Integral Blower Installation
Manual
Manuel d’Installation d’un Ventilateur Intégré
Manual de Instalación de un Ventilador Integrado
Models/
Modèles/
Modelos:
VTN630
VTN1030
Integral Blower Installation
Integral Blower models VTN630 and VTN1030 are integrated into the ventilation hood at the time of installation.
Refer to the Installation Manual for important safety instructions.
Use gloves when installing blower unit.
Suitable for the following hood models:
HOOD MODELS |
BLOWER |
|
|
PH30HS, PH36GS, PH36HS, PH54GS, |
VTN1030 |
VCIB36JP, VCIN36JP, PH42GS, PH48GS, |
VTN630 |
PH48HS, VCIB48JP, VCIN48JP, VCIN54JP, |
|
VCIB54JP |
|
|
|
Installation Instructions
81/4" (210)
87/8"
(225)
21/4"
(57)
|
|
63/4" |
|
41/8" |
67/8" |
(171) |
|
25" |
|||
(105) |
(175) |
||
|
|
(635) |
Integral Blower Model VTN1030
87/8"
(225)
81/4" |
|
|
(210) |
|
25" |
|
67/8" |
|
41/8" |
(635) |
|
(175) |
|
|
(105) |
|
|
1.The blower is attached to the hood using weld studs provided on the mounting plate. Guide the motor mounting plate over the studs.
NOTE:
The blower can be installed for horizontal or vertical discharge only on HS and GS models.
2.Attach (4) nuts (included with hood) to the weld studs. Tighten nuts to secure the blower to the hood.
Weld Stud Locations
3.Connect the blower’s Molex plug connector to the connector present inside the hood.
From Blower
From Control Panel
Wiring the Hood with an Integral Blower
Integral Blower Model VTN630
English