Packing Data
Installation Instruction
PK
(Catalog Number 1786–TCAP)
Use this document as a guide when you install a ControlNett tap
dummy load. This document will be packaged with 5 tap dummy loads.
About the Tap Dummy Load
The tap dummy load allows you to install extra taps on your trunk line
without installing ControlNet nodes. The tap dummy load facilitates the
maintenance of your network by providing termination of a tap not in
use; holding a space for a node to be added in the future.
The tap dummy load can be used on any number of taps in your
ControlNet system. Refer to the ControlNet Coax Media Planning and
Installation Manual (Publication 1786-6.2.1) to determine how many
taps you can install in your system.
Publication 1786-5.15 – September 1997
ControlNet Tap Dummy Load Installation Instructions2
European Union Directive Compliance
This product has the CE mark and is approved for installation within the
European Union and EEA regions. It has been designed and tested to
meet the following directives.
EMC Directive
This product is tested to meet Councl Directive 89/336/EEC
Electromagnetic Compatibility (EMC) and the following standards, in
whole or in part, documented in a technical construction file:
• EN 50081-2EMC – Generic Emission Standard, Part 2 – Industrial
Environment
• EN 50082-2EMC – Generic Immunity Standard, Part 2 – Industrial
Environment
Low Voltage Directive
This product is tested to meet Council Directive 73/23/EEC Low
Voltage, by applying the safety requirements of EN-61131-2
Programmable Controllers, Part 2 – Requirements and Tests.
For specific information required by EN-61131-2, see the appropriate
sections in this publication, as well as the following Allen-Bradley
publications:
• Industrial Automation Wiring and Grounding Guidelines for Noise
Immunity, publication 1770-4.1
• Guidelines for Handling Lithium Batteries, publication AG-5.4
• Automation Systems Catalog, publication B111
Publication
1786-5.15 – September 1997
ControlNet Tap Dummy Load Installation Instructions
Installing the Tap Dummy Load
1. Remove the dust cap from the existing tap.
2. Install the tap dummy load over the exposed end of dummy as shown
below.
3
1786-TCAP
T
ap Dummy
Load
ControlNet T
Dummy
ap
30131–M
Publication
1786-5.15 – September 1997