GE Industrial Solutions AF-600 FP User Manual [en, fr, es]

GE Consumer & Industrial
Electrical Distribution
AF-650 GP & AF-600 FP
TM
Nema 1 Kits Instruction
1.1Instruction IP21 / Nema 1
AF-650 GP & AF-600 FP IP21/Nema 1 Kit
1
Illustration 1.1: Unit Size 12
AF-650 GP (230 V to 1/3 to 3 HP, 460 V to 1/2 to 5 HP)
AF-600 FP (230 V, 1 to 3 HP, 460 V, 1 to 5 HP)
A - Top cover
B – Brim
C – Base part
D – Base cover
E – Screw(s)
When option module A and/or option module B is/are used, the brim (B) must be fitted on the top cover (A).
If the Nema 1 enclosure kit is used, there must be a clearance between the drives of a minimum of 50 mm or 2 inches.
Illustration 1.2: Unit Size 13
AF-650 GP (230 V, 5 HP, 460 V, 7.5 to 10 HP, 575 V 1 to 10 HP)
AF-600 FP (230 V, 5 HP, 460 V, 7.5 to 10 HP, 575 V 1 to 10 HP)
130BT324.10
1
1
AF-650 GP & AF-600 FP IP21/Nema 1 Kit
Illustration 1.3: Unit Size 23
AF-650 GP (230 V, 7.5 to 10 HP, 460 V/575 V 15 to 20 HP)
AF-600 FP (230 V, 10 to 15 HP, 460 V/575 V 15 to 25 HP)
Illustration 1.4: Unit Sizes 24, 33, & 34
AF-650 GP (230 V, 15 to 50 HP, 460 V/575 V 25 to 100 HP)
AF-600 FP (230 V, 15 to 60 HP, 460 V/575 V 30 to 125 HP)
A - Top cover
B – Brim
C – Base part
D – Base cover
E – Screw(s)
F - Fan cover
G - Top clip
When option module A and/or option module B is/are used, the brim (B) must be fitted on the top cover (A).
If the Nema 1 enclosure kit is used, there must be a clearance between the drives of a minimum of 50 mm or 2 inches.
2
Loading...
+ 7 hidden pages