Vehicle Systems Disassembly & Assembly 16
2. Hold the spool (2) on a vise by inserting rigid
wood pieces(Fig. 2-1) etc. to prevent damage on
the surface. Remove the cap screw(11),
disassemble spring seat(7) and spring(6), and
remove wiper(4) and O-ring(3). At this time, take
care that cap screw or other parts are not ejected
out by the spring force.
3. Remove the screw(15) on the spool head, remove
the seal plate(5), wiper(4) and O-ring(3).
4. Unscrew and remove the solenoid valve (24),
remove spring(22) and poppet(21).
5. Take off plug(18), and remove spring(17) and
poppet(16).
6. Unscrew the lock nut on the shut-of valve(20).
Turn the set screw by 1 or 2 turns and take it off
inwardly, and take out the main body of the shutoff valve.
7. Remove the socket head bolt(40), take out the
solenoid(38). Since an O-ring is mounted on the
in-low part of the solenoid providing large friction
force, do not apply excessive force to twist it.
Remove shuttle(36) and spring(37) from inside to
outside.
8. Unscrew the two relief valve assemblies(41) and
remove them from the assembly.
Though the two valves are identical in appearance,
however, since the pressure settings for the main
relief and second relief valves are different, mark
the two relief valves for distinguish them.
【Cautions for Disassembling the Relief Valve】
In principle, the relief valve has to be replaced in
assembly unit. Therefore, do not disassemble it
except when necessary. If it is necessary to
disassemble, refer to the Relief Valve Maintenance
Manual. Mark each part for identification in
assembling.
9. Take out plug(52), remove spring(51) and
spool(50).
10. Take out plug(30) and remove spool(26) and
spring(27) in assembly state.
Hold the sub-assembled spool(26) with a vise
using rigid wood pieces(Fig. 2-1) to prevent
damage on spool surface. Take out plug(29) and
remove the check valve(28) from inside.
11. Take out plug(34) and remove spring(33) and
poppet assembly(32).
Then, remove the main poppet from the poppet
assembly(32).
The poppet assembly was described as the
unload valve in the Operation Section earlier.
12. Take out the two plugs (42) and (59).
These three plugs are only for open/close,
without internal sub-parts. Therefore, do not
disassemble them except when necessary.
13. Finally, remove the O-rings and wipers on each
disassembled part.
Disassembling the Spool Section
Assembly for Tilting
The combination No. shall be in accordance with the
attached Part List (Part No.: C0213-41201).
Fig. 2-2 is the detail drawing.
1. Take out the O-rings(12) & (18) from the fitting
surface, remove spring(11) and poppet(10).
2. Unscrew the socket head bolt(14) and take out
the cap(6).
Take out the spool(2) in sub-assembled state from
the valve housing(1). At this time, remove the seal
plate(3), wiper(5) and O-ring(4), on the cap side,
as mounted on the spool(2).
3. Loosen the screw(13) on the opposite side,
remove seal plate(3), wiper(5), and O-ring(4).