GASPO 252 Hand-operated
ENCLOSURE INSTALLATION AND FIXING
with GAS SPRINGS
Ø500
Fixing plates to
cement
Fix the fixing plates to the enclosure with
the provided bolts
FITTING THE POST INTO THE ENCLOSURE
To facilitate the fitting operations into the enclosure, we advise
to bring the post to standing out position. Then sink the assembly
into the enclosure and fixing it by the M10x20 TSEI screws
0.0
Concrete casting
around the fixing plates
of the enclosure
Fixing plates
Pebbles for fluids to
soak away
250
Enclosure 795
Once setting is completed, Gaspo 252 enclosure
must be flush with pavement
F
A
l
D
'
a
I
p
N
r
i
c
I
a
n
c
e
l
l
o
F
A
l
D
'
a
I
p
N
r
i
c
a
n
c
e
GASPO 252 FUNCTIONING
12
11
10
9
8
I
l
l
o
1
2
3
4
567
12
1
11
2
10
9
3
8
4
5
7
6
Lowering the post:
- Insert the shaped spanner into the lock under the post cover.
- To unlock the post, turn the spanner anticlockwise and lower the post completely
- When the post is completely lowered, to lock the post in down position and be allowed to
remove the spanner, turn it clockwise
the gate opener
made in Italy
GB
Drwg. No. 6450
Resetting the post: carry out the previous operations backwards: insert the spanner, turn it
anticlockwise to unlock and lift the post, then turn it clockwise to lock the post and be allowed
to remove the spanner.
INSTALLATION AND FUNCTIONING
OF THE HAND-OPERATED POST GASPO 252
meccanica
F
FADINI