Procedures and Scope of work for installing an
HL800 Mixer.
The HL800 Mixer is included in the Retail
Installation Credit (WRN Claim) program.
SCOPE OF WORK GUIDE
SCOPE OF WORK
KROGER/GENERAL CONTRACTOR RESPONSIBILITIES:
Receive, Uncrate and Set in Place the HL800 Mixer
Provide Electrical Outlet
Under normal circumstances the mixer should not need to be anchored to the floor.
However, anchoring can keep mixer from ‘walking” under extreme conditions such as
uneven or slippery floors. Contact the local Hobart office for instructions.
DAMAGED SHIPMENTS OR SHORTAGES
Any shortages and/or visible damage must be marked on the freight bill at the time of
delivery. If damages are found, the local office of the carrier must be notified at once and
an inspection requested. Also, notify Hobart Customer Service. If the delivery receipt is
signed clear and concealed damage is found, the carrier must be notified and inspection
requested within 15 days of delivery.
Hobart Corporation will take care of filing carrier claims for lost or damaged shipments.
The local Hobart office can ascertain if the unit can be repaired in the field or at their
location. Should replacement of unit(s) or parts be necessary, contact your Hobart
representative or the Customer Service Department.
INSTALLING HOBART OFFICE RESPONSIBILITY:
Assemble and Install All Accessories
Start Up Unit and Test Operation
Customer Demo/Training*
o Demonstrate Controls, Cleaning and Maintenance Procedures to Tortilleria
Personnel
* For details, refer to the Instruction Manual or Operator Training Video,
available at www.Hobartcorp.com\Kroger