Receive Mode (MIDI Mode) ....................................................................................................................... |
10 6 |
All Notes Off ........................................................................................................................................................... |
10 6 |
Program Change Mode (PrgChgMode) .............................................................................................................. |
10 6 |
Velocity Map (Receive) .......................................................................................................................................... |
10 7 |
Pressure Map (Receive) ......................................................................................................................................... |
10 8 |
System Exclusive ID (SysExID) ............................................................................................................................ |
10 9 |
Bank Select............................................................................................................................................................... |
10 9 |
Local Keyboard Channel (LocalKbdCh) ........................................................................................................... |
10 10 |
The Channels Page....................................................................................................................................................... |
10 14 |
Enable ..................................................................................................................................................................... |
10 14 |
Program.................................................................................................................................................................. |
10 14 |
Pan .......................................................................................................................................................................... |
10 15 |
Volume ................................................................................................................................................................... |
10 15 |
Program Lock, Pan Lock, Volume Lock ............................................................................................................ |
10 15 |
Program Change Formats........................................................................................................................................... |
10 15 |
Extended Program Changes ............................................................................................................................... |
10 16 |
QAccess.................................................................................................................................................................. |
10 16 |
The Soft Buttons in MIDI Mode................................................................................................................................. |
10 18 |
Program Change (PrgChg).................................................................................................................................. |
10 18 |
Reset Channels (RsetCh)...................................................................................................................................... |
10 18 |
Panic........................................................................................................................................................................ |
10 18 |
Chapter 11 |
Master Mode |
MAIN............................................................................................................................................................................... |
11 1 |
Tune .......................................................................................................................................................................... |
11 2 |
Transpose |
.................................................................................................................................................................11 2 |
TOC-ix
FX Mode................................................................................................................................................................... |
11 2 |
Drum Remap........................................................................................................................................................... |
11 2 |
ID Entry.................................................................................................................................................................... |
11 2 |
Setup Controllers (SetupCtls) ............................................................................................................................... |
11 2 |
Master Table Lock (Master Lock) ......................................................................................................................... |
11 3 |
Demo Button ........................................................................................................................................................... |
11 3 |
Buttons Mode (Buttons)......................................................................................................................................... |
11 3 |
Display ..................................................................................................................................................................... |
11 3 |
MAPS............................................................................................................................................................................... |
11 5 |
Velocity Map (Master)............................................................................................................................................ |
11 5 |
Pressure Map (Master)........................................................................................................................................... |
11 7 |
Intonation................................................................................................................................................................. |
11 8 |
Key Action Map...................................................................................................................................................... |
11 9 |
Intonation Key (Int.Key)........................................................................................................................................ |
11 9 |
Default Sequence .................................................................................................................................................. |
11 10 |
OUTPUT........................................................................................................................................................................ |
11 10 |
Output Clock......................................................................................................................................................... |
11 10 |
Digital Output Volume (Dig. out volume)........................................................................................................ |
11 10 |
Digital Output (Dig. Out).................................................................................................................................... |
11 10 |
Aux Out Pair Mode .............................................................................................................................................. |
11 10 |
Clock Source.......................................................................................................................................................... |
11 11 |
TEMPO .......................................................................................................................................................................... |
11 11 |
General MIDI Mode (GM On, GM Off).................................................................................................................... |
11 12 |
OBJECT.......................................................................................................................................................................... |
11 13 |
Rename................................................................................................................................................................... |
11 14 |
Delete...................................................................................................................................................................... |
11 14 |
UTILS (UTILITIES) ...................................................................................................................................................... |
11 16 |
CLOCK .......................................................................................................................................................................... |
11 17 |
Reset............................................................................................................................................................................... |
11 18 |
Loader............................................................................................................................................................................ |
11 18 |
About ............................................................................................................................................................................. |
11 18 |
Save ................................................................................................................................................................................ |
11 18 |
SAMPLE MEMORY (MEMORY) .............................................................................................................................. |
11 18 |
MAP........................................................................................................................................................................ |
11 19 |
Defragment (Defrag) ............................................................................................................................................ |
11 19 |
Preview Sample (PRVIEW) ........................................................................................................................................ |
11 19 |
Getting Started with the Sequencer ............................................................................................................................ |
12 1 |
What is a Sequencer?.............................................................................................................................................. |
12 1 |
Song Mode: The MAIN Page ....................................................................................................................................... |
12 1 |
Current Song (CurSong)........................................................................................................................................ |
12 2 |
Tempo....................................................................................................................................................................... |
12 2 |
Recording Track (RecTrk) ...................................................................................................................................... |
12 3 |
Program (Prog) ....................................................................................................................................................... |
12 3 |
Track Number (Trk:#)............................................................................................................................................. |
12 3 |
Volume (Vol)............................................................................................................................................................ |
12 4 |
Pan ............................................................................................................................................................................ |
12 5 |
Mode......................................................................................................................................................................... |
12 6 |
Location (Locat) ...................................................................................................................................................... |
12 6 |
TOC-x
Mode Indicators (+ and x): .................................................................................................................................... |
12 6 |
Activity Indicators.................................................................................................................................................. |
12 6 |
Track Status Indicators........................................................................................................................................... |
12 6 |
Track Channels........................................................................................................................................................ |
12 7 |
Soft Buttons on the MAIN Page ........................................................................................................................... |
12 7 |
The Save Changes Dialog ...................................................................................................................................... |
12 8 |
Song Mode: The BIG Page .......................................................................................................................................... |
12 10 |
Time In ................................................................................................................................................................... |
12 10 |
Time Out ................................................................................................................................................................ |
12 10 |
Song End ................................................................................................................................................................ |
12 11 |
Loop........................................................................................................................................................................ |
12 11 |
RecMode ................................................................................................................................................................ |
12 11 |
Metron.................................................................................................................................................................... |
12 11 |
Song Mode: The FX Pages .......................................................................................................................................... |
12 12 |
Song Mode: The MIXER Page .................................................................................................................................... |
12 12 |
Out .......................................................................................................................................................................... |
12 12 |
The Rec, Play, and Stop Soft Buttons ................................................................................................................. |
12 13 |
The Keep Soft Button ........................................................................................................................................... |
12 13 |
The Done Soft Button........................................................................................................................................... |
12 13 |
Song Mode: The METRONOME Page...................................................................................................................... |
12 13 |
Metronome ............................................................................................................................................................ |
12 14 |
CountOff ................................................................................................................................................................ |
12 14 |
Program.................................................................................................................................................................. |
12 14 |
Channel .................................................................................................................................................................. |
12 14 |
Strong Note............................................................................................................................................................ |
12 14 |
Strong Vel............................................................................................................................................................... |
12 14 |
Soft Note ................................................................................................................................................................ |
12 14 |
Soft Vel ................................................................................................................................................................... |
12 14 |
The Rec, Play, and Stop Soft Buttons ................................................................................................................. |
12 14 |
The Done Soft Button........................................................................................................................................... |
12 14 |
Song Mode: The Filter Pages (RECFLT and PLYFLT)............................................................................................. |
12 15 |
Notes....................................................................................................................................................................... |
12 15 |
LoKey ..................................................................................................................................................................... |
12 15 |
Hi............................................................................................................................................................................. |
12 15 |
LoVel....................................................................................................................................................................... |
12 16 |
Hi............................................................................................................................................................................. |
12 16 |
Controllers ............................................................................................................................................................. |
12 16 |
Controller............................................................................................................................................................... |
12 16 |
LoVal....................................................................................................................................................................... |
12 16 |
Hi............................................................................................................................................................................. |
12 16 |
PitchBend............................................................................................................................................................... |
12 16 |
ProgChange ........................................................................................................................................................... |
12 16 |
MonoPress ............................................................................................................................................................. |
12 16 |
PolyPress................................................................................................................................................................ |
12 16 |
The Rec, Play, and Stop Soft Buttons ................................................................................................................. |
12 16 |
The Done Soft Button........................................................................................................................................... |
12 16 |
Song Mode: The MISC Page....................................................................................................................................... |
12 17 |
Control Chase........................................................................................................................................................ |
12 17 |
Quant...................................................................................................................................................................... |
12 17 |
Grid......................................................................................................................................................................... |
12 17 |
Swing...................................................................................................................................................................... |
12 18 |
TOC-xi
Release.................................................................................................................................................................... |
12 18 |
Key Wait................................................................................................................................................................. |
12 18 |
Song Mode: The STATS Page ..................................................................................................................................... |
12 18 |
The Song Editor............................................................................................................................................................ |
12 19 |
Song Editor: The COMMON Page ............................................................................................................................ |
12 19 |
Tempo..................................................................................................................................................................... |
12 19 |
TimeSig................................................................................................................................................................... |
12 19 |
FX Track ................................................................................................................................................................. |
12 20 |
DrumTrack............................................................................................................................................................. |
12 20 |
MidiDst .................................................................................................................................................................. |
12 20 |
Soft Buttons on the COMMON Page................................................................................................................. |
12 21 |
Song Editor: The TRACK Page .................................................................................................................................. |
12 21 |
Common Parameters for Edit Song: Track Functions ..................................................................................... |
12 22 |
Region/Criteria Box Parameters ......................................................................................................................... |
12 22 |
Soft Buttons on the TRACK Page ....................................................................................................................... |
12 23 |
Song Editor: Track Functions ..................................................................................................................................... |
12 24 |
Erase ....................................................................................................................................................................... |
12 24 |
Copy ....................................................................................................................................................................... |
12 24 |
Bounce .................................................................................................................................................................... |
12 25 |
Insert....................................................................................................................................................................... |
12 26 |
Delete...................................................................................................................................................................... |
12 26 |
Quantize................................................................................................................................................................. |
12 27 |
Shift......................................................................................................................................................................... |
12 28 |
Transpose ............................................................................................................................................................... |
12 28 |
Grab ........................................................................................................................................................................ |
12 29 |
Change ................................................................................................................................................................... |
12 30 |
Remap..................................................................................................................................................................... |
12 31 |
Song Editor: The EVENT Page................................................................................................................................... |
12 31 |
Initial Program, Volume, Pan.............................................................................................................................. |
12 32 |
Location.................................................................................................................................................................. |
12 32 |
Bar, Beat, and Tick ................................................................................................................................................ |
12 32 |
Event Type and Value .......................................................................................................................................... |
12 32 |
Soft Buttons on the EVENT Page ....................................................................................................................... |
12 33 |
Tempo Track .......................................................................................................................................................... |
12 33 |
Storage Mode Page ........................................................................................................................................................ |
13 1 |
Using USB Devices ................................................................................................................................................. |
13 2 |
Storage Mode Common Features ................................................................................................................................ |
13 4 |
Directories................................................................................................................................................................ |
13 4 |
Path ........................................................................................................................................................................... |
13 4 |
Common Dialogues................................................................................................................................................ |
13 4 |
The STORE Page ............................................................................................................................................................ |
13 6 |
Storing Overview.................................................................................................................................................... |
13 6 |
Select Object Type To Store ................................................................................................................................... |
13 7 |
Select Object Range To Store ................................................................................................................................. |
13 7 |
The Store Advanced Page...................................................................................................................................... |
13 7 |
The LOAD Page ............................................................................................................................................................. |
13 9 |
Loading .WAV and .AIF Audio Files ................................................................................................................. |
13 10 |
Loading Individual Objects From a .P3K Or Compatible File Type ............................................................. |
13 10 |
TOC-xii
Loading Methods.................................................................................................................................................. |
13 11 |
The Utilities (UTILS) Page .......................................................................................................................................... |
13 14 |
Soft Buttons on the Utilities Page ....................................................................................................................... |
13 14 |
Export ............................................................................................................................................................................ |
13 15 |
Format ........................................................................................................................................................................... |
13 15 |
Tutorial: Load An Audio File, Create A New Keymap And Program ................................................................ |
13 16 |
The Keymap Editor ....................................................................................................................................................... |
14 1 |
Keymap Editor Parameters ................................................................................................................................... |
14 3 |
The Soft Buttons in the Keymap Editor............................................................................................................... |
14 5 |
Special Double Button Presses in the Keymap Editor....................................................................................... |
14 6 |
Building a Keymap........................................................................................................................................................ |
14 7 |
Editing Samples ............................................................................................................................................................. |
14 9 |
The Miscellaneous (MISC) Page ........................................................................................................................... |
14 9 |
The TRIM Page...................................................................................................................................................... |
14 12 |
Part 1: Assign Instruments To Tracks .................................................................................................................. |
15 2 |
Part 2: Set The Tempo............................................................................................................................................. |
15 3 |
Part 3: Record Your First Track, Save The Song ................................................................................................. |
15 4 |
Part 4: Record Additional Tracks.......................................................................................................................... |
15 7 |
Part 5: Fixing Mistakes........................................................................................................................................... |
15 8 |
Part 6: Adjusting The Volume Of Each Instrument ......................................................................................... |
15 10 |
Part 7: Learning More About Song Mode ......................................................................................................... |
15 15 |
MIDI Implementation Chart ......................................................................................................................................... |
A 1 |
Specifications................................................................................................................................................................... |
A 2 |
Using the Bootloader Menu ................................................................................................................................... |
B 1 |
System Update (PC3K Software, Objects, Etc.) ................................................................................................... |
B 2 |
Run Diags PC3K Diagnostics Utility.................................................................................................................. |
B 2 |
System Reset............................................................................................................................................................. |
B 2 |
System Utilities ........................................................................................................................................................ |
B 3 |
Removing the fuse holder ...................................................................................................................................... C 1
Programs .......................................................................................................................................................................... |
D 1 |
Setups ............................................................................................................................................................................. |
D 13 |
Effect Chains.................................................................................................................................................................. |
D 15 |
Effect Presets with Algorithms ................................................................................................................................... |
D 21 |
How to Use These Tables...................................................................................................................................... |
D 21 |
TOC-xiii
Reverbs.................................................................................................................................................................... |
D 21 |
Delays ...................................................................................................................................................................... |
D 25 |
Chorus ..................................................................................................................................................................... |
D 27 |
Flange ...................................................................................................................................................................... |
D 27 |
Phaser ...................................................................................................................................................................... |
D 28 |
Trem / Panner / Spatial.......................................................................................................................................... |
D 29 |
Rotary ...................................................................................................................................................................... |
D 29 |
Distortion ................................................................................................................................................................ |
D 30 |
Dynamics ................................................................................................................................................................ |
D 31 |
EQ / Filters .............................................................................................................................................................. |
D 31 |
Chorus / Combi...................................................................................................................................................... |
D 33 |
Flange / Combi ....................................................................................................................................................... |
D 34 |
Keymaps......................................................................................................................................................................... |
D 36 |
Samples .......................................................................................................................................................................... |
D 42 |
Arpeggiator Shift Patterns........................................................................................................................................... |
D 49 |
Arpeggiator Velocity Patterns..................................................................................................................................... |
D 51 |
Object Types and Conversion Details .......................................................................................................................... |
E 1 |
Soundblock (Sample Objects) ................................................................................................................................ |
E 1 |
Keymap Objects ....................................................................................................................................................... |
E 1 |
Program Objects....................................................................................................................................................... |
E 1 |
Setup Objects............................................................................................................................................................ |
E 1 |
Index |
|
TOC-xiv
Chapter 1
Introduction
Greetings. Your new instrument offers amazing acoustic, electric, and synthesizer sounds, combined with sample loading and advanced programming features that will let you create almost any sound you can imagine. This manual covers the PC3K in its 88, 76, and 61 note configurations (PC3K8, PC3K7, and PC3K6.) For the most part, anywhere we talk about the PC3K in this manual we mean any of these instruments.
The PC3K comes loaded with 64 MB of ROM sounds, powered by Kurzweil’s newest custom chip set. In addition to the great sounds and programming features, the PC3K is fully equipped with performance features you’ll use at every gig. For example, there are nine conveniently situated sliders for accurately emulating the drawbars on a tone wheel organ such as a Hammond B3™. And the PC3K’s 24 dedicated sound select buttons, along with its Quick Access banks will let you instantly choose and change sounds whenever you like.
In addition to the many impressive features and sounds of the PC3, the PC3K allows users to tap into the massive wealth of samples and programs developed for our legendary K Series over the past 18 years. The PC3K is capable of loading most K series object files (with extensions .KRZ,
.K25, or .K26,) including samples, keymaps, programs, and setups, (see Appendix E for details,) once again underscoring our commitment to the concept of non obsolescence by design. Additionally, the PC3K can load .PC3 files that were created with the PC3. The PC3K can also load WAVE and AIFF files (see page 13 10 for details.) You can choose to delve into the extensive libraries of existing K Series samples or decide to fill the PC3Kʹs flash memory with your own custom samples. In either case, you have the most powerful version of Kurzweilʹs V.A.S.T technology ever developed at your fingertips to help sculpt your sounds. Sample files can be loaded via USB from a thumb drive or directly from a computer.
The PC3K offers 128 megabytes of user sample memory, and samples remain loaded even while power is off. Once samples are loaded into the PC3Kʹs flash memory, there is zero load time for those samples when powering on the instrument.
Advanced program, keymap and sample editing features allow you to customize your sounds further. Youʹre able to map any sample to any key, tune individual samples, change the start, alt start, loop point and end point of samples and even assign a controller to adjust sample start point in real time.
If you’ve used other Kurzweil gear, you’ll have no trouble getting up and running quickly. Bear in mind, however, that the PC3K’s beauties are more than skin deep; you’ll want to read this manual, as well as the materials at the www.kurzweil.com website to take full advantage of your instrument.
1-1
Introduction
Keeping Current
Check for new documentation and operating system upgrades before you start using your instrument. When new software is available for the PC3K, it will be posted at www.kurzweil.com. You’ll use the PC3K’s Boot Loader (described in this manual) to upgrade your instrument to use the new software.
Pictured below is the 88 key PC3K8.
Arp |
SW |
The PC3K’s 800+ programs include the Orchestral and Contemporary sound blocks, General MIDI (GM), Stereo Triple Strike Piano, Classic Keys for realistic vintage electric piano sounds, and new String Sections. Multi zone performance setups are also provided; many of these setups use note triggers to play factory recorded songs that provide grooves and arpeggiation that make great templates for performance or recording. An on board sequencer with front panel transport buttons lets you record your ideas any time inspiration strikes. This sequencer (Song mode) lets you play back MIDI type 0 or 1 sequences, record and play back your own songs, and record multi timbral sequences received via MIDI.
Before we get into explaining VAST, here are a few of the features that by themselves make the PC3K an impressive stage and studio machine. It has 128 voice polyphony and is fully multi timbral, so that different programs can be played on each MIDI channel. There’s an on board digital effects processor providing multiple simultaneous effects, including real time effects control, internally or via MIDI. In fact, the PC3K offers more effects processing power than Kurzweil’s much lauded KSP8 studio effects processor.
The PC3K offers 128 megabytes of user sample memory. Samples can be loaded via USB from a thumb drive or directly from a computer, and samples remain loaded even while power is off. Once samples are loaded into the PC3Kʹs flash memory, there is zero load time for those samples when powering on the instrument. The PC3K is compatible with most K series object files (with extensions .KRZ, .K25, or .K26,) including samples, keymaps, programs, and setups (see Appendix E for details.) Additionally, the PC3K can load .PC3 files that were created with the PC3. The PC3K can also load WAVE and AIFF files (see page 13 10 for details.)
In addition to the standard stereo audio output pair, there are two additional balanced analog outputs, as well as a digital output. All of the outputs are available to you simultaneously.
For backup, storage, and moving files, there’s two types of USB ports on the back panel of the PC3K. A USB storage port allows you to connect a USB device such as a thumb drive, and a second USB Computer port lets you connect the PC3K to a computer for file transfer and MIDI connectivity.
1-2
Introduction
How the PC3K Works
The PC3K integrates three MIDI driven components: a MIDI controller (the keyboard, or an external MIDI controller), a sound engine, and an effects processor that employs the same effects used in Kurzweil’s KSP8. The sound engine responds to the MIDI events generated by the MIDI controller, and turns them into sounds that are processed within the variable architecture of the algorithms—or by oscillators for KB3 programs. The resulting sound can then be routed through the PC3K’s effects and to the audio outputs.
The PC3K’s Variable Architecture Synthesis Technology (V.A.S.T.) lets you build sounds from realistic instrumental samples and sampled synth waveforms—then modify the nature of those sounds through a wide variety of digital signal processing (DSP) functions. The PC3K also generates its own synth waveforms, which can be combined with the samples or used on their own.
While many other synthesizers may offer a fixed set of DSP tools (typically filtering, pitch, and amplitude modulation) the PC3K’s Variable Architecture lets you arrange a combination of DSP functions from a long list of choices. The functions you choose define the type of synthesis you use.
Each layer of every program has its own DSP architecture, which we call an algorithm. Within each algorithm, you can select from a variety of DSP functions. Each function can be independently controlled by a variety of sources including LFOs, ASRs, envelopes, a set of unique programmable functions (FUNs), as well as any MIDI control message. The many different DSP functions and the wealth of independent control sources give you an extremely flexible, truly vast collection of tools for sound creation and modification.
The PC3K offers powerful editing features we call Dynamic V.A.S.T. and Cascade Mode.
•Dynamic V.A.S.T. allows you to “wire” your own algorithms, combining different DSP functions in any order you like, including parallel and serial configurations.
•Cascade Mode lets you route any layer of a program into the DSP of any other layer. Any of the 32 layers of a program can go into any other layer.
When you’re ready to jump in and start creating programs, turn to Chapter 6.
In addition to VAST synthesis, the PC3K offers many oscillator based programs that give you the classic sound of tone wheel organs like the Hammond B3. KB3 mode, as we call it, is completely independent of VAST, and has its own set of editing procedures. Nine dedicated sliders on the PC3K’s front panel give you real time drawbar control over these organ sounds. Buttons above the sliders control rotating speaker speed, percussion, and other organ features.
The quickest way to get to the KB3 programs is by pressing the KB3 button (above the sliders, to the left of the screen). The blue LED in the KB3 button will light when the current program is a KB3 program.
The VA 1 (Virtual Analog Synthesizer) programs included with the PC3K offer realistic emulations of classic analog synthesizers, built from Kurzweil’s unique anti aliased DSP generated oscillators. The PC3K’s power shaped oscillators let you transition smoothly from one waveform into another in real time, without using cross fades.
1-3
Introduction
VA 1 programs are scattered throughout the PC3K. Look for them in the Synth Category and the Classic Keys Bank. You’ll see “KVA Oscillator” appear in the Keymap screen on the left hand side of the display.
How to Use This Manual
This manual describes how to connect and power up your PC3K, getting around the front panel, and a brief description of the operating modes. For information on editing and advanced programming features, refer to additional material provided on the Kurzweil website:
http://www.kurzweil.com
The best way to read this manual is with your PC3K in front of you. By trying the examples we give to illustrate various functions, you can get a quick understanding of the basics, then move on to the more advanced features.
Your PC3K shipping carton should include the following in addition to your instrument:
•Power cable
•Sustain pedal
•USB cable
•Getting Started manual (this book)
If you don’t have all of these components, please call your Kurzweil/Young Chang dealer.
You may also want to purchase a USB thumb drive for portable backups and storage.
When you need to update the PC3K’s software or run diagnostic tests, you’ll use the Boot Loader. To bring up the Boot Loader, hold down the Exit button (below the cursor buttons, to the right of the display) while powering on your PC3K. Refer to Appendix B for details on the Boot Loader.
The PC3K uses a CR2032 battery to power its clock. The battery should last five years, and a message will tell you when the battery needs replacing. The access panel on the bottom of the PC3K (which you can easily remove with a screwdriver) allows you to get at the battery for removal and replacement.
CAUTION: Danger of explosion if battery is incorrectly replaced. Replace only with the same or equivalent type (CR2032).
1-4
Introduction
Options
Ask your Kurzweil dealer about the following PC3K options:
The PC3K has a socket for a 64 MB expansion card to add additional Kurzweil ROM sounds. This is user installable (the expansion kit comes with complete instructions).
The PC3K has jacks for three switch pedals (for functions like sustain or program/setup changes) and two continuous pedals (for functions like volume control and wah). Your Kurzweil dealer stocks the following optional pedals:
FS 1 |
Standard box shaped switch pedal |
KFP 1 |
Single piano style switch pedal |
KFP 2M |
Double piano style switch pedal unit |
CC 1 |
Continuous pedal |
There’s a dedicated modular jack (like a telephone jack) on the rear panel of the PC3K for connecting this 600 mm (24 inch) ribbon controller. You can configure the PC3K to use the ribbon as a single large controller, or a three section controller with independent settings for each section.
You can plug a Yamaha (or equivalent) breath controller into the dedicated jack on the PC3K’s rear panel.
You can plug a USB mass storage device such as a “thumb drive” into the PC3K for transferring samples, backing up, archiving, sharing your work, and updating your software. Any size USB mass storage device will work, though thumb drives are recommended for their portability, durability, and low price.
Note: Most USB thumb drives are compatible with the PC3K, but some older USB thumb drives and larger USB bus powered drives will not work with the PC3K if they require more than 100 mA of current (high power USB devices.) When attempting to use an incompatible USB device, the PC3K will display the message “USB device requires too much power”. The PC3K is designed to work with low power USB devices and can provide a maximum of 100 mA to a USB device. Power requirement specifications for thumb drives are not always made clearly available by the manufacturer, but a newly purchased thumb drive will most likely be compatible. If possible, check the power requirement specifications of your USB device before purchase.
1-5
Introduction
Options
1-6
Chapter 2
Startup
If hooking up new gear is familiar to you, and you just want to get going, here’s a quick description of what you need to get started with your PC3K. If you need more information, thorough descriptions of each step follow.
Make Connections
1.Set the keyboard on a hard, flat, level surface. Make sure to leave plenty of room for ventilation.
2.Four adhesive backed rubber feet are provided with your PC3K. If you want to attach them to the bottom of the PC3K(recommended to prevent scratching your tabletop), carefully turn the keyboard over, remove the paper backing from the rubber feet and attach them now, near each corner, all on the same level.
3.Connect the power cable.
4.Make sure your sound system is at a safe volume level. Also make sure that the PC3K’s MASTER VOLUME slider (on the far left side of the front panel) is all the way down.
5.Plug in a pair of stereo headphones or run standard (1/4 inch) audio cables from your amplifier or mixer to the MIX audio outputs on the PC3K. (Use the Main Left out for mono.) Balanced (“TRS” or “Stereo”) cables are recommended.
1.Power up your PC3K, raise the level of the MASTER VOLUME slider, and check out some of the programs and setups. The PC3K starts up in Program mode by default. Press one of the mode buttons to the left of the display to switch modes.
2.If you hear distortion, reduce the gain on your mixing board, or use the pad if it has one.
3.Scroll through the program list with the Alpha Wheel, or the dedicated Category and Program buttons, and try the PC3K’s many sounds.
2-1
Startup
Startup—the Details
This section walks you through the hookup of your PC3K. We’ll take a look at the rear panel, then describe the power, audio, and other cable connections.
Don’t connect anything until you make sure your PC3K is properly and safely situated. Also, if your PC3K has been out in the cold, give it time to warm up to room temperature before starting it, since condensation may have formed inside the PC3K. It is normal for the rear panel near the MIDI jacks to become warm after a while.
The PC3K runs on AC power: 100, 120, 230, or 240 volts at 50–60 Hz. Your dealer will set the voltage switch to match the voltage in your area. The voltage level is set with a selector on the rear panel of the PC3K. Unless you are sure it needs to be changed, you shouldn’t adjust this.
When you’ve connected the cable at the PC3K end (as you face the back of the PC3K, the power connection is at the right), plug it into a grounded outlet. If your power source does not have the standard three hole outlet, you should take the time to install a proper grounding system. This will reduce the risk of a shock.
Analog
After you’ve turned down the level on your sound system, connect the PC3K’s analog audio outputs to your sound system using a pair of stereo or mono audio cables. Mono cables will always work, but if you’re going into balanced inputs, use stereo cables for a better signal to noise ratio and a bit more volume. The PC3K’s analog outputs are balanced, and generate a “hotter” signal than some previous Kurzweil instruments.
You’ll find four 1/4 inch balanced audio output jacks on the rear panel. For now, connect one end of each audio cable to your mixing board or PA system inputs, and connect the other end to the jacks marked Main Left and Right on the rear panel of the PC3K. If you have only one input available, use the PC3K’s Main Left output to get the full signal in mono.
In Master mode you can set the Aux outputs to duplicate the Main Outs – useful for monitoring and other operations. They are always in stereo, as is the headphone out.
2-2
Startup
Startup—the Details
Digital
For digital audio output from the PC3K, connect a 75 Ohm coaxial cable from the PC3K’s RCA Digital Out jack to the AES or S/PDIF input of the receiving device. You may need an RCA to XLR adapter to connect with the receiving device. If the receiving device receives only optical signals, you’ll need a converter as well. The PC3K’s Master Page (press the Master mode button) lets you select a range of useful sample rates for the digital output.
The RCA jack labeled ʺSync Inʺ allows you to synchronize the PC3Kʹs S/PDIF Digital Audio output sample rate to an external S/PDIF source. Although no audio signal is received by the ʺSync Inʺ jack, its clock is received and may be used to set the output sample rate. For details, see the Master Mode OUTPUT page parameter Digital Output (Dig. Out) on page 11 10. NOTE: Sync In is NOT a ʺWord Clockʺ input. Only a valid S/PDIF signal is recognized.
The simplest MIDI configuration uses a single 5 pin MIDI cable: either from the MIDI Out port of your PC3K to the MIDI In port of another instrument, or from the MIDI Out port of another MIDI controller to the MIDI In port of the PC3K. There are all sorts of possible configurations, including additional synths, personal computers, MIDI effects processors, and MIDI patch bays. Depending on your system, you may want to use the PC3K’s MIDI Thru port to pass MIDI information from a MIDI controller to the PC3K and on to the next device in your system. You can also connect MIDI devices to the PC3K’s MIDI Out port, which can send channelized MIDI information from the keyboard or through the PC3K from your MIDI controller.
The MIDI Thru port can be configured to serve as an additional MIDI Out by sliding the nearby switch to the Out position.
You can also use the PC3K’s USB port to send and receive MIDI. By default the PC3K will show up as a USB MIDI device. If you choose USB Temporary Drive from Storage mode, the PC3K will temporarily (while on that Storage mode page) become a “virtual storage device” and USB MIDI will be disabled. Different host programs on your computer may indicate various errors as the USB MIDI device is no longer present. Leaving Storage mode will restore USB MIDI functionality.
USB MIDI and 5 pin MIDI can be used at the same time; the MIDI signals will be combined into a single 16 channel MIDI stream.
2-3
Startup
Startup—the Details
Plug your switch or continuous pedals into the corresponding jacks on the PC3K’s rear panel. We recommend using the Kurzweil pedals described on page 1 5, but you can use almost any switch or continuous pedal, as long as it adheres to the following specifications (as most pedals do):
Switch pedals |
1/4 inch tip sleeve plug |
Continuous pedals |
10 kOhm linear taper potentiometer, 1/4 inch tip ring sleeve plug |
|
with the wiper connected to the tip. |
If you use a third party (non Kurzweil) switch pedal, make sure it’s connected before you turn on your PC3K. This ensures that the pedal will work properly (it might function backward—off when it’s down and on when it’s up—if you turn on your PC3K before plugging in the pedal).
Similarly, don’t press any of your switch pedals while powering up, because the PC3K verifies each pedal’s orientation during power up. If you’re pressing a pedal, you might cause it to work backward.
The pedals are independently programmable within each zone of every setup. Here are the default settings for the five pedals you can use with the PC3K:
Switch Pedal 1 |
Controller 64 |
(Sustain) |
Switch Pedal 2 |
Controller 66 |
(Sostenuto) |
Switch Pedal 3 |
Controller 67 |
(Soft) |
Continuous Control Pedal 1 |
Controller 11 |
(Expression / Volume) |
Continuous Control Pedal 2 Controller 4 (Foot Pedal) produces a “wah” effect in many setups
The 3.5mm jack labeled Breath accepts a standard breath controller, which sends standard MIDI Breath (MIDI 2) messages. The PC3K’s preset programs and setups don’t respond to breath, but if you have other instruments that do respond to Breath, you can control them from the PC3K via MIDI.
You can also program the PC3K so that the breath controller sends a different MIDI message. This would enable you to use a breath controller to affect the PC3K, but then other instruments receiving MIDI from the PC3K would no longer respond to the PC3K’s breath controller (unless you also programmed them to receive the same MIDI Controller that the PC3K’s breath controller is sending).
2-4
Startup
Startup—the Details
Plug the optional Kurzweil Ribbon Controller into the modular Ribbon jack on the rear panel. The ribbon controller itself should rest on a flat surface; it fits nicely between the keys and the buttons and sliders on the front panel.
The ribbon is a continuous controller. You can program the ribbon controller to send MIDI Controller messages 1–127, as well as several specialized messages. It generates values of 0–127 for whatever MIDI Controllers you assign it to send. Just press it, and slide your finger along the ribbon to change the value of the message it’s sending.
You can configure the ribbon to have one control section that runs its entire length, or to have three sections of equal length. It sends its highest values when you press it at the end where the cable connects. When you configure it to have three sections, each section sends its highest values at the end closest to the cable.
Caution: The modular jack is designed for connection to the Kurzweil Ribbon Controller option only. Don’t plug any other modular plugs into the Ribbon jack.
The PC3K’s power switch is on the rear panel, adjacent to the power cable connection.
When you power up, the display briefly shows some startup information. The Program mode display then appears. It looks like the diagram below, though your PC3K may be different from the example.
The first time you power up (or after a reset), your instrument will be set to operate on MIDI Channel 1 (as shown at the far right of the top line above).
Set the volume at a comfortable level. You’ll get the best signal to noise ratio if you keep the PC3K at full volume, and adjust the level from your mixing board. You may also want to adjust the display contrast and brightness. There are two small knobs on the rear panel of the PC3K for this purpose.
2-5
Startup
Startup—the Details
You can plug a USB mass storage device such as a “thumb drive” into the PC3K for backing up, archiving, sharing your work, and updating your software. Any size USB mass storage device will work, though thumb drives are recommended for their portability, durability, and low price. The USB Storage port is on the back panel of the PC3K, but it is easily accessible from the front of the instrument. A USB connector will only fit into the port if oriented properly, so don’t force it into the port, as this may damage your PC3K or USB device. If you are having trouble inserting your USB connector into the port, try flipping the connector over.
Note: Most USB thumb drives are compatible with the PC3K, but some older USB thumb drives and larger USB bus powered drives will not work with the PC3K if they require more than 100 mA of current (high power USB devices.) When attempting to use an incompatible USB device, the PC3K will display the message “USB device requires too much power”. The PC3K is designed to work with low power USB devices and can provide a maximum of 100 mA to a USB device. Power requirement specifications for thumb drives are not always made clearly available by the manufacturer, but a newly purchased thumb drive will most likely be compatible. If possible, check the power requirement specifications of your USB device before purchase.
Caution: Do not remove a USB device while the display says Loading... or Saving.... Removing a USB device during a file transfer can cause data corruption.
Next to the USB Storage port on the back panel of the PC3K is a USB Computer port. The USB Computer port works for MIDI (transmit and receive) or to connect your PC3K to a computer for file transfer. By default, the USB port is set to MIDI mode. When selecting USB PC connection in Storage mode, USB MIDI will temporarily be disabled.
We recommend that you use the USB cable provided with your PC3K and do not use extension USB cables. The PC3K’s USB Computer port is only intended for connection to a USB Type A port.
In USB Storage mode, a ʺPC3Kʺ virtual drive will appear on your computer desktop. One important thing to know here is that this is a virtual drive. You can save to this drive from the PC3K, but you must immediately transfer that file to your desktop (or other folder). You must copy data from the PC3K virtual drive to your computer’s drive or else the data will be lost.
Note: When transferring files to and from the PC3K via the USB Computer Port, the maximum size of files that can be transferred is approximately 1.6MB. This is suitable for most objects. For transferring audio sample files, use the USB Storage Port with a USB mass storage device such as a “thumb drive.” When using the USB Storage Port to transfer files, the file size that can be transferred is limited only by the size of the USB mass storage device, and the PC3K’s available object and sample memory.
2-6