Erbe EIP 2 Service Manual

Page 1
2018-0780116-261
SERVICE MANUAL
EIP 2
V 1.0.x V 1.1.x
ELECTROSURGERY
Page 2
Page 3
SERVICE MANUAL
Page 4
Registered trademarks of Erbe Elektromedizin GmbH: AUTO CUT®, AXUS®, BICISION®, BiClamp®, classicCOAG®, classic­CUT®, CLEVERCAP®, DeCo®, dryCUT®, endoCUT®, endoCOAG®, ERBE®, erbe power your performance.®, ERBECRYO®, ERBEFLO
®
, ERBEFLO AeroRinse®, ERBEJET®, ERBELift®, ERBOKRYO®, FIAPC®, forcedCOAG®, Hybrid knife®,
HybridKnife
®
, ICC 200®, ICC 80®, KYRON®, NESSY®, NESSY Ω®, PLURA®, preciseAPC®, Preflow®, pulsedAPC®,
ReMode
®
, REMODE®, softCOAG®, sprayCOAG®, swiftCOAG®, The Color Blue®, thermoSEAL®, twinCOAG®, VIO®.
Service Manual Art. No. 80116-261
All rights to this manual, in particular rights of duplication, dissemination and translation, are reserved. No part of this man­ual may be reproduced in any form (by photocopying, microfilming or other methods) or processed, duplicated or dissem­inated by the use of electronic systems without the written consent of Erbe Elektromedizin GmbH.
The information contained in this manual may be amended or supplemented without prior notice and represents no obli­gation on the part of Erbe Elektromedizin GmbH.
Printed by Erbe Elektromedizin
Printed in Germany
Copyright © Erbe Elektromedizin GmbH, Tübingen 2018
Page 5
5 / 56
Table of Contents
80116-261
2018-07
Table of Contents
1 Safety information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Classification of the safety information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Knowledge of the User Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Protection from the risk of electric shock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Electrostatically sensitive components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Liability and warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2 Modifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3 Unit description. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Unit variants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Factory setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Controls at the front. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Symbols. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Controls at the rear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Description of function . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
4 Technical Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
5 Installation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Installation possibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
6 Circuit Descriptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Block diagram EIP 2 (120 V / 230 V) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Block diagram EIP 2 (100 V). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Beschreibung der einzelnen Baugruppen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Line input . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Transformer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Bridge-connected rectifier. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Switching controller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Monitoring the motor control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Motor control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Microcontroller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
CAN module (optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Footswitch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Control panel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Motor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Page 6
Table of Contents
6 / 56
80116-261
2018-07
7 Service programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Calling up service program mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Navigating between service programs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Leaving the service program mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Description of service programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
Service program S1 Flow test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .26
Service program S2 LED Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27
Service program S3 Continuous running / Burn-In . . . . . . . . . . . . . . . . . . . .28
Service program S4 Version output . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29
Service program S5 Automatic pressure control. . . . . . . . . . . . . . . . . . . . . . .30
8 Remedying malfunctions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
9 Maintenance and servicing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Technical safety check, national regulations, trained persons . . . . . . . . . . . . . . 33
Test intervals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
Technical safety check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
Important information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .34
User manual and visual inspections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35
Tests to be conducted in accordance with the national specifications
and regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . .35
Performance tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .35
10 Replacing components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Change pump head . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Change gear motor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Change main board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
11 Spare parts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
EIP 2 without ECB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
EIP 2 with ECB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
Page 7
7 / 56
1 Safety information
80116-261
2018-07
CHAPTER 1
Safety information
Classification of the safety information
Knowledge of the User Manual
The User Manual for this unit constitutes an integral part of this Service Manual. For performing servicing activities it is assumed that the reader has knowledge of the User Manual, especially procedures for installation, putting into operation, and handling.
Protection from the risk of electric shock
WARNING! The WARNING! safety indication refers to a risk of personal injury.
CAUTION! The CAUTION! safety indication refers to a risk of damage to property.
ATTENTION! The ATTENTION! safety indication refers to a risk which can cause
equipment to become unserviceable.
IMPORTANT! The IMPORTANT! designation indicates application information and
other particularly important information.
WARNING! The supply voltage must match the voltage specified on the rating
plate. Connect the unit / the equipment cart to a properly installed grounded outlet. Only use the Erbe power cord or an equivalent power cord for this purpose. The power cord must bear the national test sym
-
bol.
For safety reasons, multiple outlets and extension cords should not be used. If their use is unavoidable, they also must be provided with proper grounding.
WARNING! Unplug the power cord from the outlet before exchanging parts of the
unit or cleaning it.
WARNING! Do not plug a wet power cord into the unit or into an outlet.
Page 8
1 Safety information
8 / 56
80116-261
2018-07
Electrostatically sensitive components
Liability and warranty
WARNING! Do not touch any unprotected wires or conductive surfaces while the
unit is opened and under voltage.
WARNING! Blown line fuses may only be replaced by a competent technician. Only
replacement fuses of the rating specified on the unit's name plate may be used. Before resuming operation the unit must be subjected to a performance test by a competent technician.
CAUTION! This unit contains electrostatically sensitive components. Work at an
anti-static workplace while repairing the unit. Wear a grounding arm
­band while working with electrostatically sensitive components. Hold the circuit boards by their non-conducting corners. Use an anti-static container for transporting electrostatically sensitive components and the circuit boards.
ATTENTION! Adjustments, tests, modifications, maintenance and repair work may
only be performed by Erbe or persons trained by Erbe. If the work is not performed by trained persons, Erbe accepts no liability and warranty rights become void.
It is recommended that the technical safety check also be performed by Erbe or persons trained by Erbe.
ATTENTION! Only use original Erbe spare parts. The manufacturer accepts no liability
and the warranty rights becomes void if original spare parts are not used.
Page 9
9 / 56
2 Modifications
80116-261
2018-07
CHAPTER 2
Modifications
From V 1.1.x
Hardware
No changes
Software
Component affected Description of the modification
Service programs New Service program:
S 5 Automatic pressure control
Page 10
2 Modifications
10 / 56
80116-261
2018-07
Page 11
11 / 56
3 Unit description
80116-261
2018-07
CHAPTER 3
Unit description
Unit variants
The EIP 2 (Erbe Irrigation Pump) is available in the following unit variants:
230 V with ECB socket
1
230 V without ECB socket
120 V without ECB socket
100 V with ECB socket
100 V without ECB socket
Factory setting
The EIP 2 has the following settings when it is delivered by the manufac­turer:
Quick activation button I = 30%
2
Quick activation button II = 50%
Quick activation button III = 80%
Automatic pressure control activated
for units up to software version 1.0.0
Automatic pressure control deactivated (for units from software version 1.1.0)
1. ECB = Erbe Communication Bus for connecting the EIP 2 to a VIO electrosurgical unit.
2. Flow in % relative to the maximum flow of 500 ml/min.
IMPORTANT! Once settings have been changed and saved they still apply even after
the unit has been restarted. A reset (= switching the unit back to the factory setting) is not possible.
Page 12
3 Unit description
12 / 56
80116-261
2018-07
Controls
Controls at the front
Fig. 3-1
IMPORTANT! This chapter contains an overview of the controls of the unit(s). The rel-
evant User Manual for the unit(s), knowledge of which is assumed for servicing work, provides detailed information about how to use the unit(s).
1
2
3
4
5
6
7
8
9
1 Power switch
2 Quick activation button I (30 % of capacity1 / approx. 150 ml/min)
3 Quick activation button II (50 % of capacity / approx. 250 ml/min)
4 Quick activation button III (80 % of capacity / approx. 400 ml/min)
5 Flow display
6 Up / Down buttons
7 Activation button
8 Pump head lid
9 Direction arrow for irrigation liquid
1. Flow in % relative to the maximum flow of 500 ml/min.
Page 13
13 / 56
3 Unit description
80116-261
2018-07
Symbols
Read User Manual.
The unit meets the requirements of Type CF and is protected against the effects of a defibrillator discharge.
Never place your fingers in the pump head.
Controls at the rear
Fig. 3-2
1
2
3
4
5
1 Optional ECB socket (ECB = Erbe Communication Bus) for connecting
the EIP
2 to a VIO electrosurgical unit
2 Footswitch socket
3 Potential equalization
4 Power connection
5 Power fuse
Page 14
3 Unit description
14 / 56
80116-261
2018-07
Description of function
Peristaltic pump principle The EIP 2 (Erbe Irrigation Pump) is a peristaltic pump. This operating prin-
ciple is based on pressing or squeezing a flexible pump hose at one or more points and on movement of the squeezed point in the desired direc
­tion of liquid flow. For this reason peristaltic pumps are sometimes re­ferred to as peristaltic squeeze pumps. Movement of the squeezed point is accomplished with the aid of a pump rotor that has rollers around its pe
­rimeter. Flow is determined by rotor speed (speed of motion of the squeezed point) and internal cross-section of the hose.
Advantages of peristaltic pumps With peristaltic pumps the medium and the pump do not come into contact
with one another. Therefore peristaltic pumps are particularly suited for metering a very wide range of media. As opposed to other types of pump like diaphragm pumps, with peristaltic pumps it is very easy to adapt the material of the pump hose, or components coming into contact with the medium, to the product being pumped. A pump hose is selected and used that is chemically suited for the product being pumped ("milled hose").
Page 15
15 / 56
4 Technical Data
80116-261
2018-07
CHAPTER 4
Technical Data
Power supply for devices with 230 V
Nominal line voltage Line current Power fuse Nominal line frequency
230 V ± 10% 200 mA T 0.2 A 50 / 60 Hz
Power input in Standby Mode 5 W
Power input at max. irrigation flow 20 W
Potential equalization terminal Yes
Power supply for devices with 120 V
Nominal line voltage Line current Power fuse Nominal line frequency
120 V ± 10% 400 mA T 0.4 A 50 / 60 Hz
Power input in Standby Mode 3 W
Power input at max. irrigation flow 20 W
Potential equalization terminal Yes
Power supply for devices with 100 V
Nominal line voltage Line current Power fuse Nominal line frequency
100 V ± 10 % 315 mA T 0.315 A 50 / 60 Hz
Power input in Standby Mode 3 W
Power input at max. irrigation flow 20 W
Potential equalization terminal Yes
Operating mode
Continuous duty Yes
Page 16
4 Technical Data
16 / 56
80116-261
2018-07
Dimensions and weight
Width x height x depth 205 x 125 x 170 mm (without pump head)
Width x height x depth 205 x 125 x 210 mm (with pump head)
Weight 3 kg
Ambient conditions for transport and storage of unit
Te mp er a tu r e -40 °C to + 70 °C
Relative humidity 10% – 95%
Ambient conditions for operation of unit
Te mp er a tu r e +10 °C to + 40 °C
Relative humidity 15% – 80%, noncondensing
Acclimatizing
If the unit has been stored or transported at temperatures below +10 °C or above +40 °C, the unit will require approx. 3
hours to acclimatize at room temperature.
Standards
Classification according to EC Directive 93/42/EEC II a
Protection class as per EN 60 601-1 I
Type as per EN 60 601-1 CF
Page 17
17 / 56
5 Installation
80116-261
2018-07
CHAPTER 5
Installation
Installation possibilities
For EIP 2 (Erbe Irrigation Pump) there are three installation possibilities:
Installation on an Erbe VIO Cart.
Installation on an Erbe Universal Cart.
EIP 2 as a stand alone variant.
These installation possibilities are described in the User Manual for the EIP
2 and the User Manuals for the above equipment carts.
Page 18
5 Installation
18 / 56
80116-261
2018-07
Page 19
19 / 56
6 Circuit Descriptions
80116-261
2018-07
CHAPTER 6
Circuit Descriptions
Page 20
6 Circuit Descriptions
20 / 56
80116-261
2018-07
Block diagram EIP 2 (120 V / 230 V)
Fig. 6-1
M
AC
DC
DC
DC
Line input
Transformer
Bridge-
connected
Switching
Mainboard
Microcontroller
Motor
Control panel
Monitoring
the
motor
control
Motor
control
(PWM)
CAN module
(optional)
120 V
230 V
ECB 1
ECB 2
2 x 9 V
1.33 A
24 V
24 V
5 V
ECB Erbe Communication Bus
U-Motor
U-Motor
I-Motor
5 V
rectifier
controller
Page 21
21 / 56
6 Circuit Descriptions
80116-261
2018-07
Block diagram EIP 2 (100 V)
Fig. 6-2
M
AC
DC
DC
DC
Line input
Transformer
Bridge
connected
Switching
Mainboard
Microcontroller
Motor
Control panel
Monitoring
the
motor
control
Motor
control
(PWM)
CAN module
(optional)
100 V
ECB 1
ECB 2
2 x 12 V
1.25 A
24 V
24 V
5 V
ECB Erbe Communication Bus
U-Motor
U-Motor
I-Motor
5 V
rectifier
controller
Page 22
6 Circuit Descriptions
22 / 56
80116-261
2018-07
Description of the various assemblies
Line input
The EIP 2 can be operated on line voltages of 230 V, 120 V, or 100 V. First of all the appropriate figure must be set, ±10
%, in the window of the volt-
age selector switch on the main board.
Tra ns form er
The transformer converts the line voltage input from 230 V ±10 % or 120
V ±10 % to 2 x 9 V. The maximum available current is 1.33 A.
For operation of the EIP 2 at a line voltage of 100 V ±10 % a different type of transformer must be used. That transformer converts the line voltage input to 2 x 12
V um. The maximum available current is 1.25 A.
Bridge-connected rectifier
The bridge-connected rectifier provides the operating voltage of 24 V.
Switching controller
The switching controller provides an operating voltage of 5 V.
Monitoring the motor control
This circuit is designed to prevent a faulty motor control from leading to uncontrolled pump activity. The operating voltage of 24
V is only supplied to the motor control if the microcontroller releases it by actuating the monitoring circuit accordingly.
Motor control
The motor control is regulated by the microcontroller via a PWM signal at a level of 5
V. The output voltage of the motor control is increased to a
maximum of 24
V depending on the PWM signal.
CAUTION! An incorrect setting can cause damage to the unit.
Page 23
23 / 56
6 Circuit Descriptions
80116-261
2018-07
Microcontroller
The Type PIC18F258 microcontroller handles several tasks:
Evaluation of current and voltage measurements of motor monitoring
Adjustment of motor control to the current and voltage levels via a
PWM signal
Checking of any activations by pushbutton or footswitch
Updating of display on the control panel
Communication via a CAN interface with the VIO electrosurgical unit
(only on units with ECB socket, ECB = Erbe Communication Bus).
CAN module (optional)
The CAN module enables communication between EIP 2 and the VIO elec­trosurgical unit.
Footswitch
The pump can be activated with the EIP 2 footswitch.
Control panel
The control panel makes it possible for the user to perform settings on the EIP
2.
Three so-called quick activation buttons enable direct adjustment of the setting, which is otherwise performed using the Up and Down buttons. The pump can be started with the activation button.
The display section on the control panel is comprised of three 7-segment displays, which are updated constantly by the microcontroller.
Motor
The motor is a DC motor with a nominal voltage of 24 V and a nominal cur­rent of 1.1 A.
The motor has a flanged gear unit, via which the pump head is driven.
Page 24
6 Circuit Descriptions
24 / 56
80116-261
2018-07
Page 25
25 / 56
7 Service programs
80116-261
2018-07
CHAPTER 7
Service programs
Calling up service program mode
When switching on the unit hold down the up / down buttons.
On units with an ECB socket (ECB = Erbe Communication Bus) the service programs can be called up either by pressing the above button combina
-
tion or via CAN-ID.
Navigating between service programs
As soon as the unit is in service program mode, you can toggle between the various service programs S1 – S5 using the up / down buttons.
Leaving the service program mode
Hold down the up / down buttons until the display shows .
The unit performs a program reset and starts up again in operating mode.
Page 26
7 Service programs
26 / 56
80116-261
2018-07
Description of service programs
Service program S1 Flow test
Description
The S1 service program is used to check the flow of irrigation liquid over a period of 1
minute at a flow setting of 100 %.
If the service program ends successfully, the message "CS1" (Complete Service Program
1) is output on the display. If a fault occurs during execu-
tion, the message "ES1" (Error Service Program 1) is displayed.
Both messages can be canceled by pressing the activation button.
If a fault occurs during execution, its cause can be localized in operating mode. To do this, abort the service program. The unit then automatically switches to operating mode and the display shows an error message.
Run time
1 minute.
Set value
Fixed at 100 %.
To activate the service program
Press the activation button.
To abort the service program
Press quick activation button III.
Page 27
27 / 56
7 Service programs
80116-261
2018-07
Service program S2 LED Test
Description
Service program S2 is used to check correct operation of all the LEDs on the control panel.
Run time
Not limited.
Set value
Not applicable.
To activate the service program
Press the activation button.
To abort the service program
Press quick activation button III.
Page 28
7 Service programs
28 / 56
80116-261
2018-07
Service program S3 Continuous running / Burn-In
Description
Service program S3 checks whether EIP 2 can withstand a substantial con­tinuous load.
If the service program ends successfully, the message "CS3" (Complete Service Program
3) is output on the display. If a fault occurs during execu-
tion, the message "ES3" (Error Service Program 3) appears.
Both messages can be canceled by pressing the activation button.
If a fault occurs during execution, its cause can be localized in operating mode. To do this, abort the service program. The unit then automatically switches to operating mode and the display shows an error message.
Run time
10 minutes.
Set value
Fixed at 80 %.
To activate the service program
Press the activation button.
To abort the service program
Press quick activation button III.
Page 29
29 / 56
7 Service programs
80116-261
2018-07
Service program S4 Version output
Description
Service program S4 indicates the software version of EIP 2.
Run time
Not limited.
Set value
Not applicable.
To activate the service program
Press the activation button.
To abort the service program
Press quick activation button III.
Page 30
7 Service programs
30 / 56
80116-261
2018-07
Service program S5 Automatic pressure control
Availability
From software version 1.1.0.
Description
The automatic pressure control of the EIP 2 can be activated and deacti­vated with service program S5.
Run time
Not limited.
Set value
When service program S5 is activated, a selection can be made between the following settings with the up / down buttons:
Display S50: Automatic pressure control deactivated.
Display S51: Automatic pressure control activated.
The internal EEPROM of the PIC18 automatically saves the setting select­ed.
To activate the service program
Press the activation button.
To abort the service program
Press quick activation button III.
Page 31
31 / 56
8 Remedying malfunctions
80116-261
2018-07
CHAPTER 8
Remedying malfunctions
WARNING! Unplug the power cord from the outlet before exchanging parts of the
unit or cleaning it.
ATTENTION! Adjustments, technical tests, modifications, maintenance and repair
work may only be performed by Erbe or persons trained by Erbe. If the work is not performed by trained persons, Erbe accepts no liability and warranty rights become void.
Error Possible cause Remedy
The set value flashes and the pump is deactivated.
Time out error. The activation time of t < 20
s was exceeded.
Terminate present activation. Then re-activate the pump.
The pump lid symbol (- n -) flashes and the pump cannot be activated or the already activated pump is deactivated.
The pump lid was not closed before activation of the pump.
Close pump lid.
The pump lid was opened with the pump activated.
Close pump lid.
Display E 1 Motor control faulty. Change main board,
see page 44.
Display E 2 Motor current exceeds the per-
missible limit. Pump head faulty or damaged.
Check pump head to make sure it is fitted properly.
Change pump head if it is faulty, see page 37.
Motor current exceeds the per­missible limit. Gear motor faulty or damaged.
Change gear motor, see page 39.
Display E 3 No measurable current flow. The
connection between the gear motor and the main board was interrupted.
Restore connection between gear motor and main board.
No measurable current flow. Gear motor faulty.
Change gear motor, see page 39.
No measurable current flow. Cur­rent measurement gain has failed.
Change main board, see page 44.
Display E 4 Monitoring circuit of motor con-
trol faulty.
Change main board, see page 44.
Page 32
8 Remedying malfunctions
32 / 56
80116-261
2018-07
Display E 5 CRC Check faulty. Due to various
influences such as ageing or radi
­ation the memory of the PIC may be altered.
Change main board, see page 44.
Display L 1 A quick activation button was
programmed with flow that is too low or too high.
Observe programming rules for quick activation buttons:
Flow on button < flow on but­ton Flow on button < flow on but­ton
Error Possible cause Remedy
Page 33
33 / 56
9 Maintenance and servicing
80116-261
2018-07
CHAPTER 9
Maintenance and servicing
Technical safety check, national regulations, trained persons
Test intervals
ATTENTION! Adjustments, tests, modifications, maintenance and repair work may
only be performed by Erbe or persons trained by Erbe. If the work is not performed by trained persons, Erbe accepts no liability and warranty rights become void.
It is recommended that the technical safety check also be performed by Erbe or persons trained by Erbe.
IMPORTANT! The safety check is a preventive measure in which there is examined
whether the equipment is safe and ready for operation. In order to per
­form the tests the relevant specifications and regulations of the partic­ular country must be observed.
IMPORTANT! A technical safety check must be performed every time after mainte-
nance, but at least once per year.
Page 34
9 Maintenance and servicing
34 / 56
80116-261
2018-07
Technical safety check
For simplification the device to be tested is referred to below as the "test specimen".
Important information
WARNING! For safety reasons (personnel protection) the test specimen should
generally be operated by a suitable isolating transformer.
An exceptional case is the tests for grounded conductor resistance, ground leakage current, and patient leakage current, in which the test specimen is supplied with current via the safety tester.
ATTENTION! In the event of a fault occurring in the test specimen or individual com-
ponents during the technical safety check the test steps taken so far no longer apply.
Remedy the defect and repeat the technical safety check from the beginning.
IMPORTANT! It is assumed that the user knows how to operate the test specimen,
the test equipment, the measuring equipment, and auxiliary test equip
­ment. The test instructions only apply in conjunction with the relevant test steps.
IMPORTANT! Test equipment, measuring equipment, and auxiliary test equipment
(cables, test boxes, etc.) are listed separately at the beginning of each test unit. Where Erbe article numbers are specified, only original Erbe test equipment, measuring equipment, and auxiliary test equipment may be used.
IMPORTANT! The test report for the technical safety check can be requested from
Erbe Technical Service Tübingen. For the address see address sheet on last page.
Page 35
35 / 56
9 Maintenance and servicing
80116-261
2018-07
User manual and visual inspections
Test specimen and accessories (where enclosed) undamaged exter­nally.
User manual present.
All labels on the test specimen (conformity declaration mark, rating
plate, and all wording) present and readily legible.
Tests to be conducted in accordance with the national specifications and regulations
Grounded conductor test Ground terminal to chassis.
Ground terminal to potential equalization pin.
Leakage current
measurement
Ground leakage current, normal condition (N.C.).
Ground leakage current, single-fault condition (S.F.C.).
Patient leakage current, normal condition (N.C.).
Patient leakage current, single-fault condition (S.F.C.).
Performance tests
Testing tools
Test setup
The test specimen is connected to the power supply via the power cord.
Test procedure
Power switch 1. Check power switch for smooth operation. The power switch must be
easy to operate and must neither stick nor scrape.
2. Press power switch. The power switch must snap into the "ON" posi-
tion and the test specimen must perform a system start.
Control buttons 1. Check all the buttons on the control panel to make sure they are
operating properly. Press each button at least twice.
Erbe
Art.-No.
Designation
20325-000 Footswitch for EIP 2
20325-001 Tubing set Erbe EIP 2 (100 V, 2 3 0 V)
Page 36
9 Maintenance and servicing
36 / 56
80116-261
2018-07
7-segment displays and LEDs 1. Start test specimen in service program mode and select service pro-
gram S2.
2. Test 7-s eg men t d is pla y s: All the segments on the three 7-segment displays should be an equally bright green color.
3. Test LED s: The border of the activation button should be backlit in yellow.
Deactivation when opening the
pump head / head sensor
1. Test st ep 1 : Select 80 % flow on the test specimen. Hold down the activation button and the pump motor will start up. Open the pump head lid, keeping the activation button pressed. The pump motor should stop.
2. Test st ep 2 : With the pump lid open, activate the test specimen using the activation button. The pump motor must not start up and on the display a symbol similar to an "n" (= pump lid symbol) should flash.
3. Test st ep 3 : Connect up footswitch. Repeat test step 1, now activating the test specimen with the footswitch.
4. Test st ep 4: Repeat test step 2, now activating the test specimen with the footswitch.
Automatic shutdown in the
event of continuous activation
1. Test st ep 1 : Select 80 % flow on the test specimen and activate the pump motor using the activation button. Activation should stop within a time window of 18 s to 22 s.
2. Test st ep 2 : Connect up footswitch. Repeat test step 1, now activating the test specimen with the footswitch. Activation should stop within a time window of 18 s to 22 s.
Check the automatic
pressure control
IMPORTANT! For units from software version 1.1.0 onwards, the automat-
ic pressure control can be optionally activated or deactivated (see service program S5). For this test, the automatic pressure control must be activat
-
ed.
1. Insert tube and fill with irrigation liquid (water).
2. To simulate a blockage, clamp the tube at the distal end.
3. Set pump flow to 100 %.
4. Activate pump motor using activation button (or footswitch) and keep it activated. The test specicmen should reduce flow very audibly.
5. Undo the clamp on the tube. The test specicmen should increase flow very audibly back to set pump flow.
6. Terminate activation.
Page 37
37 / 56
10 Replacing components
80116-261
2018-07
CHAPTER 10
Replacing components
Change pump head
Tools Phillips screwdriver PH 1
Remove pump head
1. Open pump head lid completely.
2. Undo screws (2).
3. Withdraw pump head toward the front.
WARNING! Unplug the power cord from the outlet before exchanging parts of the
unit or cleaning it.
ATTENTION! Adjustments, technical tests, modifications, maintenance and repair
work may only be performed by Erbe or persons trained by Erbe. If the work is not performed by trained persons, Erbe accepts no liability and warranty rights become void.
IMPORTANT! Only use original replacement parts.
1
2
2
3
Page 38
10 Replacing components
38 / 56
80116-261
2018-07
Fit new pump head
4. Fit new pump head in reverse order.
Page 39
39 / 56
10 Replacing components
80116-261
2018-07
Change gear motor
Tools Phillips screwdriver PH 1 (short and long)
Phillips screwdriver PH 2
Box wrench size 7
Remove pump head
1. Open pump head lid completely.
2. Undo screws (2).
3. Withdraw pump head toward the front.
WARNING! Unplug the power cord from the outlet before exchanging parts of the
unit or cleaning it.
ATTENTION! Adjustments, technical tests, modifications, maintenance and repair
work may only be performed by Erbe or persons trained by Erbe. If the work is not performed by trained persons, Erbe accepts no liability and warranty rights become void.
IMPORTANT! Only use original replacement parts.
1
2
2
3
Page 40
10 Replacing components
40 / 56
80116-261
2018-07
Remove housing cover
4. Undo screws in the sub-base (2).
5. Undo screws in the rear panel (3).
6. Remove housing cover carefully, first upward and then to the rear.
4
5
6
4
5
5
Page 41
41 / 56
10 Replacing components
80116-261
2018-07
Remove front frame
7. Undo screws in the frame (2).
8. Loosen nut (1) in the housing bottom. The nut can be removed com­pletely but does not have to be.
9. Pull away front frame toward the front as permitted by the display connector (not illustrated).
8
9
7
7
Page 42
10 Replacing components
42 / 56
80116-261
2018-07
10. Remove connectors J34, J35, and J10 from the main board and remove the front frame completely toward the front.
J10
J32
J36
J31
J34
J35
J31
Page 43
43 / 56
10 Replacing components
80116-261
2018-07
Change gear motor
11. Undo screws on the gear motor (4) and remove the gear motor to the rear.
12. Fit a new gear motor in reverse order.
13. Fit front frame in reverse order.
14. Close housing cover.
11
ATTENTION! Check line voltage setting
The EIP 2 can be operated on a line voltage of 230 V, 120 V, or 100 V. Therefore, every time the unit is opened always check afterwards whether the correct line voltage ±10
% is set on the line voltage selec-
tor switch on the main board.
Page 44
10 Replacing components
44 / 56
80116-261
2018-07
Change main board
Tools Phillips screwdriver PH 1 (short and long)
Phillips screwdriver PH 2
Box wrench size 7
Remove housing cover see page 40.
Remove front frame see page 41.
Change main board
1. Remove connectors J32 and J36 from main board.
2. Only units with ECB socket ( ECB = Erbe Communication Bus) also remove connector J31 from main board.
WARNING! Unplug the power cord from the outlet before exchanging parts of the
unit or cleaning it.
ATTENTION! Adjustments, technical tests, modifications, maintenance and repair
work may only be performed by Erbe or persons trained by Erbe. If the work is not performed by trained persons, Erbe accepts no liability and warranty rights become void.
IMPORTANT! Only use original replacement parts.
J10
J32
J36
J31
J34
J35
J31
Page 45
45 / 56
10 Replacing components
80116-261
2018-07
3. Undo nuts (4) and withdraw main board carefully.
4. Fit new main board in reverse order.
5. Fit front frame in reverse order.
6. Close housing cover.
3
3
3
3
ATTENTION! Check line voltage setting
The EIP 2 can be operated on a line voltage of 230 V, 120 V, or 100 V. Therefore, every time the unit is opened always check afterwards whether the correct line voltage ±10
% is set on the line voltage selec-
tor switch on the main board.
Page 46
10 Replacing components
46 / 56
80116-261
2018-07
Page 47
47 / 56
11 Spare parts
80116-261
2018-07
CHAPTER 11
Spare parts
Abbreviations
ECB = Erbe Communication Bus
Page 48
11 Spare parts
48 / 56
80116-261
2018-07
EIP 2 without ECB
Fig. 11-1
55603-018 (4)
51611-101 (230/120/100 V
~) (1)
30325-800 (230 V~) (1)
30325-804 (100 V~) (1)
30325-800 (120 V~) (1)
55100-003 (1)
55207-003 (1)
230 V
~: 51611-055 (2)
120 V~: 51611-102 (2)
100 V~: 51611-060/T 0.4 A (2)
51611-058/T 0.315 A (2)
55002-016 (2)
51604-102 (1)
51400-012 (1)
51601-056 (1)
51500-064 (1)
51500-023 (1)
55100-001 (1)
55200-001 (1)
55207-000 (1)
51501-099 (1)
30325-020 (1)
51501-224 (4)
40140-075 (1)
Page 49
49 / 56
11 Spare parts
80116-261
2018-07
Fig. 11-2
51501-225 (2)
55022-000 (3)
30325-021 (1)
51511-063 (2)
55105-000 (1)
55000-116 (2)
55000-116 (2)
Page 50
11 Spare parts
50 / 56
80116-261
2018-07
Fig. 11-3
55603-018 (5)
30325-007 (1)
40325-006 (1)
30325-801 (1)
55603-035 (5)
40325-009 (1)
80310-063 (1)
55000-121 (4)
55603-070 (4)
40325-001 (1)
30325-802 (1)
55021-108 (1)
55000-114 (2)
40325-011 (1)
55000-115 (4)
40325-021 (1)
Page 51
51 / 56
11 Spare parts
80116-261
2018-07
Fig. 11-4
J31
J10
J36
J35
J34
J32
30325-000 (1)
30325-002 (1)
30325-017 (1)
Page 52
11 Spare parts
52 / 56
80116-261
2018-07
EIP 2 with ECB
Fig. 11-5
55603-018 (4)
51611-079 (230/120/100 V
~) (1)
30325-800 (230 V~) (1)
30325-804 (100 V~) (1)
30325-800 (120 V~) (1)
230 V~: 51611-055 (2)
120 V~: 51611-102 (2)
100 V~: 51611-060/T 0.4 A (2)
51611-058/T 0.315 A (2)
55100-003 (1)
55207-003 (1)
55002-016 (2)
51604-102 (1)
51400-012 (1)
51601-056 (1)
51500-064 (1)
51500-023 (1)
40140-075 (1)
30325-803 (1)
30325-019 (1)
51501-224 (4)
55100-001 (1)
55200-001 (1)
55207-000 (1)
51501-099 (1)
Page 53
53 / 56
11 Spare parts
80116-261
2018-07
Fig. 11-6
51501-225 (2)
55022-000 (3)
30325-021 (1)
51511-063 (2)
55105-000 (1)
55000-116 (2)
55000-116
Page 54
11 Spare parts
54 / 56
80116-261
2018-07
Fig. 11-7
55603-018 (5)
30325-007 (1)
40325-006 (1)
30325-801 (1)
55603-035 (5)
40325-009 (1)
80310-063 (1)
55000-121 (4)
55603-070 (4)
40325-001 (1)
30325-802 (1)
55021-108 (1)
55000-114 (2)
40325-011 (1)
55000-115 (4)
40325-021 (1)
Page 55
55 / 56
11 Spare parts
80116-261
2018-07
Fig. 11-8
J31
J10
J31
30134-024 (1)
30325-017 (1)
30325-000 (1)
30325-002 (1)
J36
J35
J34
J32
Page 56
11 Spare parts
56 / 56
80116-261
2018-07
Loading...