SUB Series Current Sensors
INSTALLATION INSTRUCTIONS
STEP 1: For each phase being monitored, you will need one two-piece current sensor assembly. (A three-phase meter will
require three (3) current sensor assemblies.) Open the two-piece current sensor assembly by releasing the nylon
clamp using a flathead screwdriver.
Using a flathead screwdriver, press the tab on the nylon clamp to open the current sensor assembly.
STEP 2: Reassemble current sensor assembly around the conductor(s) to be monitored. Be sure that the current sensor
halves marked "Load" are both facing the load side of the conductor being monitored. The colored arrow will be on
the source side of the conductor being monitored and MUST be pointed in a clockwise direction around the conductor being monitored. Tighten nylon clamp to complete assembly.
IMPORTANT:
When looking from the source side of the conductor(s) being monitored, you should see the arrow on the current sensor
assembly, and the arrow should be pointing clockwise around the conductor(s) being monitored.
If the arrow is not on the source side, inaccurate readings may result.
62-0343-01
SUB SERIES CURRENT SENSORS
Automation and Control Solutions
Honeywell International Inc.
1985 Douglas Drive North
Golden Valley, MN 55422
Honeywell Limited-Honeywell Limitée
35 Dynamic Drive
Toronto, Ontario M1V 4Z9
www.honeywell.com/buildingsolutions
® U.S. Registered Trademark
© 2011 Honeywell International Inc.
62-0343—01 M.S. 02-11
Printed in U.S.A.