Buchi NIRMaster Essential Operation Manual

NIRMaster™
Operation Manual
11593580 | E en
Imprint
Product Identification: Operation Manual (Original) NIRMaster™ 11593580
Publication date: 09.2022
Version E
BÜCHI Labortechnik AG Meierseggstrasse 40 Postfach CH-9230 Flawil 1 E-Mail: quality@buchi.com BUCHI reserves the right to make changes to the manual as deemed necessary in the light of experience, especially with respect to structure, illustrations and technical details. This manual is copyrighted. Information from it may neither be reproduced, distributed, or used for competitive purposes, nor made available to third parties. The manufacture of any component with the aid of this manual without prior written agreement is also prohibited.
Büchi Labortechnik AG Table of contents
Table of contents
1 About this document........................................................................................................... 6
1.1 Mark-ups and symbols ..........................................................................................................6
1.2 Trademarks ...........................................................................................................................6
1.3 Connected devices ................................................................................................................6
2 Safety....................................................................................................................................7
2.1 Proper use .............................................................................................................................7
2.2 Use other than intended ........................................................................................................7
2.3 Staff qualification ...................................................................................................................7
2.4 Warning notices in this document.......................................................................................... 8
2.5 Warning and directive symbols.............................................................................................. 8
2.6 Residual risks ........................................................................................................................9
2.6.1 Glass and acrylic breakage ......................................................................................9
2.6.2 Faults during operation.............................................................................................9
2.6.3 Data loss................................................................................................................... 9
2.7 Personal protective equipment ..............................................................................................9
2.8 Modifications........................................................................................................................10
3 Product description...........................................................................................................11
3.1 Description of function .........................................................................................................11
3.1.1 Effective NIR light path ...........................................................................................12
3.1.2 Reference laser signal path....................................................................................12
3.1.3 NIRWare software suite.......................................................................................... 12
3.2 Measurement modes...........................................................................................................13
3.2.1 Diffuse reflection mode...........................................................................................13
3.2.2 Transflectance mode ..............................................................................................14
3.3 Configuration .......................................................................................................................14
3.3.1 NIRMaster instrument............................................................................................. 14
3.4 Scope of delivery .................................................................................................................14
3.5 Type plate............................................................................................................................15
3.6 Technical data .....................................................................................................................15
3.6.1 NIRMaster™ Essential ...........................................................................................15
3.6.2 Ambient conditions .................................................................................................16
3.6.3 Materials .................................................................................................................16
3.6.4 Installation site........................................................................................................17
4 Transport and storage ......................................................................................................18
4.1 Transport .............................................................................................................................18
4.2 Storage ................................................................................................................................18
4.3 Lifting the instrument ...........................................................................................................18
4.4 Lock / unlock the transportation lock ...................................................................................19
Operation Manual NIRMaster™ iii
Table of contents Büchi Labortechnik AG
5 Installation..........................................................................................................................21
5.1 Before installation ................................................................................................................21
5.1.1 Electrical connections requirement......................................................................... 21
5.2 Establishing electrical connections......................................................................................21
5.2.1 Connect the mains cable ........................................................................................22
5.3 Connect the instrument to the PC using the supplied ethernet cable.................................. 22
5.4 Install the BUCHI NIRWare software on the computer........................................................ 22
5.5 Setting up the network connection between Computer and instrument ..............................23
6 Operation............................................................................................................................24
6.1 Initializing the instrument .....................................................................................................24
6.1.1 System warm-up..................................................................................................... 24
6.2 System Suitability Test ........................................................................................................24
6.2.1 Temperature tests ..................................................................................................24
6.2.2 NIR linearity test .....................................................................................................25
6.2.3 Signal-to-noise ratio determination.........................................................................25
6.2.4 Wavenumber stability test ......................................................................................25
6.3 Reference measurements ...................................................................................................25
6.3.1 External reference ..................................................................................................25
6.3.2 Internal reference ...................................................................................................25
6.3.3 Performing a reference measurement....................................................................26
6.4 How to perform a measurement ..........................................................................................28
6.5 Shutting down the instrument ..............................................................................................29
7 Cleaning and servicing .....................................................................................................30
7.1 Regular maintenance work..................................................................................................30
7.2 Cleaning the housing...........................................................................................................30
7.3 How to lift off the top cover ..................................................................................................31
7.4 Exchanging the outer filters .................................................................................................33
7.5 Exchanging the inner filters .................................................................................................34
7.6 Cleaning the external reference ..........................................................................................34
7.7 Cleaning the spinner............................................................................................................35
7.8 Cleaning the add-ons and the custom sample vessels .......................................................35
7.9 How to reset the system fuses ............................................................................................35
7.10 Exchanging the lamp ...........................................................................................................36
7.11 Resetting the lamp lifetime counter .....................................................................................37
7.12 Exchanging the laser unit ....................................................................................................37
7.13 Extended system service and testing ..................................................................................38
8 Help with faults ..................................................................................................................39
8.1 Troubleshooting...................................................................................................................39
8.2 Enhanced system diagnose (NADIA) ..................................................................................39
8.3 Reference measurement fails.............................................................................................. 40
9 Taking out of service and disposal.................................................................................. 41
9.1 Taking out of service ...........................................................................................................41
9.2 Disposal...............................................................................................................................41
9.3 Returning the instrument .....................................................................................................41
iv
Operation Manual NIRMaster™
Büchi Labortechnik AG Table of contents
10 Appendix ............................................................................................................................42
10.1 Spare parts and accessories ...............................................................................................42
10.1.1 Spare parts .............................................................................................................42
10.1.2 Accessories ............................................................................................................43
Operation Manual NIRMaster™ v
1 | About this document
1 About this document
1.1 Mark-ups and symbols
Büchi Labortechnik AG
This operation manual is applicable for all variants of the instrument. Read this operation manual before operating the instrument and follow the instructions to ensure safe and trouble-free operation. Keep this operation manual for later use and pass it on to any subsequent user or owner. BÜCHI Labortechnik AG accepts no liability for damage, faults and malfunctions resulting from not following this operation manual. If you have any questions after reading this operation manual:
u Contact BÜCHI Labortechnik AG Customer Service.
https://www.buchi.com/contact
NOTE
This symbol draws attention to useful and important information.
R This character draws attention to a requirement that must be met before the
instructions below are carried out.
u This character indicates an instruction that must be carried out by the user.
ð This character indicates the result of a correctly carried out instruction.
Mark-up Explanation
Win dow
Tab
Dia log
[Button] Buttons are marked-up like this.
[Field names] Field names are marked-up like this.
[Menu / Menu item] Menus or menu items are marked-up like this.
Status Status is marked-up like this.
Signal Signals are marked-up like this.
1.2 Trademarks
Product names and registered or unregistered trademarks that are used in this document are used only for identification and remain the property of the owner in each case.
Software Windows are marked-up like this.
Tabs are marked-up like this.
Dialogs are marked-up like this.
6/46
1.3 Connected devices
In addition to these operating instructions, follow the instructions and specifications in the documentation for the connected devices.
Operation Manual NIRMaster™
Büchi Labortechnik AG
2 Safety
2.1 Proper use
2.2 Use other than intended
Safety | 2
The instrument is designed and built for laboratories and production environments (at-line). It serves to determine the concentration of selected constituents contained within a substance. The instrument can be used for the following tasks:
Determination of quantifiable product properties.
Use of any kind other than that described in Chapter2.1 "Proper use", page7 and any application that does not comply with the technical specifications (see Chapter3.6 "Technical data", page15) constitutes use other than that intended. In particular, the following applications are not permissible:
Use of the instrument in rooms which require Ex-protected instruments.
Use of samples, which can explode or inflame (example: explosives, etc.) due to
shock, friction, heat or spark formation.
2.3 Staff qualification
Unqualified persons are unable to identify risks and are therefore exposed to greater dangers. The device may only be operated by suitably qualified laboratory staff. These operating instructions are aimed at the following target groups:
Users
Users are persons that meet the following criteria:
They have been instructed in the use of the device.
They are familiar with the contents of these operating instructions and the
applicable safety regulations and apply them.
They are able on the basis of their training or professional experience to assess
the risks associated with the use of the device.
Operator
The operator (generally the laboratory manager) is responsible for the following aspects:
The device must be correctly installed, commissioned, operated and serviced.
Only suitably qualified staff may be assigned the task of performing the
operations described in these operating instructions.
The staff must comply with the local applicable requirements and regulations for
safe and hazard-conscious working practices.
Safety-related incidents that occur while using the device should be reported to
the manufacturer (quality@buchi.com).
Operation Manual NIRMaster™
7/46
2 | Safety
Büchi Labortechnik AG
BUCHI service technicians
Service technicians authorized by BUCHI have attended special training courses and are authorized by BÜCHI Labortechnik AG to carry out special servicing and repair measures.
2.4 Warning notices in this document
Warning notices warn you of dangers that can occur when handling the device. There are four danger levels, each identifiable by the signal word used.
Signal word Meaning
DANGER Indicates a danger with a high level of risk which could result in
death or serious injury if not prevented.
WARNING Indicates a danger with a medium level of risk which could result in
death or serious injury if not prevented.
CAUTION Indicates a danger with a low level of risk which could result in mi-
nor or medium-severity injury if not prevented.
NOTICE Indicates a danger that could result in damage to property.
2.5 Warning and directive symbols
The following warning symbols are displayed in this operation manual or on the instrument.
Symbol Meaning
General warning
Dangerous electrical voltage
Laser beam
Laser class 1
Avoid exposure to laser beam
Hot surface
8/46
Device damage
Breakable items
Operation Manual NIRMaster™
Büchi Labortechnik AG
2.6 Residual risks
Safety | 2
Symbol Meaning
Magnetic field
Unplug device
Wear safety goggles
Wear protective gloves
Heavy weight, lifting requires more than one person
The instrument has been developed and manufactured using the latest technological advances. Nevertheless, risks to persons, property or the environment can arise if the instrument is used incorrectly. Appropriate warnings in this manual serve to alert the user to these residual dangers.
2.6.1 Glass and acrylic breakage
Broken glass and acrylic can cause severe cuts. Broken glass or acrylic can enter production.
u Handle the Petri Dishes and other glass and acrylic components carefully and do
not drop them.
u Always visually inspect glass and acrylic components for damage every time they
are to be used.
u Do not continue to use glass and acrylic components that are damaged. u Always wear protective gloves when disposing of broken glass and acrylic.
2.6.2 Faults during operation
If a device is damaged, sharp edges or exposed electrical wires can cause injuries.
u Regularly check device for visible damage. u If faults occur, switch off the device immediately and inform the operator. u Do not continue to use devices that are damaged.
2.6.3 Data loss
In the event of a power failure, e.g. due to lightning or interruption of power supply, measurement data may be lost.
u Carry out regular data backup.
2.7 Personal protective equipment
Depending on the application, hazards due to heat and/or corrosive chemicals may arise.
Operation Manual NIRMaster™
9/46
2 | Safety
Büchi Labortechnik AG
u Always wear appropriate personal protective equipment such as safety goggles,
protective clothing and gloves.
u Make sure that the personal protective equipment meets the requirements of
the safety data sheets for all chemicals used.
2.8 Modifications
Unauthorized modifications can effect safety and lead to accidents.
u Use only genuine BUCHI accessories, spare parts and consumables. u Carry out technical changes only with prior written approval from BUCHI. u Only allow changes to be made by BUCHI service technicians.
BUCHI accepts no liability for damage, faults and malfunctions resulting from unauthorized modifications.
10/46
Operation Manual NIRMaster™
Büchi Labortechnik AG
2
1
4
6
3 Product description
3.1 Description of function
Product description | 3
The instrument is a benchtop Fourier Transformation Near Infrared spectrometer (FT-NIR) to identify and quantify analytes of interest. It generates an invisible near infrared interferogram beam which interacts with the mole- cules of a sample, generating a characteristic feedback. The feedback is picked up via a measurement cell by a detector and mathematically processed via Fourier transformation into a spectrum. This spectrum is charac- teristic for a given sample and allows identification as well as quantification of its components. How the interferogram is generated An interferogram is an interference pattern of phase-shifted beams. The instrument is a single-beam polarization interferometer, generating its interferogram in four steps:
1. Polarization of the light source output
The polarizer polarized light, emitted by the light source
generates a well-defined polarization output of the undefined
. Thus, only diagonally polarized
light is transmitted.
2. Beam splitting and orthogonal polarization
The polarized light enters a double refracting block (comparator) 3. Here, the light is broken down into two, orthogonally polarized components with a small, static phase shift.
3. Generating the ongoing phase shift
An assembly of two double refracting wedges is arranged after the comparator. Wedge
is stationary, while wedge 5 is constantly shifted back and forwards by a fast linear-drive. The movement and the geometric arrangement provides a change of thickness in the light path. This leads to an ongoing phase shift between the light beams.
4. Beam recombination and interferogram output
A second polarizer
converts the phase shifted beams into a single light output
with intensity variation – the interferogram
Operation Manual NIRMaster™
11/46
3 | Product description
875432
1
1
2
6
4
3
6
5
LASER – 633 nm
Spare lamp
1
2
3
4
5
6
7
8
1
2
3
4
5
6
3.1.1 Effective NIR light path
Büchi Labortechnik AG
Number Explanation
NIR light source assembly with spare lamp and motorized parabolic re­flector
First polarizer
Comparator (double refracting block)
Stationary double refracting wedge
Moving double refracting wedge
Second polarizer
Sample
Interferogram detector
3.1.2 Reference laser signal path
Number Explanation
Laser output window
Second polarizator (works as a beam splitter for the laser)
Laser output-power sensor
First polarizer
Laser feedback detector
Linear motor for wedge movement
3.1.3 NIRWare software suite
NIRWare is the interface program suite between the instrument and the operator. All program parts need to be hosted on a separate PC.
12/46
Operation Manual NIRMaster™
Büchi Labortechnik AG
1
3
2
1
2
3
Product description | 3
All measurements are performed using the NIRWare Operator. The NIRWare Operator includes the following program elements by default:
Operator interface(s)
Administrative tools
Report templates
Software to run routine analysis
Comprehensive database with analysis data and other
Advanced software and system management is done with the NIRWare Management Console tool. The NIRWare Management Console combines various software modules
NIRWare Application Designer to define NIRWare Operator applications.
NIRWare Sample Manager to administrate all samples and reference values.
NIRWare Administrative Tools for applications and calibrations interchange and
other administrative tasks.
NIRWare Security Designer to define users and user groups according to custom
security policies.
The BUCHI Database Manager is used for any database operations.
Optional:.
NIRWare LIMS to import and export sample information and measurement data.
NIRWare Library Designer is a powerful software module for substance identity
control using full spectral comparison. It is designed for the development of spectral libraries tailored to individual user requirements
To connect the instrument with a PC see Chapter5.5 "Setting up the network connection between Computer and instrument", page23.
3.2 Measurement modes
3.2.1 Diffuse reflection mode
Non-translucent materials can be ana­lyzed via diffuse reflection.
NIR light penetration is limited by the sample material. It interacts with the sample, is refracted and diffusely re­flected into the sensor. The reflected rays contain the spectral information of the sample.
Sample Sensor Light
Operation Manual NIRMaster™
13/46
3 | Product description
2
1
4
3
1
2
3
4
Primary lamp
Internal fuses
Interferometer
Interferometer
interface panel
LASER assembly
Cable
USB Connector
ON / OFF button
Add-on Connector
feedthrough
3.2.2 Transflectance mode
3.3 Configuration
3.3.1 NIRMaster instrument
Büchi Labortechnik AG
Translucent and opaque liquids can be analyzed via transflectance mode. The light penetrates the liquid, is diffusely re­flected by the reference plate and passes through the sample a second time. The transflected rays contain the spectral in­formation of the sample.
Transflectance cover Sample cup Sensor Light
14/46
3.4 Scope of delivery
Fig.1: Shows the main components of the instrument at open housing.
NOTE
The scope of delivery depends of the configuration of the purchase order.
Accessories are delivered as per the purchase order, order confirmation, and delivery note.
Operation Manual NIRMaster™
Büchi Labortechnik AG
6
7
8
11
9
10
3
2
1
5
4
3.5 Type plate
Product description | 3
The type plate identifies the instrument. The type plate is located at the rear of the instrument.
Fig.2: Type plate
1 Symbol for "electronics recycling" 2 Initial product code
3 Approvals 4 Symbol for "Do not dispose of as
household waste"
5 Year of manufacture 6 Power consumption maximum
7 Frequency 8 Input voltage range
9 Serial number 10 Instrument name
11 Company name and address
3.6 Technical data
3.6.1 NIRMaster™ Essential
Specification NIRMaster™ Essential
Dimensions (W x D x H) 420 x 560 x 360 mm
Weight 43 kg
Minimum clearance on all sides 150 mm
Connection voltage 100 – 240 VAC ± 10 %
Frequency 50 / 60 Hz
Power consumption 150 W
IP Code 54
Internal fuse 4A / 240V
Type of interferometer Polarisation interferometer with
Spectral range 800 – 2500 nm
Resolution
Operation Manual NIRMaster™
(with boxcar apodization)
Wavenumber accuracy (at an ambient temperature of 25°C ± 5°C)
TeO2 wedges
12 500 – 4000 cm–1
8 cm–1
± 0.2 cm–1
15/46
3 | Product description
Büchi Labortechnik AG
Specification NIRMaster™ Essential
Signal-to-noise ratio 10000
(peak-to-peak noise of a linear corrected base- line between 5600−6000 cm-1)
Number of scans/sec. 2 - 4
Illumination spot diameter 9 mm
Analog digital converter 24 bit
Lamp type Tungsten-halogen
Average life (lamp)
Type of laser 12 VDC HeNe, wavelength at
Connection voltage 100 – 240 VAC ± 10 %
Detector Extended range InGaAs (temper-
Internal reference Gold plate
External reference Spectralon®
Sample rotation Easy-spin drive, a magnetic spin-
3.6.2 Ambient conditions
For indoor use only.
Max. altitude above sea level 2000 m
Ambient temperature 5 - 40 °C (25 °C)
6000 h
632.992 nm
ature controlled)
ner is included for high perfor­mance measurement of inhomo­geneous sample
16/46
Maximum relative humidity 80 % for temperatures up to 31
Storage temperature max. 45 °C
3.6.3 Materials
Component Material of construction
Spectrometer base Aluminum
Wedges TeO
Polarizers Glass
Upper housing part PMMA, food grade
Lower housing part Stainless steel, food grade 1.4301
Spinner PETP, stainless steel 1.4305 / 1.4301
XL add-on Stainless steel 1.4305, glass
°C decreasing linearly to 50 % rela-
tive humidity at 40 °C
2
Operation Manual NIRMaster™
Büchi Labortechnik AG
3.6.4 Installation site
Product description | 3
Component Material of construction
External reference Aluminum, glass inlay, PTFE inlay
Transflectance adapter Stainless steel 1.4435
Detector InGaAs
Magnets NdFeB
The installation site allows that the power supply can be disconnected at any time
in an emergency.
The installation site has a firm, level and nonslip surface.
The installation site has a fume hood.
The installation site has an own mains outlet socket for the instrument.
The installation site has enough space that cables / tubes can be routed safely.
The installation site has no obstacles (e.g. water taps, drains, etc.).
The installation site is not exposed to external thermal loads, such as direct solar
radiation.
The installation site is not located near vibration-sensitive devices.
The installation site meets the requirements for the connected devices. See
related documentation
The installation site meets the requirements of the safety data sheets for all
solvents and samples used.
The installation site meets the safety requirements. See Chapter2 "Safety",
page7
The installation site meets the specifications according to the technical data (e.g.
weight, dimension, etc.). See Chapter3.6 "Technical data", page15
Operation Manual NIRMaster™
17/46
4 | Transport and storage
4 Transport and storage
4.1 Transport
4.2 Storage
Büchi Labortechnik AG
NOTICE
Risk of breakage due to incorrect transportation
u Make sure that all parts of the device are safely packed in such a way as to
prevent breakage, ideally in the original box.
u Avoid sharp movements during transit.
u After transportation, check the device for damage. u Damage that has occurred in transit should be reported to the carrier. u Keep packing for future transportation.
u Make sure that the ambient conditions are complied with (see Chapter3.6
"Technical data", page15).
u Wherever possible, store the device in its original packaging. u After storage, check the device for damage and replace if necessary.
4.3 Lifting the instrument
WARNING
Danger due to incorrect transportation
The possible consequences are crushing injuries, cuts and breakages.
u The instrument should be transported by two persons at the same time. u Lift the instrument at the points indicated.
18/46
Operation Manual NIRMaster™
Büchi Labortechnik AG
Locked
Locked
4.4 Lock / unlock the transportation lock
Transport and storage | 4
NOTICE
Risk of instrument damage at use with engaged transportation lock.
u Disengage the transportation lock prior use.
u Switch off the instrument. u Unplug the power cord. u Unlock the housing. u Lift off the top cover.
ð The locking mechanism is accessible.
Operation Manual NIRMaster™
u Turn the knob in clockwise direction.
ð The locking mechanism is unlocked and the linear drive of the interferometer is
freely moveable.
19/46
4 | Transport and storage
Locked
Büchi Labortechnik AG
u Close the top cover. u Lock all four latches. u Plug in the power cord. u Switch on the instrument.
20/46
Operation Manual NIRMaster™
Büchi Labortechnik AG
5 Installation
5.1 Before installation
5.1.1 Electrical connections requirement
Installation | 5
NOTICE
Instrument damage due to switching it on too early.
Switching on the instrument too early after transportation can cause damage.
u Climatize the instrument after transportation.
NOTICE
For safe servicing the instrument it needs to be disconnect from the mains power supply.
Precondition:
R The instrument is installed with a locked or secured plug.
R The instrument is installed stationary (without power plug).
u An external power switch is required.
5.2 Establishing electrical connections
NOTICE
Risk of instrument damage because of not suitable power supply cables.
Not suitable power supply cables can cause bad performance or an instrument damage
u Use only BUCHI power supply cables.
Precondition: R The electrical installation is as specified on the
type plate.
R The electrical installation is equipped with a
proper grounding system.
R The electrical installation is equipped with
suitable fuses and electrical safety features.
R The installation site is as specified in the
technical date. See Chapter3.6 "Technical data", page15
u Connect the power supply cable to the
connection on the instrument. See Chapter3.3 "Configuration", page14
Operation Manual NIRMaster™
21/46
5 | Installation
Büchi Labortechnik AG
u Connect the mains plug to an own mains outlet
socket.
5.2.1 Connect the mains cable
Precondition: R The cover is removed.
u Route the mains cable through the cable gland in the lower chassis.
u Connect the cable to the main socket at
mounted on the rear of the instrument lower chassis.
5.3 Connect the instrument to the PC using the supplied ethernet cable
u Remove the cover from the top of the
instrument with the key provided. (Two fixings on the left hand side, two fixings on the right hand side)
u Route the ethernet cable through the cable gland in the lower chassis.
u Connect the cable to the ethernet socket on the
rear of the cream colored optical bench.
5.4 Install the BUCHI NIRWare software on the computer
Install the BUCHI NIRWare software on the computer
Install BUCHI NIRWare software suite following the instruction in Chapter 4 “Software Installation” of the NIRWare Quick Guide.
22/46
Note!
Activate the relevant licences for software and any pre-calibrations that are required.
Operation Manual NIRMaster™
Büchi Labortechnik AG
5.5 Setting up the network connection between Computer and
Installation | 5
instrument
u Start the computer, and open the dialog box
Pro pert ies
u Highlight the option [Internet Protocol Version 4 (TCP/
.
Et hern et
IPv4)] from the list.
u Click the button [Properties].
ð The dialog box
IPv 4)
u Activate the radio button next to [Use the following IP
open.
Int erne t P rotocol Ve rsio n 4 (TC P/
address].
u Enter the following values.
IP address: 192.168.1.2
Subnet mask: 255.255.255.0
u Click the button [OK].
ð The dialog box
close.
IPv 4)
u Click the button [OK].
ð The dialog box
Int erne t P rotocol Ve rsio n 4 (TC P/
Eth erne t P roperti es
close.
The network settings are now correctly set up so communication between the in­strument and computer is possible.
Start NIRWare operator software and verify that the Computer is correctly con­nected to the instrument.
Operation Manual NIRMaster™
23/46
6 | Operation
Büchi Labortechnik AG
6 Operation
6.1 Initializing the instrument
u To start the instrument press the green power button on the left side of the
instrument for 1 – 3 seconds.
ð The indicator light at the housing front will light up yellow, to indicate the
bootup process.
u Switch on the PC with the installed NIRWare software suite.
ð The instrument is ready to log in when the indicator light will change from yellow
to green, after approximately 60 seconds.
6.1.1 System warm-up
When cooled down below working temperature, the spectrometer needs a warm-up time of approx. 15 min. The warm-up time starts as soon as the instrument is switched on.NOTICE!Insufficient warm-up time can influence the quality of
measurement. A longer warm-up time might be required at low environmental temperature.
6.2 System Suitability Test
NOTE
Frequent tests should be performed to minimize the risk of erroneous measurements.
The System Suitability Test (SST) serves as an internal functionality and performance test of the spectrometer. A SST has do be done after each restart of the instrument to monitor and verify the system performance. The following SST values are tested:
Internal system temperatures (e.g. Laser, interferometer, detectors)
Linearity
Signal-to-noise ratio
Wavenumber stability
At the end of each SST a report protocol will be generated. The test results are compared to values ex factory and inform the user about the system condition. The report protocol is stored in the internal database for service and quality control in XML-format.. The time between two SST requests can be set with the NIRWare Application Designer. The recommended standard value between two tests is 24 hours, a test­run takes approximately 5 min. If the instrument is used in continuous operation, a longer checking interval might be suitable.
24/46
6.2.1 Temperature tests
The instrument is equipped with a number of sensors to monitor internal temperatures. Correct operation of the instrument is ensured when the measured internal temperatures are within specified ranges.
u Check if all actual temperature values are within the limits.
Operation Manual NIRMaster™
Büchi Labortechnik AG
6.2.2 NIR linearity test
6.2.3 Signal-to-noise ratio determination
Operation | 6
u Mind the ambient temperature data as listed in Chapter3.6.2 "Ambient
conditions", page16
Precondition: R If temperature is too low:
u Let system warm up sufficiently.
Precondition: R If temperature is too high:
u Clean filters and provide sufficient airflow.
The linearity of the NIR detector is tested by presenting five filters with known absorbance to the instrument. The measured absorbance is compared to the known reference value. To pass this test, all absorbance factors must be within the tolerance.
With this test the ratio of signal power to noise power is determined. A high flux (maximum intensity) and a low flux (10 % intensity) beam is being analyzed for a number of wavenumber intervals. To pass these test, the average and the minimum values must be within the tolerance.
6.2.4 Wavenumber stability test
The wavenumber stability of the instrument is checked by presenting a PMMA filter to the instrument. The measured spectra is compared to a known reference spectra. To pass the test the measured spectra should be within the wavenumber tolerance limits of the reference spectra.
6.3 Reference measurements
Frequent reference measurements compensate for environmental effects, which might influence the spectra. A combination of internal and external reference measurements provides best result quality and measurement stability.
6.3.1 External reference
NOTE
External referencing needs user interaction.
In order to measure the reflectance of a sample, the measured intensity spectrum of the sample is divided by a reference spectrum. The reference spectrum is generated by a white standard in the sample position. See Chapter6.3.3 "Performing a reference measurement", page26.
6.3.2 Internal reference
NOTE
Internal referencing is performed by the instrument automatically.
Operation Manual NIRMaster™
25/46
6 | Operation
1
2
Büchi Labortechnik AG
The internal referencing is used to minimize the need for external referencing and user interaction. The interval between two tests can be set via the NIRWare Application Designer.
6.3.3 Performing a reference measurement
NOTE
For proper device calibration, the external reference or the transflectance adapter must be placed plane on top of the sample window.
Could otherwise lead to incorrect calibration.
u Do not tilt the external reference / transflectance adapter. u The external reference must be aligned to match the cut-out of the centering
plate on top of the instrument.
u When working with the transflectance adapter, the spinner device is a
recommended accessory.
u All items / surfaces must be absolutely clean. u The external reference and the transflectance adapter must be damage and
scratch free.
After the expiration of a predefined time interval (60 min. by default), a dialog (1) will remind the operator to perform an external reference measurement. The interval can be set in the Application Designer. The software guides the user through the process:
When the external reference (2) has been positioned properly, press the ‘Checkmark’ button. The instrument will automatically measure the reference spectrum.
26/46
Operation Manual NIRMaster™
Büchi Labortechnik AG
Operation | 6
External reference positioning with installed spinner:
External reference positioning for XL addon (without spinner):
For proper device calibration, the external reference must be placed plane on top of the sample window of the instrument. It is not necessary to remove the spinner. In case the spinner is installed, turn the external reference until it fits perfectly. Transflectance adapter positioning with / without spinner:
Operation Manual NIRMaster™
27/46
6 | Operation
3
Büchi Labortechnik AG
When the measurement is done (3), the user will be requested to remove the external reference.
Press the ‘Checkmark’ button to finish the procedure.
Frequency of reference measurement
An additional external reference measurement is mandatory:
after an application change
after a lamp exchange and lamp failure
after a service (when the top cover has been reinstalled and locked)
28/46
when changing the add-on or measurement setup
at every system start / restart
6.4 How to perform a measurement
Detailed instructions how to perform a measurement can be found in chapter 5 "Creating a qualitative and a quantitative application" of the NIRWare Quick Guide.
Operation Manual NIRMaster™
Büchi Labortechnik AG
6.5 Shutting down the instrument
Operation | 6
u Close the NIRWare program on the separate PC. u Press the ON / OFF button on the left side of the instrument for 1 – 3 seconds to
switch it off.
Operation Manual NIRMaster™
29/46
7 | Cleaning and servicing
7 Cleaning and servicing
7.1 Regular maintenance work
Büchi Labortechnik AG
NOTE
Users may only carry out the servicing and cleaning operations described in this section.
Any servicing and repair work which involves opening up the casing may only be carried out by BUCHI service technicians.
Action
Daily
Weekly
Additional information
Yearly
7.2 Cleaning the housing 1 Clean the surfaces in direct contact with the sample af­ter each measurement in order to avoid contamina­tion.
7.8 Cleaning the add-ons and
1 After each measurement
the custom sample vessels
7.6 Cleaning the external refer-
1
ence
7.7 Cleaning the spinner 1
7.4 Exchanging the outer filters 1 Check if the filter is clogged and replace latest every 6'000 h
7.5 Exchanging the inner filters 1 Check if the filter is clogged and replace latest every 6'000 h
7.10 Exchanging the lamp 1 When defective, latest ev­ery 6'000 h
7.12 Exchanging the laser unit 2 When defective, latest ev­ery 20'000 hours
7.13 Extended system service
2
and testing
30/46
1 - User; 2 - BUCHI service technicians
7.2 Cleaning the housing
NOTE
Avoid scratches on optical surfaces due to cleaning.
Scratches can influence the measurement precision.
u Never use any objects for cleaning which might scratch the optical surfaces.
u Switch off the instrument and all directly connected electronic devices. u Clean the housing with a soft, lint free damp cloth with mild soapy water.
Operation Manual NIRMaster™
Büchi Labortechnik AG
Cleaning and servicing | 7
u In addition, use surface disinfectant wipes in combination with similar
disinfectant spray on alcohol basis.
u Clean the sample window on top of the instrument. u Use an antimicrobial wipe. u Avoid fingerprints on any optical surface. u For coated optical surfaces, use abrasion-resistant precision cloths.
7.3 How to lift off the top cover
NOTICE
Ingress of particles.
Risk of instrument damage.
u Check proper seating and reliable locking before use. u Do not operate instrument when housing is open or unlocked.
To get access to the light source and the interferometer it is necessary to remove the top cover of the instrument.
Operation Manual NIRMaster™
31/46
7 | Cleaning and servicing
1
Büchi Labortechnik AG
u Switch off the instrument. u Disconnect the external power supply. u Clean the housing i.e. remove any dust between the upper and lower cover. u Lift the four black dust flaps (1) two at each side of the instrument.
ð The latches are accessible.
u Turn the housing-key and bring the latches into horizontal position to unlock the
housing.
u Carefully lift off the top cover. u Unplug the internal power cable. u To reinstall the cover, re-plug the internal power cable. u Carefully place the top cover onto the instrument. u Turn the housing-key and bring the latches into vertical position to lock the
housing.
u Put the four black dust flaps (1) back on. u Connect the external power supply to the instrument. u Switch on the instrument.
32/46
Operation Manual NIRMaster™
Büchi Labortechnik AG
Cleaning and servicing | 7
7.4 Exchanging the outer filters
u Pull off the filter frames located at the bottom. NOTICE!Do not tilt the
instrument. The access is possible from the side.
Operation Manual NIRMaster™
33/46
7 | Cleaning and servicing
1
3
2
7.5 Exchanging the inner filters
Büchi Labortechnik AG
u Take out each filter pad. u Insert new filter pads. u Reassemble the filter frames. u Make sure the ventilation slots of the filter frames show into opposite direction
to avoid a shortcut of the cooling airflow.
34/46
u Lift off the top cover.
ð The filter drawers are accessible below the fans.
u Push the drawer (1).
ð The filter holder moves out of its position.
u Pop out the sandwich filter. u For each filter, place a new filter pad between the metal grids (2). u Put the filters back in its holders. u Push the drawers back into position (3). u Close the housing.
7.6 Cleaning the external reference
NOTE
Do not use any cleaning media with abrasive character which might scratch the surface.
u For cleaning use abrasion-resistant precision cloths.
Operation Manual NIRMaster™
Büchi Labortechnik AG
7.7 Cleaning the spinner
Cleaning and servicing | 7
u If substances still adhere, clean the surfaces with alcohol. u Avoid contact with hard objects. u Do not drop the external reference. u Keep it in a dry and clean place.
u The spinner can be cleaned in a dishwasher. NOTICE!Not cleaning the spinner
on a regular basis can lead to a reduced force transmission of the inner wheel and inlay. As a result the sample cup will not rotate.
u The O-ring of the inner wheel needs replacement in case its mechanical treated. u Replacement is recommended by a service person.
7.8 Cleaning the add-ons and the custom sample vessels
u All BUCHI add-ons can be rinsed and cleaned with disinfectants on alcohol basis.
NOTICE!Spray-disinfection should be used in addition to surface disinfection with wipes only.
u The following sample vessels can be cleaned in a dishwasher with standard
detergents:
Petri dishes
Unbreakable cup
Spinner cpl.
XL add-on
High performance cup
7.9 How to reset the system fuses
NOTICE
Device fuses may be triggered occasionally (e.g. due to voltage peaks).
When fuses trigger frequently action needs to be taken.
u Inform your customer service. u Do not try to repair or modify the fuses.
Operation Manual NIRMaster™
35/46
7 | Cleaning and servicing
Fuse ok
Fuse triggered
Büchi Labortechnik AG
Precondition: R The primary fuses are located inside the instrument next to the interferometer
power supply socket.
u Switch off the instrument. u To get access to the resettable fuses, lift off the top cover as described in
Chapter7.3 "How to lift off the top cover", page31.
u Push in the fuse for reset. u Switch on the instrument.
7.10 Exchanging the lamp
CAUTION
Risk of minor burns by hot lamp module.
u Do not touch hot parts or surfaces. u Let the lamp module cool down. u Do not touch the bulb glass.
NOTE
After lamp-module exchange, a reference spectrum should be generated to match the individual light intensity output of the module. See Chapter6.3 "Reference measurements", page25.
36/46
Operation Manual NIRMaster™
Büchi Labortechnik AG
1
2
3
4
5
Cleaning and servicing | 7
u Switch off the instrument. u Lift off the top cover (1) and put it aside. u Unplug the mains plug inside the device (2). u Unplug the power cable (3) of the primary / secondary lamp module. u Turn the locking lever upwards (4) to unlock the module. u Carefully pull out the lamp (5). u Put the new lamp in. u Turn the locking lever downwards to lock the module. u Connect the power cable of the primary / secondary lamp module. u Connect the mains plug inside the device. u Install the top cover again. u Switch on the instrument u Reset the lamp lifetime counter using the separate PC as described in chapter
7.8.4. of the NIRWare Operation Manual.
7.11 Resetting the lamp lifetime counter
To correctly monitor the lamp lifetime the software hour counter has to be reset after each lamp replacement. See chapter 7.8.4. of the NIRWare Operation Manual.
7.12 Exchanging the laser unit
NOTE
A BUCHI service technician is required to replace the LASER unit.
Operation Manual NIRMaster™
37/46
7 | Cleaning and servicing
7.13 Extended system service and testing
Büchi Labortechnik AG
Over its lifetime, the intensity of the laser light will decrease. It is continuously monitored by a sensor to be sure levels are above a certain threshold.
Contact BUCHI customer service for the annual extended service and testing.
38/46
Operation Manual NIRMaster™
Büchi Labortechnik AG
8 Help with faults
8.1 Troubleshooting
Help with faults | 8
Problem Possible cause Action
System is over­heated
System does not power up
External reference measurement fails
Sample cup does not rotate
Incorrect measure­ments results
Filter clogged u Exchange outer / inner
filters.
Power outage u Make sure that the
instrument has power.
Built-in resettable fuses or electronic malfunction
u Reset internal fuses. u If error persists, call service
for repair.
See Chapter8.3 "Reference measurement fails", page40
u Clean all optical surfaces in
the measurement path.
u Perform NADIA Chapter8.2
"Enhanced system diagnose (NADIA)", page39.
Spinner contaminated with oil
u Clean spinner in dishwasher.
or fat
Not enough sample material available
Sample not homogenious or representative
u Use sufficient sample
material.
u Take a representative
sample.
u Mix the sample before
measurement.
Humidity of sample material u Only use dry samples.
Temperature of sample mate­rial
Sample cup inadeqate u Only use from BUCHI
Malfunctions or errors which are not listed in the table are to be corrected by a BUCHI technical engineer. In this case please refer to your local BUCHI customer service agent.
8.2 Enhanced system diagnose (NADIA)
Additional tests to the SST can be run via the NIRWare Automatic Diagnose (NADIA) tool. It can be used to verify the condition of the instrument e.g. during service for an enhanced performance check. To run NADIA see chapter 5.9 in the NIRWare Operations Manual.
u Wait until the sample
reaches ambient temperature.
recommended sample cups. See Chapter10.1.2 "Accessories", page43
Operation Manual NIRMaster™
39/46
8 | Help with faults
8.3 Reference measurement fails
Büchi Labortechnik AG
When the deviation between the stored reference spectrum is out of limit, the reference measurement will fail. A dialog will show both curves and give details of the measurement result. Possible reasons for a reference measurement to fail:
Optical surfaces (e.g. external reference) are dirty or scratched
Environmental conditions out of operational range (e.g. condensating humidity at
optical surfaces)
Defective instrument (e.g. electronic damage)
After lamp-module exchange
What to do:
u Clean the external reference and the instrument output window. u Place the external reference onto the output window and press the ‘Rerun’
button to repeat the measurement.
u If measurement still fails, a new reference spectrum can be stored by pressing
the ‘Checkmark’ button. NOTICE!An administrator login is required to store the new data set. Setting a new reference spectrum should be the last option after consequent trouble shooting (run SST).
40/46
Operation Manual NIRMaster™
Büchi Labortechnik AG
9 Taking out of service and disposal
9.1 Taking out of service
9.2 Disposal
9.3 Returning the instrument
Taking out of service and disposal | 9
u Switch off the instrument and disconnect it from the mains power supply. u Remove all cables from the device.
The operator is responsible for proper disposal of the instrument.
u When disposing of equipment observe the local regulations and statutory
requirements regarding waste disposal.
u When disposing, observe the disposal regulations of the materials used. Materials
used see Chapter3.6 "Technical data", page15.
Before returning the instrument, contact the BÜCHI Labortechnik AG Service Department.
https://www.buchi.com/contact
Operation Manual NIRMaster™
41/46
10 | Appendix
Büchi Labortechnik AG
10 Appendix
10.1 Spare parts and accessories
Use only genuine BUCHI consumables and spare parts in order to ensure correct, safe and reliable operation of the system.
NOTE
Any modifications of spare parts or assemblies are only allowed with the prior written permission of BUCHI.
10.1.1 Spare parts
Order no. Image
Spinner 11056771
External reference 11056371
Outer filter holder with pads, 2 pcs 11056672
Set spare filter pads 10 pcs 11056773
Inner filter pads, 10 pcs 11056917
Ferrit sleeve 5 mm 11056714
Ferrit sleeve 6 mm 11056715
Housing-key 11056766
Plug bushing 3-6mm 10 pcs 11056665
42/46
Plug bushing 6-9mm 10 pcs 11056666
Operation Manual NIRMaster™
Büchi Labortechnik AG
Appendix | 10
Order no. Image
Set round cord 10 pcs 11056667
Spinner (inlay-) ring 11056772
Replacement Window HPSC 046246
Primary lamp module N560-001
Adapter plate for gold cell
For both High Performance Transflectance Cells 11056994 or 11056995.
10.1.2 Accessories
Compatibility
Sample holding accessories Easy-Spin
Petri dishes
High performance cup
Unbreakable cup
Small plastic bags
High performance trans­flectance gold cell
Sample dimensions 100 mm Adaptable 35 mm
*Included in system as described in Chapter3.4 "Scope of delivery", page14. **See Chapter3.2 "Measurement modes", page13.
Magnetic spinner*
XL* glass spacer Adapter plate
for gold cell
High performance cup 046259
Operation Manual NIRMaster™
Order no. Image
43/46
10 | Appendix
Büchi Labortechnik AG
Order no. Image
Robust cup 11055058
Glass petri dishes 10 pcs. (up view)
Not suitable for use with Transflectance Cover
Transflectance cover 0.3 mm
Not suitable for use with robust cup
041636
Transflectance cover for robust cup 11055998
Pressing Stamp
To compress and compact samples like ground meat or cheese. Stainless steel, approx. 1.8 kg.
XL-Add-On 11056784
44/46
Operation Manual NIRMaster™
BUCHI Affiliates:
Europe
Quality in your hands
Switzerland/Austria
BÜCHI Labortechnik AG
CH – 9230 Flawil T +41 71 394 63 63 F +41 71 394 64 64 buchi@buchi.com www.buchi.com
Italy
BUCHI Italia s.r.l.
IT – 20010 Cornaredo (MI) T +39 02 824 50 11 F +39 02 575 12 855 italia@buchi.com www.buchi.com/it-it
NIR-Online
Germany
NIR-Online GmbH
DE – 69190 Walldor f T +49 6227 73 26 60 F +49 6227 73 26 70 nir-online@buchi.com www.nir-online.de
Benelux
BÜCHI Labortechnik GmbH
Branch Office Benelux NL – 3342 GT Hendrik-Ido-Ambacht T +31 78 684 94 29 F +31 78 684 94 30 benelux@buchi.com www.buchi.com/bx-en
Russia
BUCHI Russia/CIS
RU – 127006 Moscow T +7 495 36 36 495 russia@buchi.com www.buchi.com/ru-ru
France
BUCHI Sarl
FR – 91140 Villebon-sur-Yvette T +33 1 56 70 62 50 F +33 1 46 86 00 31 france@buchi.com www.buchi.com/fr-fr
Spain
BUCHI Ibérica S.L.U.
ES – 08960 Barcelona T +34 936 06 8010 iberica@buchi.com www.buchi.com/es-es
America
Brazil
BUCHI Brasil Ltda.
BR – Valinhos SP 13271-200 T +55 19 3849 1201 F +55 19 3849 2907 brasil@buchi.com www.buchi.com/br-pt
Germany
BÜCHI Labortechnik GmbH
DE – 45127 Essen T +800 414 0 414 0 (Toll Free) T +49 201 747 49 0 F +49 201 747 49 20 deutschland@buchi.com www.buchi.com/de-de
United Kingdom
BUCHI UK Ltd.
GB – Suffolk CB8 7SQ T +44 161 633 1000 F +44 161 633 1007 uk@buchi.com www.buchi.com/gb-en
USA/Canada
BUCHI Corporation
US – New Castle, DE 19720 T +1 877 692 8244 (Toll Free) T +1 302 652 3000 F +1 302 652 8777 us-sales@buchi.com www.buchi.com/us-en
Asia
China
BUCHI China
CN – 200233 Shanghai T +86 21 6280 3366 F +86 21 5230 8821 china@buchi.com www.buchi.com/cn-zh
Korea
BUCHI Korea Inc.
KR – Seoul 153-782 T +82 2 6718 7500 F +82 2 6718 7599 korea@buchi.com www.buchi.com/kr-ko
India
BUCHI India Private Ltd.
IN – Mumbai 400 055 T +91 22 667 75400 F +91 22 667 18986 india@buchi.com www.buchi.com/in-en
Malaysia
BUCHI Malaysia Sdn. Bhd.
MY – 47301 Petaling Jaya, Selangor T +60 3 7832 0310 F +60 3 7832 0309 malaysia@buchi.com www.buchi.com/my-en
BUCHI Support Centers:
South East Asia
BUCHI (Thailand) Ltd.
TH-Bangkok 10600 T +66 2 862 08 51 F +66 2 862 08 54 bacc@buchi.com www.buchi.com/th-th
Middle East
BÜCHI Labortechnik AG
UAE – Dubai T +971 4 313 2860 F +971 4 313 2861 middleeast@buchi.com www.buchi.com
Indonesia
PT. BUCHI Indonesia
ID – Tangerang 15332 T +62 21 2222 9478 F +62 21 5568 7906 indonesia@buchi.com www.buchi.com/id-in
Singapore
BUCHI Singapore Pte. Ltd.
SG – Singapore 609919 T +65 6565 1175 F +65 6566 7047 singapore@buchi.com www.buchi.com/sg-en
Latin America
BUCHI Latinoamérica S. de R.L. de C.V.
MX – Mexico City T +52 55 9001 5386 latinoamerica@buchi.com www.buchi.com/es-es
Japan
Nihon BUCHI K.K.
JP – Tokyo 110-0008 T +81 3 3821 4777 F +81 3 3821 4555 nihon@buchi.com www.buchi.com/jp-ja
Thailand
BUCHI (Thailand) Ltd.
TH – Bangkok 10600 T +66 2 862 08 51 F +66 2 862 08 54 thailand@buchi.com www.buchi.com/th-th
We are represented by more than 100 distribution partners worldwide. Find your local representative at: www.buchi.com
Loading...