Broadband Microwave Transmission Line and
Antenna Analyzer
Anritsu Company
490 Jarvis Drive
Morgan Hill, CA 95037-2809
USA
P/N: 10680-00003
Copyright 2006 - 2014 Anritsu Company
Printed: January 2014
Revision: H
CE Conformity Marking
Anritsu affixes the CE Conformity marking onto its conforming products in accordance with Council Directives
of The Council Of The European Communities in order to indicate that these products conform to the EMC and
LVD directive of the European Union (EU).
C-tick Conformity Marking
Anritsu affixes the C-tick marking onto its conforming products in accordance with the electromagnetic
compliance regulations of Australia and New Zealand in order to indicate that these products conform to the
EMC regulations of Australia and New Zealand.
Notes On Export Management
This product and its manuals may require an Export License or approval by the government of the product
country of origin for re-export from your country.
Before you export this product or any of its manuals, please contact Anritsu Company to confirm whether or
not these items are export-controlled.
When disposing of export-controlled items, the products and manuals need to be broken or shredded to such a
degree that they cannot be unlawfully used for military purposes.
Mercury Notification
This product uses an LCD backlight lamp that contains mercury. Disposal may be regulated due to
environmental considerations. Please contact your local authorities or, within the United States, the
Electronics Industries Alliance (www.eiae.org) for disposal or recycling information.
EPC WEEE Directive 2002/96/EC
Chinese RoHS Statement
Safety Symbols
To prevent the risk of personal injury or loss related to equipment malfunction, Anritsu Company uses the
following symbols to indicate safety-related information. For your own safety, please read the information
carefully before operating the equipment.
Symbols Used in Manuals
Danger
This indicates a risk from a very dangerous condition or procedure that could result in
serious injury or death and possible loss related to equipment malfunction. Follow all
precautions and procedures to minimize this risk.
Warning
Caution
This indicates a risk from a hazardous condition or procedure that could result in
light-to-severe injury or loss related to equipment malfunction. Follow all precautions
and procedures to minimize this risk.
This indicates a risk from a hazardous procedure that could result in loss related to
equipment malfunction. Follow all precautions and procedures to minimize this risk.
Safety Symbols Used on Equipment and in Manuals
The following safety symbols are used inside or on the equipment near operation locations to provide
information about safety items and operation precautions. Ensure that you clearly understand the meanings of
the symbols and take the necessary precautions before operating the equipment. Some or all of the following
five symbols may or may not be used on all Anritsu equipment. In addition, there may be other labels attached
to products that are not shown in the diagrams in this manual.
This indicates a prohibited operation. The prohibited operation is indicated symbolically
in or near the barred circle.
This indicates a compulsory safety precaution. The required operation is indicated
symbolically in or near the circle.
This indicates a warning or caution. The contents are indicated symbolically in or near
the triangle.
This indicates a note. The contents are described in the box.
These indicate that the marked part should be recycled.
S810D/S820D MM 10680-00003 Rev. HSafety-1
For Safety
Warning
Warning
Warning
Always refer to the operation manual when working near locations at which
the alert mark, shown on the left, is attached. If the operation, etc., is
performed without heeding the advice in the operation manual, there is a
risk of personal injury. In addition, the equipment performance may be
reduced.
Moreover, this alert mark is sometimes used with other marks and
descriptions indicating other dangers.
When supplying power to this equipment, connect the accessory 3-pin
power cord to a 3-pin grounded power outlet. If a grounded 3-pin outlet is
not available, use a conversion adapter and ground the green wire, or
connect the frame ground on the rear panel of the equipment to ground. If
power is supplied without grounding the equipment, there is a risk of
receiving a severe or fatal electric shock.
This equipment can not be repaired by the operator. Do not attempt to
remove the equipment covers or to disassemble internal components.
Only qualified service technicians with a knowledge of electrical fire and
shock hazards should service this equipment. There are high-voltage parts
in this equipment presenting a risk of severe injury or fatal electric shock to
untrained personnel. In addition, there is a risk of damage to precision
components.
Electrostatic Discharge (ESD) can damage the highly sensitive circuits in
the instrument. ESD is most likely to occur as test devices are being
Caution
Warning
Safety-2S810D/S820D MM 10680-00003 Rev. H
connected to, or disconnected from, the instrument’s front and rear panel
ports and connectors. You can protect the instrument and test devices by
wearing a static-discharge wristband. Alternatively, you can ground
yourself to discharge any static charge by touching the outer chassis of the
grounded instrument before touching the instrument’s front and rear panel
ports and connectors. Avoid touching the test port center conductors
unless you are properly grounded and have eliminated the possibility of
static discharge.
Repair of damage that is found to be caused by electrostatic discharge is
not covered under warranty.
This equipment is supplied with a rechargeable battery that could
potentially leak hazardous compounds into the environment. These
hazardous compounds present a risk of injury or loss due to exposure.
Anritsu Company recommends removing the battery for long-term storage
of the instrument and storing the battery in a leak-proof, plastic container.
Follow the environmental storage requirements specified in the product
data sheet.
Appendix A — Test Data Master for CW Source Modules
Index
Contents-2S810D/S820D MM 10680-00003 Rev. H
Chapter 1 — General Information
1-1Introduction
This manual provides maintenance instructions for the Site Master Model S810D/S820D Broadband
Microwave Transmission Line and Antenna Analyzer. It describes the product and provides performance
verification procedures, parts replacement procedures, and a replaceable parts list.
1-2Description
The Site Master S810D, covering 25 MHz to 10.5, and the S820D, covering 25 MHz to 20.0 GHz, are the most
accurate, reliable and convenient one port microwave transmission line and antenna analyzers available for
installation, verification, troubleshooting, and repair of microwave communication systems.
Measurement capabilities includes return loss, SWR, cable loss, and distance-to-fault (DTF) analysis. Patented
RF interference rejection enables accurate measurements in the presence of high RF activity. Data Analysis
software enables assessment of system trends, problems, and performance in addition to professional report
generation. An optional power monitor is available to make power measurements quickly and easily. A built-in
GPS receiver (optional) provides location information for each trace and saved with archived data.
The Site Master Models S810D and S820D use vector error correction, solving the most common and the most
difficult accuracy problems of field test equipment operation, while improving system quality and reducing
maintenance expenses. Difficult test specifications are easy to verify with the Site Master Models S810D and
S820D. Vector error correction and a simple, friendly user interface within the unit further improve the quality
and convenience of measurements compared to traditional scalar techniques. Vector error correction also
improves the quality of Distance-To-Fault data. Not only is the reflection magnitude more accurate, the
waveguide dispersion correction for fault distance (different frequencies travel at different speeds) is also more
accurate and repeatable.
1-3Related Documents
Other documents are available for the S810D and S820D at the Anritsu web site at www.anristu.com.
• Site Master S810D and S820D User Guide (10680-00001)
• Site Master S8x0D Programming Manual (10680-00002)
S810D/S820D MM 10680-00003 Rev. H1-1
Front Panel KeysGeneral Information
1-4Front Panel Keys
Figure 1-1.S810D/S820D Site Master Front Panel Hard and Soft Keys
Tab le 1-1.Callout Index for Figure 1-1, “S810D/S820D Site Master Front Panel Hard and Soft Keys”
Index Description
1
2
3
4
5
6
7
8
9
Save and Recall Setup buttons. 21 setups available.
Markers button. Six markers available.
Limits button. Create pass/fail measurements with single limit line, upper mask limit, and/or lower
mask limit.
Save and Recall Display buttons. Up to 200 memory locations with alphanumeric data labeling
and automatic time/date stamps.
Sys button. Allows language selection for user interface on-screen menus and messages in
Chinese, English, French, German, Japanese, and Spanish.
Soft Keys (six) on right with corresponding soft menu labels on left.
Function Hard Keys (four). From left to right, the keys are Mode, Freq/Dist, Amplitude, and Meas/Disp.
TFT Color Display. Standard TFT color display (640 x 480) with variable brightness control and
viewable in direct sunlight. Displays signal traces and graphs, as well as Soft Key Menu on right
side.
System case. Overall size is 24.4 cm x 17.8 cm x 6.1 cm (9.52” x 7.0” x 2.4”)
10
1-2S810D/S820D MM 10680-00003 Rev. H
System top connectors. From left to right, RS-232 Serial Interface (DB-9 m), External DC Power
Port (Coaxial Connector), GPS Antenna (BNC), RF Out/Reflection 50Ω.
General InformationTop Connectors
1-5Top Connectors
S810D/S820D with RF Detector Option
Figure 1-2.S810D/S820D Top Connectors with RF Detector Option on Right
Table 1-2.Callout Index for Figure 1-2, “S810D/S820D Top Connectors with RF Detector Option on Right”
(Instrument will be equipped with this connector, or #6 below, or fitted with a hole plug.)
CW Source Module Interface connector. DB-26(m).
(Instrument will be equipped with this connector, or #5 above, or fitted with a hole plug.)
External DC Power connector for 12-15 VDC at 3A. Coaxial power connector (m). To the left are
the Batter Charging Green LED (top) and External Power Green LED (bottom).
TFT Color Display.
S810D/S820D MM 10680-00003 Rev. H1-3
OptionsGeneral Information
1-6Options
• Option 2, 2 MHz Frequency Extension (S8X0D/2)
• Option 5, Power Monitor (S8X0D/5 sensor not included)
• Option 11NF, Replaces Standard K (f) Test Port Connector with N(f) (S8X0D/11NF)
• Option 22NF, N(f) 2-Port Cable Loss Measurements (S8X0D/22NF)
• Option 22SF, SMA (f) 2-Port Cable Loss Measurements (S8X0D/22SF)
• Option 31, GPS Receiver (S8X0D/31)
1-7Recommended Test Equipment
The following test equipment is recommended for use in testing and maintaining the Site Master S810D and
S820D.
Frequency Counter Frequency: < 3 GHz Anritsu Model MF2412B/C with
Option 01. Without Option 01
requires a 10 MHz external
reference
Calibration/Verification Kit Special, designed by Anritsu Anritsu Model SC6815, includes
components with N and K type
connectors.
Calibration/Verification Kit Special, designed by Anritsu Anritsu Model SC7668, includes
components with N connectors. Use
with instruments with Option 11NF.
RF Reference Source Frequency: 50 MHz
Anritsu Model MA2418A
Power Output: 0 dBm
DC Power Supply For Anritsu Model MA2418A Anritsu Part Number 2000-933
RF Detector Frequency: 10 MHz to 20 GHz Anritsu Model 560-7N50B
Adapter Connector: N(m) to K (f) Anritsu Model 34NKF50
Attenuator Attenuation: 10 dB
Connector: N(m) to N(f)
Attenuator Attenuation: 30 dB
Connector: N(m) to N(f)
RF Coaxial Cable Frequency: 10 MHz to 20 GHz
Connector: K (m) to K (m)
RF Coaxial Cable Connector: BNC (m) to BNC (m) Any
Personal Computer Serial PortAny Windows XP PC
Serial Cable Null Modem Anritsu Part Number 800-441
AttenuatorAttenuation: 10 dB
Connector: K (m) to K (f)
AttenuatorAttenuation: 20 dB
Connector: K (m) to K (f)
AdapterConnector: N(f) to K (m)Anritsu Model 34NFK50
Aeroflex/Weinschel Model 1-10
Aeroflex/Weinschel Model 1-30
Any
Anritsu Model 43KC-10
Anritsu Model 43KC-20
1-4S810D/S820D MM 10680-00003 Rev. H
Chapter 2 — Performance Verification
2-1Introduction to Performance Verification
This chapter contains tests that can be used to verify the performance of the Site Master Models S810D and
S820D.
•Section “2-2 Frequency Accuracy” on page 2-1
•Section “2-3 Return Loss Verification” on page 2-2
•Section “2-4 Power Monitor (Option 5) Verification” on page 2-5
•Section “2-5 Two-Port Cable Loss Measurement Verification (Option 22)” on page 2-7
• “CW Power Verification Procedure” on page 2-8
• “CW Frequency Verification Procedure” on page 2-10
2-2Frequency Accuracy
The following test can be used to verify the CW frequency accuracy of the Site Master. Measurement
calibration of the Site Master is not required for this test.
Equipment Required
•Anritsu Model MF2412B/C Frequency Counter or equivalent
•RF Cable with appropriate connectors to connect the instrument and the frequency counter
Frequency Accuracy Procedure
1. Connect the external power supply (Anritsu part number 40-187-R) to the Site Master.
2. Press and hold the ESCAPE/CLEAR
•This sets the instrument to the factory preset state.
NoteBefore continuing, allow a five minute warm up for the internal circuitry to stabilize.
3. Press the FREQ/DIST
4. Press the
5. Press the
6. Press the MEAS/DISP
7. Connect the RF cable from the Site Master Test Port to the RF Input on the Frequency Counter.
8. Verify that the frequency readout on the Frequency Counter is 2 GHz ±6 kHz.
9. Press the
F1 soft key, set to 2 GHz, then press the ENTERkey.
F2 soft key, set to 2 GHz, then press the ENTERkey.
Fixed CW soft key to turn Fixed CW off.
key.
key and then the Fixed CW soft key to turn Fixed CW on.
key, then press the ON/OFFkey to turn on the Site Master.
S810D/S820D MM 10680-00003 Rev. H2-1
Return Loss VerificationPerformance Verification
2-3Return Loss Verification
The following test can be used to verify the accuracy of return loss measurements. Measurement calibration of
the Site Master is required for this test. The Verification Software (P/N 2300-488) included with the Anritsu
SC6815 Calibration/Verification Kit or the Anritsu SC7668 Calibration Kit must be installed into the PC prior
to performing this test.
Equipment Required
•Anritsu SC6815 Calibration/Verification Kit.
•Anritsu SC7668 Calibration/Verification Kit.
Note
•Personal Computer running Windows 95 or later, one available COM port, a CDROM drive and/or a
The SC6815 kit can be used with all S8x0D units.
The SC7668 kit can only be used with S8x0D units with Option 11NF.
USB port.
Return Loss Software Installation
1. Insert the Verification Software CD into the CDROM drive.
2. Click the Start button and select Run.
3. In the Run box, type x:\setup (where x is the drive letter of the CDROM drive) and select OK.
4. Follow the on screen setup instructions to install the Verification Software.
5. After the software has been installed, re-boot the PC.
Return Loss Verification Procedure
1. On the PC, start the Microwave CAL Verification Software from the Start menu and follow the steps
below as presented in the opening dialog box.
2. Install the Serial Interface cable (Anritsu P/N 800-441) to the PC COM port and the Serial Interface
connector on the Site Master Test Connector Panel.
3. Connect the external power supply (Anritsu P/N 40-187-R) to the Site Master.
4. Press and hold the ESCAPE/CLEAR
•This sets the instrument to the factory preset state.
NoteBefore continuing, allow a five minute warm up for the internal circuitry to stabilize.
5. Press the MEAS/DISP
6. Press the
2-2S810D/S820D MM 10680-00003 Rev. H
Resolution soft key, and select 517.
key.
key, then press the ON/OFFkey to turn on the Site Master.
Performance VerificationReturn Loss Verification
7. Insert the Calibration USB memory device or disc that came with the SC6815 kit or the SC7668 kit
into the PC disk drive.
8. On the PC, select OK to close the opening window. The test selection dialog box appears as shown
below.
Figure 2-2.Test Selection Dialog Box
9. Click on the appropriate db Type button for the Site Master being tested:
•If instrument is a Site Master S810D, click on the
•If instrument is a Site Master S820D, click on the
Note
If the instrument has Option 11NF installed, skip Step #10 through Step #22 on page 2-4 and go to
Step #23 on page 2-4,
6 dB Type - K S810D button.
6 dB Type - K S820D button.
10. Follow the on-screen instructions and connect the Open, Short, Load, and SC6729 6 dB Offset
Termination from the SC6815 Calibration Kit to the S8X0D test port when instructed.
11. After the final test, the test results will be displayed on the screen. Verify that the displayed trace is
within the limit lines.
12. The final selection screen provides options to save, print or continue testing.
Figure 2-3.CAL Verification Software Final Screen Dialog Box
S810D/S820D MM 10680-00003 Rev. H2-3
Return Loss VerificationPerformance Verification
13. To save the data as a text file, select Export to Text File. The software will prompt for a name and
location to save the file. The data will be saved in a tabular format that can be read by most text
editor programs.
14. To save the data as a dat file, select Save as Dat File. The software will prompt for a name and
location to save the file. A dat file saves the data in a graphical format that can be recalled and
viewed using the Verification Software program.
15. To print the data, select Print. The software first prompts to save the data as a text file (see Step #13)
and then prints the data to the default printer connected to the PC.
16. When the final selection screen reappears, click the Yes
button to continue.
17. When the test selection screen reappears:
•If the instrument is a Site Master S810D, click on the 20 dB Type - K S810D
•If the instrument is a Site Master S820D, click on the 20 dB Type - K S820D
18. Click the Yes
button to keep the existing calibration.
button.button.
Figure 2-4.Keep Existing Calibration Screen
19. Follow the instructions on the screen to test the 20 dB offset termination. Verify that the measured
results are within the limit lines.
20. Save or print the test data if desired.
21. When the final selection screen reappears, click the Yes
button to continue.
22. Install the 34RKNF50 to the S8X0D K female test port.
23. On the test selection screen, click on the appropriate db Type button for the Site Master being tested:
•If instrument is a Site Master S810D, click on the
•If instrument is a Site Master S820D, click on the
6 dB Type - N S810D button.
6 dB Type - N S820D button.
24. Follow the instructions on screen to perform the calibration and measurement.
25. Save or print the test data if desired.
26. Repeat the measurement process for the 20 dB offset termination.
27. Verify that the measured result is within the limit lines.
28. Save or print the test data if desired.
Note
For the S820D, N-Type verification will be performed up to 18 GHz only due to the frequency limit of
the N-Type connector. Any data displayed above 18 GHz is for reference only.
If the Power Monitor (Option 5) is installed in the Site Master, the following test can be used to verify the
accuracy of the power measurements. Measurement calibration of the Site Master is not required for this test.
•The 50 MHz Calibrator Output on a power meter can be used as a substitute for the RF
Reference Source.
•DC Power Supply for the MA2418A, Anritsu 2000-933
Procedure
1. Connect the DC power supply to the MA2418A Reference Source.
•For Power Monitor Setup, see Figure 2-5, “Power Monitor Verification Setup” on page 2-6.
2. Connect the external power supply (Anritsu part number 40-187-R) to the Site Master.
3. Press and hold the ESCAPE/CLEAR
•This sets the instrument to the factory preset state.
key, then press the ON/OFFkey to turn on the Site Master.
4. Press the MODE (9)
5. Use the Up/Down arrow key to highlight
6. Connect the RF Detector output to the
7. With no power applied to the detector, press the
complete,
8. Connect the MA2418A Reference Source to the input of the 560-7N50B RF detector. Verify that the
power monitor reading is 0.0 dBm ±1 dB.
9. Connect the output of the MA2418A Reference Source to the two attenuators so as to add 40 dB of
attenuation (see Figure 2-5, “Power Monitor Verification Setup” on page 2-6).
10. Connect the MA2418A Reference Source and the attenuators to the input of the 560-7N50B RF
detector.
Zero Adj:On is displayed in the message area.
key.
Power Monitor, then press ENTER.
RF Detector input of the Site Master.
Zero soft key to zero the power monitor. When
S810D/S820D MM 10680-00003 Rev. H2-5
Power Monitor (Option 5) VerificationPerformance Verification
11. Verify that the power monitor reading is now –40.0 dBm ±2 dB.
Figure 2-5.Power Monitor Verification Setup
2-6S810D/S820D MM 10680-00003 Rev. H
Performance VerificationTwo-Port Cable Loss Measurement Verification (Option 22)
2-5Two-Port Cable Loss Measurement Verification (Option 22)
Overview
The two-port cable loss measurement verification consists of three procedures:
• CW Power Verification Procedure with the CW Frequency Verification
•CW Source Module, Anritsu CWM220NF (shown below in Figure 2-6) or Anritsu CWM220SF.
•RF Detector, Anritsu 560-7N50B RF Detector (shown below in Figure 2-6) or Anritsu 560-7S50B.
•Anritsu MF2412B/C Frequency Counter
•BNC cable
•BNC to N adapter (or BNC to K adapter)
•Anritsu 43KC-10 10 dB Attenuator
•Anritsu 43KC-20 20 dB Attenuator
•Anritsu 34NKF50 N (m) to K (f) Adapter
•Anritsu 34NFK50 N (f) to K (m) Adapter
Figure 2-6.CW Source Module (CWM220NF) and RF Detector (560-7N50B)
S810D/S820D MM 10680-00003 Rev. H2-7
Two-Port Cable Loss Measurement Verification (Option 22)Performance Verification
Note
Always turn off the S8X0D before connecting or disconnecting the CWM220xF CW Source Module
to the CW Source Module Interface port of the S8X0D.
CW Power Verification Procedure
1. Turn off the Site Master.
2. Connect the input port of the detector to the RF OUT X (f) of the CW Source Module.
3. Connect the cable of the detector to the DETECTOR INPUT of the CW Source Module.
4. Connect the TO S8X0D RF PORT X-TYPE of the CW Source Module to RF OUT of S8X0D.
5. Connect the cable of the CW Source Module to the CW Source Module Interface port of the S8X0D as
shown in Figure 2-7 below.
Figure 2-7.Two-Port Cable Loss General Connections
Tab le 2-1.Callout Index for Figure 2-7, “Two-Port Cable Loss General Connections”
Index Callout Description (1 of 2)
1
2
3
4
5
6
2-8S810D/S820D MM 10680-00003 Rev. H
S810D/S820D SiteMaster
CW Source Module To S8X0D RF Port connected to the S8xD RF Out/Reflection 50Ω connector
Anritsu CW Source Module
CW Source Module RF OUT port connected the RF Detector Input Port
RF Detector
RF Detector Cable Input Plug connected to the CW Source Module Detector Input port
Performance VerificationTwo-Port Cable Loss Measurement Verification (Option 22)
Table 2-1.Callout Index for Figure 2-7, “Two-Port Cable Loss General Connections”
Index Callout Description (2 of 2)
7
6. Press and hold the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the S8x0D.
7. Press MODE hard key.
8. Use the Up/Down arrow key to highlight Cable Loss – Two Port, then press ENTER.
9. Press the F1 soft key and set F1 = 10 MHz.
10. Press the F2 soft key and:
11. Observe that the waveform displayed resembles the display shown in Figure 2-8 below.
CW Source Module CW Source Module Interface port connected to the S8x0D CW Source
Module Interface
•If the instrument is a Site Master S810D unit, set F2 = 10.5 GHz.
•If the instrument is a Site Master S820D unit:
with CWM220NF and CWM220B-NF, set F2 = 18 GHz
with CWM220SF and CWM220B-SF, set F2 = 20 GHz.
Figure 2-8.Cable Loss Two-Port Typical Waveform
12. Press the MARKER soft key and:
•Select M1, select Marker to Peak.
•Select M2, select Marker to Valley.
13. Verify that:
•M1 is less than +15 dBm.
•M2 is greater than –15 dBm.
S810D/S820D MM 10680-00003 Rev. H2-9
Two-Port Cable Loss Measurement Verification (Option 22)Performance Verification
CW Frequency Verification Procedure
1. Turn off the Site Master
2. Connect the TO S8X0D RF PORT X-TYPE of the CW Source Module to RF OUT of S8X0D.
3. Connect the cable of the CW Source Module to the CW Source Module Interface port of the S8X0D.
4. Connect the RF-OUT X (f) to the Anritsu MF2412B/C with appropriate adapter and BNC cable as
shown in Figure 2-9 below.
Figure 2-9.Two-Port CW Frequency Verification Connections
Tab le 2-2.Callout Index for Figure 2-9, “Two-Port CW Frequency Verification Connections”
Index Callout Description
1
2
3
4
5
6
7
Note
5. Press and hold the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the S8X0D.
S810D/S820D SiteMaster
CW Source Module To S8X0D RF Port connected to the S8xD RF Out/Reflection 50Ω connector
Anritsu CW Source Module
CW Source Module CW Source Module Interface port connected to the S8x0D CW Source
Module Interface
BNC to N connector or BNC to K connector adapters as required.
BNC Cable as required
Anritsu MF2412B/C Frequency Counter with Opt 01
A 10 MHz external reference is required if the Anritsu MF2412B/C does not have Option 01
installed.
2-10S810D/S820D MM 10680-00003 Rev. H
Performance VerificationTwo-Port Cable Loss Measurement Verification (Option 22)
6. Press MODE hard key.
7. Use the Up/Down arrow key to highlight Cable Loss – Two Port, then press ENTER.
8. Press the F1 soft key and set F1 to 2.75 GHz.
9. Press the F2 soft key and set F2 to 2.75 GHz.
10. Power on the Anritsu MF2412B/C Frequency Counter.
11. Verify that the frequency displayed on the frequency counter is 2,750,000 kHz ±8.25 kHz.
S810D/S820D MM 10680-00003 Rev. H2-11
Two-Port Cable Loss Measurement Verification (Option 22)Performance Verification
Two-Port Cable Loss Measurement Accuracy Procedure
1. Turn off the Site Master
2. Connect the input port of the detector to the RF OUT X (f) of the CW Source Module.
•When using the Anritsu CWM220NF CW Source Module and the Anritsu 560-7N50B
RF Detector, insert Anritsu 34NKF50 and 34NFK50 adapters between the CWM220NF and the
560-7N50B, as shown below in Figure 2-11 below
•When using the Anritsu CWM220SF CW Source Module and the Anritsu 560-7S50B
RF Detector, adapters are not required.
Figure 2-10. Two-Port Cable Loss Measurement Accuracy Connections
Tab le 2-3.Callout Index for Figure 2-10, “Two-Port Cable Loss Measurement Accuracy Connections”
Index Callout Description (1 of 2)
1
2
3
2-12S810D/S820D MM 10680-00003 Rev. H
S810D/S820D SiteMaster
CW Source Module To S8X0D RF Port connected to the S8xD RF Out/Reflection 50Ω connector
Anritsu CW Source Module
If using the Anritsu CWM220NF CW Source Module and the Anritsu 560-7N50B RF Detector,
insert an Anritsu 34NKF50* adapter (see index #6) and an Anritsu 34NFK50 adapter (see index #7
below) between the CW Source Module and the RF Detector.
* The 34NKF50 adapter is not required if the instrument is equipped with Option 11NF (Nconnector)
Performance VerificationTwo-Port Cable Loss Measurement Verification (Option 22)
Table 2-3.Callout Index for Figure 2-10, “Two-Port Cable Loss Measurement Accuracy Connections”
Index Callout Description (2 of 2)
4
5
6
7
8
3. Connect the cable of the detector to the DETECTOR INPUT of the CW Source Module.
4. Connect the TO S8X0D RF PORT X-TYPE of the CW Source Module to RF OUT of S8x0D.
5. Connect the cable of the CW Source Module to the CW Source Module Interface port of the S8x0D.
6. Press and hold the ESCAPE/CLEAR key, then press the ON/OFF key to turn on the S8x0D.
7. Let the S8x0D warm up for 15 minutes.
8. Press MODE hard key.
9. Use the Up/Down arrow key to highlight Cable Loss – Two Port, then press ENTER.
10. Press START CAL, then press ENTER.
CW Source Module CW Source Module Interface port connected to the S8x0D CW Source
Module Interface
CW Source Module RF Out port.
Adapter, Anritsu 34NKF50 adapter, N(m) to K (f). Only required if using a CWM220NF CW Source
Module and a 560-7N50B RF Detector.
Adapter, Anritsu 34NFK50 adapter, N(f) to K (m). Only required if using a CWM220NF CW Source
Module and a 560-7N50B RF Detector.
RF Detector, Anritsu 560-7N50B or Anritsu 560-7S50B.
S810D/S820D MM 10680-00003 Rev. H2-13
Two-Port Cable Loss Measurement Verification (Option 22)Performance Verification
11. Wait until the Cal On display appears in the top left corner of the screen.
Figure 2-11. Two-Port Cable Loss Measurement Verification with 10 db Attenuator
Tab le 2-4.Callout Index for Figure 2-11, “Two-Port Cable Loss Measurement Verification with 10 db Attenuator”
Index Callout Description (1 of 2)
1
2
3
4
5
6
7
S810D/S820D SiteMaster
CW Source Module To S8X0D RF Port connected to the S8xD RF Out/Reflection 50Ω connector
Anritsu CW Source Module
If using the Anritsu CWM220NF CW Source Module and the Anritsu 560-7N50B RF Detector,
insert an Anritsu 34NKF50* adapter (see index #6) and an Anritsu 34NFK50 adapter (see index #7
below) between the CW Source Module and the RF Detector.
* The 34NKF50 adapter is not required if the instrument is equipped with Option 11NF (Nconnector)
CW Source Module CW Source Module Interface port connected to the S8x0D CW Source
Module Interface.
CW Source Module RF Out port.
Adapter, Anritsu 34NKF50 adapter, N(m) to K (f). Only required if using a CWM220NF CW Source
Module and a 560-7N50B RF Detector.
Adapter, Anritsu 34NFK50 adapter, N(f) to K (m). Only required if using a CWM220NF CW Source
Module and a 560-7N50B RF Detector.
2-14S810D/S820D MM 10680-00003 Rev. H
Performance VerificationTwo-Port Cable Loss Measurement Verification (Option 22)
Table 2-4.Callout Index for Figure 2-11, “Two-Port Cable Loss Measurement Verification with 10 db Attenuator”
Index Callout Description (2 of 2)
8
9
12. Connect the Anritsu 43KC-10 10 dB Attenuatorbetween the detector and the CW Source Module (or
Note
13. Press MARKER, then select M1, and then select Marker To Peak.
14. Press MARKER, then select M2, and then select Marker To Valley.
15. Verify that both M1andM2 are –10 dB ±0.85 dB.
16. If they are marginally out of specification, repeat from Step #9 on page 2-13.
RF Detector, Anritsu 560-7N509B or Anritsu 560-7S50B.
Attenuator, Anritsu 43KC-10, 10dB Attenuator.
between the 34NKF50 and 34NFK50, as shown in Figure 2-12 above).
The frequency range is from 10 MHz to 18 GHz for CWM220NF and CWM220B-NF.
The frequency range is from 10 MHz to 20 GHz for CWM220SF and CWM220B-SF.
Figure 2-12. Two-Port Cable Loss Measurement Verification with 10 dB and 20 dB Attenuators
S810D/S820D MM 10680-00003 Rev. H2-15
Two-Port Cable Loss Measurement Verification (Option 22)Performance Verification
Tab le 2-5.Callout Index for Figure 2-12, “Two-Port Cable Loss Measurement Verification with 10 dB and 20 dB
Attenuators”
Index Callout Description
1
2
3
4
5
6
7
8
9
10
S810D/S820D SiteMaster
CW Source Module To S8X0D RF Port connected to the S8xD RF Out/Reflection 50Ω connector
Anritsu CW Source Module
If using the Anritsu CWM220NF CW Source Module and the Anritsu 560-7N50B RF Detector,
insert an Anritsu 34NKF50* adapter (see #6 below) and an Anritsu 34NFK50 adapter (see #7
below) between the CW Source Module and the RF Detector.
* The 34NKF50 adapter is not required if the instrument is equipped with Option 11NF (Nconnector)
CW Source Module CW Source Module Interface port connected to the S8x0D CW Source
Module Interface
CW Source Module RF Out port.
Adapter, Anritsu 34NKF50 adapter, N(m) to K (f). Only required if using a CWM220NF CW Source
Module and a 560-7N50B RF Detector.
Adapter, Anritsu 34NFK50 adapter, N(f) to K (m). Only required if using a CWM220NF CW Source
Module and a 560-7N50B RF Detector.
RF Detector, Anritsu 560-7N50B or Anritsu 560-7S50B.
Attenuator, Anritsu 43KC-10, 10dB Attenuator.
Attenuator, Anritsu 43KC-20, 20 dB Attenuator.
17. Add the 43KC-20 attenuator to the 43KC-10 attenuator to make 30 dB attenuation.
18. Press MARKER, select M1, select Marker To Peak.
19. Press MARKER, select M2, select Marker To Valley.
20. Verify that bothM1 and M2 are –30 dB ±1.35 dB.
21. If M1 and M2 are marginally out of specification, repeat from Step #9 on page 2-13, but skip Step #12,
Step #13, and Step #14, and then continuing with the rest of this procedure.
2-16S810D/S820D MM 10680-00003 Rev. H
Chapter 3 — Removal and Replacement
3-1Introduction
The removal and replacement chapter provides the following sections, information, and procedures:
• Section 3-2, “Accessories, Parts, and Hardware” on page 3-2
• “Accessories” on page 3-2
• “Replaceable Parts” on page 3-3
• “Hardware” on page 3-3
• “Case Parts” on page 3-4
• Section 3-3, “Battery Pack Removal and Replacement” on page 3-5
• Section 3-4, “Battery General Information” on page 3-7
• Section 3-5, “Battery Testing Procedure” on page 3-8
• Section 3-6, “Front Panel Assembly Removal and Replacement” on page 3-9
• Section 3-7, “LCD Assembly Replacement” on page 3-11
• Section 3-8, “Keypad PCB Replacement” on page 3-12
• Section 3-9, “Keypad Membrane Replacement” on page 3-13
• Section 3-10, “Power Monitor PCB Replacement” on page 3-14
• Section 3-11, “Real Time Clock Battery Replacement” on page 3-15
• Section 3-12, “Main/RF PCB Assembly Replacement” on page 3-16
• Section 3-13, “Source Control PCB Assembly Replacement” on page 3-18
S810D/S820D MM 10680-00003 Rev. H3-1
Accessories, Parts, and HardwareRemoval and Replacement
3-2Accessories, Parts, and Hardware
Accessories
Tab le 3-1.S810D/S820D Site Master Accessories
Part NumberDescription Qty
10680-00001User’s Guide, Site Master S810D and S820D
10680-00002Programming Manual, Site Master S810D and S820D (disk only)
2300-347Handheld Software Tools
40-187-RAC/DC Adapter
2000-1029Battery Charger
806-141Automotive Power Adapter
65717Soft Carrying Case
800-441Serial Interface Cable Assembly
551-1961-RUSB to RS232 Adapter Cable
22N50Open/Short, N(m)
28N50-2Precision Termination, N(m)
22K50Open/Short, K (m)
28K50Precision Termination, K (m)
34NFK50Adapter, N(m) to K (f)
SC6815Calibration/Verification Kit
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3-2S810D/S820D MM 10680-00003 Rev. H
Removal and ReplacementAccessories, Parts, and Hardware
Replaceable Parts
Table 3-2.S810D/S820D Site Master Replaceable Parts
Part NumberDescription Qty
15-123Color Liquid Crystal Display Assembly
551-1694Adapter, 2-Row 32-Pin Inter-Connect Adapter (m-m) for Option PCB
633-26Lithium Coin Real-Time Clock Battery
633-27Rechargeable Battery, NiMH
46649-4Membrane Keypad, Main
3-71657-3Keypad PCB Assembly
ND64376Power Monitor PCB Assembly
ND66448Main/RF PCB Exchange Assembly, S810D
ND66449Main/RF PCB Exchange Assembly, S810D with Option 11NF
ND66450Main/RF PCB Exchange Assembly, S820D
ND66451Main/RF PCB Exchange Assembly, S820D with Option 11NF
ND67171Exchange Module, CWM220NF
ND67172Exchange Module, CWM220SF
ND68537Source Control PCB Exchange Assembly, S8x0D, part of Option 22,
Two-Port Cable Loss Measurement, provides control for external CW
Source Module, CWM220xF
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Hardware
Table 3-3.S810D/S820D Site Master Hardware
Part NumberDescriptionQty
900-861Pan Head Screw, 4-20, 0.365
900-791Screw, 2-56, 0.375
900-720 Screw, 4-40, 0.187
900-326Kep Nut, 4-40, 0.187
790-18M-F Standoff, 4-40, 0.375, Hex
785-405Plain Standoff, 4-40, 0.187, Hex
785-927M-F Standoff, 4-40, 0.625
761-79Cap Vinyl, Black, Round
19
77
6
3
4
4
3
2
S810D/S820D MM 10680-00003 Rev. H3-3
Accessories, Parts, and HardwareRemoval and Replacement
Case Parts
Tab le 3-4.S810D/S820D Site Master Case Parts
Part Number Description Qty
61440-1Top Case
46653-3Bottom Case
48231-3Battery Door
790-509, 790-510, and 48241 Battery Door Latch (3 pieces)
790-515Spring, Battery Compartment
790-551Door Lock Receptacle
46655Case Corner Bumpers
62934ID Label, Model S820D
62935ID Label, Model S810D
1
1
1
1
1
1
4
1
1
3-4S810D/S820D MM 10680-00003 Rev. H
Removal and ReplacementBattery Pack Removal and Replacement
3-3Battery Pack Removal and Replacement
This procedure provides instructions for removing and replacing the Site Master battery pack.
Note
1. With the Site Master standing upright on a stable surface, locate the battery access door (see
2. Lift up the access door handle and rotate it 90 degrees counterclockwise.
Many of the procedures in this section are generic, and apply to many similar instruments. Photos
and illustrations used are representative and may show instruments other than the Site Master.
Figure 3-1).
Figure 3-1.Removing the Battery Access Door
3. Lift the door and remove the door.
4. Grasp the battery lanyard and pull the battery straight up and out of the unit, as illustrated in
Figure 3-1 above.
S810D/S820D MM 10680-00003 Rev. H3-5
Battery Pack Removal and ReplacementRemoval and Replacement
5. Replacement is the opposite of removal. Note the orientation of the battery contacts, and be sure to
insert the new battery with the contacts facing the rear of the unit (Figure 3-2).
Figure 3-2.Battery Orientation
3-6S810D/S820D MM 10680-00003 Rev. H
Removal and ReplacementBattery General Information
3-4Battery General Information
The following information relates to the care and handling of the Site Master battery, and NiMH batteries in
general.
Anritsu Batteries and Chargers
• Use only Anritsu approved battery packs.
• Recharge the battery only in the Site Master or in an Anritsu-approved charger.
Battery General Care and Use
• Always use the battery for its intended purpose only.
• Never use a damaged or worn out charger or battery.
• Never short-circuit the battery terminals.
• Do not drop, mutilate or attempt to disassemble the battery.
Charging
• The Nickel Metal Hydride (NiMH) battery supplied with the Site Master is shipped in a
discharged state.
• Before using the Site Master, the internal battery must first be charged for three hours, either in
the Site Master or in the optional battery charger (Anritsu part number: 2000-1029).
• When the Site Master or battery charger is not in use, disconnect it from the power source.
• Do not charge batteries for longer than 24 hours; overcharging may shorten battery life.
• If left unused a fully charged battery will discharge itself over time.
Storage Temperatures
• Temperature extremes will affect the ability of the battery to charge. Allow the battery to cool
down or warm up as necessary before use or charging.
• Storing the battery in extreme hot or cold places will reduce the capacity and lifetime of the
battery.
Battery Conditioning
• With a new NiMH battery, full performance is achieved after three to five complete charge and
discharge cycles.
• Discharge an NiMH battery from time to time to improve battery performance and battery life.
Battery Replacement and Disposal
• The battery can be charged and discharged hundreds of times, but it will eventually wear out.
• The battery may need to be replaced when the operating time between charging becomes
noticeably shorter than normal.
• Do not dispose of batteries in a fire!
• Batteries must be recycled or disposed of properly.
• Do not place batteries in household garbage.
S810D/S820D MM 10680-00003 Rev. H3-7
Battery Testing ProcedureRemoval and Replacement
3-5Battery Testing Procedure
The following procedure describes how to test the battery.
1. With the Site Master off and the battery installed, connect the Universal AC Adapter to the
15VDC (1350 mA)
connector. The External Power LED and the Battery Charging LED will light.
If the Battery Charging LED does not light, the battery may be too low to immediately start full
charging. Leaving the unit connected to AC power for several hours may bring the battery up to a
Note
level where full charging can begin. Turn the unit off and back on to see if the Battery Charging LED
lights indicating a full charge cycle has begun. Charging is inhibited below 0ºC (0 degrees C) and
above 45ºC (45 degrees C). If the unit is too hot, the battery will not start charging until the unit
temperature has reached 43ºC (43 degrees C).
2. Disconnect the AC-DC Adapter when the Battery Charging LED turns off, indicating the battery is
fully charged.
3. Press and hold the ESCAPE/CLEAR
key, then press the ON/OFFkey to turn on the Site Master. This
sets the instrument to the factory preset state. Press ENTER when prompted to continue.
4. Press the SYS key, followed by the
Status soft key. Verify that the indicated battery charge is greater
than or equal to 80%.
•If the value is 80% or above, press the ESCAPE/CLEAR
key and continue with this procedure.
•If the value is lower than 80%, a discharge/charge cycle may be needed to improve the battery
capacity.
- Completely discharge the battery, as described in Step #5 and Step #6 below.
- Then recharge the battery as described in Step #1 and Step #2 above.
•If the battery capacity does not increase after a discharge/charge cycle, replace the battery.
5. Press the START CAL
key (to keep the Site Master from going into HOLD mode) and make note of
the test start time.
12.5-
6. When the Site Master display fades and the Site Master switches itself off, make note of the test stop
time.
7. The total test time from Step #5 to Step #6 should be greater than or equal to 1.5 hours.
8. If the battery charge started at 80% or more and the total battery test time is less than 70 minutes,
replace the battery.
3-8S810D/S820D MM 10680-00003 Rev. H
Removal and ReplacementFront Panel Assembly Removal and Replacement
3-6Front Panel Assembly Removal and Replacement
Overview
This procedure provides instructions for removing and replacing the Site Master front panel assembly. With
the front panel assembly removed, the LCD display, keypad PCB, keypad membrane, and main PCB
assemblies can be removed and replaced.
Note
Many of the procedures in this section are generic, and apply to many similar instruments. Photos
and illustrations used are representative and may show instruments other than the Site Master.
Replacement Procedure
1. Place the Site Master face up on a stable work surface.
2. Remove the four rubber corner bumpers by carefully lifting and sliding the bumpers off of the case
corners (Figure 3-3).
Figure 3-3.Remove the Corner Bumpers
3. With the bumpers removed, the access holes for the case screws are revealed.
4. Use a Phillips screwdriver to remove the four screws securing the two halves of the Site Master case
together.
5. Carefully lift up on the right side (as viewed from the front) of the front half of the case and begin to
separate the two halves.
Caution
6. Carefully disconnect the LCD display cable from J14 on the main PCB.
7. Carefully disconnect the keypad interface cable from J4 on the main PCB.
8. Carefully disconnect the LCD display backlight cable from J1 on the main PCB.
9. Remove the front panel assembly.
S810D/S820D MM 10680-00003 Rev. H3-9
Do not force or pull the two halves of the case apart completely, as there are delicate cables
attached between the two halves that must be disconnected first.
Front Panel Assembly Removal and ReplacementRemoval and Replacement
10. Reverse the above steps to replace the front panel assembly.
NoteThe corner bumpers only mount one way. That is, the raised area inside one end of the bumper
(Figure 12) is made to conform to the contour of the front cover only.
Figure 3-4.Corner Bumper Detail with Raised Area
3-10S810D/S820D MM 10680-00003 Rev. H
Removal and ReplacementLCD Assembly Replacement
3-7LCD Assembly Replacement
Overview
This procedure provides instructions for removing and replacing the Liquid Crystal Display (LCD) once the
front panel assembly has been separated from the Site Master.
Replacement Procedure
1. Remove the front panel assembly as directed in Section 3-6, “Front Panel Assembly Removal and
Replacement” on page 3-9.
2. Place the front panel assembly face down on a protected work surface.
3. Remove the 14 Phillips screws that attach the backing plate to the front panel assembly.
4. Remove the front panel backing plate, carefully feeding the cables through the access holes to avoid
damage to the cables or connectors.
Note
5. Remove the rubber cushion pad from the LCD assembly and remove the assembly.
6. Reverse the above steps to install the replacement assembly.
Remove the speaker wire from the retaining clip to allow the removal of the front backing plate. The
speaker is not used in the S810D/S820D.
Figure 3-5.Front Panel Backing Plate
S810D/S820D MM 10680-00003 Rev. H3-11
Keypad PCB ReplacementRemoval and Replacement
3-8Keypad PCB Replacement
Overview
This procedure provides instructions for removing and replacing the keypad PCB.
Replacement Procedure
1. Remove the front panel assembly as directed in Section 3-6, “Front Panel Assembly Removal and
Replacement” on page 3-9.
2. Place the front panel assembly face down on a protected work surface.
3. Remove the 14 Phillips screws that attach the backing plate to the front panel assembly.
4. Remove the front panel backing plate, carefully feeding the cables through the access holes to avoid
damage to the cables or connectors.
5. Remove the rubber cushion pad from the key pad PCB and remove the PCB.
Figure 3-6.Front Panel Keypad PCB Location
6. Reverse the steps above steps to install the replacement assembly.
3-12S810D/S820D MM 10680-00003 Rev. H
Removal and ReplacementKeypad Membrane Replacement
3-9Keypad Membrane Replacement
Overview
This procedure provides instructions for replacing the key pad membrane.
Replacement Procedure
1. Remove the front panel assembly as directed in Section 3-6, “Front Panel Assembly Removal and
Replacement” on page 3-9.
2. Remove the key pad PCB as directed in section Section 3-8, “Keypad PCB Replacement” on page 3-12
3. Remove the keypad membrane by gently pulling the membrane up and out of the holes in the front
panel.
4. Reverse the above steps to install the replacement membrane.
Figure 3-7.Front Panel Keypad Membrane
S810D/S820D MM 10680-00003 Rev. H3-13
Power Monitor PCB ReplacementRemoval and Replacement
3-10 Power Monitor PCB Replacement
Overview
This procedure provides instructions for replacing the Power Monitor PCB (P/N ND64376).
Replacement Procedure
1. Remove the front panel assembly as directed in Section 3-6, “Front Panel Assembly Removal and
Replacement” on page 3-9.
2. Disconnect the RF Detector connector ribbon cable from P1 on the Power Monitor PCB.
Figure 3-8.RF Detector PCB Replacement
3. Remove the three Phillips screws that secure the Power Monitor PCB to the Main PCB.
4. Gently lift the Power Monitor PCB and separate connector J1 of the Power Monitor PCB from J6 of
the Main PCB.
5. Reverse the above steps to install the replacement Power Monitor PCB, taking care to properly align
the pins of connector J1 of the Power Monitor PCB with connector J6 of the Main PCB.
3-14S810D/S820D MM 10680-00003 Rev. H
Removal and ReplacementReal Time Clock Battery Replacement
3-11 Real Time Clock Battery Replacement
Overview
This procedure provides instructions for replacing the Lithium Coin Real Time Clock Battery (P/N 633-26).
Procedure
1. Remove the front panel assembly as directed in Section 3-6, “Front Panel Assembly Removal and
Replacement” on page 3-9.
2. Locate the RTC battery as shown in Figure 3-9 below.
Figure 3-9.Real Time Clock Battery
3. Using a non-metallic probe, gently pry the battery from its holder, taking care not to damage the
holder or surrounding components.
The RTC battery may be secured in the holder with a small quantity of clear RTV sealant on top of
Note
4. Install the new RTC battery, making sure that the positive (+) side of the battery faces up.
5. Replace the front panel assembly as directed in Section 3-6, “Front Panel Assembly Removal and
the battery. Replace this sealant when replacing the battery to insure that the battery remains
properly secured. Do not allow the sealant to come between the battery and the holder contacts.
Replacement” on page 3-9.
S810D/S820D MM 10680-00003 Rev. H3-15
Main/RF PCB Assembly ReplacementRemoval and Replacement
3-12 Main/RF PCB Assembly Replacement
Overview
This procedure provides instructions for replacing the Main/RF PCB assembly.
Note
Some photos and steps in this procedure may vary depending on the options installed in the unit.
Disregard any steps that do not apply to the specific unit being serviced.
Replacement Procedure
1. Remove the front panel assembly as directed in Section 3-6, “Front Panel Assembly Removal and
Replacement” on page 3-9.
2. Disconnect the battery connector from J7 on the Main PCB.
3. Disconnect the semi-rigid coaxial cable from the RF PCB, as indicated in Figure 3-10 below.
Figure 3-10. Main/RF PCB Assembly
4. Disconnect the RF Detector connector ribbon cable from P1 on the Power Monitor PCB.
5. Remove the PCB mounting screws and the GPS and Serial Interface connector mounting fasteners.
6. Remove the GPS connector from the connector panel.
7. Carefully lift the top of the Main PCB up and clear of the connector panel.
8. Fold the Main PCB back to allow access to the RF PCB below and remove the three 0.25” standoffs
that secure the RF PCB to the case (Figure 3-11).
9. Remove the Main/RF PCB assembly with the connector panel.
10. Reverse the steps above to install the new Main/RF PCB assembly.
Note
3-16S810D/S820D MM 10680-00003 Rev. H
The connector panel fits into grooves in the two halves of the case. Make sure the panel is correctly
aligned with the grooves before reassembling the two halves together.
Removal and ReplacementMain/RF PCB Assembly Replacement
Figure 3-11. Main/RF PCB Removal
Table 3-5.Callout Index for Figure 3-11, “Main/RF PCB Removal”
Index Callout Description
1
Remove the three (3) 0.25” standoffs that secure the RF PCB to the case.
S810D/S820D MM 10680-00003 Rev. H3-17
Source Control PCB Assembly ReplacementRemoval and Replacement
3-13 Source Control PCB Assembly Replacement
Overview
This procedure provides instructions for replacing the Option 22 CW Source Control PCB assembly.
Note
Some photos and steps in this procedure may vary depending on the options installed in the unit.
Disregard any steps that do not apply to the specific unit being serviced.
Replacement Procedure
Caution
1. Remove the front panel assembly as directed in Section 3-6, “Front Panel Assembly Removal and
2. Place the instrument with the display and front panel buttons facing down.
If the Option 22 CW Source Control PCB assembly removal procedure is done incorrectly, it can
bend or break the pins on the 551-1694 2-row 32-pit (m-m) adapter that connects the Option 22 PCB
assembly to the Main PCB assembly. It is highly recommended to only perform this procedure when
spare 551-1694 adapters are available.
Replacement” on page 3-9.
3-18S810D/S820D MM 10680-00003 Rev. H
Removal and ReplacementSource Control PCB Assembly Replacement
Figure 3-12. Main PCB Assembly and Option 22 CW Source Control PCB Assembly
Table 3-6.Callout Index for Figure 3-12, “Main PCB Assembly and Option 22 CW Source Control PCB Assembly”
Index Callout Description (1 of 2)
1Option 22 CW Source Control PCB assembly.
2RS-232C DB-9 (m) connector. Remove two (2) hex mounting standoffs.
3GPS Antenna connector. Remove to two (2) 6-32 kep nuts.
4RF Coaxial cable and connector. Undo the SMA connector.
5Internal mounting bracket for Option 22. Remove the 6-32 kep nut.
7Option 22 CW Source Control PCB assembly. Remove five (5) 6-32 Phillips mounting screws.
S810D/S820D MM 10680-00003 Rev. H3-19
Source Control PCB Assembly ReplacementRemoval and Replacement
Tab le 3-6.Callout Index for Figure 3-12, “Main PCB Assembly and Option 22 CW Source Control PCB Assembly”
Index Callout Description (2 of 2)
8Main PCB assembly. Remove five (5) 6-32 Phillips mounting screws.
9Main PCB assembly. Disconnect the battery connector from J7.
Out of view and mounted on the other side of the Option 22 PCB assembly is the 2-Row 32-
10
11Connector panel and top of instrument.
12Bottom of instrument
3. Outside the case, remove two (2) hex standoffs from the RS-232C DB-9 (m) connector
4. Inside the case, remove two (2) 6-32 kep nuts from the GPS connector (Figure 3-12 #3).
5. Disconnect the semi-rigid coaxial cable SMA connector from the RF PCB. Leave the cable in place
6. Remove the 6-32 kep nut holding the Connector Adapter Plate in place. The plate will be lose but not
Socket Interconnect Header Connector. Below that is the 551-1694 2-row 32-pin (m-m) adapter.
The adapter connects to a second 2-Row 32-Socket Interconnect Header Connector mounted on
the Main PCB.
(Figure 3-12 #2).
(Figure 3-12 #4).
removable at this point (Figure 3-12 #5).
7. Outside the case, remove two (2) hex standoffs from the Option 22 CW Source DB-26 (m) connector
(Figure 3-12 #6).
8. Inside the case, remove five (5) 6-32 Phillips mounting screws holding the Option 22 CW Source
Control PCB assembly in place (Figure 3-12 #7).
9. Remove five (5) 6-32 Phillips mounting screws holding the Main PCB assembly in place (Figure 3-12
#8).
10. Disconnect the battery connector from J7 on the Main PCB (Figure 3-12 #9).
11. The Connector Panel, Main PCB, and the Option 22 CW Source Module assemblies should be loose.
12. Gently lift the bottom edge of the Main PCB assembly closest to the ribbon cable (Figure 3-12 #11)
and gently pull towards the bottom of the case. The goal is to create clearance between the Connector
Panel and the Main PCB assembly.
13. Gently lift the Connector Panel assembly (Figure 3-12 #12) and pull it towards the top of the
instrument. The goal is to create more clearance between the Connector Panel and the DB-26
connector on the Option 22 CW Source Control PCB assembly.
14. Finally, gently lift the back edge of the Option 22 CW Source Control assembly.
15. When the Option 22 DB-26 connector is free from the Connector Panel, continue to lift the Option 22
CW Source Control PCB assembly.
Connecting the 2-row 32-pin header connectors on the Option 22 and Main PCB assemblies is the
Note
551-1694 2-row 32-pin (m-m) adapter. The 32-pin adapter may remain in the Main PCB assembly or
stay with the Option 22 PCB assembly.
16. Inspect the pins on the 551-1694 2-row 32-pin (m-m) adapter. If they are bent, replace the adapter.
17. Installation of the replacement Option 22 CW Source Control PCB assembly is the reverse process.
18. Start with installing the 551-1694 2-row 32-pin (m-m) adapter on the Main PCB.
19. Make sure the Connector Adapter Plate is in place and that the slot on the Plate is correctly
positioned around the 6-32 mounting stud on the inside of the Back Panel.
3-20S810D/S820D MM 10680-00003 Rev. H
Removal and ReplacementSource Control PCB Assembly Replacement
20. Insert the DB-26 connector through the Connector Adapter Plate and Connector Panel openings.
21. When DB-26 connector is through the Connector Panel opening, gently lower the Option 22 CW
Source Control PCB assembly onto the Main PBC, making sure the header on the Option 22 header
connects successfully with the 551-1694 2-row 32-pin (m-m) adapter.
22. Once the headers and adapter have successfully connected, begin to add but not tighten the
remaining hardware.
23. Reconnect the J5 power connector.
24. Tighten the Phillips screws holding the Main PCB assembly.
25. Tighten the Phillips screws holding the Option 22 CW Source Control PSCB assembly.
26. Tighten the hex standoff nuts on the DB-26 connector.
27. Tighten the 6-32 kep nut holding the Connector Adapter panel in place.
28. Tighten the RF coax connector.
29. Tighten the 6-32 kep nuts holding the GPS connector.
30. Tighten the hex standoff nuts on the RS-232C DB-9 serial connector.
S810D/S820D MM 10680-00003 Rev. H3-21
Source Control PCB Assembly ReplacementRemoval and Replacement
3-22S810D/S820D MM 10680-00003 Rev. H
Appendix A — Test Data Master for
CW Source Modules
S810D/S820D MM 10680-00003 Rev. HA-1
Customer
ModelSerial No.Anritsu R.O.Customer P.O.DateTested By