Liquid Controls K-7, K-15, K-30 User Manual

Installation & Parts Manual
K-7, K-15, & K-30
Air Actuated & Differential Check Valves
Installation: M400-30
www.lcmeter.com
Table of Contents
!!
!!
! WARNING
Before using this product, read and understand the instructions.
Save these instructions for future reference.
All work must be performed by qualified personnel trained in the proper application, installation, and maintenance of equipment and/or systems in accordance with all applicable codes and ordinances.
Failure to follow the instructions set forth in this publication could result in property damage, personal injury, or death from fire and/or explosion, or other hazards that may be associated with this type of equipment.
General Information ..................................................2
Specifications ............................................................3
K-7 Valves .................................................................4-5
Installation .................................................................4
New Installations .......................................................4
Retrofit Installations...................................................4
Disassembly and Reassembly ..................................5
K-15 Valves ...............................................................6-7
Installation .................................................................6
New Installations .......................................................6
Retrofit Installations...................................................6
Disassembly and Reassembly ..................................7
K-30 Valves ...............................................................8
Installation .................................................................8
New Installations .......................................................8
Retrofit Installations...................................................8
Illustrated Parts Breakdown ......................................9-11
K-7 Valves .................................................................9
K-15 Valves ...............................................................10
K-30 Valves ...............................................................11
Publication Updates and Translations
The most current English versions of all Liquid Controls publications are available on our website, www.lcmeter.com. It is the responsibility of the Local Distributor to provide the most current version of LC Manuals, Instructions, and Specification Sheet s in the required language of the country, or the language of the end user to which the products are shipping . If there are questions about the language of any LC Manuals, Instructions, or Specification Sheets, please contact your Local Distributor.
General Information
Liquid Controls Air Actuated/Differential Check V alves are designed to prevent flow whenever air or vapor is present, thereby assuring accurate measurement.
Check Valves are normally closed, spring loaded valves installed on the meter outlet. When fluid enters the valve from the inlet side, and the pressure is greater than the back pressure combined with the force of the spring, the spring will compress, opening the valve and allowing fluid
K-7 Valve Operation
to pass through (as shown in the figure below). When back pressure plus spring strength is greater than
the fluid pressure entering the meter, the valve will remain closed.
These meters are used in conjunction with the air/vapor eliminator to prevent air/vapor from being metered. This is important when split compartment testing.
2
Model/Applications
K-7 Valves:
Model No. Material Spring Seals Applications
A2811 Cast Iron Standard Viton Chlorinated Solvents A2817 Aluminum Standard Viton Petroleum Products A28171 Aluminum Medium Viton Petroleum Products A28172 Aluminum Heavy Duty Viton Petroleum Products A2821 Aluminum Standard PTFE Liquid Sweeteners, Methanol A2826 Aluminum Standard Viton Liquid Sweeteners A2831 Cast Iron Standard PTFE Caustics A2851 Aluminum Standard EPT NH3 Applications. A2862 Stainless Steel Standard PTFE Acidic PH Liquids
K-15 Valves:
Model No. Material Spring Seals Applications
A3830
Aluminum, Aluminum Guide
Standard Viton Aviation Fuels
A3845
Aluminum, Bronze Guide
Standard Viton Petroleum Products
K-30 Valve:
Model No. Material Spring Seals Applications
A4845 Aluminum Standard Viton Petroleum Products
Used on M-5 & M-7 - 1½" & 2" Meters Maximum Flow Rate = 150 gpm (568 lpm) Working Pressure: 150 psi (10.5 bar)
Used on M-15 & M-25 - 3" Meters Maximum Flow Rate = 300 gpm (1,136 lpm) Working Pressure = 150 psi (10.5 bar)
Used on M-30 - 3" Meters Maximum Flow Rate = 300 gpm (1,136 lpm) Working Pressure = 150 psi (10.5 bar)
Specifications
K-7 Valves
3
K-15 & K-30 Valves
K-7 Valves
!!
!!
!WARNING!
Before disassembly of any meter or accessory component, ALL INTERNAL PRESSURES MUST BE RELIEVED. Pressure must be 0 (zero) psi. Close all liquid and vapor lines between the
meter and liquid or gas pressure source (such as the supply tank, discharge lines and supply lines).
New Installations
When ordered with a new metering system, the Check Valve is supplied mounted to the metering system as shown to the right. A line must be connected to the flange on the outlet side of the 2-stage, preset valve. This flange connection is 2” NPT.
Finally, install a vent line from one port of the check valve to the air eliminator. Plug the other side of the check valve.
Retrofit Installations
Depending on the existing configuration, adding a Check V alve may require modification of the outlet piping.
After the internal pressure is relieved from the system, the output line can be disconnected from the output side of the meter. If the system includes an electronic, 2­stage, preset valve, remove it from the meter. The check valve assembly can then be connected to the output side of the meter.
Use the four bolts and washers to fasten the valve assembly to the meter. The valve has an arrow showing the direction of flow. Ensure that the valve is properly oriented.
Tighten the bolts in a crossing pattern. Once the check valve is secure, the electronic, 2-stage, preset valve can be connected to the back check valve as shown to the right. Once this is complete, the output piping may be reconnected to the electronic, 2-stage, preset valve. The preset valve output fitting is 2” NPT.
Run a line from one port of the check valve to the air eliminator. Plug the other side of the check valve.
4
Loading...
+ 8 hidden pages