Frigidaire FFRE1033U10, FFRE1033U1E0, FFRE1033UE0, FFRE103ZA10, FFRE1233U10 Installation Guide

...
0 (0)
Frigidaire FFRE1033U10, FFRE1033U1E0, FFRE1033UE0, FFRE103ZA10, FFRE1233U10 Installation Guide

Installation Instructions

READ BEFORE INSTALLING UNIT

BR Window Mounting (10,000 - 12,000 BTU)

INSTALLATION WARNINGS AND CAUTION

Carefully read the installation manual before beginning.

be exposed:

Carefully inspect location where air conditioner will be installed. Be sure it will support the weight of the unit over an extended period of time.

NOTE:

the best way to store unit during winter, or when not in use.

The top rail on your unit may already be installed. If not, follow the steps below.

Top Rail Hardware

Qty.

 

 

 

4

 

 

Top Rail

1

 

 

Before installing, the top rail must be assembled on the unit.

 

 

 

Mounting Hardware

Qty.

 

 

 

 

 

 

 

 

 

7

 

 

 

(For Wooden windows)

2

 

 

 

 

 

 

 

(For Vinyl-Clad windows)

2

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

weather seals

5

 

 

 

window sash seal foam

1

 

 

 

insulation panel

2

 

 

 

ruler

1

 

 

 

 

 

 

 

 

 

 

Drill (If pilot holes are needed)

Top Rail

Fig. B

Fig. C

 

 

66129926910

1

Installation

LEFT + RIGHT FILLER PANEL ASSEMBLY

NOTE: Top Rail and Side Panels at each side are offset to provide the proper pitch to the rear. This is necessary for proper condensed water utilization and drainage. If you are not using the Side Panels for any reason, this pitch to the rear must be maintained!

Place unit on floor, a bench or a table. There is a Left and Right side Filler Panels - be sure to use the proper panel for each side. When installed, the flange for securing the panel in place to the window sill will be facing into the room.

A.Hold the side Panel in one hand and gently pull back the center to free the open end. See FIG. 1.

B.Slide the free end “T” section of the panel directly into the cabinet as shown in FIG. 2. Slide the panel down. Be sure to leave enough space to slip the top and bottom of the frame into the rails on the cabinet.

C.Once the panel has been installed on the side of the cabinet, make sure it sits securely inside the frame channel by making slight adjustments. Slide the top and bottom ends of the frame into the top and bottom rails of the cabinet. See FIG. 3.

D.Slide the panel all the way in and repeat on the other side.

FIG. 1

FIG. 2 “T” section

FIG. 3 Top Rail

Bottom Rail

Cut the seal foam(adherent type) into proper length. Then stick the seal foam at the lower part of the window frame. Your air conditioner is designed to install in standard double hung windows with opening widths of 24 to 40 inches (609 mm to 1016 mm) (FIG. 4A & FIG. 4B)

Lower sash must open sufficiently to allow a clear vertical opening of 18.2 inches (462 mm ). Side louvers and the rear of the air conditioner must have clear air space to allow enough airflow through the condenser, for heat removal. The rear of the unit must be outdoors, not inside a building or garage.

Fig. 4A

SEAL FOAM

 

 

 

 

 

 

 

 

 

 

SEAL FOAM

 

 

 

 

 

 

 

 

 

Fig. 4B

 

 

 

 

 

 

 

 

24" to 40"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

24" to 40"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(609 mm to 1016mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(609 mm to 1016mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18.2" min

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18.2" min

 

 

 

WINDOW SILL

 

 

 

(462 mm)

 

 

 

 

 

 

INNER

 

 

 

 

(462 mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WINDOW SILL

 

 

 

 

 

INTERIOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WALL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wooden Windows

 

 

 

 

 

 

 

 

 

 

 

 

Vinyl-Clad Windows

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Storm Window:

If the air conditioner is blocked by Storm Window, add wood as shown in FIG. 5, or remove storm window before air conditioner is installed.

If Storm Window Frame must remain, be sure the drain holes or slots are not caulked or painted shut. Accumulated Rain Water or Condensation must be allowed to drain out.

 

 

 

 

SASH

FIG. 5

Storm window

 

 

 

 

 

 

 

 

 

Board

1-1/2” min

thickness as

frame or other

required, for

(38 mm)

obstruction.

proper pitch to

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

rear, along

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

entire sill.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fasten with

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

nails or screws.

2

Loading...
+ 3 hidden pages