3
Set desired deposit size by adjusting valve open
time. Refer to valve controller operating manual.
10
1. Mount valve with an EFD universal
valve mount (#7002VM) or other fixture.
2. Connect fluid supply line to valve. If
3/8” tubing is used, change to fitting
#7610BP supplied.
3. Connect fluid supply line to reservoir.
The reservoir can accept either 1/4” OD
or 3/8” OD tubing using #62518PT
supplied.
4. Connect valve control air hose to
ValveMate
TM
controller (or other pneumatic switch) used to control valve
open time.
5. Choose a dispensing tip or nozzle—
small tips (18-20 gauge) for low viscosity
fluid and larger tip or nozzle for higher
viscosities.
6. Fill reservoir by pouring fluid directly
into tank liner or manufacturer’s bottle
placed inside reservoir. Secure cover
prior to setting pressure.
7. Set reservoir pressure to low for thin
fluids and higher for thick fluids.
8. Place a cup under the dispensing tip
or nozzle and actuate the valve until fluid
lines, valve and dispensing tip are free
of air.
9. Set desired flow rate by adjusting fluid
reservoir pressure, valve stroke setting
*
or changing dispensing tip or nozzle.
10. Set desired deposit size by adjusting
valve open time. Refer to valve
controller operating manual.
*
725DA and 725DA-SS only
8