Epson AN2WA87 Installation Instructions Manual

Page 1
INSTALLATION INSTRUCTIONS
Epson All-in-One Collaborative Whiteboard
AN2 Series
AN2 87" and 100"
Page 2
AN2 Series Installation Instructions
DISCLAIMER
Milestone AV Technologies and its affiliated corporations and subsidiaries (collectively "Milestone"), intend to make this manual accurate and complete. However, Milestone makes no claim that the information contained herein covers all details, conditions or variations, nor does it provide for every possible contingency in connection with the installation or use of this product. The information contained in this document is subject to change without notice or obligation of any kind. Milestone makes no representation of warranty, expressed or implied, regarding the in formation cont ai ned her ein. Mil estone assu mes no responsibility for accuracy, completeness or sufficiency of the information contained in this document.
IMPORTANT SAFETY INSTRUCTIONS
WARNING: A WARNING alerts you to the possibility of
serious injury or death if you do not follow the inst ructions.
CAUTION: A CAUTION alerts you to the possibility of
damage or destruction of equipment if you do not follow the corresponding instructions.
WARNING: Failure to read, thoroughly understand, and
follow all instructions can result in serious personal injury, damage to equipment, or voidi ng of f actory wa rrant y! It i s the installer’s responsibility to make sure all components are properly assembl ed and installed using the instructions provided.
WARNING: Use this mounting system only for its intended
use as described in these instructions. Do not use attachments not recommended by the manufacturer.
WARNING: Never operate this mounting system if it is
damaged. Return the mounting system to a servi ce cen ter fo r examination and repair.
WARNING: Do not use this product outdoors.
IMPORTANT ! : The AN2 Series includes the AN2 87" and
100" mounts. These mounts are designed to be used ONLY with the following Epson projector models:
BrightLink Pro 1430Wi
BrightLink Pro 1420Wi
BrightLink 595Wi
BrightLink 585Wi
IMPORTANT ! :
mounted to
a bare 8" concrete or 8"x8"x16" concrete block wall;
a 2" x 4" wo od stud s (16" on center mi nimu m to 24" o n center maximum) wall with a minimum drywall thickness of 1/2" (12.7mm);
a 2" x 4"-25ga minimum steel studs (16" on center minimum to 24" on center maximum) wall with a minimum drywall thickness of 1/2" (12.7mm).
The AN2 Series systems are designed to be
:
--SAVE THESE INSTRUCTIONS--
WARNING: Failure to provide adequat e structural strength
for this component can result in serious personal injury or damage to equipment! It is the installer’s responsibility to make sure the structure to which this component is attached can support five t imes t he combi ned wei ght of al l eq uip ment. Reinforce the structure as required before installing the component. The wall to which the mount is being attached may have a minimum drywall th ickness of 1/2" (12.7mm) for wood and steel stu d wa lls, and NO drywall on co ncr ete walls.
Page 3
Installation Instructions AN2 Series
DIMENSIONS
AN2-87
DIMENSIONS: INCHES [MILLI METERS]
AN2-100
DIMENSIONS: INCHES [MILLIMETERS]
3
Page 4
AN2 Series Installation Instructions
LEGEND
Tighten Fastener
Apretar elemento de fijación Befestigungsteil festziehen Apertar fixador Serrare il fissaggio Bevestiging vastdraaien Serrez les fixations
Loosen Fastener
Aflojar elemento de fijación Befestigungsteil lösen Desapertar fixador Allentare il fissaggio Bevestiging losdraaien Desserrez les fixations
Phillips S cr ewdriver
Destornil lador Phillips Kreuzschlitzschraubendreher Chave de fendas Phillips Cacciavite a stella Kruiskopschroevendraaier Tournevis à pointe cruciforme
Pencil Mark
Marcar con lápiz Stiftmarkierung Marcar com lápis Segno a matita Potloodmerkteken Marquage au crayon
Drill Hole
Perforar Bohrloch Fazer furo Praticare un foro Gat boren Percez un trou
Adjust
Ajustar Einstellen Ajustar Regolare Afstellen Ajuster
Open-Ended Wrench
Llave de boca Gabelschlüssel Chave de bocas Chiave a punte aperte Steeksleutel Clé à fourche
By Hand
A mano Von Hand Com a mão A mano Met de hand À la main
Hex-Head Wrench
Llave de cabeza hexagonal Sechskantschlüssel Chave de cabeça sext avada Chiave esagonale Zeskantsleutel Clé à tête hexagonal e
Remove
Quitar Entfernen Remover Rimuovere Verwijderen Retirez
Optional
Opcional Optional Opcional Opzionale Optie En option
Security Wrench
Llave de seguridad Sicherheitsschlüssel Chave de segurança Chiave di sicurezza Veiligheidssleutel Clé de sécurité
Page 5
Installation Instructions AN2 Series
TOOLS REQUIRED FOR INSTALLATION
PARTS
1/8" (wood) 1/2" (drywall) 8mm (concrete)
6mm (concrete - AF6 toggler)
9200-003827
A (1) [Upper wall bracket]
E (1) [Valence]
N (1) M (4) 10-24 x 3/8"
[Boom spacer]
3/8" 7/16"
B (1) [Wall hanging bracket]
F (4) 1/4-20 x 1-3/4"
P (1) 5/16"
#1, #2
G (4) 1/4"
H (4) 1/4-20 Snap toggle
Q (1) 5/16"
3/8" 7/16"
C (1) [Left valence bracket]
QQ (2) [Calibration marker spacer]
D (1) [Right valence bracket]
J (4)
1/4 x 2-1/2"
K (4)
Hilti Hud-L #8 x 60
L (10) 10-24 x 1/4" [includes 2 extra]
R (8) [4" cable tie]
9200-003817
S (1) [Boom projector mount]
V (4)
M4 x 12mm
HH (1) [Marker kit]
GG (1) [Whiteboard]
W (2) M4 x 30mm
T (1) [Projecto r interface]
U (1) [Sensor cover]
X (4) 10-24 x 1-3/4"
JJ (5) #8 x 1/2"
MM (5) [Whiteboard bracket]
Y (1) 5/32"
KK (5) Toggler AF6
9200-003805
NN (1) [IR Cable]
Z (4) #8-9 x 1-1/2"
CC (2) #8 x 1/2"
LL (5) #8 x 1-1/2"
AA (2) 3/16"
DD (2) #4-24 x 1/4"
FF (1) [Marke r tray]
BB (4) Toggler AF6
EE (1) [Control panel assembly]
OUTSIDE BOX
PP (4) [Leveling feet]
5
Page 6
AN2 Series Installation Instructions
INSTALLATION
Determining Location
2 3/4”
3
5
[70mm]
10 5/8”
[270mm]
2
2
CENTER OF SCREEN
1
1. Determine desired height of whiteboard (measured from floor). (See Figure 1)
2. Determine desired center of whiteboard. (See Figure 1)
3. Measure 10-5/8 inches (270mm) up from desired height (top) of whiteboard and 2-3/4 inches (69mm) to the right of center of whiteboard and mark location. (See Figure 1)
NOTE: This pilot hole may be placed in drywall only, if
necessary.
4. Determine location of studs behind drywall.
5. Drill one pil ot hol e (see Tabl e 1 fo r s iz e) at lo cat ion mark ed in Step 3 (See Figure 1) and follow fastener information (appropriate for wall type) located in Table 1.
IMPORTANT ! : See Fastener Installation Methods at end of Installation Instructions for details on installing product into various wall types.
STUDS
Figure 1
Table 1: Fastener Information
WALL TYPE PILOT
HOLE
Drywall only­(boom attach only) / Steel studs
Wood stud
Concrete
1/2" 1/4-20 Toggler an chor kit (F,
1/8" 1/4 x 2-1/2" hex head lag (J)
8mm x 80mm
(Only for installing whiteboard bracket into concrete)
6mm x 45mm
FLOOR
FASTENERS (see PARTS drawing)
G, H)
- 1/4-20 x 1-3/4" Phillips screw (F)
- 1/4" washer (G)
- 1/4-20 Snap toggler (H)
1/4" was her (G) - OPTIONAL
1/4 x 2-1/2" hex head lag (J) Hilti Hud-L #8x60 anchor (K)
#8-9x1-1/2" Phillips screw (Z) Toggler AF6 (BB) or (KK)
Page 7
Installation Instructions AN2 Series
Installing Wall Bracket
1. Slide the ta bs on the upper w all br acket (A ) int o the sl ots o n wall hanging bracket (B). (See Figure 2)
(view from front)
(A)
tabs
(B)
(B)
(A)
5. Tighten fastener against wall bracket. (See Figure 3)
6. Determine location of studs behind drywall, and mark a minimum of two locations f or wall b racket attach men t over studs. (See Figure 4)
NOTE: For wood or st eel stud walls, mark at least t wo locations
for attachmen t a minimum of 16" apart and a maximum of 24" apart, AND within slots on wall bracket assembly.
NOTE: For concrete walls, mark at least two locations for
attachment a minimum of 16" apart, AND within slots on wall bracket assembly.
7. Drill one pilot hole (see Table 1 for size) at each location marked in Step 5 (See Figure 4) and follow fastener information (appropriate for wall type) located in Table 1.
6
7
tabs
(view from back)
Figure 2
2. Install one fastener (See Table 1) into previously drilled hole, leaving 1/2" of fastener extending from wall. (See Figure 3)
3. Hang wall bracket assembly onto fastener. (See Figure 3)
NOTE: Notch in wall bracket assembly indicates center of
whiteboard.
2 4
Notch indicates center of screen
Fastener
3
8
Fasteners (2 or 3)
Figure 4
NOTE: Proceed to Fastener Installation M ethods section at
end of Installation Instructions.
8. Fasten wall bracket assembly to wall using fasteners appropriate to wall type (See Table 1). (See Figure 4)
Figure 3
4. Level wall bracket assembly.
7
Page 8
AN2 Series Installation Instructions
Model AN2-100]
Installing Boom Projector Mount
IMPORTANT ! : The boom projector mount ships ready
to install for the AN2 87" model.
AN2-87: Proceed to Step 6.
AN2-100: Proceed to Steps 1 - 5 .
1. (AN2-100 Only) Support the projector mount from underneath the boom arm while removing the four screws and washers from bot tom of pro jector mount . (See Figur e 5)
Adjustable plate
5
87
mark
5
3
Plastic spacer
[Remove for
5. (AN2-100 Only) Turn adjustment bolt to move projector mount towards end of boom arm, until front of adjustable plate lines up with "100" marking on boom arm. (See Figure 5)
6. Hang boom projector mount (S) over bolt on wall bracket assembly and loosely fasten (hand tighten) using boom spacer (N), 5/16" washer (P) and 5/16" nut (Q). (See Figure 6)
7. Align four fastener holes along botto m of boom projector mount behind four holes in wall bracket. (See Figure 6)
8. Install an d tighten f our 10-24 x 3/8" Phillips f lat he ad screws (M) through wal l brack et as sembly i nto b oom projec tor arm (S). (See Figure 6)
(S)
(N)
Bolt
100
mark
1
4
(X) x 4
NOTE: Be sure that lock is located on this side of projector mount.
Figure 5
2. (AN2-100 Only)Lower pr oject or mount and ha rdwar e from underneath boom arm.
3. (AN2-100 Only) Remove and discar d plastic spacer. (See Figure 5)
IMPORTANT ! : Make sure that lock on projector mount is located on correct side of bo om arm. (See Figure 5)
IMPORTANT ! : Make sure that plastic glides on top of boom arm haven’t shifted. Be sure to fasten Phillips machine screws (W) through the plastic glides.
10
6
(Q)
(Q)
(P)
8
(M) x 4
Figure 6
9. Place level lengthwise on top of boom projector arm (S).
10. Level boom projector ar m (S) by loosen ing or t ight ening the 5/16" nut (Q) on the bolt from the wall bracket assembly. (See Figure 6)
4. (AN2-100 Only) Replace long fasteners with four 10-24 x 1-3/4" Phillips machine screws (X), and refasten projector mount to boom arm. (See Figure 5)
Page 9
Installation Instructions AN2 Series
Installing Whiteboard and Sensor
IMPORTANT ! : Use at least two people when lifting and installing whiteboard. Handle the frame and back of
whiteboard, and avoid touching the front of whiteboard as much as possible.
1. Lay box flat and open.
2. Stand whiteboard up and add leveling feet (PP) to each corner on the back of whiteboard. Do not over tighten. (See Figure 7)
3.
Hang whiteboard (GG) onto wall bracket assembly using pre-installed bracket on back of whiteboard assembly. (See Figure 7)
(View shown from behind wall to which wall bracket assembly is attached)
Pre-installed bracket
(GG)
(S)
2
(PP) x 4
3
3
5
Wall bracket assembly
Figure 7
4. Center whiteboard assembly on wall bracket.
NOTE: Notch in wall bracket assembly indicates center of
whiteboard.
5. Level the whiteboard against the wall by placing a level against the front of it, and adjusting the leveling feet. (See Figure 7)
6. Continue to adjust until whiteboard is leveled with the wall.
7. Remove and keep one fastener from bottom of sensor.
NOTE: The sensor is i ncluded wit h the Epson projector, n ot the
AN2BA Series mount.
8. Remove and keep sensor cover. (See Figure 8)
9. Attach sensor to boom arm bracket using two M4 x 30mm Phillips cap head screws (W). (See Figure 9)
NOTE: Insert the two Phillips scr ews into senso r. The magne ts
on the sensor will hold the sensor in place on the bracket while fastening the screws.
8
Figure 8
9
(W) x 2
Figure 9
9
Page 10
AN2 Series Installation Instructions
Installing Projector
1. Attach proj ector interface (T) to projector using four M4 x 12mm Phillips cap head screws (V). (See Figure 10)
Latch
1
(V) x 4
(T)
Figure 10
NOTE: Make sure projector mount is in UNLOCKED position
and remove key from projector mount.(See Figure 11)
2. Lift project or with attached i nterface (T) and sl ide buttons on interface into slots on boom projector mount (S). (See Figure 11)
3. Slide latch t o LOCKED position to lock projector in place. (See Figure 11)
4. Add and route cables following instructions included with the projector.
NOTE: Do NOT place extra cable length behind the sensor
bracket.
Slot
(S)
(T)
Slot
LOCKED
Buttons
UNLOCKED
3
2
Figure 11
5. Place a level on top of the boom arm mount and level the mount after the projector is installed. (See Figure 12)
5A. Tighten nut to increase boom arm angle. 5B. Loosen nut to decrease boom arm angle.
6. Place a level on top of interface (T) and level. (See Figure 12)
10
CAUTION: While leveli ng mo unt:
Ensure nut is fully engaged onto bolt, and AT LEAST
ONE thread appears through nut.
DO NOT over tighten nut! Over tightening WILL
damage wall behind mount.
5A
5A
5B
5B
Figure 12
Page 11
Installation Instructions AN2 Series
Align Projector Image
Using remote control included with projector:
1. Select MENU
2. Select SETTINGS
3. Select PATTERN
4. Select TEST PATTERN
5. Use the test pattern projected o n the whi teb oard to roughly align image to whiteboard, and make the necessary projector adjustments following instructions included with Epson projector and using the following adjustment instructions for the mount.
IMPORTANT ! : The projected image should NEVER project onto the whiteboard frame. An image overlapping onto the whiteboard frame may prevent the projector touch sensor from working properly.
Projector Adjustments
Roll Adjustment (Horizontal Tilt)
Adjust proje cto r so th at t he lef t an d r ight v ertical lines of the t est pattern are parallel with each other and each side of whiteboard.
1. Loosen ROLL adju stmen t lo cking scr ew us ing a #2 Phillips screwdriver. (See Figure 13)
Yaw Adjustment (Rotation)
Adjust projector so that the top and bottom horizontal lines of the test pattern are parallel with each other and with top and bottom of whiteboard.
1. Loosen yaw adjustment locking screw using a #2 Phillips screwdriver. (See Figure 14)
2. Turn yaw micro-adjustment screw right or left using a #2 Phillips scr ewdriver un til image is properly aligned on t arget.
3. Tighten yaw adjustment locking screw using a #2 Phillips screwdriver. (See Figure 14)
1
3
2
2. Turn ROLL micro-adjustment screw right or left using a #2 Phillips scr ewdriver u ntil image i s properly aligned on t arget.
3. Tighten ROLL adjustment locking screw using a #2 Phi l lips screwdriver.
3
1
2
2
2
Figure 14
Figure 13
11
Page 12
AN2 Series Installation Instructions
Pitch Adjustment (Vertical Elevation)
Adjust projector so that the top and bottom horizontal lines of the test pattern are parallel with each other and with top and bottom of whiteboard.
1. Loosen pitch adjustment locking screw using a #2 Phillips screwdriver. (See Figure 15)
2. Turn pitch micro-adjustment screw right or left using a #2 Phillips scr ewdriver u ntil image i s properly aligned on t arget.
3. Tighten pitch a djustment locking screw usi ng a #2 Phillips screwdriver.
2
2
1 3
Figure 15
Micr o Adjustme nt IMPORTANT ! : The projected image should NEVER
project onto the whiteboard frame. An image overlapping onto the whiteboard frame may prevent the projector touch sensor from working properly.
1. If required, turn the micro adjust fastener clockwise to extend projector further from wall. (See Figure 16)
2. If required, turn the micro adjust fastener
counterclockwise to retract projector closer to wall.
1
2
Extend
Retract
Figure 16
Installing Control Pad
1. Open lower cover on control pad (included with projector). (See Figure 17)
2. Insert control pad into control housing (EE) by sliding it up under tabs inside housing. (See Figure 17)
Tabs
(EE)
2
Control pad
1
12
Figure 17
Page 13
Installation Instructions AN2 Series
25
3. Align holes in control pad with bosses in control housing and push control pad into place. (See Figure 18)
4. Secure control pad into place using two #4-24 x 1/4" Phillips pan head screws (DD). Do NOT over tighten. (See Figure 18)
5. Close lower cover of control pad. (See Figure 18)
6. Attach all cables, including IR cable (NN), to control pad following instructions included with projector/control pad.
7. Use cable ti es (R), as ne cessary , to sec ure the cabl es within control panel. (See Figure 18)
3
Bosses
Installing Control Housing
1. Open door on control panel assembly (EE).
2. Insert edges of control pa nel assembly (EE) into groove in whiteboard frame, with tab placed behind whiteb oard. (See Figure 19)
3. Slide contro l panel a ssembly up al ong side o f white board to the desired height. (See Figure 19)
4. Determine attachment location on wall. (See Figure 19)
5. Mark attachment hole through slot in control panel assembly (EE). (See Figure 19)
6. Slide control panel assembly up or down, away from marked hole.
7. Drill one pil ot hole (see Table 1 for si ze) at location marked in Step 5 (See Figure 19) and follow fastener information (appropriate for wall type) located in Table 1.
8. Proceed to Fastener Installation Methods section at end of Installation Instructions.
Attach to wall
4
through this slot
5
7
4
6
(DD) x 2
7
Cable tie anchors
Screen
(EE)
3
5
Figure 19
8
Tab
USB port
Figure 18
8. OPTIONAL: The tab in the control panel assembly door may be removed to al l ow at tachment t o t he USB port. ( See Figure 18)
13
Page 14
AN2 Series Installation Instructions
Adding Whiteboard Brackets to Whiteboard
NOTE: Use 3 whiteboard brackets (minimum of 2 brackets)
along bottom of whiteboard, and locate brackets as close to outer corn ers as po ssible. Remain ing brackets may be used along sides of whiteboard, as desired.
1. Install whiteboard brackets (MM) using:
Wood/steel studs/dryw all: one #8 x 1-1/2" scr ew (LL) into back of each whiteboard bracket.
Concrete wall:one #8 x 1-1/2" screw (LL) into b ack of each whiteboa rd bracket, and i nto installed AF6 toggler (KK).
2. Fasten to whiteboard frame us ing one #8 x 1/2" sel f-drilling screw (JJ) per whiteboard bracket (MM).
(C)
Left brace
(D)
2
(E)
1
Bracket placed on outside edge of brace
(MM)
2
1
(LL)
(JJ)
Figure 20
Attaching Valence
1. Align right val ence br ack et ( D) al ongout side of rig ht brace on back of valence (E), and fasten with two 10-24 x 1/4" Phillips pan head machine screws (L). (See Figure 21)
2. Align left val ence bracket ( C) alongoutside of left brace on back of vale nce (E), and fas ten with two 10- 24 x 1/4" Phillips pan head machine screws (L). (See Figure 21)
3. Slide the vale nce (E) with attached brackets into the boom projector mount (S), sliding brackets under tabs in boom and adjust distance as required. (See Figure 22)
4. Fasten through bracket slots into boom mount using four 10-24 x 1/4" Phillips pan head machine screws (L). (See Figure 22)
1 2
(L) x 4
Right brace
Figure 21
4
(E)
Tabs
(L) x 4
3
Figure 22
5. Readjust projector following inst ructions in the Align Projector Image section.
14
Page 15
Installation Instructions AN2 Series
Calibrating Finger Touch Unit (FTU)
1. Snap calibration marker spacers (QQ) into bottom of calibration markers included with Epson projector. (See Figure 23)
NOTE: Ensure tha t magnet on ca librat ion mark er spacer (QQ)
lines up with target on calibration marker. (See Figure 23)
2
Target
1
Calibration marker
(QQ) x 2
1
Magnet
Figure 23
2. Calibrate the finger touch unit (FTU) following instructions included with the Epson projector.
Attaching Sensor Cover and Outer Cover
1. Reattach the sensor cover, using the fastener previously removed. (See Figure 2)
Tab on bottom of sensor cover
3
Top of screen
Figure 25
Attaching Marker Tray
1.
Attach marker tray (FF) at any point along bottom of whiteboard using two #8 x 1/2" self-drilling screws (CC). (See Figure 26)
Figure 24
2. Hold sensor outer cover (U) under boom projector mount and begin slidi ng downwar d toward to p of whitebo ard. (See Figure 25)
3. Continue sliding cover downward until tabs at bottom of cover slip into slot on top of whiteboard. (See Figure 25)
(FF)
Screen
1
1
(CC) x 2
Figure 26
15
Page 16
AN2 Series Installation Instructions
FASTENER INSTALLATION METHODS
NOTE: Refer to Table 1 for ap propriate hardwa re and pilot hole
sizes for various wall types.
Steel Stud / Drywall
1. Hold metal channel on anchor (H) flat alongside plastic straps and slide channel through hole. (See Figure 27)
Drywall
Plastic straps
(H)
1
Figure 27
2. Holding plastic straps on anchor (H), pull anchor away from wall un til cha nnel r ests fl ush behi nd wall making sur e anch or channel is positioned vertically on drywall, or steel stud (if present). (See Figure 28)
3. Slide plastic cap on anchor (H) towards wall until flange of cap is flush with wall. (See Figure 28)
Steel stud (if present)
4
Plastic straps
(side view)
5. Line up anchor with attachment point.
6. Insert 1/4-20 x 1-3/4" Phillips pan head screw (F) through 1/4" washer (G), corresponding mounting hole in product and into anchor (H), and tighten unt il f l ush agai nst product. DO NOT over tighten! (See Figure 30)
(G) x 4
6
Steel stud (if present)
Drywall Plastic cap
Anchor metal channel
Figure 29
Steel stud (if present)
Drywall
(F) x 4
Drywall
Plastic cap
2
3
(H)
Anchor metal channel
(side view)
Figure 28
4. Snap off p la stic st raps on anchor at wall by pushing s id e to side, snapping off straps level with flange of plastic cap. (See Figure 29)
Product
Anchor metal channel
(side view)
Figure 30
16
Page 17
Installation Instructions AN2 Series
Wood Stud NOTE: Refer to Table 1 for ap propriate hardwa re and pilot hole
sizes for various wall types.
1. Use one 1/4 x 2-1/2" lag bolt (J) through product and into
pilot hole. (See Figure 31)
2. Repeat for remaining pilot hole.
1
(J) x 2
2
Figure 31 Concrete NOTE: Refer to Table 1 for ap propriate hardwa re and pilot hole
sizes for various wall types.
1. Install an anchor (K) into each pilot hole using a hammer,
making sure that the anchor is flush with the wall.
2. Use one 1/4 x 2-1/2" lag bolt (J) through product into each
anchor in wall.
1
(K)
2
(J)
Figure 32
17
Page 18
AN2 Series Installation Instructions
18
Page 19
Installation Instructions AN2 Series
19
Page 20
AN2 Series Installation Instructions
8800-002671 Rev02 06/15
Milestone AV Technologies 3100 North Detroit Street, Warsaw, IN 46582
P: 574.267.8101 or 800.622.3737 F: 574.267.7804 or 877.325.4832 E: info@da-lite.com
www.milestone.com
© 2015 Milestone AV Technologies LLC
Loading...