Page 1
Welsing
MAMMOMAT Novation
Installation Protocol
System
SP
Service provider Installation Protocol
08380490
Print No.:
Replaces: SPB7-250.813.03.01.02
SPB7-250.813.03.02.02
© Siemens AG
The reproduction, transmission or use
of this document or its contents is not
permitted without express written
authority. Offenders will be liable for
damages. All rights, including rights
created by patent grant or registration
of a utility model or design, are
reserved.
English
Doc. Gen. Date: 08.04
2004
Page 2
2 Revision / Disclaimer
1Revision / Disclaimer
Document revision level
The document corresponds to the version/revision level effective at the time of system
delivery. Revisions to hardcopy documentation are not automatically distributed.
Please contact your local Siemens office to order current revision levels.
Disclaimer
The installation and service of equipment described herein is to be performed by qualified
personnel who are employed by Siemens or one of its affiliates or who are otherwise
authorized by Siemens or one of its affiliates to provide such services.
Assemblers and other persons who are not employed by or otherwise directly affiliated
with or authorized by Siemens or one of its affiliates are directed to contact one of the
local offices of Siemens or one of its affiliates before attempting installation or service procedures.
MAMMOMAT Novation SPB7-250.813.03.02.02 Siemens AG
08.04 CS SD 24
Page 2 of 12
Medical Solutions
Page 3
Table of Contents 3
1- 0Table of Contents
1 _______ Scope of services _______________________________________________ 4
Delivery, installation, cabling and start-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Room preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Delivery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
System cabling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Other work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2 _______ Installation Protocol _____________________________________________ 6
Site data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Installation steps performed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Activity report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
General remarks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3 _______ Changes to previous version _____________________________________ 11
Siemens AG SPB7-250.813.03.02.02 MAMMOMAT Novation
Medical Solutions
08.04 CS SD 24
Page 3 of 12
Page 4
4 Scope of services
1Scope of services
2-
Delivery, installation, cabling and start-up 0
Room preparation 0
• The following topics must be clarified with the project manager before the delivery date:
Building inspection by the service provider
Floor loading
Floor condition
Barriers, crane, tools.
• The project manager must be on site for information on arrival of the service provider.
• The orientation point is marked by the project manager.
• The current project plan is handed over to the service provider on site.
• Line voltage is available at the on-site system distributor.
• The system emergency off is installed by the customer.
• Cable ducts etc. must be installed.
• All room preparations by the customer are completed and the room is swept clean.
• Radiation protection partition is available.
• To be able to install the covers, the system must be started up partially. This requires a
Siemens service engineer who connects and switches on the voltage to the MAMMOMAT Novation
DR
.
• Seal the joints of the unit base with silicone.
NOTE
All work must be performed in accordance with the supplied documents.
Delivery 0
• A long elevating truck is required for transporting the unit carrier on the pallet.
• The system is brought into the room.
• Unpacking and bringing in all system components of the unit.
• Inspecting the components for damage.
Installation 0
• Taking along all required tools, measuring and installation aids according to the tool list.
• Positioning and aligning all system components according to the project plan or the
statements of the PM.
• Installing accessories and options.
MAMMOMAT Novation SPB7-250.813.03.02.02 Siemens AG
08.04 CS SD 24
Page 4 of 12
Medical Solutions
Page 5
Scope of services 5
• Aligning, drilling and anchoring the unit base, if necessary, screw tight and tighten with
DR
the torque stated in the MAMMOMAT Novation
installation instructions.
• Remove all transport protection devices.
• All fastenings must be tightened with the torques stated in the installation instructions
and secured where necessary with Locite 221.
• All values must be entered according to instructions in the corresponding certificates.
• Install the detector
System cabling 0
• Perform the cabling of the system components of the MAMMOMAT Novation
tions, control consoles and monitors corresponding to the installation instructions.
• Connect foot switches.
DR
, op-
Other work 0
• Close all cable ducts.
• Clearing and cleaning the installation room (swept clean).
• Unpack accessories, if the premises allow this.
• Return all installation racks and packaging materials.
• Damage caused to the building by the work must be reported to the project manag-
er/person responsible for the project.
Siemens AG SPB7-250.813.03.02.02 MAMMOMAT Novation
Medical Solutions
08.04 CS SD 24
Page 5 of 12
Page 6
6 Installation Protocol
2Installation Protocol
3-
Site data 0
SAP No.: ________________ System Ser. No.: ___________________
Customer: _____________________________________________________
Country/city: _____________________________________________________
Installation team: _____________________________________________________
Project manager: _____________________________________________________
Installation start: ________________ Installation end: ___________________
MAMMOMAT Novation SPB7-250.813.03.02.02 Siemens AG
08.04 CS SD 24
Page 6 of 12
Medical Solutions
Page 7
Installation Protocol 7
Installation steps performed 0
Work performed
yes no
The system was installed according to the supplied documents.
Delivery of the system:
All components were delivered. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
The system delivery is complete, according to dispatch note. . . . . . . . . . . . . .
All parts are undamaged. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
The system emergency off is installed by the customer. . . . . . . . . . . . . . . . . .
❐❐
❐
❐
❐
❐
❐
❐
❐
❐
Siemens AG SPB7-250.813.03.02.02 MAMMOMAT Novation
Medical Solutions
08.04 CS SD 24
Page 7 of 12
Page 8
8 Installation Protocol
Work performed
yes no
Installation:
The stand is anchored to the floor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
The radiation shield is anchored to the floor. . . . . . . . . . . . . . . . . . . . . . . . . .
Missing parts are noted in the installation protocol. . . . . . . . . . . . . . . . . . . . .
The project plan was available. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
The radiation shield and AWS are installed according to project plan . . . . . .
Covers are mounted. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
❐
❐
❐
❐
❐
❐
❐
❐
❐
❐
❐
❐
Cabling:
System cables are run and connected according to the documents. . . . . . . . .
All options are positioned and cabled . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Enough cable ducts were available and with a sufficient length . . . . . . . . . . . .
❐
❐
❐
❐
❐
❐
MAMMOMAT Novation SPB7-250.813.03.02.02 Siemens AG
08.04 CS SD 24
Page 8 of 12
Medical Solutions
Page 9
Installation Protocol 9
Activity report 0
Day Start End E M V R KA Work performed Employees/
number
Total (Mh)
Explanation of the activity report
Day / Start / End Date / start of work / end of work (time)
E Bringing in the entire system in hours per/day
M Installation of the entire system in hours per/day
V Cabling of the system in hours per/day
R Travelling time in hours per/day
KA No order-related working time in hours per/day
Work performed Work performed
Employees/number Number of employees who were employed in the period
Total (Mh) Man hours, number of accumulated hours multiplied by number of employ-
ees
Siemens AG SPB7-250.813.03.02.02 MAMMOMAT Novation
Medical Solutions
08.04 CS SD 24
Page 9 of 12
Page 10
10 Installation Protocol
General remarks 0
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
A copy of this remains at the system and is filed in the Assembly/Installation folder.
__________________________ ______________________ ___________________________
Place, date Installation team employee Siemens project manager/
person responsible for the project
______________________ ___________________________
Name in block letters Name in block letters
MAMMOMAT Novation SPB7-250.813.03.02.02 Siemens AG
08.04 CS SD 24
Page 10 of 12
Medical Solutions
Page 11
Changes to previous version 11
3Changes to previous version
4-
Chapter Page Change
All All Converted to DMS
Siemens AG SPB7-250.813.03.02.02 MAMMOMAT Novation
Medical Solutions
08.04 CS SD 24
Page 11 of 12
Page 12
12 Changes to previous version
MAMMOMAT Novation SPB7-250.813.03.02.02 Siemens AG
08.04 CS SD 24
Page 12 of 12
Medical Solutions