
InstructionSheet
InstructionSheet
Part No. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .06286500
IMPORTANT SAFETY INFORMATION. READ AND FOLLOW ALL SAFETY INSTRUCTIONS. Follow label information
and instructions concerning Wet or Damp Locations, installation near combustible materials, insulation, building materials,
and proper lamping. Do not install in areas subject to combustible vapors or gases. Before wiring to power supply and
during servicing or relamping, turn off power at fuse or circuit breaker. All servicing or relamping must be performed by
qualified service personnel. Product must be grounded to avoid potential electric shock or other potential hazard.
Product must be mounted in locations and at heights and in a manner consistent with its intended use, and in
compliance with the National Electrical Code and local codes. The use of accessory equipment not recommended by
the manufacturer or installed contrary to instructions may cause an unsafe condition. Do not block light emanating from
product in whole or part, as this may cause an unsafe condition. Do not allow items such as drapes, curtains, screens or
the like to come into contact with the product or to block light from the product, as this may cause an unsafe condition.
INSTALLATION INSTRUCTIONS
CFR EB/EBDMCP
1.
Bend brackets as shown in detail “A”.
Install the fixture in the ceiling using
mounting channel or bar (byothers)
laced in the adjustable mounting brack-
p
ets. Mount the fixture in the ceiling so
that the weight of the fixture is supported by the mounting channel or bar
and/or hanger wires secured to the
building structure.
2. Adjust the fixture so the bottomof the
plaster frame is flush with the ceiling line
and in alignment with adjacent fixtures.
Secure mounting brackets by tightening
wing nuts on either side of the fixture.
3. Remove J-Box cover(s) and determine
where the supply wiring conduit will
enter the J-Box. CAUTION: CONDUIT
CONNECTORS MAY INTERFER WITH
COMPONENTS HOUSED IN THE JBOX CHECK CLEARANCES BEFORE
REMOVING KNOCKOUTS.
Conduit in conformance with the
National Electric Code.
4. Remove J-Box cover plate. Remove
appropriate knockout and assemble
appropriate connector for the supply
wire used. Connect ground wires to
green ground leads. Connect white
(common) to white (leads). Connect
power supply (line) to black lead(s).
Reinstall J-Box cover.
WARNING: DO NOT pinch wires
between J-Box/ballast cover and JBox. Consult a Qualified Electrician
for all other options that require other
wiring configurations.
5.
Install the reflector after all ceiling
installtion and finishing work is com
plete. Push reflector into plaster frame
and align with threaded stud. Secure
reflector with wing nut and tighten until
reflector flange is flush to ceiling.
6. Install the proper lamps (by others).
Attach the
-
Plaster Frame
Bend brackets in
ine with marks
l
n flange.
o
DETAIL A
JBox
J-Box Covers
Mounting
Bracket
Secure Reflector
to Threaded Stud
with Wing Nut
(Not Shown).
Reflector
Reflector Flange
www.prescolite.com • Prescolite TollFree Technical Support 1.888.PRS.4TEC • Hours: 8am - 5pm ET
TTEMPT T
CAUTION:
701 Millennium Boulevard • Greenville, SC 29607
With representatives of
Copyright 2007, 02/07 revision, All Rights Reserved - Printed in U.S.A.
DO NOT
OPERATION OF THE FIXTURE DEPEND ON THE INTEGRITY OF THE WIRING.
A
O MODIFY
fices in principal cities throughout North
OR REWIRE F
ACT
-INST
Y
OR
America.
ALLED WIRING ON THE FIXTURE. SAFETY AND PROPER