Abbreviations surrounded by broken circle:
Connection optional or required, depending on model
G 7824 AP
Steam/Electric (D/EL)
EN
Notes on supply connections:
Cold, hot and demineralised water, high-pressure steam, condensate and compressed air
supplies can be routed through the ceiling or, alternatively, through the floor. A combination of
the two is possible.
When installing a run of several washer-disinfectors, drain hoses can be passed through a
made-to-measure floor tray to a central drain.
Electrical
connection
Connection cable, min. cross-sectional area mm²5 x 2.5Connector terminal cross-section mm²4
Connection cable, min. lengthFrom top edge of MAV panelling if supply lines
Above finished floor if supply lines pass through
Socket must be accessible after installation.
Protect supply lead against thermal exposure.Observe correct phase sequence (clockwise).
Maximum permitted mains voltage variation: +/- 10%
The use of an earth leakage circuit breaker (ELCB) is
Rated load kW10.2
Fuse rating A3 x 16
1. Voltage
pass through ceiling
floor
Plug and socket connection recommended to
facilitate accessibility for electrical safety tests.
Connection to electrical supply should be in
accordance with valid regulations and safety
standards.
strongly recommended.
Rated current: In accordance with fuse rating.
Tripping current: 30 mA.
m4.0
m1.5
3N AC 400-415/50
V/Hz
Equipotential
bond and earth
conductor
Equipotential bond and earth conductor must be
Threaded connection bolt with nut and washer fitted
on machine. Size:
connected!
Installationsplan G 7824 D/EL AP
Stand: 01.07.2010
Seite 2
M 8x1
Rated load kW10.2
Fuse rating A3 x 30Connection cable, min. cross-sectional area mm²4 x 4
Country variations:
2. Voltage
V/Hz3 AC 230/50
3. Voltage V/Hz3 AC 208/60
Rated load kW10.2
Fuse rating A3 x 30Connection cable, min. cross-sectional area AWG4 x 10
Network / Printer
connection
Serial interface:Connection cable length including RS232 plug (supplied
An RS232 connection socket above the machine must be
Connection / Installation must be carried out in accordance
output signals
TA OPERATIONContact closed during drying blockV/A/Hz200-240/1/50-60
PRG RUNNINGContact closed during washing, drying and cool-downV/A/Hz200-240/1/50-60
OPERATIONContact closed while machine is runningV/A/Hz200-240/1/50-60
FAULTContact closed when fault occursV/A/Hz200-240/1/50-60
PRG ENDContact closed between end of programme and door opening V/A/Hz200-240/1/50-60
PAUSE w. WASHContact closed during 'Pause with wash action' stageV/A/Hz200-240/1/50-60
DRAIN STDContact closed during drainageV/A/Hz200-240/1/50-60
DRAIN RECY.Contact closed during drainage (water recycling drain pump)V/A/Hz200-240/1/50-60
COLDContact closed during cold water intakeV/A/Hz200-240/1/50-60
HOTContact closed during hot water intakeV/A/Hz200-240/1/50-60
DEMIN. COLDContact closed during cold demineralised water intakeV/A/Hz200-240/1/50-60
DEMIN. HOTContact closed during hot demineralised water intakeV/A/Hz200-240/1/50-60
DOS1-EXTControl signal for external dispenser pump 1V/A/Hz200-240/1/50-60
DOS2-EXTControl signal for external dispenser pump 2V/A/Hz200-240/1/50-60
DOS3-EXTControl signal for external dispenser pump 3V/A/Hz200-240/1/50-60
DOS4-EXTControl signal for external dispenser pump 4V/A/Hz200-240/1/50-60
Connection
module
The following interfaces for transferring or printing process
data are available on the machine:
as standard)
provided on site.
with IEC 60950.
Potential-free contacts (NO contacts):
A maximum of 9 contacts are available, possible assignment:
m5.0
Max. contact load:
Module input
SLA HZGPeak-load negotiation - HeatingV/Hz200-240/50-60
DOS-EXTFill level of external dispenser canisterV/Hz200-240/50-60
MEDIUMMedium dispensing active, signal for flow and volume controlV/Hz200-240/50-60
Max. water hardnessG 7824gr/gal4 G 7824 WES (with water softener)gr/gal60
Min. flow pressurekPa (psi)200 (29)
Max. pressurekPa (psi)1000 (145)
Throughputl/min15 On-site connection thread according to DIN 44 991Inch3/4" external thread
signals
Cold waterMax. temperature°C20
Control voltage
(11.5 NH)
Installationsplan G 7824 D/EL AP
Stand: 01.07.2010
Seite 3
Hot waterMax. temperature°C60
Max. water hardnessG 7824gr/gal4 G 7824 WES (with water softener)gr/gal60
Min. flow pressurekPa (psi)200 (29)
Max. pressurekPa (psi)1000 (145)
Throughputl/min15 On-site connection thread according to DIN 44 991Inch3/4" external thread
(11.5 NH)
Final rinse waterWater quality defined by cleaning requirements, e.g. reverse
Max. temperature°C60 Max. conductivity (e.g. for surgical instruments)µS/cm15
Min. flow pressurekPa (psi)200 (29)
Max. pressurekPa (psi)1000 (145)
Throughputl/min15 On-site connection thread according to DIN 44 991Inch3/4" external thread
On-site connection thread according to ISO 228-1.Inch1/2" ext. thread
A dirt trap and condensate drain is to be provided on site
The steam generator should be operated in accordance with
The steam condensate should comply with applicable
CondensateOn-site connection thread according to ISO 228-1Inch1/2" ext. thread
osmosis, demineralised water, ultra-purified water, etc.
directly upstream from the steam connection on the machine.
applicable regulations.
standards for sterilizing. The controlled use of volatile
treatment chemicals may result in higher pH values and
electrical conductivity values which are permissible but must
be discussed with manufacturers beforehand.
(USA: 11.5 NH)
Compressed airCapacity Qnm³/h
Supply pressurekPa (psi)600-1,200 (88-174)
Connection thread (on site)Inch1/2" int. thread
(ft³/min)
0.12
(0.0706)
Cooling circuit
feed line
(optional)
Temperature of cooling circuit feed line °C 6
Max. cooling capacity kW
Hose connector – Steam condenser (ext. dia. × l) mm 14 x 25
Faucet and supply line filter to be provided on site!
Electrically operated shut-off valves required to control
A connection hose with an internal diameter of 14 mm and a
Steam condenser (DK, optional) can be connected to a
cooling circuit. In the absence of such a cooling circuit, the
steam condenser should be connected to cold water:
cooling circuit.
length of 1.50 m from the ceiling should be provided on site.
3.5 (11,942)
(Btu/h)
Installationsplan G 7824 D/EL AP
Stand: 01.07.2010
Seite 4
Cooling circuit
return pipe
(optional)
Hose connector – Steam condenser (ext. dia. × l) mm 14 x 25
Faucet to be provided on site!
A connection hose with an internal diameter of 14 mm and a
Necessary to connect steam condenser to cooling circuit
length of 1.50 m from the ceiling should be provided on site.
Waste waterMax. temperature°C93
Ports for drain
hoses
Connection for two drain pumpsDN50
Max. head heightm3.0
Max. peak deliveryl/min100
Drain hoses 2x (int. dia. x wall thickness x l) suppliedmm22 x 6 x 1500
2 hose sleeves to be provided on site (ext. dia. x l)mm22 x 30
Connection for steam condenser drain hose (optional), only
required if a steam condenser is connected to cold water
supply:
Max. head heightm3.0
Max. deliveryl/min6
Drain hose (Int. dia. × wall thickness × l)mm14 x 3 x 2500
hose sleeve to be provided on site (ext. dia. x l)mm14 x 30
Connection for condensate drain hose:DN50
Max. head heightm3.0
Max. deliveryl/min1
Drain hose (Int. dia. × wall thickness × l)mm6 x 2 x 2500
hose sleeve to be provided on site (ext. dia. x l)mm6 x 20
Min. diameter of main drain pipeDN100
Installation of odour trap recommended.
Port diametermm36
Holes must be drilled in the designated areas/points to suit
on-site conditions before installing the machine.
DN50
Installationsplan G 7824 D/EL AP
Stand: 01.07.2010
Seite 5
VentedMachine-side connection (ext. dia. × wall thickness)mm100 x 1.25
Air extracted from the 'unclean' side of the operation should
I. Vent direct to atmosphere. Vent multiple washer Vent air throughput m³/h
Temperature - Mean value / peak max. °C70/95
Relative humidity - Mean value / peak max. % 80/100
Max. permissible pressure loss in vent duct Pa (psi)350 (0.05)
II. Vent to atmosphere via steam condenser. Vent multiple
Vent air throughputm³/h
Temperature - Mean value / peak max.°C28/32
Relative humidity - Mean value / peak max.% <70/100
Max. permissible pressure loss in vent ductPa (psi)150 (0.02)
III. Connection without steam condenser to external fan Min. throughput capacity of on-site vent in washing cyclem³/h
Min. throughput capacity of on-site vent in drying cyclem³/h
Temperature - Mean value / peak max.°C70/95
Relative humidity - Mean value / peak max.% 80/100
IV. Connection with steam condenser to external fan-assisted
Min. throughput capacity of on-site vent in washing cyclem³/h
Min. throughput capacity of on-site vent in drying cyclem³/h
Temperature - Mean value / peak max.°C28/32
Relative humidity - Mean value / peak max.% <70/100
Prevent condensate backflow into washer-disinfector. Pitch
be replenished by ensuring sufficient air intake.
disinfectors individually (do not use manifold):
washer-disinfectors individually (do not use manifold):
assisted vent:
vent:
vent ducting and discharge condensate at lowest point.
125
(ft³/min)
(ft³/min)
(ft³/min)
(ft³/min)
(ft³/min)
(ft³/min)
(73.6)
125
(73.6)
50
(29.4)
150
(88.3)
50
(29.4)
150
(88.3)
Machine feetHeight-adjustablemm10
Floor boltsParts supplied with floor tray
Heat dissipation
Clean sidekW
Machine dataHeight incl. floor tray and lidmm1544
Height incl. floor tray and top-box panellingmm1928
Widthmm900
Depthmm768
Net weightkg370 Dynamic floor loadN~4910Knocked down width incl. palletmm1020
Knocked down height incl. palletmm1600
Installation should only be carried out by authorised fitters in accordance with valid regulations!
Observe installation instructions when installing machine! All rights reserved! Dimensions in mm
to room
Foot diametermm25
Adhesive anchors (4 off)mmM 8 x 150
Hole diametermm8
Unclean sidekW
Load on removal
kW
(Btu/h)
(Btu/h)
(Btu/h)
0.5
(1706)
0.5
(1706)
0.5
(1706)
Installationsplan G 7824 D/EL AP
Stand: 01.07.2010
Seite 6
Notes on supply connections:
Cold, hot and demineralised water, high-pressure steam, condensate and compressed air supplies
can be routed through the ceiling or, alternatively, through the floor. A combination of the two is
possible. Cooling circuit feed and return pipes for steam condenser (optional) through ceiling only.
Easily accessible central faucet and main switch recommended.
Waste water connection:
The on-site drain pipe serving the machine drain hose should be located at the side of the machine.
Service ports in the machine casing can be made on site for connection to on-site utilities. Drain hoses
are of a sufficient length to extend to the ports and should be extended outside the machine casing.
Ports should be 36 mm in diameter. Two grommets, Mat. no. 2723340, required to provide antiscuffing hose protection.
Two blind stoppers, Mat. no. 27119630, are required to provide anti-scuffing protection for condensate
and steam condenser hoses. Blind stoppers should be cut open on site.
When installing a run of several washer-disinfectors, drain hoses can be passed through a made-tomeasure floor tray to a central drain. Connection to a common drain pipe above the machines is also
possible. This option requires the use of a strain-relief bush for the drain hoses. If a steam condenser
is supplied from a potable water supply, the machine should be connected to the drainage system
using the non-return device provided. The max. head height of the pumps should should be taken into
consideration!
All drain hoses from washer-disinfectors should be connected to the on-site drain pipe using pressuretight connections.
Electrical connection:
Electrical supply lines can be routed through floor or ceiling. Min. cable length of 1500 mm above
finished floor surface required with access through floor. Min. cable length of 4000 mm from top edge
of top-box panelling required with access through ceiling.
Standard installation, chemical supply connections:
Install supply lines vertically from ceiling, adjust and locate. All pipework, including insulation, fittings
and valves with taps should be located within the designated area (520 mm × 130 mm). No part of the
installation should extend beyond this area.
Hot, cold and demineralised water lines, high-pressure steam and condensate lines end with a ¾" ext.
thread and compressed air lines with a ½" int. thread 2160 mm above finished floor.
Miele recommends the installation of a non-return valve directly below the condensate trap in order to
prevent water hammer.
If washer-disinfector is installed with a steam condenser, install cooling circuit feed and return pipes
vertically from ceiling and secure. The cooling circuit feed and return pipes connect to the machine in
the installation area via a hose sleeve at the same height as the water intake connections. The cooling
circuit feed and return pipes are connected to the steam condenser with a hose provided on site
(interior diameter 14 mm/nominal pressure 800 kPa). The connection hoses should end approx. 1.5 m
below the ceiling.
In the absence of cooling circuit, connect steam condenser to cold water.
Easily accessible central faucet and main switch recommended.
Installationsplan G 7824 D/EL AP
Stand: 01.07.2010
Seite 7