Standby Power Supplies - Quick Start Guide

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Overview

 

 

 

 

 

 

 

 

 

Pre-installation Checklist

 

 

 

 

 

 

Alpha GMX Uninterruptible Power

Supplies are

designed

to power

signal

 

To Ensure Operator Safety:

 

 

 

 

 

 

processing equipment in cable television and broadband

LAN distribution

 

Only qualified personnel should install the power supply in

accordance with

 

 

 

systems.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

all applicable electrical codes.

 

 

 

 

 

During AC line operation, AC power is converted into a quasi square wave

 

 

 

 

 

 

 

 

Use eye protection whenever working with batteries.

 

 

 

 

 

and regulated by a ferroresonant transformer at the selected output voltage.

 

 

 

 

 

 

 

Use only sealed, lead-acid type batteries with a minimum rating of 55Ah

 

 

 

The regulated voltage is connected to the load via VOUT ± terminal block

 

 

 

 

connections, and some power is directed to the battery charger to maintain

a

 

(gelled-electrolyte or equivalent).

 

 

float charge on the batteries.

 

 

 

 

 

 

 

 

 

Unpacking and Inspection:

 

 

When the incoming AC line voltage significantly deviates from normal, the

 

• Remove the GMX Power Supply from the shipping container. Verify that

 

 

GMX Power Supply automatically switches from the AC line to Standby mode,

 

the power supply (including Remote Temperature Sensor) and any other

 

 

maintaining power to the load.

 

 

 

 

 

 

 

 

 

 

ordered options have been included.

 

 

Key components include:

 

 

 

 

 

 

 

 

 

• Carefully inspect the contents of the shipping container. If any items are

 

 

 

 

 

 

 

 

 

 

 

 

 

 

damaged or missing, contact Alpha Technologies or the shipping company

 

 

• Line Interactive Ferro Technology (LIFT)

 

 

 

 

 

immediately. Most shipping companies only have a short claim period.

 

 

 

 

 

 

 

 

 

 

 

 

 

• Wide input voltage range of ±30%

 

 

 

 

Preinstallation Inspection:

 

 

 

 

 

 

• During shipping, movement of components may occur. Inspect the power

 

 

• Compact packaging with light-weight ferro

 

 

 

 

 

 

 

 

 

 

 

supply for possible shipping-related failures, such as loosened or damaged

 

 

• Field programmable flash memory

 

 

 

 

 

 

 

 

 

 

 

 

connectors. If needed, inspect the interior for loose or damaged connectors.

 

 

• Built-in battery circuit breaker

 

 

 

 

 

Correct any discrepancies before proceeding with the power supply

 

 

 

 

 

 

 

installation.

 

 

• IEC style line cord

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Do not install the power supply without performing a complete

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Battery Breaker

 

preinstallation inspection and start-up test.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

To download the latest revision of the GMX Technical Manual,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Alpha P/N 017-932-B0, visit www.alpha.com.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Or, call 1-800-863-3930 for assistance.

 

 

 

 

 

 

 

 

 

 

 

Inverter

 

(7:00 AM to 5:00 PM Pacific Time)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cooling Fan

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Status LEDs

Smart

Display Battery Input

Battery Temperature

 

 

 

 

 

 

 

Terminal Block

Probe Connector

 

 

 

 

 

 

 

© 2006 Alpha Technologies

 

 

 

 

 

 

 

 

Page 1

of 4

 

017-932-B1-001, Rev. A, Effective 03/06

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Alpha Standby Power Supplies User Manual

Standby Power Supplies - Quick Start Guide

Installation

NOTE:

Before applying power, verify AC input utility. Verify a low-resistance ground is installed in accordance with applicable regional standards.

Installation Procedure

1.Turn Battery Breaker OFF.

2.Check battery cables for correct polarity (Red +, Black -).

3.Connect battery cables to battery input connector (observe color/polarity).

4.Connect the Temperature Probe.

5.Connect the Local/Remote Indicator (LRI) to the terminal block (if applicable).

6.Connect status monitoring connectors, including Tamper Switch (if applicable).

7.Connect the GMX to the utility outlet.

8.Switch enclosure AC breaker ON; measure and verify correct AC voltage at utility outlet.

9.Switch Battery Breaker ON.

8

5

14

(Example) 7,12,15

10.Verify no alarms are present (it may take up to 60 seconds for the NO BATTERIES alarm to clear).

11.Initiate a self-test by simultaneously pressing the DOWN arrow key and ENTER key. Using a true RMS multimeter, verify VOUT voltage. Verify no alarms are present. Abort the self-test by by simultaneously pressing the DOWN arrow key and ENTER key.

12.Unplug the GMX line cord and turn OFF the battery breaker.

13.Verify Service Power Inserter (SPI) toggle switch in ON position (not ALT).

14.Connect the SPI (network load) to the terminal block. If you are not using an SPI, connect the load directly to the VOUT terminals on the terminal block. Observe proper polarity.

15.Plug in the GMX line cord and switch the Battery Breaker ON.

16.Perform live inverter test.

Turn AC input breaker OFF.

Verify GMX transfers to “Inverter” mode.

Turn AC input breaker ON.

Verify GMX transfers back to Utility.

CONGRATULATIONS!

The self-test and live-inverter tests have been successfully completed, the unit is ready to be placed into service.

13

1,9

6

10

11

2,3

4

 

© 2006 Alpha Technologies

Page 2 of 4

017-932-B1-001, Rev. A, Effective 03/06