Fairbanks 9109 User Manual

A. Introduction
The 9109 family of OMCs are constructed of stainless steel load cells, have 4 hole mounting pattern for securing, and built in checking. All cells used are true hermetically sealed units. The OMC assemblies are compact, resistant to oxidation, and have replaceable 'suspension' parts for super long life and excellent resolution. See the following chart for either stainless steel or galvanized mounting assemblies.
B. Specifications
Output: 2 mV/v (see certificate for exact output spec)
Type: Double-Ended Shearbeam
Wiring: (Color code on the load cell cable)
Black - Excitation Green + Excitation White + Signal Red - Signal Yellow Shield
C. Capacities:
Product
No.
Capacity Description
98463 1 K 9109-1, SS, NTEP, FM, Hermetically Sealed, DESB, SS Mount 98464 2.5K 9109-2, SS, NTEP, FM, Hermetically Sealed, DESB, SS Mount 98465 5K 9109-3, SS, NTEP, FM, Hermetically Sealed, DESS, SS Mount 98466 10K 9109-4, SS, NTEP, FM, Hermetically Sealed, DESB, SS Mount 98467 25K 9109-5, SS, NTEP, FM, Hermetically Sealed, DESB, SS Mount 98468 50K 9109-6, SS, NTEP, FM, Hermetically Sealed, DESB, SS Mount 98469 1K 9109-7, SS, NTEP, FM, Hermetically Sealed, DESB, GALV Mount 98470 2.5K 9109-8, SS, NTEP, FM, Hermetically Sealed, DESB, GALV Mount 98471 5K 9109-9, SS, NTEP, FM, Hermetically Sealed, DESB, GALV Mount 98472 10K 9109-10,SS, NTEP, FM, Hermetically Sealed, DESB, GALV Mount 98473 25K 9109-11,SS, NTEP, FM, Hermetically Sealed, DESB, GALV Mount 98474 50K 9109-12,SS, NTEP, FM, Hermetically Sealed, DESB, GALV Mount
(DESB = Double Ended Shearbeam GALV = Galvanized)
50629 1 3/04 Issue #2
Bulletin 50629 Issue #2
Omnicell 9109 Series:
Instructional Bulletin 3/04
50629 2 3/04 Issue #2
D. Installation:
The Omnicell is fully assembled when shipped and ready for installation.
With the vessel, tank, or hopper supported safely on blocks, jacks or by
other means:
• Set each OMC assembly base onto a flat surface centered under the support leg/support flange
• Loosely bolt the flange of the support legs to the OMCs' load mounting plates
• Select the checking that best suits the application and rotate the posts and/or mounting yokes for proper checking clearances (there are many settings variations that can be used to get the right checking clearances).
• Ensure the vessels load 'legs' are directly over the center of the load cell's load mounting plate
• Mark the holes where the anchor bolts will be placed, or drill down through the holes in the base
• Drill and set anchor bolts, then mount the base and secure, with lock washers and nuts
• Wire the load cell into the junction box or sectional controller or QMB using the color code listed above, or printed on the cable.
• Use the calibration sheet packed with each cell for Intalogix™ Technology instruments' exact settings of cell outputs.
• Carefully lower the vessel onto the cells ensuring that any one or more cells are not overloaded during the process
• Use the proper manual for instrument calibration
1
Loading...
+ 4 hidden pages