Miele PG8132SCIXXL Installation Guide

0 (0)
Miele PG8132SCIXXL Installation Guide

Installation plan

PG 8130

PG 8131

PG 8132

PG 8133

It is essential to read the operating instructions and service documents before installation or use of this appliance. This will prevent both personal injury and damage to the machine.

en - AU, NZ

M.-Nr. 10 720 840

Installation notes

 

 

 

 

 

 

 

 

 

Please read and observe the operating instructions and the

 

 

 

 

 

service documents regarding installation and setting up of this

 

 

 

 

 

dishwasher.

 

 

Installation

 

 

 

 

 

 

 

 

 

 

This dishwasher must be installed by a suitably qualified person

requirements

with the appropriate electrical and plumbing qualifications in

 

accordance with the installation instructions supplied.

 

This dishwasher must be installed in accordance with all applicable

 

standards and guidelines, including legal requirements and health

 

and safety regulations.

 

The machine must be commissioned and operatives trained in its

 

use by Miele Professional Service or by an authorised Miele Service

 

Partner only.

Electrical

Connection to the electrical supply must be in accordance with valid

connection

legal requirements, health and safety regulations, and applicable

 

standards. The mains connection cable must be protected from the

 

risk of thermal damage.

 

We recommend connecting the dishwasher to the power supply via a

 

suitable plug and socket as this will make it easier to carry out the

 

electrical safety test during commissioning and after any service

 

work.

 

For hard-wired dishwashers, connection must be via a main switch

 

to be provided on site, which must completely isolate the machine

 

from the power supply with a contact gap of at least 3 mm.

 

The plug, socket, and main switch must be easily accessible once the

 

dishwasher has been installed.

Equipotential

For added safety, the dishwasher should be protected with a residual

bonding and

current device with a trip current of 30 mA.

earthing

Equipotential bonding should be carried out if required. The screw

 

connection point for equipotential bonding is located at the back of

 

the dishwasher. Equipotential bonding and earthing must be carried

 

out before the machine is commissioned.

Water connection

This appliance must be installed according to AS/NZS 3500.1. This

 

appliance has been supplied with a separate backflow prevention

 

device (non-return valve) and must be connected to the water tap..

 

The tap for the water supply must be easily accessible.

 

The dishwasher can be connected to either a cold water or hot water

 

supply.

Environmental

Condensate can build up in the area surrounding the dishwasher.

requirements

Any cabinetry and fittings in the room must therefore be suitable for

 

purpose. If the machine is fitted under a suitable worktop (built-under

 

and integrated models), the stainless steel steam deflector plate

 

provided must be fitted above the door aperture to protect the

 

worktop from moisture damage. A matching steam deflector plate is

 

also available for order at a later date from Miele Professional Service.

2

PG 8130 / PG 8131 / PG 8132 / PG 8133

Installation notes

Connecting an A dispensing system for liquid detergent and rinse aid can be

external

connected at the back of the machine.

dispensing

system

PG 8130 / PG 8131 / PG 8132 / PG 8133

3

Loading...
+ 7 hidden pages