Efd 725D INSTALLATION GUIDE

Introduction
The 725D Series is simple to use and will operate many millions of cycles without maintenance.
The unique design of the 725D Series valve provides a clean fluid cutoff with pullback for precise fluid application at high cycle rates.
The 725DA-SS and 725DA valves feature an adjustable pullback and flow control. The 725D and 725D-SS do not have the adjustable feature.
Each valve is shipped with a dispensing tip adapter, fluid inlet fitting and 5-feet actuating air hose installed. For high flow applications, the dispensing tip adapter can be removed for installation of 1/4 NPT metal or plastic nozzles.
725D Series Piston Valve
INSTALLATION GUIDE
Electronic pdf files of EFD®manuals are also available at www.efd-inc.com/manuals.html.
USA: 800-556-3484 or +1-401-434-1680 Europe: 0800 585733 or +44 (0) 1582 666334 Asia: +86 (21) 5854 2345 technical@efd-inc.com www.efd-inc.com
®
A NORDSON COMPANY
supply line
Inlet fitting
1/8 NPT
Control air hose
Fluid
Air cylinder body
Open
Close
Stroke adjustment
Fluid body
Tip adapter 1/4 NPT
Dispensing tip
Installation
1
7
5
C
l
o
s
e
O
p
e
n
3
Set desired deposit size by adjusting valve open time. Refer to valve controller operating manual.
10
1. Mount valve with an EFD universal
valve mount (#7002VM) or other fixture.
2. Connect fluid supply line to valve. If
3/8” tubing is used, change to fitting #7610BP supplied.
3. Connect fluid supply line to reservoir.
The reservoir can accept either 1/4” OD or 3/8” OD tubing using #62518PT supplied.
4. Connect valve control air hose to
ValveMate
TM
controller (or other pneu­matic switch) used to control valve open time.
5. Choose a dispensing tip or nozzle—
small tips (18-20 gauge) for low viscosity fluid and larger tip or nozzle for higher viscosities.
6. Fill reservoir by pouring fluid directly
into tank liner or manufacturer’s bottle placed inside reservoir. Secure cover prior to setting pressure.
7. Set reservoir pressure to low for thin
fluids and higher for thick fluids.
8. Place a cup under the dispensing tip
or nozzle and actuate the valve until fluid lines, valve and dispensing tip are free of air.
9. Set desired flow rate by adjusting fluid
reservoir pressure, valve stroke setting
*
or changing dispensing tip or nozzle.
10. Set desired deposit size by adjusting
valve open time. Refer to valve controller operating manual.
*
725DA and 725DA-SS only
8
Air Output
Exhaust
2
6
4
9
Prior to installing this valve, please read the associated reservoir and valve controller operating instructions to become familiar with the operation of all components of the dispensing system.
To exhaust
To pressurize
A NORDSON COMPANY
®
Steady
Test
Run
Setup Program
Time Set
Clear
Fast Slow
POWER
RUN
SETUP
CYCLE
Fast Slow
Time Set
Pressure
STOP
Time
Purge
Loading...
+ 2 hidden pages