Flowserve PMV W User Manual

USER INSTRUCTIONS
Switchbox Model W Series
Installation
Operation
Maintenance
General
The W series switchbox is designed to be directly mounted onto actuators having connections according to Namur VDE 3845.
Installation
W series switchbox is mounted onto the actuator using 2 squares fixed each one to the box with 2 M5x8 hexagonal head screws and connected to the actuator with 2 M5x8 hexagonal head screws. During assembly pay attention that tongue fit perfectly the pinion slot.
Hex. screws M5 x 8
Square
Wiring instructions
Remove the cover after unscrewing the 4 screws. Remove the plugs from the cable entries and substitute them with adequate cable glands to ensure a watertight seal. A wiring diagram is printed on the nameplate. Follow it carefully for the right connection to your system. Size the cables according to the application and be sure to ground at ground terminal provided. Solenoids may also be wired through the switch enclosure.
Adjusting limit switches
WARNING: disconnect power before removing cover!
Make the actuator/valve system rotate CW, then adjust as follows:
1. Pull the BOTTOM cam to disengage it from splines, then rotate it CW just until switch trips. Reengage the cam with splines.
2. Make the actuator/valve system rotate CCW.
3. Push the TOP cam to disengage it from splines, then rotate it CCW just until switch trips. Reengage the cam with splines.
Installation
Cam
Splines
Cam adjustment
Dimensions
L x W x H = 125 x 80 x 101,5 mm Weight 510 - 700 g
Connection diagrams — Certification info
Palmstierna International AB
Korta Gatan 9 SE-171 54 Solna, Sweden
Name plate
The information is subject to change without notice
Tel: +46 8 555 106 00 Fax: +46 8 555 106 01 www.pmv.nu infopmv@flowserve.com
Loading...