Installation 990-91461-001 12/2020
Galaxy VL Li-Ion Battery Control Breaker Kit
(GVLOPT005)
NOTE: Install the Li-Ion battery control breaker kit in the UPS before the power
cables are installed. Follow the UPS installation manual to prepare for
installation.
1. Remove the plates from the front of the UPS.
2. Remove the DIN rail.
Schneider Electric
35 rue Joseph Monier
92500 Rueil Malmaison
France
+ 33 (0) 1 41 29 70 00
www.se.com
As standards, specifications, and design
change from time to time, please ask for
confirmation of the information given in this
publication.
© 2020 – 2020 Schneider Electric. All rights
reserved.
Galaxy VL Li-Ion Battery Control Breaker Kit (GVLOPT005)
3. Click the AUX switch onto the left side of the battery control breakers. Click the
two battery control breakers onto the DIN rail.
4. Reinstall the DIN rail in the UPS.
5. Connect the power cables:
a. Connect the provided power cable 0W13298 to the connectors next to the
bonding contactor. 4-pole connector is output and 3-pole connector is
input.
b. Route the power cable 0W13298 to the front of the cabinet and connect to
the two battery control breakers (bottom position). Connect input to the
left battery control breaker and output to the right battery control breaker.
c. Connect power cables (not provided) to the battery control breakers (top
position), route out through the top of the UPS, and connect to the Li-Ion
battery cabinet. Follow the UPS installation manual to create top cable
entry in the UPS. Follow the installation instructions for the Li-Ion battery
cabinet to connect the power cables in the Li-Ion battery cabinet.
NOTE: Minimum power cable size is 2.5 mm2(14 AWG).