Milestone AV Technologies and its affiliated corporations and
subsidiaries (collectively "Milestone"), intend to make this
manual accurate and complete. However, Milestone makes no
claim that the information contained herein covers all details,
conditions or variations, nor does it provide for every possible
contingency in connection with the installation or use of this
product. The information contained in this document is subject
to change without notice or obligation of any kind. Milestone
makes no representation of warranty, expressed or implied,
regarding the in formation cont ai ned her ein. Mil estone assu mes
no responsibility for accuracy, completeness or sufficiency of
the information contained in this document.
IMPORTANT SAFETY INSTRUCTIONS
WARNING: A WARNING alerts you to the possibility of
serious injury or death if you do not follow the inst ructions.
CAUTION: A CAUTION alerts you to the possibility of
damage or destruction of equipment if you do not follow the
corresponding instructions.
WARNING: Failure to read, thoroughly understand, and
follow all instructions can result in serious personal injury,
damage to equipment, or voidi ng of f actory wa rrant y! It i s the
installer’s responsibility to make sure all components are
properly assembl ed and installed using the instructions
provided.
WARNING: Use this mounting system only for its intended
use as described in these instructions. Do not use
attachments not recommended by the manufacturer.
WARNING: Never operate this mounting system if it is
damaged. Return the mounting system to a servi ce cen ter fo r
examination and repair.
WARNING: Do not use this product outdoors.
IMPORTANT ! : The AN2 Series includes the AN2 87" and
100" mounts. These mounts are designed to be used ONLY
with the following Epson projector models:
•BrightLink Pro 1430Wi
•BrightLink Pro 1420Wi
•BrightLink 595Wi
•BrightLink 585Wi
IMPORTANT ! :
mounted to
•a bare 8" concrete or 8"x8"x16" concrete block wall;
•a 2" x 4" wo od stud s (16" on center mi nimu m to 24" o n
center maximum) wall with a minimum drywall
thickness of 1/2" (12.7mm);
•a 2" x 4"-25ga minimum steel studs (16" on center
minimum to 24" on center maximum) wall with a
minimum drywall thickness of 1/2" (12.7mm).
The AN2 Series systems are designed to be
:
--SAVE THESE INSTRUCTIONS--
WARNING: Failure to provide adequat e structural strength
for this component can result in serious personal injury or
damage to equipment! It is the installer’s responsibility to
make sure the structure to which this component is attached
can support five t imes t he combi ned wei ght of al l eq uip ment.
Reinforce the structure as required before installing the
component. The wall to which the mount is being attached
may have a minimum drywall th ickness of 1/2" (12.7mm) for
wood and steel stu d wa lls, and NO drywall on co ncr ete walls.
2
Page 3
Installation InstructionsAN2 Series
DIMENSIONS
AN2-87
DIMENSIONS: INCHES
[MILLI METERS]
AN2-100
DIMENSIONS: INCHES
[MILLIMETERS]
3
Page 4
AN2 SeriesInstallation Instructions
LEGEND
Tighten Fastener
Apretar elemento de fijación
Befestigungsteil festziehen
Apertar fixador
Serrare il fissaggio
Bevestiging vastdraaien
Serrez les fixations
Loosen Fastener
Aflojar elemento de fijación
Befestigungsteil lösen
Desapertar fixador
Allentare il fissaggio
Bevestiging losdraaien
Desserrez les fixations
Phillips S cr ewdriver
Destornil lador Phillips
Kreuzschlitzschraubendreher
Chave de fendas Phillips
Cacciavite a stella
Kruiskopschroevendraaier
Tournevis à pointe cruciforme
Pencil Mark
Marcar con lápiz
Stiftmarkierung
Marcar com lápis
Segno a matita
Potloodmerkteken
Marquage au crayon
Drill Hole
Perforar
Bohrloch
Fazer furo
Praticare un foro
Gat boren
Percez un trou
Opcional
Optional
Opcional
Opzionale
Optie
En option
Security Wrench
Llave de seguridad
Sicherheitsschlüssel
Chave de segurança
Chiave di sicurezza
Veiligheidssleutel
Clé de sécurité
4
Page 5
Installation InstructionsAN2 Series
TOOLS REQUIRED FOR INSTALLATION
PARTS
1/8" (wood)
1/2" (drywall)
8mm (concrete)
6mm (concrete - AF6 toggler)
9200-003827
A (1)
[Upper wall
bracket]
E (1)
[Valence]
N (1)
M (4)
10-24 x 3/8"
[Boom spacer]
3/8"
7/16"
B (1)
[Wall hanging
bracket]
F (4)
1/4-20 x 1-3/4"
P (1)
5/16"
#1, #2
G (4)
1/4"
H (4)
1/4-20 Snap toggle
Q (1)
5/16"
3/8"
7/16"
C (1)
[Left valence bracket]
QQ (2)
[Calibration marker
spacer]
D (1)
[Right valence
bracket]
J (4)
1/4 x 2-1/2"
K (4)
Hilti Hud-L #8 x 60
L (10)
10-24 x 1/4"
[includes 2
extra]
R (8)
[4" cable tie]
9200-003817
S (1)
[Boom projector mount]
V (4)
M4 x 12mm
HH (1)
[Marker kit]
GG (1)
[Whiteboard]
W (2)
M4 x 30mm
T (1)
[Projecto r interface]
U (1)
[Sensor cover]
X (4)
10-24 x 1-3/4"
JJ (5)
#8 x 1/2"
MM (5)
[Whiteboard bracket]
Y (1)
5/32"
KK (5)
Toggler AF6
9200-003805
NN (1)
[IR Cable]
Z (4)
#8-9 x 1-1/2"
CC (2)
#8 x 1/2"
LL (5)
#8 x 1-1/2"
AA (2)
3/16"
DD (2)
#4-24 x 1/4"
FF (1)
[Marke r tray]
BB (4)
Toggler AF6
EE (1)
[Control panel
assembly]
OUTSIDE
BOX
PP (4)
[Leveling feet]
5
Page 6
AN2 SeriesInstallation Instructions
INSTALLATION
Determining Location
2 3/4”
3
5
[70mm]
10 5/8”
[270mm]
2
2
CENTER OF SCREEN
1
1.Determine desired height of whiteboard (measured from
floor). (See Figure 1)
2.Determine desired center of whiteboard. (See Figure 1)
3.Measure 10-5/8 inches (270mm) up from desired height
(top) of whiteboard and 2-3/4 inches (69mm) to the right
of center of whiteboard and mark location. (See Figure 1)
NOTE: This pilot hole may be placed in drywall only, if
necessary.
4.Determine location of studs behind drywall.
5.Drill one pil ot hol e (see Tabl e 1 fo r s iz e) at lo cat ion mark ed
in Step 3 (See Figure 1) and follow fastener information
(appropriate for wall type) located in Table 1.
IMPORTANT ! : See Fastener Installation Methods at
end of Installation Instructions for details on installing
product into various wall types.
STUDS
Figure 1
Table 1: Fastener Information
WALL TYPEPILOT
HOLE
Drywall only(boom attach
only) /
Steel studs
Wood stud
Concrete
1/2"1/4-20 Toggler an chor kit (F,
1/8"1/4 x 2-1/2" hex head lag (J)
8mm x 80mm
(Only for
installing
whiteboard
bracket into
concrete)
6mm x 45mm
FLOOR
FASTENERS (see
PARTS drawing)
G, H)
- 1/4-20 x 1-3/4" Phillips
screw (F)
- 1/4" washer (G)
- 1/4-20 Snap toggler (H)
1/4" was her (G) - OPTIONAL
1/4 x 2-1/2" hex head lag (J)
Hilti Hud-L #8x60 anchor (K)
#8-9x1-1/2" Phillips screw (Z)
Toggler AF6 (BB) or (KK)
6
Page 7
Installation InstructionsAN2 Series
Installing Wall Bracket
1.Slide the ta bs on the upper w all br acket (A ) int o the sl ots o n
wall hanging bracket (B). (See Figure 2)
(view from front)
(A)
tabs
(B)
(B)
(A)
5.Tighten fastener against wall bracket. (See Figure 3)
6.Determine location of studs behind drywall, and mark a
minimum of two locations f or wall b racket attach men t over
studs. (See Figure 4)
NOTE: For wood or st eel stud walls, mark at least t wo locations
for attachmen t a minimum of 16" apart and a maximum
of 24" apart, AND within slots on wall bracket
assembly.
NOTE: For concrete walls, mark at least two locations for
attachment a minimum of 16" apart, AND within slots
on wall bracket assembly.
7.Drill one pilot hole (see Table 1 for size) at each location
marked in Step 5 (See Figure 4) and follow fastener
information (appropriate for wall type) located in Table 1.
6
7
tabs
(view from back)
Figure 2
2.Install one fastener (See Table 1) into previously drilled
hole, leaving 1/2" of fastener extending from wall. (See
Figure 3)
3.Hang wall bracket assembly onto fastener. (See Figure 3)
NOTE: Notch in wall bracket assembly indicates center of
whiteboard.
2
4
Notch indicates
center of screen
Fastener
3
8
Fasteners
(2 or 3)
Figure 4
NOTE: Proceed to Fastener Installation M ethods section at
end of Installation Instructions.
8.Fasten wall bracket assembly to wall using fasteners
appropriate to wall type (See Table 1). (See Figure 4)
Figure 3
4.Level wall bracket assembly.
7
Page 8
AN2 SeriesInstallation Instructions
Model AN2-100]
Installing Boom Projector Mount
IMPORTANT ! : The boom projector mount ships ready
to install for the AN2 87" model.
•AN2-87: Proceed to Step 6.
•AN2-100: Proceed to Steps 1 - 5 .
1.(AN2-100 Only) Support the projector mount from
underneath the boom arm while removing the four screws
and washers from bot tom of pro jector mount . (See Figur e 5)
Adjustable plate
5
87
mark
5
3
Plastic
spacer
[Remove for
5.(AN2-100 Only) Turn adjustment bolt to move projector
mount towards end of boom arm, until front of adjustable
plate lines up with "100" marking on boom arm. (See
Figure 5)
6.Hang boom projector mount (S) over bolt on wall bracket
assembly and loosely fasten (hand tighten) using boom
spacer (N), 5/16" washer (P) and 5/16" nut (Q). (See Figure 6)
7.Align four fastener holes along botto m of boom projector
mount behind four holes in wall bracket. (See Figure 6)
8.Install an d tighten f our 10-24 x 3/8" Phillips f lat he ad screws
(M) through wal l brack et as sembly i nto b oom projec tor arm
(S). (See Figure 6)
(S)
(N)
Bolt
100
mark
1
4
(X) x 4
NOTE: Be sure
that lock is
located on this
side of projector
mount.
Figure 5
2.(AN2-100 Only)Lower pr oject or mount and ha rdwar e from
underneath boom arm.
3.(AN2-100 Only) Remove and discar d plastic spacer. (See
Figure 5)
IMPORTANT ! : Make sure that lock on projector mount
is located on correct side of bo om arm. (See Figure 5)
IMPORTANT ! : Make sure that plastic glides on top of
boom arm haven’t shifted. Be sure to fasten Phillips
machine screws (W) through the plastic glides.
10
6
(Q)
(Q)
(P)
8
(M) x 4
Figure 6
9.Place level lengthwise on top of boom projector arm (S).
10. Level boom projector ar m (S) by loosen ing or t ight ening the
5/16" nut (Q) on the bolt from the wall bracket assembly.
(See Figure 6)
4.(AN2-100 Only) Replace long fasteners with four
10-24 x 1-3/4" Phillips machine screws (X), and refasten
projector mount to boom arm. (See Figure 5)
8
Page 9
Installation InstructionsAN2 Series
Installing Whiteboard and Sensor
IMPORTANT ! : Use at least two people when lifting and installing whiteboard. Handle the frame and back of
whiteboard, and avoid touching the front of whiteboard as much as possible.
1.Lay box flat and open.
2.Stand whiteboard up and add leveling feet (PP) to each corner on the back of whiteboard. Do not over tighten. (See Figure 7)
3.
Hang whiteboard (GG) onto wall bracket assembly using pre-installed bracket on back of whiteboard assembly. (See Figure 7)
(View shown from behind
wall to which wall bracket
assembly is attached)
Pre-installed
bracket
(GG)
(S)
2
(PP) x 4
3
3
5
Wall bracket
assembly
Figure 7
4.Center whiteboard assembly on wall bracket.
NOTE: Notch in wall bracket assembly indicates center of
whiteboard.
5.Level the whiteboard against the wall by placing a level
against the front of it, and adjusting the leveling feet. (See
Figure 7)
6.Continue to adjust until whiteboard is leveled with the wall.
7.Remove and keep one fastener from bottom of sensor.
NOTE: The sensor is i ncluded wit h the Epson projector, n ot the
AN2BA Series mount.
8.Remove and keep sensor cover. (See Figure 8)
9.Attach sensor to boom arm bracket using two M4 x 30mm
Phillips cap head screws (W). (See Figure 9)
NOTE: Insert the two Phillips scr ews into senso r. The magne ts
on the sensor will hold the sensor in place on the
bracket while fastening the screws.
8
Figure 8
9
(W) x 2
Figure 9
9
Page 10
AN2 SeriesInstallation Instructions
Installing Projector
1.Attach proj ector interface (T) to projector using four
M4 x 12mm Phillips cap head screws (V). (See Figure 10)
Latch
1
(V) x 4
(T)
Figure 10
NOTE: Make sure projector mount is in UNLOCKED position
and remove key from projector mount.(See Figure 11)
2.Lift project or with attached i nterface (T) and sl ide buttons on
interface into slots on boom projector mount (S). (See
Figure 11)
3.Slide latch t o LOCKED position to lock projector in place.
(See Figure 11)
4.Add and route cables following instructions included with
the projector.
NOTE: Do NOT place extra cable length behind the sensor
bracket.
Slot
(S)
(T)
Slot
LOCKED
Buttons
UNLOCKED
3
2
Figure 11
5.Place a level on top of the boom arm mount and level the
mount after the projector is installed. (See Figure 12)
5A. Tighten nut to increase boom arm angle.
5B. Loosen nut to decrease boom arm angle.
6.Place a level on top of interface (T) and level. (See Figure 12)
10
CAUTION: While leveli ng mo unt:
•Ensure nut is fully engaged onto bolt, and AT LEAST
ONE thread appears through nut.
•DO NOT over tighten nut! Over tightening WILL
damage wall behind mount.
5A
5A
5B
5B
Figure 12
Page 11
Installation InstructionsAN2 Series
Align Projector Image
Using remote control included with projector:
1.Select MENU
2.Select SETTINGS
3.Select PATTERN
4.Select TEST PATTERN
5.Use the test pattern projected o n the whi teb oard to roughly
align image to whiteboard, and make the necessary
projector adjustments following instructions included with
Epson projector and using the following adjustment
instructions for the mount.
IMPORTANT ! : The projected image should NEVER
project onto the whiteboard frame. An image overlapping
onto the whiteboard frame may prevent the projector
touch sensor from working properly.
Projector Adjustments
Roll Adjustment (Horizontal Tilt)
Adjust proje cto r so th at t he lef t an d r ight v ertical lines of the t est
pattern are parallel with each other and each side of
whiteboard.
1.Loosen ROLL adju stmen t lo cking scr ew us ing a #2 Phillips
screwdriver. (See Figure 13)
Yaw Adjustment (Rotation)
Adjust projector so that the top and bottom horizontal lines of
the test pattern are parallel with each other and with top and
bottom of whiteboard.
1.Loosen yaw adjustment locking screw using a #2 Phillips
screwdriver. (See Figure 14)
2.Turn yaw micro-adjustment screw right or left using a #2
Phillips scr ewdriver un til image is properly aligned on t arget.
3.Tighten yaw adjustment locking screw using a #2 Phillips
screwdriver. (See Figure 14)
1
3
2
2.Turn ROLL micro-adjustment screw right or left using a #2
Phillips scr ewdriver u ntil image i s properly aligned on t arget.
3.Tighten ROLL adjustment locking screw using a #2 Phi l lips
screwdriver.
3
1
2
2
2
Figure 14
Figure 13
11
Page 12
AN2 SeriesInstallation Instructions
Pitch Adjustment (Vertical Elevation)
Adjust projector so that the top and bottom horizontal lines of
the test pattern are parallel with each other and with top and
bottom of whiteboard.
1.Loosen pitch adjustment locking screw using a #2 Phillips
screwdriver. (See Figure 15)
2.Turn pitch micro-adjustment screw right or left using a #2
Phillips scr ewdriver u ntil image i s properly aligned on t arget.
3.Tighten pitch a djustment locking screw usi ng a #2 Phillips
screwdriver.
2
2
13
Figure 15
Micr o Adjustme nt
IMPORTANT ! : The projected image should NEVER
project onto the whiteboard frame. An image overlapping
onto the whiteboard frame may prevent the projector
touch sensor from working properly.
1.If required, turn the micro adjust fastener clockwise to
extend projector further from wall. (See Figure 16)
2.If required, turn the micro adjust fastener
counterclockwise to retract projector closer to wall.
1
2
Extend
Retract
Figure 16
Installing Control Pad
1.Open lower cover on control pad (included with projector).
(See Figure 17)
2.Insert control pad into control housing (EE) by sliding it up
under tabs inside housing. (See Figure 17)
Tabs
(EE)
2
Control
pad
1
12
Figure 17
Page 13
Installation InstructionsAN2 Series
25
3.Align holes in control pad with bosses in control housing
and push control pad into place. (See Figure 18)
4.Secure control pad into place using two #4-24 x 1/4" Phillips
pan head screws (DD). Do NOT over tighten. (See Figure 18)
5.Close lower cover of control pad. (See Figure 18)
6.Attach all cables, including IR cable (NN), to control pad
following instructions included with projector/control pad.
7.Use cable ti es (R), as ne cessary , to sec ure the cabl es within
control panel. (See Figure 18)
3
Bosses
Installing Control Housing
1.Open door on control panel assembly (EE).
2.Insert edges of control pa nel assembly (EE) into groove in
whiteboard frame, with tab placed behind whiteb oard. (See
Figure 19)
3.Slide contro l panel a ssembly up al ong side o f white board to
the desired height. (See Figure 19)
4.Determine attachment location on wall. (See Figure 19)
5.Mark attachment hole through slot in control panel
assembly (EE). (See Figure 19)
6.Slide control panel assembly up or down, away from
marked hole.
7.Drill one pil ot hole (see Table 1 for si ze) at location marked
in Step 5 (See Figure 19) and follow fastener information
(appropriate for wall type) located in Table 1.
8.Proceed to Fastener Installation Methods section at end
of Installation Instructions.
Attach to wall
4
through this slot
5
7
4
6
(DD) x 2
7
Cable
tie anchors
Screen
(EE)
3
5
Figure 19
8
Tab
USB port
Figure 18
8.OPTIONAL: The tab in the control panel assembly door
may be removed to al l ow at tachment t o t he USB port. ( See
Figure 18)
13
Page 14
AN2 SeriesInstallation Instructions
Adding Whiteboard Brackets to Whiteboard
NOTE: Use 3 whiteboard brackets (minimum of 2 brackets)
along bottom of whiteboard, and locate brackets as
close to outer corn ers as po ssible. Remain ing brackets
may be used along sides of whiteboard, as desired.
1.Install whiteboard brackets (MM) using:
•Wood/steel studs/dryw all: one #8 x 1-1/2" scr ew (LL)
into back of each whiteboard bracket.
•Concrete wall:one #8 x 1-1/2" screw (LL) into b ack of
each whiteboa rd bracket, and i nto installed AF6 toggler
(KK).
2.Fasten to whiteboard frame us ing one #8 x 1/2" sel f-drilling
screw (JJ) per whiteboard bracket (MM).
(C)
Left brace
(D)
2
(E)
1
Bracket
placed on
outside edge
of brace
(MM)
2
1
(LL)
(JJ)
Figure 20
Attaching Valence
1.Align right val ence br ack et ( D) al ongout side of rig ht brace
on back of valence (E), and fasten with two 10-24 x 1/4"
Phillips pan head machine screws (L). (See Figure 21)
2.Align left val ence bracket ( C) alongoutside of left brace on
back of vale nce (E), and fas ten with two 10- 24 x 1/4" Phillips
pan head machine screws (L). (See Figure 21)
3.Slide the vale nce (E) with attached brackets into the boom
projector mount (S), sliding brackets under tabs in boom
and adjust distance as required. (See Figure 22)
4.Fasten through bracket slots into boom mount using four
10-24 x 1/4" Phillips pan head machine screws (L). (See
Figure 22)
1
2
(L) x 4
Right brace
Figure 21
4
(E)
Tabs
(L) x 4
3
Figure 22
5.Readjust projector following inst ructions in the Align
Projector Image section.
14
Page 15
Installation InstructionsAN2 Series
Calibrating Finger Touch Unit (FTU)
1.Snap calibration marker spacers (QQ) into bottom of
calibration markers included with Epson projector. (See
Figure 23)
NOTE: Ensure tha t magnet on ca librat ion mark er spacer (QQ)
lines up with target on calibration marker. (See
Figure 23)
2
Target
1
Calibration
marker
(QQ) x 2
1
Magnet
Figure 23
2.Calibrate the finger touch unit (FTU) following instructions
included with the Epson projector.
Attaching Sensor Cover and Outer Cover
1.Reattach the sensor cover, using the fastener previously
removed. (See Figure 2)
Tab on bottom
of sensor cover
3
Top of screen
Figure 25
Attaching Marker Tray
1.
Attach marker tray (FF) at any point along bottom of
whiteboard using two #8 x 1/2" self-drilling screws (CC).
(See Figure 26)
Figure 24
2.Hold sensor outer cover (U) under boom projector mount
and begin slidi ng downwar d toward to p of whitebo ard. (See
Figure 25)
3.Continue sliding cover downward until tabs at bottom of
cover slip into slot on top of whiteboard. (See Figure 25)
(FF)
Screen
1
1
(CC) x 2
Figure 26
15
Page 16
AN2 SeriesInstallation Instructions
FASTENER INSTALLATION METHODS
NOTE: Refer to Table 1 for ap propriate hardwa re and pilot hole
sizes for various wall types.
Steel Stud / Drywall
1.Hold metal channel on anchor (H) flat alongside plastic
straps and slide channel through hole. (See Figure 27)
Drywall
Plastic straps
(H)
1
Figure 27
2.Holding plastic straps on anchor (H), pull anchor away from
wall un til cha nnel r ests fl ush behi nd wall making sur e anch or
channel is positioned vertically on drywall, or steel stud (if
present). (See Figure 28)
3.Slide plastic cap on anchor (H) towards wall until flange of
cap is flush with wall. (See Figure 28)
Steel stud
(if present)
4
Plastic straps
(side view)
5.Line up anchor with attachment point.
6.Insert 1/4-20 x 1-3/4" Phillips pan head screw (F) through
1/4" washer (G), corresponding mounting hole in product
and into anchor (H), and tighten unt il f l ush agai nst product.
DO NOT over tighten! (See Figure 30)
(G) x 4
6
Steel stud
(if present)
Drywall
Plastic cap
Anchor metal channel
Figure 29
Steel stud
(if present)
Drywall
(F) x 4
Drywall
Plastic cap
2
3
(H)
Anchor metal channel
(side view)
Figure 28
4.Snap off p la stic st raps on anchor at wall by pushing s id e to
side, snapping off straps level with flange of plastic cap.
(See Figure 29)
Product
Anchor metal channel
(side view)
Figure 30
16
Page 17
Installation InstructionsAN2 Series
Wood Stud
NOTE: Refer to Table 1 for ap propriate hardwa re and pilot hole
sizes for various wall types.
1.Use one 1/4 x 2-1/2" lag bolt (J) through product and into
pilot hole. (See Figure 31)
2.Repeat for remaining pilot hole.
1
(J) x 2
2
Figure 31
Concrete
NOTE: Refer to Table 1 for ap propriate hardwa re and pilot hole
sizes for various wall types.
1.Install an anchor (K) into each pilot hole using a hammer,
making sure that the anchor is flush with the wall.
2.Use one 1/4 x 2-1/2" lag bolt (J) through product into each
anchor in wall.
1
(K)
2
(J)
Figure 32
17
Page 18
AN2 SeriesInstallation Instructions
18
Page 19
Installation InstructionsAN2 Series
19
Page 20
AN2 SeriesInstallation Instructions
8800-002671 Rev02
06/15
Milestone AV Technologies
3100 North Detroit Street, Warsaw, IN 46582
P: 574.267.8101 or 800.622.3737
F: 574.267.7804 or 877.325.4832
E: info@da-lite.com