Installation plan
PG 8063
To avoid the risk of accidents or damage to the machine, it is essential to read these instructions as well as the service documents before it is installed, commissioned and used for the first time.
en - GB, IE, AU, NZ
M.-Nr. 11 486 560
Installation notes
Installation re- |
This machine must be installed by a suitably qualified person with |
quirements |
the appropriate electrical and plumbing qualifications in accord- |
|
ance with the installation instructions supplied. |
|
This machine must be installed in accordance with all applicable |
|
standards and guidelines, including legal requirements and health |
|
and safety regulations. |
|
This machine must be commissioned and operatives trained in its |
|
use by Miele Service or by an approved Miele Service Partner only. |
Environmental re- |
Condensate can build up in the area surrounding the machine. Any |
quirements |
furniture and fittings in the room must therefore be suitable for pur- |
|
pose. |
Electrical connec- |
Connection to the electrical supply must be carried out in accordance |
tion |
with local and national safety regulations. The power cord must be |
|
protected from the risk of thermal damage. |
|
It is recommended to make electrical connection via a plug and |
|
socket so that electrical safety checks can be carried out easily. |
|
For hard-wired machines, connection must be via a main switch to |
|
be provided on site, which must completely isolate the machine from |
|
the power supply with a contact gap of at least 3 mm. |
|
The plug and socket as well as the main switch must be easily ac- |
|
cessible after the machine has been installed. |
Equipotential |
For added safety the machine should be protected with a residual |
bonding and |
current device with trip current of 30 mA. |
earthing |
Equipotential bonding should be carried out if required. A screw |
|
connection for equipotential bonding is provided at the back of the |
|
machine. Equipotential bonding and earthing must be completed be- |
|
fore the machine is commissioned. |
Plumbing |
This machine can be connected directly to a cold water supply or a |
|
hot water supply using the supplied double check valves or to a de- |
|
mineralised water supply. If a hot water supply is not available, both |
|
inlet hoses (KW/WW) must be connected to the cold water supply |
|
with a Y-connector. The stopcocks must be easily accessible. |
2 |
PG 8063 |
Installation notes
Liquid agents: poThe liquid agent container for external dispensing must be positioned sition of external either next to or underneath the machine only. The container may be containers placed on the floor or in an adjacent cabinet. Do not place the con-
tainer on top of or above the machine. Make sure that the dispensing hose does not get kinked or trapped.
Compressed air A flexible compressed air connection must be provided on-site for reprocessing air regulators. The air quality must comply with the specifications issued by the manufacturer of the breathing apparatus. The pressure must be at least 400 kPa and should not exceed
600 kPa.
The compressed air connection must be equipped with one of the following quick-release couplings:
–CEJN series 341
–Parker Rectus series 25S