Cisco Catalyst 4900M, WS-C4948-10GE-E Installation Manual

Page 1
Cisco Catalyst 4900M Switch Installation Guide
September 2010
Americas Headquarters
Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 USA http://www.cisco.com Tel: 408 526-4000
800 553-NETS (6387)
Text Part Number: 78-18350-02
Page 2
THE SPECIFICATIONS AND INFORMATION REGARDING THE PRODUCTS IN THIS MANUAL ARE SUBJECT TO CHANGE WITHOUT NOTICE. ALL STATEMENTS, INFORMATION, AND RECOMMENDATIONS IN THIS MANUAL ARE BELIEVED TO BE ACCURATE BUT ARE PRESENTED WITHOUT WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. USERS MUST TAKE FULL RESPONSIBILITY FOR THEIR APPLICATION OF ANY PRODUCTS.
THE SOFTWARE LICENSE AND LIMITED WARRANTY FOR THE ACCOMPANYING PRODUCT ARE SET FORTH IN THE INFORMATION PACKET THAT SHIPPED WITH THE PRODUCT AND ARE INCORPORATED HEREIN BY THIS REFERENCE. IF YOU ARE UNABLE TO LOCATE THE SOFTWARE LICENSE OR LIMITED WARRANTY, CONTACT YOUR CISCO REPRESENTATIVE FOR A COPY.
The following inform ation is for FCC compliance of Class A devices: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio-frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference, in which case users will be required to correct the interference at their own expense.
The following information is for FCC compliance of Class B devices: The equipment described in this manual generates and may radiate radio-frequency energy. If it is not installed in accordance with Cisco’s installation instructions, it may cause interference with radio and television reception. This equipment has been tested and found to comply with the limits for a Class B digital device in accordance with the specifications in part 15 of the FCC rules. These specifications are designed to provide reasonable protection against such interference in a residential installation. However, there is no guarantee that interference will not occur in a particular installation.
Modifying the equipment without Cisco’s written authorization may result in the equipment no longer complying with FCC requirements for Class A or Class B digital devices. In that event, your right to use the equipment may be limited by FCC regulations, and you may be required to correct any interference to radio or television communications at your own expense.
You can determine whether your equipment is causing interference by turning it off. If the interference stops, it was probably caused by the Cisco equipment or one of its peripheral devices. If the equipment causes interference to radio or television reception, try to correct the interference by using one or more of the following measures:
• Turn the television or radio antenna until the interference stops.
• Move the equipment to one side or the other of the television or radio.
• Move the equipment farther away from the television or radio.
• Plug the equipment into an outlet that is on a different circuit from the television or radio. (That is, make certain the equipment and the television or radio are on circuits controlled by different circuit breakers or fuses.)
Modifications to this product not authorized by Cisco Systems, Inc. could void the FCC approval and negate your authority to operate the product.
The Cisco implementation of TCP header compression is an adaptation of a program developed by the University of California, Berkeley (UCB) as part of UCB’s public domain version of the UNIX operating system. All rights reserved. Copyright © 1981, Regents of the University of California.
NOTWITHSTANDING ANY OTHER WARRANTY HEREIN, ALL DOCUMENT FILES AND SOFTWARE OF THESE SUPPLIERS ARE PROVIDED “AS IS” WITH ALL FAULTS. CISCO AND THE ABOVE-NAMED SUPPLIERS DISCLAIM ALL WARRANTIES, EXPRESSED OR LIMITATION, THOSE OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT OR ARISING FROM A COURSE OF DEALING, USAGE, OR TRADE PRACTICE.
IN NO EVENT SHALL CISCO OR ITS SUPPLIERS BE LIABLE FOR ANY INDIRECT, SPECIAL, CONSEQUENTIAL, OR INCIDENTAL DAMAGES, INCLUDING, WITHOUT LIMITATION, LOST PROFITS OR LOSS OR DAMAGE TO DATA ARISING OUT OF THE USE OR INABILITY TO USE THIS MANUAL, EVEN IF CISCO OR ITS SUPPLIERS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.
IMPLIED, INCLUDING, WITHOUT
Cisco and the Cisco logo are trademarks or registered trademarks of Cisco and/or its affiliates in the U.S. and other countries. To view a list of Cisco trademarks, go to this URL:
www.cisco.com/go/trademarks. Third-party trademarks mentioned are the property of their respective owners. The use of the word partner does not imply a partnership
relationship between Cisco and any other company. (1110R)
Cisco Catalyst 4900M Switch Installation Guide
Copyright © 2008–2012 Cisco Systems, Inc. All rights reserved.
Page 3
CONTENTS
Preface vii
Audience vii
Organization vii
Related Documentation viii
Hardware Documents viii Software Documentation ix Cisco IOS Documentation ix
Conventions x
Statement 1071—Warning Definition xi
Obtaining Documentation and Submitting a Service Request xvi
CHAPTER
1 Product Overview 1-1
Catalyst 4900M Switch Chassis 1-1
Catalyst 4900M Switch Chassis Features 1-2 Catalyst 4900M Switch Chassis Physical and Environmental Specifications 1-3 Catalyst 4900M Switch Chassis Rear Panel Connections and Features 1-4 Front Panel LEDs 1-5 Chassis Cooling 1-6 Power Supplies 1-7 Environmental Monitoring of the Power Supplies 1-8 Power Management for the Catalyst 4900M Switch 1-8
Power Management Modes 1-8
Catalyst 4900M Half-Card Modules 1-8
WS-X4920-GB-RJ45 Half-Card Ethernet Module 1-9 WS-X4904-10GE Half-Card Ethernet Module 1-10 WS-X4908-10GE Half-Card Ethernet Module 1-11 WS-X4908-10G-RJ45 Half-Card Ethernet Module 1-13
Serial Number Location 1-14
CHAPTER
2 Site Planning 2-1
Site Environmental Requirements 2-1
Site Power Requirements 2-2
Preinstallation Requirements 2-2 Warnings and Cautions 2-2
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
iii
Page 4
Contents
EMI Recommendations 2-3 Power Requirements and Heat Dissipation 2-3
Grounding Requirements 2-7
Safety Overview 2-7
Ensuring Safety 2-7 Working Safely with Electricity 2-8 Preventing Electrostatic Discharge Damage 2-9
Site Planning Checklist 2-9
CHAPTER
3 Installing the Switch 3-1
Checking the Contents 3-1
Rack-Mounting the Switch 3-2
Rack-Mounting Guidelines 3-2 Lifting the Chassis Safely 3-3 Required Installation Tools 3-4 Rack-Mounting the Catalyst 4900M Switch 3-4
Connecting Power to the Catalyst 4900M Switch 3-7
Connecting DC-Input Power to the Catalyst 4900M Switch 3-9
Optical Connections 3-13
Configurable Modules 3-13
Required Tools 3-14 Removing Switching Modules 3-14 Installing Switching Modules 3-16
Removing and Replacing the Power Supply 3-18
Required Tools 3-18 Removing a Power Supply 3-18 Installing a Power Supply 3-19
Removing and Replacing the Fan Assembly 3-20
Required Tools 3-20 Removing the Fan Assembly 3-20 Installing the Fan Assembly 3-21 Verifying the Installation 3-21
CHAPTER
4 Troubleshooting the Installation 4-1
Getting Started 4-1
Problem Solving to the System Component Level 4-2
Identifying Startup Problems 4-2
LED Readings 4-2
Cisco Catalyst 4900M Switch Installation Guide
iv
78-18350-02
Page 5
Troubleshooting the Power Supply 4-4
Contacting Customer Service 4-4
Contents
APPENDIX
APPENDIX
A Specifications A-1
Console Port A-1
10/100/1000BASE-T Management Port A-2
Catalyst 4900M Switch Power Supply Specifications A-2
B Compliance Information and Translated Safety Warnings B-1
Translated Safety Warnings B-1
Statement 258—Fan Tray Removal Warning B-2 Statement 1003—DC Power Disconnection B-3 Statement 1004—Installation Instructions B-4 Statement 1006—Chassis Warning for Rack-Mounting and Servicing B-6 Statement 1008—Class 1 Laser Product B-11 Statement 1011—Staring into Laser Beam B-13 Statement 1017—Restricted Area B-14 Statement 1019—Main Disconnecting Device B-16 Statement 1024—Ground Conductor B-17 Statement 1028—More Than One Power Supply B-20 Statement 1029—Blank Faceplates and Cover Panels B-22 Statement 1030—Equipment Installation B-25 Statement 1040—Product Disposal B-27 Statement 1045—Short-circuit Protection B-28 Statement 1051—Laser Radiation B-30 Statement 1072—Shock Hazard from Interconnections B-32 Statement 1074—Comply with Local and National Electrical Codes B-35 Statement 1075—Hazardous Voltage or Energy Present on DC Power Terminals B-36
European Directives B-38
Statement 287—Declaration of Conformity to R&TTE Directive 1999/5/EC for the European Community, Switzerland, Norway, Iceland and Liechtenstein B-38
Statement 2002—Declaration of Conformity with Regard to the Directives 2006/95/EC and 2004/108/EC B-39
Statement 6005—California Perchlorate Contamination Prevention Act (Title 22, California Code of Regulations, Chapter 33) B-39
Statement 6003—Taiwan Battery B-40
Statement 6004—EU Battery Disposal and Recycling B-40
Statement 6005—California Perchlorate Contamination Prevention Act (Title 22, California Code of Regulations, Chapter 33) B-40
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
v
Page 6
Contents
Statement 8000—Standards Compliance B-40
Statement 2007—EMC Environmental Conditions for Products Installed in the European Union B-42
EMC Class A Notices and Warnings B-42
Statement 257—Class A Notice for Taiwan and Other Traditional Chinese Markets B-42 Statement 340—Class A Warning for CISPR22 B-43 Statement 2017—Class A Notice for FCC B-44 Statement 2021—Class A Notice for Canada B-44 Statement 191—VCCI Class A Warning for Japan B-45 Statement 256—Class A Warning for Hungary B-45 Statement 294—Class A Warning for Korea B-46
GR-1089-CORE Issue 3 Documentation Statements B-46
Statement 7016—GR-1089-Core Intrabuilding Lightning—Immunity Requirements B-46
GR-1089-CORE Issue 4 Documentation Statements B-46
Statement 7001—ESD Mitigation B-46 Statement 7005—Intra-building Lightning Surge and AC Power Fault B-46 Statement 7012—Equipment Interfacing with AC Power Ports B-47 Statement 7013—Equipment Bonding Networks B-47 Statement 7014—Installation Location B-47 Statement 7015—Equipment Bonding and Grounding B-47 Statement 7016—Battery Return Conductor B-47 Statement 7017—Minimum Steady State DC Input Voltage B-47
I
NDEX
Statement 8003—Telecom Approvals Listing B-47
Statement 3023—FCC Part 68 Notice B-47 Statement 3015—CS-03 Certification for Canada B-49 Statement 8001—JATE Certification for Japan B-49
Japanese Electric Appliance and Radio Laws B-50
Statement 371—Power Cable and AC Adapter B-50 Statement 372—Wireless LAN Products B-50 Statement 384—Japanese Safety Reference Information B-50
Cisco Catalyst 4900M Switch Installation Guide
vi
78-18350-02
Page 7
Preface
This preface describes the audience, organization, and conventions of the Cisco Catalyst 4900M Switch Installation Guide and provides information on how to obtain related documentation.
Audience
Only trained and qualified service personnel (as defined in IEC60950 and AZ/NZS 60950) should install, replace, or service the equipment.
Organization
This guide is organized as follows:
Chapter Title Description
Chapter 1 Product Overview Describes the hardware features and functionality of the
Chapter 2 Site Planning Describes how to prepare your site for the installation of the
Chapter 3 Installing the Switch Details how to install the Catalyst 4900M switch.
Chapter 4 Troubleshooting the
Appendix A Specifications Lists the Catalyst 4900M switch system specifications.
Appendix B Translated Safety
Installation
Warnings
Catalyst
switch.
Provides troubleshooting guidelines for the initial hardware installation and suggests steps to help isolate and resolve problems.
Repeats in multiple languages the warnings in this guide.
4900M switch.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
vii
Page 8
Related Documentation
Related Documentation
Although their Release Notes are unique, the 4 platforms (Catalyst 4500, Catalyst 4900, Catalyst ME 4900, and Catalyst 4900M) use the same Software Configuration Guide, Command Reference Guide, and System Message Guide. Refer to the following home pages for additional information:
Catalyst 4500 Series Switch Documentation Home
http://www.cisco.com/go/cat4500/docs
Catalyst 4900 Series Switch Documentation Home
http://www.cisco.com/go/cat4900/docs
Cisco ME 4900 Series Ethernet Switches Documentation Home
http://www.cisco.com/en/US/products/ps7009/tsd_products_support_series_home.html
Hardware Documents
Installation guides and notes including specifications and relevant safety information are available at the following URLs:
Preface
Catalyst 4500 Series Switches Installation Guide
http://www.cisco.com/en/US/docs/switches/lan/catalyst4500/hardware/installation/guide/78-14409
-08/4500inst.html
Catalyst 4500 E-series Switches Installation Guide
http://www.cisco.com/en/US/docs/switches/lan/catalyst4500/hardware/catalyst4500e/installation/g uide/Eseries.html
For information about individual switching modules and supervisors, refer to the Catalyst 4500
Series Module Installation Guide at:
http://www.cisco.com/en/US/docs/switches/lan/catalyst4500/hardware/module/guide/mod_inst.ht ml
Regulatory Compliance and Safety Information for the Catalyst 4500 Series Switches
http://www.cisco.com/en/US/docs/switches/lan/catalyst4500/hardware/regulatory/compliance/78_
13233.html
Installation notes for specific supervisor engines or for accessory hardware are available at:
http://www.cisco.com/en/US/products/hw/switches/ps4324/prod_installation_guides_list.html
Catalyst 4900 and 4900M hardware installation information is available at:
http://www.cisco.com/en/US/products/ps6021/prod_installation_guides_list.html
Cisco ME 4900 Series Ethernet Switches installation information is available at:
http://www.cisco.com/en/US/products/ps7009/prod_installation_guides_list.html
Cisco Catalyst 4900M Switch Installation Guide
viii
78-18350-02
Page 9
Preface
Software Documentation
Software release notes, configuration guides, command references, and system message guides are available at the following URLs:
Catalyst 4500 release notes are available at:
http://www.cisco.com/en/US/products/hw/switches/ps4324/prod_release_notes_list.html
Catalyst 4900 release notes are available at:
http://www.cisco.com/en/US/products/ps6021/prod_release_notes_list.html
Cisco ME4900 4900 Series Ethernet Switch release notes are available at:
http://www.cisco.com/en/US/docs/switches/lan/catalyst4500/release/note/OL_11511.html
Software documents for the Catalyst 4500 Classic, Catalyst 4500 E-Series, Catalyst 4900, and Cisco ME 4900 Series Ethernet Switches are available at the following URLs:
Catalyst 4500 Series Software Configuration Guide
http://www.cisco.com/en/US/products/hw/switches/ps4324/products_installation_and_configurati on_guides_list.html
Related Documentation
Catalyst 4500 Series Software Command Reference
http://www.cisco.com/en/US/products/hw/switches/ps4324/prod_command_reference_list.html
Catalyst 4500 Series Software System Message Guide
http://www.cisco.com/en/US/products/hw/switches/ps4324/products_system_message_guides_list .html
Cisco IOS Documentation
Platform-independent Cisco IOS documentation may also apply to the Catalyst 4500 and 4900 switches. These documents are available at the following URLs:
Cisco IOS configuration guides, Release 12.x
http://www.cisco.com/en/US/products/ps6350/products_installation_and_configuration_guides_lis t.html
Cisco IOS command references, Release 12.x
http://www.cisco.com/en/US/products/ps6350/prod_command_reference_list.html
You can also use the Command Lookup Tool at:
http://tools.cisco.com/Support/CLILookup/cltSearchAction.do
Cisco IOS system messages, version 12.x
http://www.cisco.com/en/US/products/ps6350/products_system_message_guides_list.html
You can also use the Error Message Decoder tool at:
http://www.cisco.com/pcgi-bin/Support/Errordecoder/index.cgi
For information about MIBs, refer to:
http://www.cisco.com/public/sw-center/netmgmt/cmtk/mibs.shtml
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
ix
Page 10
Related Documentation
Conventions
This document uses the following conventions:
Preface
Convention Description
boldface font Commands and keywords are in boldface.
italic font Arguments for which you supply values are in italics.
[ ] Elements in square brackets are optional.
{ x | y | z } Alternative keywords are grouped in braces and
separated by vertical bars.
[ x | y | z ] Optional alternative keywords are grouped in brackets
and separated by vertical bars.
string A non-quoted set of characters. Do not use quotation
marks around the string, because the string will include the quotation marks.
screen font Terminal sessions and information that the system
displays are in
boldface screen
font
italic screen font Arguments for which you supply values are in italic
Information that you must enter is shown in boldface
font.
screen
screen
screen font.
font.
Ctrl- Ctrl- represents the key labeled Control—for example,
the key combination Ctrl-D means to hold down the Control key while you press the D
key.
< > Characters that do not print, such as passwords, are
shown within angle brackets.
Notes use the following conventions:
Note Means reader take note. Notes contain helpful suggestions or references to material not covered in the
publication.
Cautions use the following conventions:
Caution Means reader be careful. In this situation, you might do something that could result in equipment
damage or loss of data.
Cisco Catalyst 4900M Switch Installation Guide
x
78-18350-02
Page 11
Preface
Warnings use the following conventions:
Statement 1071—Warning Definition
Related Documentation
Warning
Waarschuwing
Varoitus
IMPORTANT SAFETY INSTRUCTIONS
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents. Use the statement number provided at the end of each warning to locate its translation in the translated safety warnings that accompanied this device.
SAVE THESE INSTRUCTIONS
BELANGRIJKE VEILIGHEIDSINSTRUCTIES
Dit waarschuwingssymbool betekent gevaar. U verkeert in een situatie die lichamelijk letsel kan veroorzaken. Voordat u aan enige apparatuur gaat werken, dient u zich bewust te zijn van de bij elektrische schakelingen betrokken risico's en dient u op de hoogte te zijn van de standaard praktijken om ongelukken te voorkomen. Gebruik het nummer van de verklaring onderaan de waarschuwing als u een vertaling van de waarschuwing die bij het apparaat wordt geleverd, wilt raadplegen.
BEWAAR DEZE INSTRUCTIES
TÄRKEITÄ TURVALLISUUSOHJEITA
Tämä varoitusmerkki merkitsee vaaraa. Tilanne voi aiheuttaa ruumiillisia vammoja. Ennen kuin käsittelet laitteistoa, huomioi sähköpiirien käsittelemiseen liittyvät riskit ja tutustu onnettomuuksien yleisiin ehkäisytapoihin. Turvallisuusvaroitusten käännökset löytyvät laitteen mukana toimitettujen käännettyjen turvallisuusvaroitusten joukosta varoitusten lopussa näkyvien lausuntonumeroiden avulla.
SÄILYTÄ NÄMÄ OHJEET
Attention
IMPORTANTES INFORMATIONS DE SÉCURITÉ
Ce symbole d'avertissement indique un danger. Vous vous trouvez dans une situation pouvant entraîner des blessures ou des dommages corporels. Avant de travailler sur un équipement, soyez conscient des dangers liés aux circuits électriques et familiarisez-vous avec les procédures couramment utilisées pour éviter les accidents. Pour prendre connaissance des traductions des avertissements figurant dans les consignes de sécurité traduites qui accompagnent cet appareil, référez-vous au numéro de l'instruction situé à la fin de chaque avertissement.
CONSERVEZ CES INFORMATIONS
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
xi
Page 12
Related Documentation
Preface
Warnung
Avvertenza
Advarsel
WICHTIGE SICHERHEITSHINWEISE
Dieses Warnsymbol bedeutet Gefahr. Sie befinden sich in einer Situation, die zu Verletzungen führen kann. Machen Sie sich vor der Arbeit mit Geräten mit den Gefahren elektrischer Schaltungen und den üblichen Verfahren zur Vorbeugung vor Unfällen vertraut. Suchen Sie mit der am Ende jeder Warnung angegebenen Anweisungsnummer nach der jeweiligen Übersetzung in den übersetzten Sicherheitshinweisen, die zusammen mit diesem Gerät ausgeliefert wurden.
BEWAHREN SIE DIESE HINWEISE GUT AUF.
IMPORTANTI ISTRUZIONI SULLA SICUREZZA
Questo simbolo di avvertenza indica un pericolo. La situazione potrebbe causare infortuni alle persone. Prima di intervenire su qualsiasi apparecchiatura, occorre essere al corrente dei pericoli relativi ai circuiti elettrici e conoscere le procedure standard per la prevenzione di incidenti. Utilizzare il numero di istruzione presente alla fine di ciascuna avvertenza per individuare le traduzioni delle avvertenze riportate in questo documento.
CONSERVARE QUESTE ISTRUZIONI
VIKTIGE SIKKERHETSINSTRUKSJONER
Dette advarselssymbolet betyr fare. Du er i en situasjon som kan føre til skade på person. Før du begynner å arbeide med noe av utstyret, må du være oppmerksom på farene forbundet med elektriske kretser, og kjenne til standardprosedyrer for å forhindre ulykker. Bruk nummeret i slutten av hver advarsel for å finne oversettelsen i de oversatte sikkerhetsadvarslene som fulgte med denne enheten.
Aviso
¡Advertencia!
TA VARE PÅ DISSE INSTRUKSJONENE
INSTRUÇÕES IMPORTANTES DE SEGURANÇA
Este símbolo de aviso significa perigo. Você está em uma situação que poderá ser causadora de lesões corporais. Antes de iniciar a utilização de qualquer equipamento, tenha conhecimento dos perigos envolvidos no manuseio de circuitos elétricos e familiarize-se com as práticas habituais de prevenção de acidentes. Utilize o número da instrução fornecido ao final de cada aviso para localizar sua tradução nos avisos de segurança traduzidos que acompanham este dispositivo.
GUARDE ESTAS INSTRUÇÕES
INSTRUCCIONES IMPORTANTES DE SEGURIDAD
Este símbolo de aviso indica peligro. Existe riesgo para su integridad física. Antes de manipular cualquier equipo, considere los riesgos de la corriente eléctrica y familiarícese con los procedimientos estándar de prevención de accidentes. Al final de cada advertencia encontrará el número que le ayudará a encontrar el texto traducido en el apartado de traducciones que acompaña a este dispositivo.
GUARDE ESTAS INSTRUCCIONES
Cisco Catalyst 4900M Switch Installation Guide
xii
78-18350-02
Page 13
Preface
Related Documentation
Varning!
VIKTIGA SÄKERHETSANVISNINGAR
Denna varningssignal signalerar fara. Du befinner dig i en situation som kan leda till personskada. Innan du utför arbete på någon utrustning måste du vara medveten om farorna med elkretsar och känna till vanliga förfaranden för att förebygga olyckor. Använd det nummer som finns i slutet av varje varning för att hitta dess översättning i de översatta säkerhetsvarningar som medföljer denna anordning.
SPARA DESSA ANVISNINGAR
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
xiii
Page 14
Related Documentation
Preface
Aviso
Advarsel
INSTRUÇÕES IMPORTANTES DE SEGURANÇA
Este símbolo de aviso significa perigo. Você se encontra em uma situação em que há risco de lesões corporais. Antes de trabalhar com qualquer equipamento, esteja ciente dos riscos que envolvem os circuitos elétricos e familiarize-se com as práticas padrão de prevenção de acidentes. Use o número da declaração fornecido ao final de cada aviso para localizar sua tradução nos avisos de segurança traduzidos que acompanham o dispositivo.
GUARDE ESTAS INSTRUÇÕES
VIGTIGE SIKKERHEDSANVISNINGER
Dette advarselssymbol betyder fare. Du befinder dig i en situation med risiko for legemesbeskadigelse. Før du begynder arbejde på udstyr, skal du være opmærksom på de involverede risici, der er ved elektriske kredsløb, og du skal sætte dig ind i standardprocedurer til undgåelse af ulykker. Brug erklæringsnummeret efter hver advarsel for at finde oversættelsen i de oversatte advarsler, der fulgte med denne enhed.
GEM DISSE ANVISNINGER
Cisco Catalyst 4900M Switch Installation Guide
xiv
78-18350-02
Page 15
Preface
Related Documentation
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
xv
Page 16
Related Documentation
Preface
Obtaining Documentation and Submitting a Service Request
For information on obtaining documentation, submitting a service request, and gathering additional
xvi
information, see the monthly What’s revised Cisco
http://www.cisco.com/en/US/docs/general/whatsnew/whatsnew.html
Subscribe to the What’s New in Cisco Product Documentation as a Really Simple Syndication (RSS) feed and set content to be delivered directly to your desktop using a reader application. The RSS feeds are a free service and Cisco currently supports RSS
Cisco Catalyst 4900M Switch Installation Guide
technical documentation, at:
New in Cisco Product Documentation, which also lists all new and
Ve rs i on 2.0.
78-18350-02
Page 17
Product Overview
Revised: January 4, 2012
This chapter describes the Catalyst 4900M switch and the supported half-card Ethernet modules. The chapter contains these sections:
Catalyst 4900M Switch Chassis, page 1-1
Catalyst 4900M Half-Card Modules, page 1-8
Serial Number Location, page 1-14
Catalyst 4900M Switch Chassis
The Catalyst 4900M switch is a 2 RU horizontal high-performance dedicated Ethernet switch. The chassis has 8 fixed 1-GB or 10-GB ports and two half-card Ethernet module slots that can accommodate a several different styles of half-card Ethernet modules. The switch has one removable variable-speed fan tray and supports redundant power supplies.
CHA PTER
Figure 1-1 shows the front of the chassis.
1
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
1-1
Page 18
Catalyst 4900M Switch Chassis
Figure 1-1 Catalyst 4900M Switch Chassis
Chapter 1 Product Overview
232121
Catalyst 4900M Switch Chassis Features
Table 1-1 lists the features of the Catalyst 4900M switch chassis.
Ta b l e 1-1 Catalyst 4900M Switch Features
Feature Description
Chassis 8-port fixed configuration plus 2 half-card module slots
Uplink ports 8 10-Gigabit ports that support X2 transceivers. By using the Cisco OneX
converter, the 8-ports also support SFP+ transceivers.
Slots 2 half-card module slots are available allowing you to configure the chassis
to your specific needs.
Memory 512-MB SDRAM, 128-MB Flash (onboard and fixed), 256 bytes serial
EEROM
Console port A console serial port (RJ-45) provides for switch management using
standard console equipment. (See
Note A console cable is not provided in the accessory kit. It can be ordered
as an option.
Ethernet management port The management port on the rear panel offers the same TCP/IP based
management services available via inband access (telnet SNMP etc.). IP address configuration via BOOTP is supported on the Management port; it also supports image download to the switch.
Figure 1-2.)
Cisco Catalyst 4900M Switch Installation Guide
1-2
78-18350-02
Page 19
Chapter 1 Product Overview
Catalyst 4900M Switch Chassis
Table 1-1 Catalyst 4900M Switch Features (continued)
Feature Description
Reset switch The Reset button is used to restart the switch. Use a paper clip or other small,
pointed object to press the Reset button.
Fan tray Variable-speed. Field replaceable.
Power supplies 1000 W AC-input and 1000 W DC-input power supplies are supported.
Note A console cable is not provided as part of the accessory kit. It is available as an option.
Catalyst 4900M Switch Chassis Physical and Environmental Specifications
Table 1-2 lists the Catalyst 4900M switch chassis environmental and physical specifications.
Ta b l e 1-2 Catalyst 4900M Switch Specifications
Item Specification
Environmental
Temperature, operating Certified for operation: 32° to 104°F (0° to 40°C)
Designed and tested for operation: 32° to 131°F (0° to 55°C)
Note The Catalyst 4900M switch is equipped with internal air temperature
sensors that are triggered at 49°C (120.2°F) generating a minor alarm and at 64°C (147.2°F) generating a major alarm. The system will shut down at 67°C (152.6°F).
Temperature, nonoperating
–40° to 167°F (–40° to 75°C)
and storage
Humidity (RH), ambient
10% to 90%
(noncondensing) operating
Altitude, operating Certified for operation: –197 to 6562 ft (–60 to 2000 m)
Heat Dissipation 1364 BTU/hour (worst case)
Physical Characteristics
Dimensions (H x W x D) 3.5 x 17.2 x 17.9 in. (8.9 x 43.7 x 45.5 cm).
Chassis requires 2 RU
The Catalyst 4900M switch chassis is designed to install in standard
1
.
19-inch equipment racks that meet ANSI/EIA ETS
300-119 standards.
Weight 34.0 lb (15.4 kg) (max)
Airflow 151.7 CFM (max)
1. RU = rack units
310-D, IEC 60297, and
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
1-3
Page 20
Chapter 1 Product Overview
Catalyst 4900M Switch Chassis
Catalyst 4900M Switch Chassis Rear Panel Connections and Features
Figure 1-2 shows the chassis rear panel with the major features identified.
Figure 1-2 View of the Rear Panel
1 2 1 2 3
4 5 7 8
6
232122
1 Input OK LED (power
5 Console port
supply)
2 Output OK LED (power
6 Management port
supply)
3 Fan Status LED 7 USB connector 4 Reset button 8 Compact Flash slot
The chassis rear panel features include:
Reset button—The Reset button is used to restart the switch. Use a paper clip or other small, pointed
object to press the Reset button.
Console port—A console serial port (RJ-45) provides for switch management using standard
console equipment. (See
Figure 1-2.) A connector pinout table is provided in Appendix A,
“Specifications,” for the console and management ports.
Management port—The Management port on the rear panel offers the same TCP/IP based
management services available via inband access (telnet SNMP etc.). IP address configuration via BOOTP is supported on the Management port; it also supports image download to the switch.
USB connector—A USB connector is provided for future expansion.
Compact Flash slot—The Compact Flash slot accepts both 64-MB and 128-MB Type 1 compact
Flash cards. You can use it for file transfer tasks such as loading a new software image. The Flash card is optional and can be obtained from third-party suppliers.
For more information, refer to Using the Compact Flash on the Catalyst 4500 Series Supervisor Engines at the following URL:
http://www.cisco.com/en/US/docs/switches/lan/catalyst4500/hardware/configuration/notes/OL_27
88.html
Cisco Catalyst 4900M Switch Installation Guide
1-4
78-18350-02
Page 21
Chapter 1 Product Overview
Front Panel LEDs
A set of LEDS on the chassis front panel (see Figure 1-3) provide visual status for the switch. Tabl e 1-3 lists the front panel LEDS and their meanings.
Figure 1-3 Chassis Front Panel LEDs
2
4
Catalyst 4900M Switch Chassis
1
3
1 PS1 LED 4 System LED 2 PS2 LED 5 10Gig port LEDs 3 Fan LED
Ta b l e 1-3 Front Panel LED Descriptions
LED Description
System
(front)
The system LED indicates the operating state of the Catalyst 4900M switch. At startup, the Catalyst diagnostic tests:
Green—All tests pass
Red—A test other than an individual port test fails
Off—System is in rommon mode or a power supply has failed
Switch is disabled
CON
Console port
(rear)
MGT
(rear)
Green—10/100 BASE-T console port is in link-up state
Off—10/100 BASE-T console port is in link-down state or not
connected
Note There are no blinking, red, or yellow states for this port
Green—10/100/1000BASE-T Management port is in link-up
state.
Off—10/100/1000BASE-T Management port is in link-down
state or not connected.
Note There are no blinking, red, or yellow states for this port.
Port
Green—Port is operational.
5
4900M performs a series of
232123
(front)
78-18350-02
Yellow—Port is disabled by user.
Flashing yellow—Power-on self-test indicates faulty port.
Off—No signal detected or link configuration failure.
Cisco Catalyst 4900M Switch Installation Guide
1-5
Page 22
Catalyst 4900M Switch Chassis
Table 1-3 Front Panel LED Descriptions (continued)
LED Description
Fan
(front and rear)
PS1 and PS2
Chapter 1 Product Overview
FAN LED indicates the fan tray status.
Green—Fan tray operational.
Red—Fault detected. One or more fans not functional.
Off—No power to the fan tray.
PS1 and the PS2 LEDs indicates the internal power supply status.
(front)
LINK A link status LED is located below the 10-GB uplink ports.
1. If either LED is green and the other is OFF the power supply is probably not plugged in. If it is red, the
Chassis Cooling
The hot-swappable chassis fan tray (WS-X4992) provides cooling air for the internal chassis components. The fans draw air in from the right side of the chassis and exhaust the heated air through perforations on the right side of the chassis.
Caution When the fan tray is removed, internal circuitry is exposed that should not be touched by tools or fingers.
The system should not operate without a fan tray for longer than is necessary to replace a faulty fan tray with a new fan tray.
Figure 1-4 shows the direction of airflow through the switch.
Off—No power to the power supply.
Green—Operational.
Red—Fault detected or the on/off switch is set to off while the
1
power supply is plugged in.
supply is either plugged in and not switched on or it is faulty. It may be necessary to interrogate the system for further status using the CLI.
Cisco Catalyst 4900M Switch Installation Guide
1-6
78-18350-02
Page 23
Chapter 1 Product Overview
Figure 1-4 Catalyst 4900M Chassis Airflow
Catalyst 4900M Switch Chassis
232124
There are five fans in the fan tray. If an individual fan fails, the other fans continue to run. Sensors monitor the internal air temperatures. The number of fans in operation and their speed varies according to the internal temperature for the quietest operation possible. If the air temperature exceeds a desired threshold, the environmental monitor displays warning messages.
Note Individual fans in the fan tray cannot be replaced; the entire fan tray must be replaced.
Power Supplies
Note For complete power specifications for the Catalyst 4900M switch, see Appendix A, “Specifications.”
The Catalyst 4900M switch has two redundant internal 1000 W AC-input or 1000 W DC-input power supplies.
The internal power supplies have individual power cords and status LEDs (PS1 and PS2 on the front panel). There are also LEDs on the power supplies that show status for the input (Input OK) and output (Output OK) currents. A power cord is used to connect the power supplies to the site AC source. There is a power switch on the AC-input power supplies; AC power is present when a power cord is plugged into a power supply and the switch is set to the On position. DC-input power supplies attach to source DC using customer-supplied cables.
The switch starts with only one power supply plugged in, but redundant failover and load sharing is not available in this configuration. Cisco recommends that you always connect both power supplies to separate AC or DC circuits for optimal power reliability.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
1-7
Page 24
Catalyst 4900M Half-Card Modules
For safety reasons, the AC power supply must be switched off and unplugged before it is removed from a chassis or inserted into a chassis. DC supplies should have power shut off from the source before they are removed.
If only one power supply is used, you must use the supplied blank faceplate to cover the empty power bay. The blank power supply cover maintains EMI shielding and proper air flow through the chassis.
Environmental Monitoring of the Power Supplies
Using the environmental monitoring and reporting functions, you can maintain normal system operation by resolving adverse environmental conditions prior to loss of operation.
Each power supply monitors its own temperature and output voltages. The Catalyst 4900M switch senses the operating condition of the power supply and reports status through software.
Power Management for the Catalyst 4900M Switch
You can select either AC-input or DC-input power supplies for your switch. The Catalyst 4900M switch supports the following power supplies:
Chapter 1 Product Overview
1000 W AC-input
1000 W DC-input
A redundant power supply can be identified and diagnosed by a running system regardless of its input status. The AC-input and DC-input supplies are interchangeable.
Power Management Modes
The Catalyst 4900M switch supports the redundant power management mode. In this mode, if both power supplies are operating normally, each provides from 20/80 to 45/55 power requirements at all times. If one power supply fails, the other unit increases power to 100 of the total power requirement.
Catalyst 4900M Half-Card Modules
The Catalyst 4900M switch chassis has two half-card slots available allowing two half-card modules to be installed. The following half-card modules are available:
WS-X4920-GB-RJ45 Half-Card Ethernet Module, page 1-9
WS-X4904-10GE Half-Card Ethernet Module, page 1-10
WS-X4908-10GE Half-Card Ethernet Module, page 1-11
WS-X4908-10G-RJ45 Half-Card Ethernet Module, page 1-13
percent of the total system
percent
The half-card modules can be mixed in a chassis.
Cisco Catalyst 4900M Switch Installation Guide
1-8
78-18350-02
Page 25
Chapter 1 Product Overview
WS-X4920-GB-RJ45 Half-Card Ethernet Module
The WS-X4920-GB-RJ45 half-card Ethernet module provides 20 10/100/1000-Mbps full-or half-duplex ports.
Figure 1-5 shows the module with the major features identified.
Figure 1-5 WS-X4920-GB-RJ45 Half-Card Ethernet Module
Catalyst 4900M Half-Card Modules
1
2
1 Module status LED 2 Port LEDs
Table 1-4 lists the specifications for the WS-X4920-GB-RJ45 half-card Ethernet Module.
Ta b l e 1-4 WS-X4920-GB-RJ45 Half-Card Module Specifications
Specification Description
Module type 10/100/1000BASE-T half-card Ethernet module
Port duplex mode Half- or full-duplex mode
Port speed 10, 100, or 1000 Mbps
Number of ports 20
Connector type RJ-45
Cable type Category 5 and Category 6
Cabling distance 328 ft (100 m)
Pluggable transceivers
Not supported
support
Module upgrades
None
available
Power over Ethernet Not supported
232118
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
1-9
Page 26
Catalyst 4900M Half-Card Modules
WS-X4904-10GE Half-Card Ethernet Module
The WS-X4904-10GE half-card Ethernet module provides 4 10-Gigabit Ethernet ports. Figure 1-6 shows the module.
Figure 1-6 WS-X4904-10GE Half-Card Ethernet Module
Chapter 1 Product Overview
1
2
1 Module Status LED 2 Port LEDs
Table 1-5 list the specifications for the WS-X4904-10GE half-card Ethernet module.
Ta b l e 1-5 WS-X4904-10GE Half-Card Ethernet Module Specifications
Specification Description
Module type 10-Gigabit Ethernet module
Port duplex mode Full-duplex mode
Port speed 10G Mbps
Number of ports 4
Connector type SC (optical)
Cable type MMF or SMF
Cabling distance Dependent on the type of X2 transceiver installed
Pluggable transceivers
X2 transceivers
support
Module upgrades
None
available
Power over Ethernet Not supported
232119
Cisco Catalyst 4900M Switch Installation Guide
1-10
78-18350-02
Page 27
Chapter 1 Product Overview
WS-X4908-10GE Half-Card Ethernet Module
The WS-X4908-10GE module (Figure 1-7) is an 8-port 10-Gigabit Ethernet module that has the ability to operate as a 16 port 1-Gigabit module by installing a Cisco TwinGig converter module in the X2 transceiver socket and then installing two 1-Gigabit SFP transceivers in the TwinGig converter.
Figure 1-7 8-Port 10-Gigabit Ethernet Module (WS-X4908-10GE)
Catalyst 4900M Half-Card Modules
1
2
1 Module Status LED 2 Port LEDs
Table 1-6 list the specifications for the WS-X4908-10GE half-card Ethernet module.
Ta b l e 1-6 WS-X4908-10GE Half-Card Ethernet Module Specifications
Specification Description
Module type 10-Gigabit Ethernet module
Port duplex mode Full-duplex mode
Port speed 10G Mbps
Number of ports 8 (10-Gigabit) or 16 (1-Gigabit). Each 10-Gigabit
port on the module can be converted into two 1-Gigabit ports using a Cisco TwinGig converter module (CVR-X2-SFP) and SFP transceivers. Each 10-Gigabit X2 port can also be converted into one 10-Gigabit SFP+ transceiver port by installing a Cisco OneX converter module ((CVR-X2-SFP10G).
Connector type SC (optical) or RJ-45 (copper)
232120
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
1-11
Page 28
Catalyst 4900M Half-Card Modules
Table 1-6 WS-X4908-10GE Half-Card Ethernet Module Specifications (continued)
Specification Description
Cable type MMF or SMF (optical) or Category 5 or Category 6
Cabling distance Dependent on the type of X2, SFP, or SFP+
Pluggable transceivers support
Module upgrades available
Power over Ethernet Not supported
Chapter 1 Product Overview
(copper)
transceiver installed
X2 transceivers
SFP+ transceiver (using a Cisco OneX converter
module)
SFP transceiver (using a Cisco TwinGig converter
module)
None
Note TwinGig converter modules may be installed in place of X2 transceiver modules if you need 1-GB SFP
transceiver connections. When you insert the TwinGig into one port, its neighbor port automatically converts to 1 GE interfaces whether it has a TwinGig installed or not, so you must position your TwinGig converters next to each other. The neighboring port to a TwinGig port cannot support an X2. Installation documentation for Cisco TwinGig converter modules can be found at:
http://www.cisco.com/en/US/docs/switches/lan/catalyst3750e_3560e/hardware/install/notes/1757202.h tml
Note When using TwinGig converters and X2 transceivers on this module, keep them grouped in pairs as
follows: ports
1–2, ports 3–4, ports 5–6 and ports 7–8. Inserting a TwinGig converter or X2 transceiver in any port will affect the capability of its neighbor port, and both will be set to handle the same type automatically. Mixing within a port group does not work. As an example, you would not be able to have an X2 transceiver in port 1 and a TwinGig converter in port 2.
Cisco Catalyst 4900M Switch Installation Guide
1-12
78-18350-02
Page 29
Chapter 1 Product Overview
WS-X4908-10G-RJ45 Half-Card Ethernet Module
The WS-X4908-10G-RJ45 half-card Ethernet module provides 8 10Gbps full-or half-duplex ports.
Figure 1-8 shows the module with major features identified.
Figure 1-8 WS-X4908-10G-RJ45 Half-Card Ethernet Module
WS-X4908-10G-RJ45
1
LINK
STATUS
1G
Catalyst 4900M Half-Card Modules
254342
1
2
3
1 Module status LED 3 1G LED (port operating in 1-Gbps mode) 2 LINK LED
Table 1-7 lists the specifications for the WS-X4908-G-RJ45 half-card Ethernet module.
Ta b l e 1-7 WS-X4908-10G-RJ45 Half-Card Module Specifications
Specification Description
Module type 1-GB or 10-G half-card Ethernet module
Port duplex mode Half- or full-duplex mode
Port speed 1-Gbps or 10-Gbps
Number of ports 8
Connector type RJ-45
Cable type Category 6, Category 6a, and Category
Cabling distance Category 6—Up to 180.5 ft (55 m) at 10-Gbps. Up to
328
ft (100 m) at 1-Gbps.
78-18350-02
Category 6a and Category 7—Up to 328 ft (100 m) at both 10-Gbps and 1-Gbps.
Cisco Catalyst 4900M Switch Installation Guide
1-13
Page 30
Serial Number Location
Table 1-7 WS-X4908-10G-RJ45 Half-Card Module Specifications (continued)
Specification Description
Pluggable transceivers support
Module upgrades available
Power over Ethernet Not supported
Serial Number Location
Figure 1-9 shows the location of the serial number for your switch. You will need this information when
contacting Cisco for support.
Figure 1-9 Catalyst 4900M Chassis Serial Number
Chapter 1 Product Overview
Not supported
None
Cisco Catalyst 4900M Switch Installation Guide
1-14
202519
SN: XXXNNNNXXXX
78-18350-02
Page 31
CHA PTER
2
Site Planning
This chapter describes how to prepare your site for installation of the Catalyst 4900M switch and contains these sections:
Site Environmental Requirements, page 2-1
Site Power Requirements, page 2-2
Grounding Requirements, page 2-7
Safety Overview, page 2-7
Site Planning Checklist, page 2-9
Note A site planning checklist is provided on page 2-8 to help ensure that you complete all site planning
activities before you install the switch.
Site Environmental Requirements
Planning a proper location for the switch and layout for your equipment rack or wiring closet is essential for successful system operation. You should install the switch in an enclosed, secure area, ensuring that only qualified personnel have access to the switch and control of the environment. Equipment that is placed too closely together or that is inadequately ventilated can cause system overtemperature conditions. In addition, poor equipment placement can make chassis panels inaccessible and difficult to maintain.
The switch operates as a standalone system mounted in a rack in a secure wiring closet. It requires a dry, clean, well-ventilated, and air-conditioned environment. To ensure normal operation, maintain ambient airflow. If the airflow is blocked or restricted, or if the intake air is too warm, an overtemperature condition can occur. The switch environmental monitor can then shut down the system to protect the system components.
To ensure normal operation and avoid unnecessary maintenance, plan your site configuration and prepare your site before installation. After installation, make sure that the site maintains an ambient temperature of 0 to 40° C (32 to 104° F). It is essential to keep the area around the chassis as free from dust and foreign conductive material (such as metal flakes from nearby construction activity) as is possible.
Multiple switches can be rack-mounted with little or no clearance above and below the chassis. However, when mounting a switch in a rack with other equipment, or when placing it on the floor near other equipment, ensure that the exhaust from other equipment does not blow into the intake vents of the chassis.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
2-1
Page 32
Site Power Requirements
Cooling air is drawn in through the right side and exhausted through the left side of the chassis. Keep the sides and rear clear of obstructions, including dust and foreign conductive material, and away from the exhaust ports of other equipment.
Appendix A, “Specifications,” lists the operating and nonoperating environmental site requirements for
the switches. To maintain normal operation and ensure high system availability, maintain an ambient temperature and EMI-free and continuous power at your site. The environmental ranges listed in Appendix A are those within which the switch will continue to operate; however, a measurement that approaches the minimum or maximum of a range indicates a potential problem. You can maintain normal operation by anticipating and correcting environmental anomalies before they exceed the maximum operating range.
Site Power Requirements
This section describes the installation site power requirements for the Catalyst 4900M switch. Verify your site power before you install the switch.
This section consists of the following sections:
Preinstallation Requirements, page 2-2
Chapter 2 Site Planning
Warnings and Cautions, page 2-2
EMI Recommendations, page 2-3
Power Requirements and Heat Dissipation, page 2-3
Preinstallation Requirements
Follow these requirements when preparing your site for the Catalyst 4900M switch installation:
Connect each switch to separate wiring on a dedicated circuit; provide each switch with its own
branch circuit connection with sufficient overcurrent protection and direct grounding to the branch circuit.
To prevent a loss of input power, be sure the total maximum load on each AC circuit is within the
current ratings of the wiring and breakers.
Warnings and Cautions
Follow these precautions when preparing your site for the Catalyst 4900M switch installation:
Caution The total maximum load on each AC or DC -input power circuit must be within the rating of the wiring
and breaker. An overload of input power can result if this requirement is not met.
Warning
Warning
Cisco Catalyst 4900M Switch Installation Guide
2-2
Read the installation instructions before connecting the system to the power source.
Installation of the equipment must comply with local and national electrical codes.
Statement 1004
Statement 1074
78-18350-02
Page 33
Chapter 2 Site Planning
Site Power Requirements
Warning
Ultimate disposal of this product should be handled according to all national laws and regulations.
Statement 1040
EMI Recommendations
Follow these guidelines when setting up the site wiring. When planning the location of the new system, consider electromagnetic interface (EMI), the distance limitations for signaling, and connector compatibility.
When wires are run for any significant distance in an electromagnetic field, radio frequency interference (RFI) can occur between the field and the signals on the wires.
Bad plant wiring can result in radio frequency interference.
Strong EMI, especially when caused by lightning or radio transmitters, can destroy the signal drivers
and receivers in the switch and can create an electrical hazard by conducting power surges through lines and into equipment.
Note To predict and remedy strong EMI, you might need to consult RFI experts.
Power Requirements and Heat Dissipation
The power requirements might be useful for planning the power distribution system needed to support the switches. Heat dissipation is an important consideration for sizing the air-conditioning requirements for an installation. Refer to
Appendix A, “Specifications,” for the power and heat ratings for a
Catalyst 4900M switch.
You will also need to provide power to the switch with the appropriate AC power cord for your location.
Table 2-1 lists the specifications for the AC power cords that are available for the 1000 W AC-input
power supply. The table includes references to illustrations of the AC power cords.
Ta b l e 2-1 1000 W AC-Input Power Supply Power Cords
Locale Power Cord Part Number AC Source Plug
Ty pe
Cordset Rating Power Cord
Reference Illustration
Argentina CAB-IR2073-C15-AR=
IRAM 2073 10 A, 250 VA C Figure 2-1
(was CAB-7KACR=)
Australia, New Zealand
Continental Europe CAB-CEE77-C15-EU=
CAB-AS3112-C15-AU=
(was CAB-7KACA=)
SAA AS 3112 10 A, 250 VA C Figure 2-2
CEE 7/7 10 A, 250 VA C Figure 2-3
(was CAB-7KACE=)
Italy CAB-C2316-C15-IT=
CEI 23-16/7 10 A, 250 VA C Figure 2-4
(was CAB-7KACI=)
North America, Japan
CAB-US515-C15-US=
(was CAB-7KAC=)
NEMA 5-15113 A, 125 VA C Figure 2-5
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
2-3
Page 34
Site Power Requirements
Table 2-1 1000 W AC-Input Power Supply Power Cords (continued)
Chapter 2 Site Planning
Locale Power Cord Part Number AC Source Plug
Ty pe
Cordset Rating Power Cord
Reference Illustration
North America CAB-N5K6A-NA= NEMA 6-15P 10 A, 250 VA C Figure 2-6
South Africa, India
Switzerland CAB-9K10A-SW=
CAB-BS546-C15-SA= BS 546
(SABS 164-1)
SEV 1011 10 A, 250 VA C Figure 2-8
10 A, 250 VA C Figure 2-7
(was CAB-7KACSW=)
United Kingdom CAB-BS1363-C15-UK=
BS 1363
2
13 A, 250 VA C Figure 2-9
(was CAB-7KACU=)
1. For Japan, ask your local electrical contractor to prepare the NEMA 5-20 power plug.
2. Plug contains a 13 A fuse.
Figure 2-1 CAB-IR2073-C15-AR=, CAB-7KACR= (Argentina)
Cordset rating: 10 A, 250 V
Plug: IRAM 2073
Length: 8 ft 2 in. (2.5 m)
Connector: IEC 60320 C15
Figure 2-2 CAB-AS3112-C15-AU=, CAB-7KACA= (Australia and New Zealand)
Cordset rating: 10 A, 250 V
Plug: SAA AS 3112
Length: 8 ft 2 in. (2.5 m)
Connector: IEC 60320 C15
113346
113347
Cisco Catalyst 4900M Switch Installation Guide
2-4
78-18350-02
Page 35
Chapter 2 Site Planning
Figure 2-3 CAB-CEE77-C15-EU=, CAB-7KACE= (Continental Europe)
Cordset rating: 10A/16 A, 250 V
Plug:
Length: 8 ft 2 in. (2.5 m)
M2511
Figure 2-4 CAB-C2316-C15-IT=, CAB-7KACI= (Italy)
Site Power Requirements
Connector:
VSCC15
186576
Cordset rating: 10 A, 250 V
Plug: CEI 23-16/7
Length: 8 ft 2 in. (2.5 m)
Connector: IEC 60320 C15
Figure 2-5 CAB-US515-C15-US=, CAB-7KAC= (North America)
Cordset rating 13A, 125V
(8.2 feet) (2.5m)
Plug:
NEMA 5-15P
113349
Connector:
IEC60320/C15
192260
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
2-5
Page 36
Site Power Requirements
Figure 2-6 CAB-N5K6A-NA (North America)
Figure 2-7 CAB-BS546-C15-SA (South Africa, India)
Plug: NEMA 6-15P
Chapter 2 Site Planning
Cordset rating: 10 A, 250 V
Length: 8.2 ft
Connector:
IEC60320/C13
186570
Cordset rating 10A, 250V
8 ft. 0 in (2.4 m)
Plug: BS 546
Connector: IEC 60320 C15
(SABS 164-1)
Figure 2-8 CAB-9K10A-SW=, CAB-7KACSW= (Switzerland)
Cordset rating: 10 A, 250 V
Plug:
Length: 8 ft. 2 in (2.5 m)
MP232-R
196271
Connector:
IEC 60320 C15
186578
Cisco Catalyst 4900M Switch Installation Guide
2-6
78-18350-02
Page 37
Chapter 2 Site Planning
Grounding Requirements
Figure 2-9 CAB-BS1363-C15-UK=, CAB-7KACU= (United Kingdom)
13A fuse
Plug: BS 1363
Grounding Requirements
Grounding is recommended on all AC-input or DC-input installations, using only approved copper connectors. Attach the provided two hole ground lug to the chassis using M4 the central office (CO) or other interior ground system with number 6 located on the rear of the chassis, as shown in
Figure 2-10 Grounding Pad Location
Cordset rating: 10 A, 250 V
Length: 8 ft 2 in. (2.5 m)
Connector: IEC 60320 C15
113351
x 8mm bolts and then to
AWG wire. The grounding pad is
Figure 2-10.
1
1 Grounding pad
Safety Overview
This section provides safety information that you should read and understand to ensure a safe switch installation.
Ensuring Safety
Follow these guidelines to ensure your safety and protect the equipment. This list is not inclusive of all potentially hazardous situations that you may be exposed to as you install the switch, so be alert.
78-18350-02
232131
Cisco Catalyst 4900M Switch Installation Guide
2-7
Page 38
Safety Overview
Chapter 2 Site Planning
Warning
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Statement 1030
Warning
This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available.
Note To completely de-energize the system, unplug the power cord.
Always use caution when lifting heavy equipment.
Always turn all power supplies off by unplugging all power cords before installing or removing a
chassis.
Keep the chassis area clear and free of dust during and after installation.
Keep tools and chassis components off of the floor and away from foot traffic.
Avoid wearing jewelry (including rings and chains) or other items that could get caught in the
chassis. Avoid wearing any loose clothing, or securely fasten items such as ties, scarves, or sleeves.
Install the system in compliance with the following local and national electrical codes.
Statement 1024
Working Safely with Electricity
Follow these basic guidelines when working with any electrical equipment:
Locate the emergency power-off switch for the room in which you are working before beginning
installation.
Disconnect all power and external cables before installing or removing a chassis.
Do not work alone when potentially hazardous conditions exist.
Never assume that power has been disconnected from a circuit; always check.
Do not perform any action that creates a potential hazard to people or makes the equipment unsafe.
Examine your work area carefully for possible hazards such as moist floors, ungrounded power
extension cables, and missing safety grounds.
Cisco Catalyst 4900M Switch Installation Guide
2-8
78-18350-02
Page 39
Chapter 2 Site Planning
Preventing Electrostatic Discharge Damage
Electrostatic discharge (ESD) damage occurs when electronic cards or components are improperly handled and can result in complete or intermittent failures. Follow these guidelines to prevent ESD damage:
Always use an ESD-preventive wrist or ankle strap, and ensure that it makes maximum contact with
the skin.
When coming into contact with any internal components, always use a wrist strap connected to one
of the following:
ESD wrist strap connector
Any unpainted grounded surface on the chassis or equipment rack
Caution Periodically check the resistance value of the antistatic strap. The measurement should be between 1 and
10 megohms (Mohms).
Handle cards by the edges only.
Site Planning Checklist
Avoid contact between the modules and clothing. The wrist strap protects only the card from ESD
voltages on the body; ESD voltages on clothing can still cause damage.
Site Planning Checklist
Table 2-2 lists the site planning activities that you should perform before you install the Catalyst 4900M
switch. Completing each activity helps to ensure a successful switch installation.
Ta b l e 2-2 Site Planning Checklist
Task No. Planning Activity Verified By Time Date
1 Space evaluation:
Space and layout Floor covering Shock and vibration Lighting Maintenance access
2 Environmental evaluation:
Ambient temperature Humidity Altitude Atmospheric contamination Airflow
3 Power evaluation:
Input power type Receptacle proximity to the equipment Dedicated (separate) circuits for redundant power supplies UPS for power failures
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
2-9
Page 40
Site Planning Checklist
Chapter 2 Site Planning
Table 2-2 Site Planning Checklist (continued)
Task No. Planning Activity Verified By Time Date
4 Grounding evaluation:
Circuit breaker size
5 Cable and interface equipment evaluation:
Cable type Connector type Cable distance limitations Interface equipment (transceivers)
6 EMI evaluation:
Distance limitations for signaling Site wiring RFI levels
Cisco Catalyst 4900M Switch Installation Guide
2-10
78-18350-02
Page 41
CHA PTER
3
Installing the Switch
Revised: January 4, 2012
This chapter describes how to install the Catalyst 4900M switch. For first-time installations, perform the procedures in the following sections in the order listed.
Checking the Contents, page 3-1
Rack-Mounting the Switch, page 3-2
Connecting Power to the Catalyst 4900M Switch, page 3-7
Connecting DC-Input Power to the Catalyst 4900M Switch, page 3-9
Optical Connections, page 3-14
Configurable Modules, page 3-14
Note Before starting the installation procedures in this chapter, complete the site planning checklist in
Chapter 2, “Site Planning,” to verify that all planning activities were completed.
Checking the Contents
Note Do not discard the shipping container when you unpack the switch. Flatten the shipping cartons and store
them. You will need the container if you need to move or ship the switch in the future.
To check the contents of the shipping container follow these steps:
Step 1 Check the contents of the accessories kit against the packing slip. Verify that you received all listed
equipment, which should include the following:
Switch hardware and software documentation, if ordered
Optional equipment that you ordered, such as network interface cables, transceivers, or special
connectors. A console cable is not provided as part of the accessory kit. It can ordered as an option.
Step 2 To begin installation, proceed to the “Rack-Mounting the Switch” section on page 3-2.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
3-1
Page 42
Rack-Mounting the Switch
Rack-Mounting the Switch
A rack-mount kit (69-1821-03) is included in the accessory kit for mounting the switch in a standard 19-inch (48.3 the front and the rear posts) does not exceed 32.5 for racks with obstructions (such as a power strip) that could impair access to the switch, four-post rack enclosures that exceed 32.5
An optional rack-mounting kit (C4900M-BKTS-KIT=) is available for installing the chassis in two-post telco racks and in four-post equipment racks that exceed 32.5
Caution Before installing the chassis in a rack, read the “Site Environmental Requirements” section on page 2-1
to become familiar with the proper site and environmental conditions. Failure to read and follow these guidelines could lead to an unsuccessful installation and possible damage to the system and components.
Caution This unit is meant to be rack-mounted, and is not intended to bear more than its own weight. Do not stack
more than two on a table top, the added weight may damage the bottom chassis.
cm) four-post equipment rack where the depth of the rack (the distance measured between
inches (82.5 cm) in depth, or for two-post equipment racks.
Chapter 3 Installing the Switch
inches (82.5 cm). This rack-mount kit is not suitable
inches (82.5 cm) in depth.
Warning
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains stable. The following guidelines are provided to ensure your safety:
• This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
• When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest
component at the bottom of the rack.
• If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in
the rack.
Statement 1006
Rack-Mounting Guidelines
Before rack-mounting the switch, ensure the following:
The equipment rack is the proper size.
The width of the rack, between the two front mounting strips or rails, must be 17.75 inches (45.09
cm).
The depth of the rack, between the front and rear mounting strips, must be at least 19.25 inches (48.9
cm) but not more than 32.5 inches (82.5 cm).
Note If your four-post rack enclosure exceeds 32.5 inches (82.5 cm) in depth, or you are
installing the chassis in a two-post equipment rack, you must order and use the optional rack-mount kit (C4900M-BKTS-KIT=).
Cisco Catalyst 4900M Switch Installation Guide
3-2
78-18350-02
Page 43
Chapter 3 Installing the Switch
The equipment rack is stable and in no danger of falling over.
The equipment rack is properly ventilated.
Rack-Mounting the Switch
The rack must have sufficient vertical clearance to insert the chassis. The chassis height is 2 U (3.5
inches (8.9 cm)).
Ensure that the shelf is constructed to support the weight and dimensions of the chassis. For physical specifications, see
We recommend that you bolt the rack to the floor.
Mount the unit at the bottom of the rack if it is the only unit in the rack.
Install heavier equipment in the lower half of the rack to maintain a low center of gravity and
Appendix A, “Specifications.”
prevent the rack from becoming top-heavy and tipping over.
Install the stabilizers before mounting or servicing the switch in the rack (if the rack is provided with stabilizing devices).
Install the chassis in an enclosed rack only if it has adequate ventilation or an exhaust fan; use an open rack whenever possible.
Ensure that the ambient temperature of the rack environment does not exceed a maximum temperature of 104° F (40° C). Note that if the switch is installed in a closed or multiunit rack assembly, the ambient operating temperature of the rack environment might be higher than the ambient room temperature.
Note that a ventilation system in a closed rack that is too powerful might also prevent cooling by creating negative pressure around the chassis and redirecting the air away from the chassis intake vent. If necessary, operate the chassis with the rack open.
To prevent airflow restriction, allow at least 3 inches (7.6 cm) of clearance around the ventilation openings on the sides of the chassis.
Use baffles correctly to assist in cooling the chassis.
Note that equipment near the bottom of a rack may generate excessive heat that is drawn upward and into the intake ports of equipment above, leading to overtemperature conditions in the chassis at or near the top of the rack.
Consider the equipment and cabling that is already installed in the rack. Ensure that cables from other equipment will not obstruct the airflow through the chassis or impair access to the power supplies or switching modules. Route cables away from field-replaceable components to avoid disconnecting cables unnecessarily for equipment maintenance or upgrades.
Allow at least 3 to 4 feet (91.4 to 121.9 cm) of clearance behind the rack for maintenance and removal of switch assemblies. If the rack is mobile, you can push it back within 1 foot (30.45 cm) of a wall or cabinet for normal operation and pull it out when necessary for maintenance.
Lifting the Chassis Safely
The chassis is not intended to be moved frequently. Before you install the switch, ensure that your site is properly prepared so that you can avoid moving the chassis later to accommodate power sources and network connections.
Whenever you lift a chassis or any heavy object, follow these guidelines:
Ensure that your footing is solid, and balance the weight of the chassis between your feet.
Lift the chassis slowly; never move suddenly or twist your body as you lift.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
3-3
Page 44
Rack-Mounting the Switch
Keep your back straight and lift with your legs, not your back. If you must bend down to lift the
chassis, bend at the knees, not at the waist, to reduce the strain on your lower back muscles.
Always disconnect all external cables before lifting or moving the chassis.
Required Installation Tools
The following tools and equipment are required to install the chassis:
Number 1, number 2 Phillips, and 3/16-inch flat-blade screwdriver
Antistatic mat or antistatic foam
Your own ESD grounding strap or the disposable ESD strap included with the system
The following tools and equipment are required to install the chassis in a rack:
Rack-mount kit
Tape measure and level
Chapter 3 Installing the Switch
Rack-Mounting the Catalyst 4900M Switch
Follow these steps to install the Catalyst 4900M switch in a four-post rack.
Step 1 Prepare for installation:
a. Place the chassis on the floor or on a sturdy table as close as possible to the rack. Leave enough
clearance to allow you to move around the chassis.
b. Use a tape measure to measure the depth of the rack. Measure from the outside of the front mounting
posts to the outside of the rear mounting strip. The four-post rack depth must be at least 19.25 (48.9
cm) but not more than 32.5 inches (82.5 cm). If the 4-post rack depth is greater than
32.5
inches (82.5 cm), order and use the optional rack-mount kit (C4900M-BKTS-KIT=).
c. Measure the space between the inner edges of the left front and right front mounting posts to ensure
that it is 17.75 between the mounting posts.)
d. Open the standard rack-mount kit, and refer to Tab l e 3-1 to verify that all parts are included.
Ta b l e 3-1 Standard Rack-Mount Kit Checklist
Quantity Part Description Received
1 Left mounting bracket
1 Right mounting bracket
2 Rear mounting brackets
12 M4 Phillips Flat-head screws
8 12-24 x 3/4-inch Phillips binder-head screws
8 10-32 x 3/4-inch Phillips binder-head screws
inches (45.09 cm) wide. (The chassis is 17.5 inches [44.5 cm] wide and must fit
inches
Cisco Catalyst 4900M Switch Installation Guide
3-4
78-18350-02
Page 45
Chapter 3 Installing the Switch
Note Figure 3-1 illustrates how to attach the front of the switch to the rack. You will also need to
Step 2 Attach the left and right L brackets using the 12 M4 Phillips pan-head screws (six on each side) provided
in the rack-mount kit. (See
Note that the L brackets connect the chassis to the rack. You can mount the L brackets to the front or rear mounting holes of the chassis, depending on which end is in the front of the rack.
Note Some equipment racks provide a power strip along the length of one of the rear posts. If the rack
Step 3 Slide the rear brackets into the front brackets. (See Figure 3-1.)
Figure 3-1 Attaching the L Brackets to the Switch
Rack-Mounting the Switch
attach the rear of the switch to the rack.
Figure 3-1.)
has this feature, consider the position of the strip when planning fastener points. Before installing the L brackets on the chassis, determine whether to install the chassis from the front or the rear of the rack.
78-18350-02
202519
Cisco Catalyst 4900M Switch Installation Guide
232125
3-5
Page 46
Rack-Mounting the Switch
Step 4 Install the chassis in the rack as follows:
a. Position the chassis in the rack (see Figure 3-2):
b. Align the mounting holes in the front and rear L brackets with the mounting holes in the equipment
c. Secure the chassis using eight (two on each flange) 12-24 x 3/4-inch screws through the elongated
d. Use a tape measure and level to ensure that the chassis is installed straight and level.
Figure 3-2 Installing the Switch in the Rack
Chapter 3 Installing the Switch
If the chassis front panel is in the front of the rack, insert the rear of the chassis between the mounting posts.
If the rear of the chassis is in the front of the rack, insert the front of the chassis between the mounting posts.
rack.
holes in the L brackets and into the threaded holes in the mounting posts.
Step 5 Attach the cable guide to the right or left side of the chassis mount.
Cisco Catalyst 4900M Switch Installation Guide
3-6
202519
232126
78-18350-02
Page 47
Chapter 3 Installing the Switch
Figure 3-3 Installing the Cable Guide
Connecting Power to the Catalyst 4900M Switch
Step 6 Do not connect the power cord at this time. Proceed to the “Connecting Power to the Catalyst 4900M
Switch” section on page 3-7.
Connecting Power to the Catalyst 4900M Switch
Follow these steps and warnings when connecting power to the Catalyst 4900M switch:
Step 1 Prior to connecting the power supply to a power source, ensure that all of the site power and grounding
requirements described in grounded as described in the “Grounding Requirements” section on page 2-7. The grounding pad for the switch is shown in Figure 3-4.
Chapter 2, “Site Planning,” have been met and the chassis is properly
232127
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
3-7
Page 48
Connecting Power to the Catalyst 4900M Switch
Figure 3-4 Grounding Pad Location
1
1 Grounding pad
Chapter 3 Installing the Switch
232131
Warning
The plug-socket combination must be accessible at all times because it serves as the main disconnecting device.
Statement 1019
Step 2 Plug the power cords into the power supplies. Refer to Figure 3-5 for the plug location.
Figure 3-5 AC-Input Power Supply
2 2
1
3
4
5 6
1 Captive screw 4 AC power connection 2 Handle 5 INPUT OK LED 3 On/off switch 6 OUTPUT OK LED
1
232129
Step 3 Connect the other end of the power cords to an AC power source. If both power supplies will be used,
make sure they are on different source AC circuits.
Step 4 Turn the power switches to the ON position. Step 5 Verify power supply operation by looking at the power supply LEDs:
The INPUT OK LED is lit green when the source AC voltage is within operating limits.
The OUTPUT OK LED is lit green when the measured DC output from the power supply is within
operating limits.
Cisco Catalyst 4900M Switch Installation Guide
3-8
78-18350-02
Page 49
Chapter 3 Installing the Switch
Connecting DC-Input Power to the Catalyst 4900M Switch
Step 6 Verify power supply operation by looking at the chassis front panel power supply LEDs:
The PS1 or PS2 LED is lit green when the power supply and fans are functioning normally.
The PS1 or PS2 LED is lit red when the power supply is not functioning normally. The on/off switch
may be set to off while the power supply is plugged in, or the power supply may be defective and not providing DC power to the switch. There may also be a fan failure.
The PS1 or PS2 LED is off when there is no power supply installed.
From the system console, enter the show power command to display the power supply and system status. For more information on this command, see the command reference publication for your software release.
If the LEDs or show power command indicate a power or other system problem, see Chapter 4,
“Troubleshooting the Installation,” for troubleshooting information.
Connecting DC-Input Power to the Catalyst 4900M Switch
Warning
Warning
Warning
Warning
Before you connect the power supply to a power source, ensure that all of the site power and grounding requirements described in
Chapter 2, “Site Planning,” have been met and the chassis is properly
grounded as described in the “Grounding Requirements” section on page 2-7.
Before performing any of the following procedures, ensure that power is removed from the DC circuit.
Statement 1003
This unit is intended for installation in restricted access areas. A restricted access area can be accessed only through the use of a special tool, lock and key, or other means of security.
Statement 1017
This product requires short-circuit (overcurrent) protection, to be provided as part of the building installation. Install only in accordance with national and local wiring regulations.
Hazardous voltage or energy may be present on DC power terminals. Always replace cover when terminals are not in service. Be sure uninsulated conductors are not accessible when cover is in place.
Statement 1075
Statement 1045
To connect source DC to the DC-input power supply, perform the following steps:
Step 1 Set the power switch or circuit breaker to the off (0) position on the source DC circuit that feeds the
power supply that you are installing.
As an added precaution, place the appropriate safety flag and lockout devices at the source power circuit breaker, or place a piece of adhesive tape over the circuit breaker handle to prevent accidental power restoration while you are working on the circuit.
Step 2 Verify that the power switch is in the off (0) position on the power supply that you are installing.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
3-9
Page 50
Connecting DC-Input Power to the Catalyst 4900M Switch
Step 3 Remove the terminal block cover by simultaneously squeezing the top and bottom sides of the cover, and
at the same time, use a fingernail to carefully pry up on the top and bottom clips on the terminal block cover to release the cover from the terminal block. Pull the cover off of the terminal block and set the cover aside. (See
Figure 3-6 Removing the Terminal Block Cover
Figure 3-6.)
2
1
3
Chapter 3 Installing the Switch
208194
1 Terminal block cover 3 Terminal block cover clip 2 Terminal block
Step 4 Using a 5/16-inch nutdriver, loosen and remove the four nut and lockwasher pairs on the terminal block
posts. Set the nuts and lockwashers aside.
Step 5 Using an M4 nutdriver, loosen and remove the nut and lockwasher from the power supply ground
terminal.
Step 6 Attach appropriate type and sized lugs to the source DC cables.
Note The lugs are not supplied as part of the chassis accessory kit; you need to purchase them
separately. See Figure 3-7 for the physical dimensions of a suitably-sized DC power cable lug.
The lugs must have:
Two holes with 0.62 ±0.02-inch spacing between the hole centers to accommodate the power supply
terminal posts.
A 90-degree bend in the barrel to allow the source DC cables to exit the terminal block.
Suitable DC power cable lugs include:
For 4 AWG-sized cable—Panduit LCD4-14AF-L or Burndy YA4C-2L-90
For 6 AWG-sized cable—Panduit LCD6-14AF-L
Cisco Catalyst 4900M Switch Installation Guide
3-10
78-18350-02
Page 51
Chapter 3 Installing the Switch
Figure 3-7 DC Power Cable Lug Dimensions
.25 in
(6.35 mm)
Connecting DC-Input Power to the Catalyst 4900M Switch
0.50 in
(12.7 mm)
0.09 in
(2.29 mm)
0.62 in
(15.75 mm)
0.27 in
(6.858 mm)
90 degrees +/- 5 degrees
0.22 in
(5.588 mm)
0.34 in
(8.64 mm)
Beveled wire entry
0.81 in
(20.574 mm)
1.16 in
(29.464 mm)
78-18350-02
1.25 in
(31.75 mm)
1.47 in
(37.3 mm)
331382
Note The source DC cables and the terminal block lugs should be sized according to local and national
installation requirements and electrical codes. Use only copper wire.
Cisco Catalyst 4900M Switch Installation Guide
3-11
Page 52
Connecting DC-Input Power to the Catalyst 4900M Switch
Step 7 Attach the appropriate size lug to the source DC ground wire. The lug must have:
A single hole able to accommodate the 4 mm ground post.
The barrel can be either straight or bent as necessary.
The ground lug is not supplied as part of the chassis accessory kit; you need to purchase it separately.
Step 8 Connect the source DC cables to the teminal block in this order (see Figure 3-8):
Position the ground cable lug on the power supply ground terminal post. Slide the lockwasher over
the ground post and tighten the nut to secure the source DC ground wire. Do not overtighten the nut.
Position the negative (–) source DC cable lug on the power supply negative (–) terminal posts. Slide
the lockwashers over the terminal posts and tighten the nuts to secure the source lug to the posts. Do not overtighten the nuts.
Position the positive (+) source DC cable lug to the power supply positive (+) terminal posts. Slide
the lockwashers over the terminal posts and tighten the nuts to secure the source lug to the posts. Do not overtighten the nuts.
Note The terminal block on the 1000 W DC-input power supply is labeled positive(+) (top two posts)
and negative (–) (bottom two posts). The ground post is located on the DC-input power supply faceplate, separate from the terminal block.
Chapter 3 Installing the Switch
Figure 3-8 Attaching the Source DC Cables to the Power Supply
1
2
3
1 Source DC positive (+) cable 3 Source DC ground cable 2 Source DC negative (–) cable
208195
Step 9 Route the two source DC cables out of the terminal block, position the terminal block cover over the
terminal block, and snap the cover into place. (See bottom clips on the terminal block cover have fully engaged the tabs on the terminal block.
Cisco Catalyst 4900M Switch Installation Guide
3-12
Figure 3-9.) Make sure that both the top and the
78-18350-02
Page 53
Chapter 3 Installing the Switch
Caution To prevent short circuit or shock hazard after wiring the DC-input power supply, you must reinstall the
terminal block cover.
Figure 3-9 Reinstalling the Terminal Block Cover
Connecting DC-Input Power to the Catalyst 4900M Switch
1
2
1 Terminal block cover 2 Terminal block
Step 10 Remove any safety flag and lockout devices or any tape from the source DC circuit breaker switch
handle, and restore power by moving the circuit breaker switch handle to the on (|) position.
208196
78-18350-02
Step 11 Turn the 1000 W DC-input supply on/off switch to ON. Step 12 Verify that the power supply operation is correct by looking at the power supply front panel power supply
LEDs:
The INPUT OK LED is green when the source DC voltage measured at the power supply is within
specifications.
The OUTPUT OK LED is green when the voltages provided by the power supply are within
specifications.
Cisco Catalyst 4900M Switch Installation Guide
3-13
Page 54
Optical Connections
You should also check the chassis front panel LEDs:
The PS1 or PS2 LED is green.
The PS1 or PS2 LED is red when the power supply is not functioning normally.
The PS1 or PS2 LED is off when the power supply is not connected to a power source.
From the system console, enter the show power command to display the power supply and system status. For more information on this command, see the command reference publication for your software release.
If the LEDs or show power command indicate a power problem or other system problem, see Chapter 4,
“Troubleshooting the Installation,” for troubleshooting information.
Optical Connections
The Cisco 4900M switch has up to 24 ports that can be configured with X2 modules with SC connectors. Module types supported are documented at:
http://www.cisco.com/en/US/docs/interfaces_modules/transceiver_modules/compatibility/matrix/OL_
6974.html
Chapter 3 Installing the Switch
Generic connection instructions for the X2 modules are at:
http://www.cisco.com/en/US/docs/interfaces_modules/transceiver_modules/installation/note/OL_2358
9.html
Installation documentation for Cisco TwinGig converter modules can be found at:
http://www.cisco.com/en/US/docs/switches/lan/catalyst3750e_3560e/hardware/install/notes/1757202.h tml
Configurable Modules
All Catalyst 4900M modules support hot swapping, which lets you install, remove, replace, and rearrange switching modules without turning off the system power. When the system detects that a switching module has been installed or removed, it runs diagnostic and discovery tests automatically, acknowledges the presence or absence of the module, and resumes system operation with no operator intervention.
This section describes the following topics:
Required Tools, page 3-15
Removing Switching Modules, page 3-15
Installing Switching Modules, page 3-17
Cisco Catalyst 4900M Switch Installation Guide
3-14
78-18350-02
Page 55
Chapter 3 Installing the Switch
Required Tools
You will need these tools to install switching modules in the Catalyst 4900M series switches:
Number 1 and number 2 Phillips screwdrivers for the captive installation screws
3/16-inch flat-blade screwdriver for the captive installation screws
Antistatic mat or antistatic foam
Wrist strap or other grounding device
Note Whenever you handle switching modules, use a wrist strap or other grounding device to prevent ESD
damage.
Removing Switching Modules
Configurable Modules
Warning
Warning
Warning
Caution To prevent ESD damage, handle switching modules by the carrier edges only.
Invisible laser radiation may be emitted from disconnected fibers or connectors. Do not stare into beams or view directly with optical instruments.
Hazardous voltage or energy is present on the backplane when the system is operating. Use caution when servicing.
Voltages that present a shock hazard may exist on Power over Ethernet (PoE) circuits if interconnections are made using uninsulated exposed metal contacts, conductors, or terminals. Avoid using such interconnection methods, unless the exposed metal parts are located within a restricted access location and users and service people who are authorized within the restricted access location are made aware of the hazard. A restricted access area can be accessed only through the use of a special tool, lock and key or other means of security.
Statement 1034
Statement 1051
Statement 1072
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
3-15
Page 56
Configurable Modules
Step 1 Disconnect any network interface cables attached to the ports on the switching module that you intend
Step 2 Loosen the captive installation screws. (See Figure 3-10.)
Chapter 3 Installing the Switch
To remove a switching module from a Catalyst 4900M series switch, perform the following steps:
to remove.
Figure 3-10 Captive Installation Screws and Ejector Levers
2
2
1
1
1 Captive screw 2 Ejector lever
Step 3 Grasp the left and right ejector levers, and simultaneously pivot the levers downward to release the
switching module from the backplane connector.
Step 4 Grasp the front panel of the switching module with one hand, and place your other hand under the carrier
to support and guide it out of the slot. Do not touch the printed circuit boards or the connector pins.
Step 5 Carefully pull the switching module straight out of the slot, keeping your other hand under the carrier to
guide it.
Step 6 Place the switching module on an antistatic mat or antistatic foam, or immediately install it in another
slot.
Step 7 If the slot is to remain empty, install a switching-module filler plate.
232517
Cisco Catalyst 4900M Switch Installation Guide
3-16
78-18350-02
Page 57
Chapter 3 Installing the Switch
Configurable Modules
Warning
Blank faceplates and cover panels serve three important functions: they prevent exposure to hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI) that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not operate the system unless all cards, faceplates, front covers, and rear covers are in place.
1029
Installing Switching Modules
Warning
Warning
Invisible laser radiation may be emitted from disconnected fibers or connectors. Do not stare into beams or view directly with optical instruments.
Voltages that present a shock hazard may exist on Power over Ethernet (PoE) circuits if interconnections are made using uninsulated exposed metal contacts, conductors, or terminals. Avoid using such interconnection methods, unless the exposed metal parts are located within a restricted access location and users and service people who are authorized within the restricted access location are made aware of the hazard. A restricted access area can be accessed only through the use of a special tool, lock and key or other means of security.
Statement
Statement 1051
Statement 1072
Caution To prevent ESD damage, handle switching modules by the carrier edges only.
To install a switching module in a Catalyst 4900M series switch, perform the following steps:
Step 1 Take the necessary precautions to prevent ESD damage as described in Appendix B and in Chapter 2. Step 2 Choose a slot for the new switching module. Ensure that you have enough clearance to accommodate
any interface equipment that you will connect directly to the switching module ports.
Step 3 Loosen the captive installation screws that secure the switching-module filler plate (or the existing
switching module) to the desired slot.
Step 4 Remove the switching-module filler plate (or the existing switching module). Save the switching-module
filler plate for future use. If you are removing an existing switching module, see the
“Removing
Switching Modules” section on page 3-15.
Step 5 To install the new switching module, grasp the switching-module front panel with one hand, and place
your other hand under the carrier to support the switching module, as shown in
Figure 3-11. Do not touch
the printed circuit boards or connector pins.
Step 6 Align the edges of the circuit board with the slot guides on the sides of the switch chassis, as shown in
Figure 3-11.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
3-17
Page 58
Configurable Modules
Chapter 3 Installing the Switch
Figure 3-11 Installing the Switching Module in the Chassis
1
1
232516
1 Captive screw
Step 7 Carefully slide the switching module into the slot until both ejector levers engage the chassis sides
equally and the module is seated in the backplane.
Step 8 Use a screwdriver to tighten the captive installation screws on each end of the switching module
faceplate.
To check the status of the module, perform the following steps:
Step 1 Ensure that the STATUS LED is green (module operational). Step 2 When the switch is online, enter the show module command. Verify that the system acknowledges the
new module and that the module’s status is listed as good in the command output.
Step 3 If the module is not operational, reseat it. If the module is still not operational, contact your customer
service representative.
Cisco Catalyst 4900M Switch Installation Guide
3-18
78-18350-02
Page 59
Chapter 3 Installing the Switch
Removing and Replacing the Power Supply
This section describes how to remove and install the AC and DC-input power supplies. This information is presented in the following sections:
Required Tools, page 3-19
Removing a Power Supply, page 3-19
Installing a Power Supply, page 3-20
Removing and Replacing the Power Supply
Warning
Note The power supplies are hot-swappable, so in redundant mode you will not need to power down the switch
Hazardous voltage or energy is present on the backplane when the system is operating. Use caution when servicing.
Locate your power supply and notice the location of the captive installation screws.
to replace most power supplies. In combined mode some slots may lose power during power supply replacement.
Statement 1034
Required Tools
You will need a flathead or Phillips screwdriver or 5/16” nut driver or socket to perform these procedures.
Removing a Power Supply
Follow these steps to remove a power supply:
Step 1 Set the power switch to the off (O) position.
Caution For DC installations, the DC power source or panel breaker should be powered down before
disconnecting input power cables from the 1000W DC power supply.
Step 2 Disconnect the power cord or cords from the power supply being removed. Step 3 Loosen the captive screws.
Caution Use both hands to remove a power supply.
Step 4 Grasp the power supply handles and pull the power supply out an inch to unseat the backplane
connections. Place one hand underneath to support the bottom of the power supply.
Step 5 Pull the power supply out of the bay and set it aside.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
3-19
Page 60
Removing and Replacing the Power Supply
Chapter 3 Installing the Switch
Warning
Blank faceplates and cover panels serve three important functions: they prevent exposure to hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI) that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not operate the system unless all cards, faceplates, front covers, and rear covers are in place.
Statement 1029
Step 6 If the power supply bay is to remain empty, install a blank power supply filler plate over the opening.
Secure the filler plate with the two mounting screws and tighten them with a screwdriver.
Installing a Power Supply
Warning
Step 1 Make sure that the power supply you are installing is not connected to a power source and that a power
Step 2 Loosen the two Phillips-head screws from the power supply filler plate (if a filler plate is present).
The plug-socket combination must be accessible at all times, because it serves as the main disconnecting device.
Follow these steps to install a power supply:
cord is not connected to the power supply.
Statement 1019
Step 3 Remove the power supply filler plate (if one is present) and set it aside.
Caution Use both hands to grasp a power supply.
Step 4 Grasp a power supply handle with one hand. Place your other hand underneath to support the bottom of
the power supply.
Step 5 Slide the power supply almost all the way into the power supply bay. Press with both thumbs evenly to
correctly seat the power supply into the connections inside.
Step 6 Using a screwdriver, tighten the two captive installation screws on the front panel of the power supply. Step 7 Make sure the power supply power switch is in the off position (O). Step 8 Before you connect the power supply to a power source, ensure that all site power and grounding
requirements have been met.
Step 9 Plug the power cord or cords into the power supply. Step 10 Connect the other end of the power cord to a power input source.
Caution In a system with multiple power supplies, connect each power supply to a separate power source. In the
event of a power source failure, if the second source is still available, it can maintain maximum overcurrent protection for each power connection.
Cisco Catalyst 4900M Switch Installation Guide
3-20
78-18350-02
Page 61
Chapter 3 Installing the Switch
Step 11 Press the power switch to the on (|) position. Step 12 Verify power supply operation by checking the power supply’s front-panel LEDs. You should see the
following:
The LED labeled INPUT OK is green.
The LED labeled OUTPUT OK is green.
Step 13 Check the power supply and system status from the system console by entering show power command.
For more information on this command, refer to the command reference publication for your switch.
Step 14 If the LEDs or show power command output indicate a power problem or other system problem, see
Chapter 4, “Troubleshooting the Installation,” for more information.
Removing and Replacing the Fan Assembly
This section describes how to remove and install the fan assembly.
Removing and Replacing the Fan Assembly
Required Tools
You will need a Phillips screwdriver for the following two procedures.
Removing the Fan Assembly
Warning
Caution Never operate the system for an extended period if the fan assembly is removed or if it is not functioning
Step 1 Loosen the two captive installation screws on the fan assembly by turning them counterclockwise. Step 2 Grasp the fan assembly with both hands and pull it outward; gently move it side to side if necessary to
When removing the fan tray, keep your hands and fingers away from the spinning fan blades. Let the fan blades completely stop before you remove the fan tray.
properly. An over-temperature condition can cause severe equipment damage.
To remove the existing fan assembly, perform the following steps:
unseat it from the backplane. Slide it out of the chassis and place it in a safe place.
Statement 258
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
3-21
Page 62
Removing and Replacing the Fan Assembly
Installing the Fan Assembly
To install the new fan assembly, perform the following steps:
Step 1 Hold the fan assembly with the captive screws on the left. Step 2 Place the fan assembly into the fan assembly bay so it rests on the chassis, and then lift the fan assembly
up slightly, aligning the top and bottom guides.
Step 3 Slide the fan assembly into the chassis until the two captive installation screws make contact with the
chassis.
Step 4 Using a screwdriver, tighten the two captive installation screws by turning them clockwise.
Verifying the Installation
Chapter 3 Installing the Switch
Note To check the operation of the fans, you need to power up the chassis.
To verify that the new fan assembly was installed correctly, perform the following steps:
Step 1 Listen for the fans; you should immediately hear them operating. If you do not hear them, ensure that
the fan assembly is inserted completely in the chassis and that the faceplate is flush with the switch back panel.
Step 2 The fan tray LED should be lit green. Step 3 If after several attempts the fans do not operate, or if you experience trouble with the installation (for
instance, if the captive installation screws do not align with the chassis holes), contact the Cisco TAC for assistance.
Cisco Catalyst 4900M Switch Installation Guide
3-22
78-18350-02
Page 63
CHA PTER
4
Troubleshooting the Installation
This chapter describes how to troubleshoot the Catalyst 4900M switch hardware installation and contains these sections:
Getting Started, page 4-1
Problem Solving to the System Component Level, page 4-2
Identifying Startup Problems, page 4-2
Troubleshooting the Power Supply, page 4-4
Contacting Customer Service, page 4-4
If your system has problems starting up, use the information in this chapter to help isolate the cause. Problems with the initial startup are often caused by poor or improper connections. Although temperature conditions above the maximum acceptable level rarely occur at initial startup, environmental monitoring functions are included because they also monitor DC-line voltages.
Note For configuration questions or problems, refer to the software configuration guide or the command
reference publication to configure or enable the interfaces.
Getting Started
When the initial system boot is complete, verify the following:
Power supplies are supplying power to the system.
The system fan assembly is operating.
System software boots successfully.
If all of these conditions are met and the hardware installation is complete, refer to the software configuration guide and the command reference publications to troubleshoot the software. However, if any of these conditions are not met, use the procedures in this chapter to isolate and, if possible, resolve the problem.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
4-1
Page 64
Chapter 4 Troubleshooting the Installation
Problem Solving to the System Component Level
Problem Solving to the System Component Level
The key to success when troubleshooting the system is to isolate the problem to a specific system component. The first step is to compare what the system is doing to what it should be doing. Because a startup problem can usually be attributed to a single component, it is more efficient to isolate the problem to a subsystem rather than troubleshoot each separate component in the system.
The switch consists of the following subsystems:
Power supply—Includes the power supply and power supply cooling. (See the “Troubleshooting the
Power Supply” section on page 4-4.)
Fan assembly system—The chassis fan assembly should operate whenever system power is on.
Usually, it continues to operate even when the environmental monitor shuts down the system because of an overtemperature or overvoltage condition. (It will shut down for a power supply shutdown.) You should be able to hear the fan assembly to determine whether or not it is operating. If the FAN LED is orange and you determine that the fan assembly is not operating, you should immediately contact a customer service representative. There are no installation adjustments that you can make if the fan assembly does not function properly at the initial startup.
Identifying Startup Problems
When you connect the power cords to the Catalyst 4900M switch, follow these steps:
Step 1 Flip the power switches to the on position (AC powered systems only). Step 2 Verify that power is available to the power supplied from the site AC or DC source. Flip breakers and
fuses if necessary.
Step 3 Listen for the system fan assembly. If you do not immediately hear the system fan assembly begin to
operate, see
Step 4 If you determine that the power supplies are functioning normally and that the fan assembly is faulty,
contact a customer service representative. If the system fan assembly does not function properly at initial startup, there are no installation adjustments that you can make.
LED Readings
LEDs indicate all system states in the startup sequence. By checking the LEDs, you can determine when and where the system failed in the startup sequence. To check the LEDs, follow these steps:
Step 1 Compare the LED states to those listed in Table 4-1.
“Troubleshooting the Power Supply” section on page 4-4.
Cisco Catalyst 4900M Switch Installation Guide
4-2
78-18350-02
Page 65
Chapter 4 Troubleshooting the Installation
Ta b l e 4-1 Power Supply LED Meanings
LED Meaning
INPUT OK (AC) This LED should turn green immediately when power is
INPUT OK (DC) This LED should turn green immediately when power is
Identifying Startup Problems
applied to the supply and the power switch is set to ON.
Green—AC input voltage is greater than 80.5 VA C ±4.5
VA C .
Red—In a dual power supply configuration (alternate unit powered) the AC input is less than 73
VAC ±3 VAC , o r t he
power supply is turned off.
Off—In a single supply configuration, signals that AC input voltage is less than 73
VAC ±3 VAC, or the power
supply is turned off.
applied to the supply.
Green—DC input voltage is greater than –38.25 VDC ±2.25
VDC.
Red—In a dual power supply configuration (alternate unit powered) the DC input is less than 33
VDC ±3 VDC, or the
power supply is turned off.
Off—In a single supply configuration, the LED shall be off to signal that DC input is less than 33
VDC ±3 VDC, or the
power supply is turned off.
OUTPUT OK Green—DC output voltages are within the normal
operating range.
Red—Output voltages below the minimum or above the maximum will create an output fail alarm and cause the LED to illuminate red.
Step 2 Verify that the LEDs on the front panel are lit:
The STATUS LED flashes yellow during diagnostic boot tests. It is green when the switch is
operational (online). If the system software is unable to start up, this LED stays orange.
The port LEDs (1-48) are green when the module is operational (online). If no signal is detected,
the LINK LED is off. The port LED remains yellow if the port is disabled. The port LED flashes yellow if the port tested faulty at startup.
Step 3 If a STATUS LED is red, contact a customer service representative for instructions. Step 4 If the boot information and system banner are not displayed, verify that the terminal is set correctly and
that it is connected properly to the console port.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
4-3
Page 66
Troubleshooting the Power Supply
Troubleshooting the Power Supply
To help isolate a power subsystem problem, perform the following steps:
Step 1 Verify that the power supply is plugged in and that the on/off switch is set to ON (if the power supply is
an AC supply).
Step 2 Look at the power supply LED (PS1 or PS2). If the LED is off or if the LED is red, unplug the power
cord, and then plug the power cord in. Be sure the on/off switch is OFF before removing the power cord from the power supply.
Step 3 If the LED remains off, there might be a problem with the AC or DC source or the power cable. Step 4 Connect the power cord to another power source if one is available. Step 5 If the LED then lights, the problem is the first power source. Step 6 If the LED fails to light after you connect the power supply to a new power source, replace the power
cord.
Step 7 If the LED still fails to light when the switch is connected to a different power source with a new power
cord, the power supply is probably faulty.
Chapter 4 Troubleshooting the Installation
If you are unable to resolve the problem, contact a customer service representative for instructions.
Contacting Customer Service
If you are unable to solve a startup problem after using the troubleshooting suggestions in this chapter, contact a customer service representative for assistance and further instructions. Before you call, have the following information ready to help your service provider assist you as quickly as possible:
Date you received the switch
Chassis serial number (located on a label on the right of the rear of the chassis, see Figure 4-1)
Type of software and release number
Maintenance agreement or warranty information
Brief description of the problem
Brief explanation of the steps you have already taken to isolate and resolve the problem
Cisco Catalyst 4900M Switch Installation Guide
4-4
78-18350-02
Page 67
Chapter 4 Troubleshooting the Installation
Figure 4-1 Serial Number Location
Contacting Customer Service
202519
SN: XXXNNNNXXXX
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
4-5
Page 68
Contacting Customer Service
Chapter 4 Troubleshooting the Installation
Cisco Catalyst 4900M Switch Installation Guide
4-6
78-18350-02
Page 69
Specifications
Revised: January 4, 2012
This appendix provides cable and power supply technical specifications for the Catalyst 4900M switches.
Console Port
The console port is an RJ-45 receptacle. The Request to Send (RTS) signal tracks the state of the Clear to Send (CTS) input.
Ta b l e A-1 Console Port Pinouts
Pin Signal Direction Description
1 RTS output request to send
2 DTR output data terminal ready
3 TXD output transmit data
4 GND
5 GND
6 RXD input receive data
7 DSR input data set ready
8 CTS input clear to send
APPENDIX
Table A-1 lists the console port pinouts.
A
Note A console cable is not provided in the accessory kit. It can be ordered as an option.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
A-1
Page 70
10/100/1000BASE-T Management Port
10/100/1000BASE-T Management Port
The 10/100/1000BASE-T management port is an RJ-45 receptacle with a Link Status LED. Table A-2 lists the 10/100BASE-T port pinouts.
Ta b l e A-2 10/100BASE-T Port Pinouts
Pin Signal Direction Description
1 RXDP input receive data
2 RXDN input receive data
3 TXDP output transmit data
4 unused
5 unused
6 TXDN output transmit data
7 unused
8 unused
Appendix A Specifications
Catalyst 4900M Switch Power Supply Specifications
The Catalyst 4900M switch 1000 W AC-input power supply (PWR-C49M-1000AC) is shown in
Figure A-1 with the major features identified. The 1000 W DC-input power supply
(PWR-C49M-1000DC) is shown in Figure A-2 with the major features identified. Tab le A-3 list the power supply specifications.
Figure A-1 1000 W AC-Input Power Supply (PWR-C49M-1000AC)
2 2
1
1 Captive installation screw 4 AC-in connector 2 Handle 5 INPUT OK LED 3 Power on/off switch 6 OUTPUT OK LED
3
4
5 6
1
232129
Cisco Catalyst 4900M Switch Installation Guide
A-2
78-18350-02
Page 71
Appendix A Specifications
Figure A-2 1000 W DC-Input Power Supply (PWR-C49M-1000DC)
Catalyst 4900M Switch Power Supply Specifications
1
2 2
4
5 6
7
8
1
232130
1 Captive installation screws 5 DC-in connector (positive (+) post) 2 Handles 6 DC-in connector (negative (–) post) 3 Power on/off switch 7 INPUT OK LED 4 Ground post 8 OUTPUT OK LED
Note DC power cable lugs are not supplied as part of the accessory kit; they must be purchased separately.
Suitable DC power cable lugs include:
For 4 AWG-sized cable—Panduit LCD4-14AF-L or Burndy YA4C-2L-90
For 6 AWG-sized cable—Panduit LCD6-14AF-L
See Figure A-3 for the dimensions of a suitably-sized lug.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
A-3
Page 72
Catalyst 4900M Switch Power Supply Specifications
Figure A-3 DC Power Cable Lug Dimensions
.25 in
(6.35 mm)
Appendix A Specifications
0.50 in
(12.7 mm)
0.09 in
(2.29 mm)
0.62 in
(15.75 mm)
0.27 in
(6.858 mm)
90 degrees +/- 5 degrees
0.22 in
(5.588 mm)
0.34 in
(8.64 mm)
Beveled wire entry
0.81 in
(20.574 mm)
1.16 in
(29.464 mm)
A-4
1.25 in
(31.75 mm)
1.47 in
(37.3 mm)
Table A-3 lists the AC-input and the DC-input power supply specifications.
Ta b l e A-3 Catalyst 4900 Series Power Supply Specifications
Item Specification AC-input power supply
Power supply output 960 W
Power supply dissipation 240 W
AC-input 12 A maximum @ 100 VA C
AC frequency 50 to 60 Hz
Output current 80 A maximum
Cisco Catalyst 4900M Switch Installation Guide
331382
5 A maximum @ 240 VA C
78-18350-02
Page 73
Appendix A Specifications
Table A-3 Catalyst 4900 Series Power Supply Specifications (continued)
Item Specification
Inrush value Cold turn on (PSU on for < 1 hour) 50 A for one cycle of
Output voltage 12 VDC
Input KVA rating 1.200 KVA
DC-input power supply
Power supply output 960 W
Power supply dissipation 320 W
DC-input 27 A @ –48 VDC (Operating range –40.5 to –56 VDC)
Output current 80 A maximum
Inrush value Hot turn on (PSU on for > 1 hour) 75 A
Output voltage 12 VDC
Input KVA rating 1.296 KVA
Catalyst 4900M Switch Power Supply Specifications
AC
21.6 A @ –60 VDC (Operating range –55 to –72 VDC)
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
A-5
Page 74
Catalyst 4900M Switch Power Supply Specifications
Appendix A Specifications
Cisco Catalyst 4900M Switch Installation Guide
A-6
78-18350-02
Page 75
APPENDIX
B
Compliance Information and Translated Safety Warnings
Note Only trained and qualified service personnel (as defined in IEC 60950-1 and AS/NZS 60950) should
install, replace, or service the equipment. Install the system in accordance with the U.S. National Electric Code if you are in the United States.
This appendix contains the following sections:
Translated Safety Warnings, page B-1
European Directives, page B-38
Statement 6003—Taiwan Battery, page B-40
Statement 6004—EU Battery Disposal and Recycling, page B-40
Statement 6005—California Perchlorate Contamination Prevention Act (Title 22, California Code
of Regulations, Chapter 33), page B-40
Statement 8000—Standards Compliance, page B-40
Statement 2007—EMC Environmental Conditions for Products Installed in the European Union,
page B-42
EMC Class A Notices and Warnings, page B-42
GR-1089-CORE Issue 3 Documentation Statements, page B-46
GR-1089-CORE Issue 4 Documentation Statements, page B-46
Statement 8003—Telecom Approvals Listing, page B-47
Japanese Electric Appliance and Radio Laws, page B-50
Translated Safety Warnings
This section repeats in multiple languages the warnings in this guide.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
B-1
Page 76
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
Statement 258—Fan Tray Removal Warning
Warning
Waarschuwing
Varoitus
Attention
Warnung
Avvertenza
Advarsel
When removing the fan tray, keep your hands and fingers away from the spinning fan blades. Let the fan blades completely stop before you remove the fan tray.
Houd tijdens het verwijderen van de ventilator de handen en vingers uit de buurt van de draaiende ventilatorschoepen. Laat de ventilatorschoepen volledig tot stilstand komen alvorens de ventilator te verwijderen.
Pidä kädet ja sormet pois tuulettimen pyörivistä siivistä tuuletinalustaa poistaessasi. Anna tuulettimen siipien pysähtyä kokonaan ennen kuin irrotat tuuletinalustan.
Lors du retrait du plateau du ventilateur, veillez à ce que vos mains et doigts restent à l’écart des pales en rotation du ventilateur. Attendez que les pales du ventilateur soient parvenues à une immobilité complète avant de retirer le plateau du ventilateur.
Beim Herausnehmen des Lüfterkastens Hände und Finger von den sich drehenden Gebläseflügeln fern halten. Vor Herausnehmen des Gebläsekastens warten, bis die Gebläseflügel völlig zum Stillstand gekommen sind.
Quando si toglie il vano della ventola, fare attenzione che le mani e le dita non vengano in contatto con la ventola in movimento. Attendere che la ventola si fermi completamente prima di togliere il vano.
Når du fjerner viftedekselet, hold hender og fingre borte fra de roterende viftebladene. La viftebladene stanse helt før du fjerner viftedekselet.
Aviso
¡Advertencia!
Varning!
Mantenha as suas mãos e dedos afastados das lâminas em movimento da ventoinha, ao retirar a respectiva bandeja. Deixe as lâminas da ventoinha parar completamente antes de retirar a bandeja.
Cuando quite la bandeja del abanico, mantenga las manos y los dedos alejados de las aspas en movimiento. Deje que las aspas se detengan completamente antes de quitar la bandeja del abanico.
Håll händer och fingrar borta från de roterande fläktbladen när du tar av fläktskyddet. Låt fläkten stanna helt innan du tar av fläktskyddet.
Cisco Catalyst 4900M Switch Installation Guide
B-2
78-18350-02
Page 77
Appendix B Compliance Information and Translated Safety Warnings
Statement 1003—DC Power Disconnection
Translated Safety Warnings
Warning
Waarschuwing
Varoitus
Attention
Warnung
Avvertenza
Advarsel
Aviso
¡Advertencia!
Before performing any of the following procedures, ensure that power is removed from the
circuit.
DC
Voordat u een van de onderstaande procedures uitvoert, dient u te controleren of de stroom naar het gelijkstroom circuit uitgeschakeld is.
Varmista, että tasavirtapiirissä ei ole virtaa ennen seuraavien toimenpiteiden suorittamista.
Avant de pratiquer l'une quelconque des procédures ci-dessous, vérifier que le circuit en courant continu n'est plus sous tension.
Vor Ausführung der folgenden Vorgänge ist sicherzustellen, daß die Gleichstromschaltung
Strom erhält.
keinen
Prima di svolgere una qualsiasi delle procedure seguenti, verificare che il circuito CC non
alimentato.
sia
Før noen av disse prosedyrene utføres, kontroller at strømmen er frakoblet likestrømkretsen.
Antes de executar um dos seguintes procedimentos, certifique-se que desligou a fonte de alimentação de energia do circuito de corrente contínua.
Antes de proceder con los siguientes pasos, comprobar que la alimentación del circuito de corriente continua (CC) esté cortada (OFF).
Varning!
Innan du utför någon av följande procedurer måste du kontrollera att strömförsörjningen till likströmskretsen är bruten.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
B-3
Page 78
Translated Safety Warnings
Appendix B Compliance Information and Translated Safety Warnings
Aviso
Advarsel
Antes de executar qualquer um dos procedimentos a seguir, verifique se a energia foi removida do circuito DC.
Før du udfører nogen af følgende procedurer, skal du sikre dig, at der ikke er strøm til jævnstrømskredsløbet.
Statement 1004—Installation Instructions
Warning
Waarschuwing
Varoitus
Cisco Catalyst 4900M Switch Installation Guide
B-4
Read the installation instructions before connecting the system to the power source.
Raadpleeg de installatie-instructies voordat u het systeem op de voedingsbron aansluit.
Lue asennusohjeet ennen järjestelmän yhdistämistä virtalähteeseen.
78-18350-02
Page 79
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
Attention
Warnung
Avvertenza
Advarsel
Aviso
¡Advertencia!
Varning!
Avant de brancher le système sur la source d'alimentation, consulter les directives d'installation.
Vor dem Anschließen des Systems an die Stromquelle die Installationsanweisungen lesen.
Consultare le istruzioni di installazione prima di collegare il sistema all'alimentatore.
Les installasjonsinstruksjonene før systemet kobles til strømkilden.
Leia as instruções de instalação antes de ligar o sistema à fonte de energia.
Lea las instrucciones de instalación antes de conectar el sistema a la red de alimentación.
Läs installationsanvisningarna innan du kopplar systemet till strömförsörjningsenheten.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
B-5
Page 80
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
Statement 1006—Chassis Warning for Rack-Mounting and Servicing
Warning
Waarschuwing
Varoitus
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special precautions to ensure that the system remains stable. The following guidelines are provided to ensure your safety:
• This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
• When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest
component at the bottom of the rack.
• If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in
the rack.
Om lichamelijk letsel te voorkomen wanneer u dit toestel in een rek monteert of het daar een servicebeurt geeft, moet u speciale voorzorgsmaatregelen nemen om ervoor te zorgen dat het toestel stabiel blijft. De onderstaande richtlijnen worden verstrekt om uw veiligheid te verzekeren:
• Dit toestel dient onderaan in het rek gemonteerd te worden als het toestel het enige in het rek is.
• Wanneer u dit toestel in een gedeeltelijk gevuld rek monteert, dient u het rek van onderen naar boven te laden
met het zwaarste onderdeel onderaan in het rek.
• Als het rek voorzien is van stabiliseringshulpmiddelen, dient u de stabilisatoren te monteren voordat u het
toestel in het rek monteert of het daar een servicebeurt geeft.
Kun laite asetetaan telineeseen tai huolletaan sen ollessa telineessä, on noudatettava erityisiä varotoimia järjestelmän vakavuuden säilyttämiseksi, jotta vältytään loukkaantumiselta. Noudata seuraavia turvallisuusohjeita:
Attention
• Jos telineessä ei ole muita laitteita, aseta laite telineen alaosaan.
• Jos laite asetetaan osaksi täytettyyn telineeseen, aloita kuormittaminen sen alaosasta kaikkein raskaimmalla
esineellä ja siirry sitten sen yläosaan.
• Jos telinettä varten on vakaimet, asenna ne ennen laitteen asettamista telineeseen tai sen huoltamista siinä.
Pour éviter toute blessure corporelle pendant les opérations de montage ou de réparation de cette unité en casier, il convient de prendre des précautions spéciales afin de maintenir la stabilité du système. Les directives ci-dessous sont destinées à assurer la protection du personnelþ:
• Si cette unité constitue la seule unité montée en casier, elle doit être placée dans le bas.
• Si cette unité est montée dans un casier partiellement rempli, charger le casier de bas en haut en plaçant
l'élément le plus lourd dans le bas.
• Si le casier est équipé de dispositifs stabilisateurs, installer les stabilisateurs avant de monter ou de réparer
l'unité en casier.
Cisco Catalyst 4900M Switch Installation Guide
B-6
78-18350-02
Page 81
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
Warnung
Avvertenza
Advarsel
Zur Vermeidung von Körperverletzung beim Anbringen oder Warten dieser Einheit in einem Gestell müssen Sie besondere Vorkehrungen treffen, um sicherzustellen, daß das System stabil bleibt. Die folgenden Richtlinien sollen zur Gewährleistung Ihrer Sicherheit dienen:
• Wenn diese Einheit die einzige im Gestell ist, sollte sie unten im Gestell angebracht werden.
• Bei Anbringung dieser Einheit in einem zum Teil gefüllten Gestell ist das Gestell von unten nach oben zu laden, wobei das schwerste Bauteil unten im Gestell anzubringen ist.
• Wird das Gestell mit Stabilisierungszubehör geliefert, sind zuerst die Stabilisatoren zu installieren, bevor Sie die Einheit im Gestell anbringen oder sie warten.
Per evitare infortuni fisici durante il montaggio o la manutenzione di questa unità in un supporto, occorre osservare speciali precauzioni per garantire che il sistema rimanga stabile. Le seguenti direttive vengono fornite per garantire la sicurezza personale:
• Questa unità deve venire montata sul fondo del supporto, se si tratta dell’unica unità da montare nel supporto.
• Quando questa unità viene montata in un supporto parzialmente pieno, caricare il supporto dal basso all’alto, con il componente più pesante sistemato sul fondo del supporto.
• Se il supporto è dotato di dispositivi stabilizzanti, installare tali dispositivi prima di montare o di procedere alla manutenzione dell’unità nel supporto.
Unngå fysiske skader under montering eller reparasjonsarbeid på denne enheten når den befinner seg i et kabinett. Vær nøye med at systemet er stabilt. Følgende retningslinjer er gitt for å verne om
sikkerheten:
Aviso
¡Advertencia!
• Denne enheten bør monteres nederst i kabinettet hvis dette er den eneste enheten i kabinettet.
• Ved montering av denne enheten i et kabinett som er delvis fylt, skal kabinettet lastes fra bunnen og opp med den tyngste komponenten nederst i kabinettet.
• Hvis kabinettet er utstyrt med stabiliseringsutstyr, skal stabilisatorene installeres før montering eller utføring av reparasjonsarbeid på enheten i kabinettet.
Para se prevenir contra danos corporais ao montar ou reparar esta unidade numa estante, deverá tomar precauções especiais para se certificar de que o sistema possui um suporte estável. As seguintes directrizes ajudá-lo-ão a efectuar o seu trabalho com segurança:
• Esta unidade deverá ser montada na parte inferior da estante, caso seja esta a única unidade a ser montada.
• Ao montar esta unidade numa estante parcialmente ocupada, coloque os itens mais pesados na parte inferior da estante, arrumando-os de baixo para cima.
• Se a estante possuir um dispositivo de estabilização, instale-o antes de montar ou reparar a unidade.
Para evitar lesiones durante el montaje de este equipo sobre un bastidor, o posteriormente durante su mantenimiento, se debe poner mucho cuidado en que el sistema quede bien estable. Para garantizar su seguridad, proceda según las siguientes instrucciones:
• Colocar el equipo en la parte inferior del bastidor, cuando sea la única unidad en el mismo.
• Cuando este equipo se vaya a instalar en un bastidor parcialmente ocupado, comenzar la instalación desde la parte inferior hacia la superior colocando el equipo más pesado en la parte inferior.
• Si el bastidor dispone de dispositivos estabilizadores, instalar éstos antes de montar o proceder al mantenimiento del equipo instalado en el bastidor.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
B-7
Page 82
Translated Safety Warnings
Appendix B Compliance Information and Translated Safety Warnings
Varning!
För att undvika kroppsskada när du installerar eller utför underhållsarbete på denna enhet på en ställning måste du vidta särskilda försiktighetsåtgärder för att försäkra dig om att systemet står stadigt. Följande riktlinjer ges för att trygga din säkerhet:
• Om denna enhet är den enda enheten på ställningen skall den installeras längst ned på ställningen.
• Om denna enhet installeras på en delvis fylld ställning skall ställningen fyllas nedifrån och upp, med de tyngsta enheterna längst ned på ställningen.
• Om ställningen är försedd med stabiliseringsdon skall dessa monteras fast innan enheten installeras eller underhålls på ställningen.
Cisco Catalyst 4900M Switch Installation Guide
B-8
78-18350-02
Page 83
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
Aviso
Advarsel
Para evitar lesões corporais ao montar ou dar manutenção a esta unidade em um rack, é necessário tomar todas as precauções para garantir a estabilidade do sistema. As seguintes orientações são fornecidas para garantir a sua segurança:
• Se esta for a única unidade, ela deverá ser montada na parte inferior do rack.
• Ao montar esta unidade em um rack parcialmente preenchido, carregue-o de baixo para cima com o componente mais pesado em sua parte inferior.
• Se o rack contiver dispositivos estabilizadores, instale-os antes de montar ou dar manutenção à unidade existente.
For at forhindre legemesbeskadigelse ved montering eller service af denne enhed i et rack, skal du sikre at systemet står stabilt. Følgende retningslinjer er også for din sikkerheds skyld:
• Enheden skal monteres i bunden af dit rack, hvis det er den eneste enhed i racket.
• Ved montering af denne enhed i et delvist fyldt rack, skal enhederne installeres fra bunden og opad med den tungeste enhed nederst.
• Hvis racket leveres med stabiliseringsenheder, skal disse installeres for enheden monteres eller serviceres i racket.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
B-9
Page 84
Translated Safety Warnings
Appendix B Compliance Information and Translated Safety Warnings
Cisco Catalyst 4900M Switch Installation Guide
B-10
78-18350-02
Page 85
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
Statement 1008—Class 1 Laser Product
Warning
Waarschuwing
Varoitus
Attention
Warnung
Avvertenza
Advarsel
Aviso
¡Advertencia!
Varning!
Class 1 laser product.
Klasse-1 laser produkt.
Luokan 1 lasertuote.
Produit laser de classe 1.
Laserprodukt der Klasse 1.
Prodotto laser di Classe 1.
Laserprodukt av klasse 1.
Produto laser de classe 1.
Producto láser Clase I.
Laserprodukt av klass 1.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
B-11
Page 86
Translated Safety Warnings
Appendix B Compliance Information and Translated Safety Warnings
Aviso
Advarsel
Produto a laser de classe 1.
Klasse 1 laserprodukt.
Cisco Catalyst 4900M Switch Installation Guide
B-12
78-18350-02
Page 87
Appendix B Compliance Information and Translated Safety Warnings
Statement 1011—Staring into Laser Beam
Translated Safety Warnings
Warning
Waarschuwing
Varoitus
Attention
Warnung
Avvertenza
Advarsel
Aviso
¡Advertencia!
Varning!
Do not stare into the beam or view it directly with optical instruments.
Niet in de straal staren of hem rechtstreeks bekijken met optische instrumenten.
Älä katso säteeseen äläkä tarkastele sitä suoraan optisen laitteen avulla.
Ne pas fixer le faisceau des yeux, ni l'observer directement à l'aide d'instruments optiques.
Nicht direkt in den Strahl blicken und ihn nicht direkt mit optischen Geräten prüfen.
Non fissare il raggio con gli occhi né usare strumenti ottici per osservarlo direttamente.
Stirr eller se ikke direkte pŒ strŒlen med optiske instrumenter.
Não olhe fixamente para o raio, nem olhe para ele directamente com instrumentos ópticos.
No mirar fijamente el haz ni observarlo directamente con instrumentos ópticos.
Rikta inte blicken in mot strålen och titta inte direkt på den genom optiska instrument.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
B-13
Page 88
Translated Safety Warnings
Statement 1017—Restricted Area
Appendix B Compliance Information and Translated Safety Warnings
Warning
Waarschuwing
Varoitus
Attention
Warnung
Avvertenza
Advarsel
This unit is intended for installation in restricted access areas. A restricted access area can be accessed only through the use of a special tool, lock and key, or other means of security.
Deze eenheid is bestemd voor installatie in plaatsen met beperkte toegang. Toegang tot een dergelijke plaats kan alleen verkregen worden door middel van een speciaal instrument, een slot en sleutel of een ander veiligheidsmiddel.
Tämä laite on tarkoitettu asennettavaksi paikkaan, johon pääsy on rajoitettua. Tällaiseen paikkaan pääsee vain erikoistyökalua, lukkoon sopivaa avainta tai jotakin muuta turvalaitetta käyttämällä.
Cet appareil est à installer dans des zones d'accès réservé. L'accès à une zone d'accès réservé n'est possible qu'en utilisant un outil spécial, un mécanisme de verrouillage et une clé, ou tout autre moyen de sécurité.
Diese Einheit ist zur Installation in Bereichen mit beschränktem Zutritt vorgesehen. Der Zutritt zu derartigen Bereichen ist nur mit einem Spezialwerkzeug, Schloss und Schlüssel oder einer sonstigen Sicherheitsvorkehrung möglich.
Questa unità è prevista per essere installata in un'area ad accesso limitato, vale a dire un'area accessibile solo mediante l'uso di un attrezzo speciale, come lucchetto e chiave, o altri dispositivi di sicurezza.
Denne enheten er beregnet på installasjon i områder med begrenset tilgang. Et begrenset tilgangsområde kan bare nås ved hjelp av et spesielt verktøy, lås og nøkkel, eller andre sikkerhetsanordninger.
¡Advertencia!
B-14
Aviso
Esta unidade foi concebida para instalação em áreas de acesso restrito. Uma área de acesso restrito é uma área à qual apenas tem acesso o pessoal de serviço autorizado, que possua uma ferramenta, chave e fechadura especial, ou qualquer outra forma de segurança.
Esta unidad ha sido diseñada para instalación en áreas de acceso restringido. Sólo puede obtenerse acceso a una de estas áreas mediante la utilización de una herramienta especial, cerradura con llave u otro medio de seguridad.
Varning!
Denna enhet är avsedd för installation i områden med begränsat tillträde. Ett område med begränsat tillträde kan endast tillträdas med hjälp av specialverktyg, lås och nyckel eller annan säkerhetsanordning.
Cisco Catalyst 4900M Switch Installation Guide
78-18350-02
Page 89
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
Aviso
Advarsel
Esta unidade deve ser instalada em áreas de acesso restrito. Uma área de acesso restrito só pode ser acessada com o uso de uma ferramenta especial, cadeado e chave ou outros meios de segurança.
Denne enhed er beregnet til installation i områder med begrænset adgang. Der kan kun opnås adgang til et begrænset område ved at bruge et særligt stykke værktøj, lås og nøgle, eller en anden form for sikkerhed.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
B-15
Page 90
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
Statement 1019—Main Disconnecting Device
Warning
Waarschuwing
Varoitus
Attention
Warnung
Avvertenza
Advarsel
Aviso
¡Advertencia!
The plug-socket combination must be accessible at all times, because it serves as the main disconnecting device.
De combinatie van de stekker en het elektrisch contactpunt moet te allen tijde toegankelijk zijn omdat deze het hoofdmechanisme vormt voor verbreking van de aansluiting.
Pistoke/liitinkohta toimii pääkatkaisumekanismina. Pääsy siihen on pidettävä aina esteettömänä.
La combinaison de prise de courant doit être accessible à tout moment parce qu'elle fait office de système principal de déconnexion.
Der Netzkabelanschluß am Gerät muß jederzeit zugänglich sein, weil er als primäre Ausschaltvorrichtung dient.
Il gruppo spina-presa deve essere sempre accessibile, poiché viene utilizzato come dispositivo di scollegamento principale.
Kombinasjonen støpsel/uttak må alltid være tilgjengelig ettersom den fungerer som hovedfrakoplingsenhet.
A combinação ficha-tomada deverá ser sempre acessível, porque funciona como interruptor principal.
El conjunto de clavija y toma ha de encontrarse siempre accesible ya que hace las veces de dispositivo de desconexión principal.
Varning!
Man måste alltid kunna komma åt stickproppen i uttaget, eftersom denna koppling utgör den huvudsakliga frånkopplingsanordningen.
Cisco Catalyst 4900M Switch Installation Guide
B-16
78-18350-02
Page 91
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
Statement 1024—Ground Conductor
Warning
Waarschuwing
78-18350-02
This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available.
Deze apparatuur dient geaard te zijn. De aardingsleiding mag nooit buiten werking worden gesteld en de apparatuur mag nooit bediend worden zonder dat er een op de juiste wijze geïnstalleerde aardingsleiding aanwezig is. Neem contact op met de bevoegde instantie voor elektrische inspecties of met een elektricien als u er niet zeker van bent dat er voor passende aarding gezorgd
is.
Cisco Catalyst 4900M Switch Installation Guide
B-17
Page 92
Translated Safety Warnings
Appendix B Compliance Information and Translated Safety Warnings
Varoitus
Attention
Warnung
Avvertenza
Advarsel
Aviso
Laitteiden on oltava maadoitettuja. Älä koskaan ohita maajohdinta tai käytä laitteita ilman oikein asennettua maajohdinta. Ota yhteys sähkötarkastusviranomaiseen tai sähköasentajaan, jos olet epävarma maadoituksen sopivuudesta.
Cet équipement doit être mis à la masse. Ne jamais rendre inopérant le conducteur de masse ni utiliser l'équipement sans un conducteur de masse adéquatement installé. En cas de doute sur la mise à la masse appropriée disponible, s'adresser à l'organisme responsable de la sécurité électrique ou à un électricien.
Dieses Gerät muss geerdet sein. Auf keinen Fall den Erdungsleiter unwirksam machen oder das Gerät ohne einen sachgerecht installierten Erdungsleiter verwenden. Wenn Sie sich nicht sicher sind, ob eine sachgerechte Erdung vorhanden ist, wenden Sie sich an die zuständige Inspektionsbehörde oder einen Elektriker.
Questa apparecchiatura deve essere dotata di messa a terra. Non escludere mai il conduttore di protezione né usare l'apparecchiatura in assenza di un conduttore di protezione installato in modo corretto. Se non si è certi della disponibilità di un adeguato collegamento di messa a terra, richiedere un controllo elettrico presso le autorità competenti o rivolgersi a un elettricista.
Dette utstyret må jordes. Omgå aldri jordingslederen og bruk aldri utstyret uten riktig montert jordingsleder. Ta kontakt med fagfolk innen elektrisk inspeksjon eller med en elektriker hvis du er usikker på om det finnes velegnet jordning.
Este equipamento deve ser aterrado. Nunca anule o fio terra nem opere o equipamento sem um aterramento adequadamente instalado. Em caso de dúvida com relação ao sistema de aterramento disponível, entre em contato com os serviços locais de inspeção elétrica ou um eletricista qualificado.
¡Advertencia!
Varning!
Este equipo debe estar conectado a tierra. No inhabilite el conductor de tierra ni haga funcionar el equipo si no hay un conductor de tierra instalado correctamente. Póngase en contacto con la autoridad correspondiente de inspección eléctrica o con un electricista si no está seguro de que haya una conexión a tierra adecuada.
Denna utrustning måste jordas. Koppla aldrig från jordledningen och använd aldrig utrustningen utan en på lämpligt sätt installerad jordledning. Om det föreligger osäkerhet huruvida lämplig jordning finns skall elektrisk besiktningsauktoritet eller elektriker kontaktas.
Cisco Catalyst 4900M Switch Installation Guide
B-18
78-18350-02
Page 93
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
B-19
Page 94
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
Statement 1028—More Than One Power Supply
Warning
Waarschuwing
Varoitus
Attention
Warnung
Avvertenza
Advarsel
Aviso
This unit might have more than one power supply connection. All connections must be removed to de-energize the unit.
Deze eenheid kan meer dan één stroomtoevoeraansluiting bevatten. Alle aansluitingen dienen ontkoppeld te worden om de eenheid te ontkrachten.
Tässä laitteessa voi olla useampia kuin yksi virtakytkentä. Kaikki liitännät on irrotettava, jotta jännite poistetaan laitteesta.
Cette unité peut avoir plus d'une connexion d'alimentation. Pour supprimer toute tension et tout courant électrique de l'unité, toutes les connexions d'alimentation doivent être débranchées.
Dieses Gerät kann mehr als eine Stromzufuhr haben. Um sicherzustellen, dass der Einheit kein Strom zugeführt wird, müssen alle Verbindungen entfernt werden.
Questa unità può avere più di una connessione all'alimentazione elettrica. Tutte le connessioni devono essere staccate per togliere la corrente dall'unità.
Denne enheten kan ha mer enn én strømtilførselskobling. Alle koblinger må fjernes fra enheten for å utkoble all strøm.
Esta unidade poderá ter mais de uma conexão de fonte de energia. Todas as conexões devem ser removidas para desligar a unidade.
¡Advertencia!
Varning!
Puede que esta unidad tenga más de una conexión para fuentes de alimentación. Para cortar por completo el suministro de energía, deben desconectarse todas las conexiones.
Denna enhet har eventuellt mer än en strömförsörjningsanslutning. Alla anslutningar måste tas bort för att göra enheten strömlös.
Cisco Catalyst 4900M Switch Installation Guide
B-20
78-18350-02
Page 95
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
Aviso
Advarsel
Esta unidade pode ter mais de uma conexão de fonte de alimentação. Todas as conexões devem ser removidas para interromper a alimentação da unidade.
Denne enhed har muligvis mere end en strømforsyningstilslutning. Alle tilslutninger skal fjernes for at aflade strømmen fra enheden.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
B-21
Page 96
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
Statement 1029—Blank Faceplates and Cover Panels
Warning
Waarschuwing
Varoitus
Attention
Warnung
Blank faceplates and cover panels serve three important functions: they prevent exposure to hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI) that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not operate the system unless all cards, faceplates, front covers, and rear covers are in place.
Lege vlakplaten en afdekpanelen vervullen drie belangrijke functies: ze voorkomen blootstelling aan gevaarlijke voltages en stroom binnenin het frame, ze bevatten elektromagnetische storing (EMI) hetgeen andere apparaten kan verstoren en ze Het systeem niet bedienen tenzij alle
kaarten, vlakplaten en afdekkingen aan de voor- en achterkant
leiden de stroom van koellucht door het frame.
zich op hun plaats bevinden.
Tyhjillä tasolaikoilla ja suojapaneeleilla on kolme tärkeää käyttötarkoitusta: Ne suojaavat asennuspohjan sisäisille vaarallisille jännitteille ja sähkövirralle altistumiselta; ne pitävät sisällään elektromagneettisen häiriön (EMI), joka voi häiritä muita laitteita; ja ne suuntaavat tuuletusilman asennuspohjan läpi. Järjestelmää ei saa käyttää, elleivät kaikki tasolaikat, etukannet ja takakannet ole kunnolla paikoillaan.
Ne jamais faire fonctionner le système sans que l’intégralité des cartes, des plaques métalliques et des panneaux avant et arrière ne soient fixés à leur emplacement. Ceux-ci remplissent trois fonctions essentielles : ils évitent tout risque de contact avec des tensions et des courants dangereux à l’intérieur du châssis, ils évitent toute diffusion d’interférences électromagnétiques qui pourraient perturber le fonctionnement des autres équipements, et ils canalisent le flux d’air de refroidissement dans le châssis.
Blanke Faceplates und Abdeckungen haben drei wichtigen Funktionen: (1) Sie schützen vor gefährlichen Spannungen und Strom innerhalb des Chassis; (2) sie halten elektromagnetische Interferenzen (EMI) zurück, die andere Geräte stören könnten; (3) sie lenken den kühlenden Luftstrom durch das Chassis. Das System darf nur betrieben werden, wenn alle Karten, Faceplates, Voder- und Rückabdeckungen an Ort und Stelle sind.
Avvertenza
Le piattaforme bianche e i panelli di protezione hanno tre funzioni importanti: Evitano l'esposizione a voltaggi e correnti elettriche pericolose nello chassis, trattengono le interferenze elettromagnetiche (EMI) che potrebbero scombussolare altri apparati e dirigono il flusso di aria per il raffreddamento attraverso lo chassis. Non mettete in funzione il sistema se le schede, le piattaforme, i panelli frontali e posteriori non sono in posizione.
Advarsel
Blanke ytterplater og deksler sørger for tre viktige funksjoner: de forhindrer utsettelse for farlig spenning og strøm inni kabinettet; de inneholder elektromagnetisk forstyrrelse (EMI) som kan avbryte annet utstyr, og de dirigerer luftavkjølingsstrømmen gjennom kabinettet. Betjen ikke systemet med mindre alle kort, ytterplater, frontdeksler og
Aviso
As faces furadas e os painéis de protecção desempenham três importantes funções: previnem contra uma exposição perigosa a voltagens e correntes existentes no contra interferência electromagnética (EMI) que poderá danificar outro equipamento; e canalizam o fluxo do ar de refrigeração através do chassis. Não deverá operar o sistema sem que todas as placas, faces, protecções anteriores e posteriores estejam nos seus lugares.
Cisco Catalyst 4900M Switch Installation Guide
B-22
bakdeksler sitter på plass.
interior do chassis; previnem
78-18350-02
Page 97
Appendix B Compliance Information and Translated Safety Warnings
Translated Safety Warnings
¡Advertencia!
Varning!
Las placas frontales y los paneles de relleno cumplen tres funciones importantes: evitan la exposición a niveles peligrosos de voltaje y corriente dentro del chasis; reducen la interferencia electromagnética (EMI) que podría perturbar la operación de otros equipos y dirigen el flujo de aire de enfriamiento a través del chasis. No haga funcionar el sistema a menos que todas las tarjetas, placas frontales, cubiertas frontales y
cubiertas traseras estén en su lugar.
Tomma framplattor och skyddspaneler har tre viktiga funktioner: de förhindrar att personer utsätts för farlig spänning och ström som finns inuti chassit; de innehåller elektromagnetisk interferens (EMI) som kan störa annan utrustning; och de styr riktningen på kylluftsflödet genom chassit. Använd inte systemet om inte alla kort, framplattor, fram- och bakskydd är på plats.
Aviso
Plaquetas vazias e painéis de proteção têm três funções importantes: impedem a exposição a tensões e correntes elétricas perigosas dentro do chassi; apresentam interferência eletromagnética (EMI) que pode danificar outros equipamentos: direcionam o fluxo do ar refrigerado pelo chassi. Não opere o sistema a menos que todas as placas, plaquetas, tampas frontais e tampas traseiras estejam em seu devido lugar.
Advarsel
Blanke frontplader og sidepaneler tjener tre vigtige formål: de forhinder udsættelse for farlig spænding og strøm inde i chassiset, de isolerer elektromagnetisk interferens (EMI), der kan forstyre andet udstyr, og de leder en strøm af kølig luft gennem chassiset. Betjen ikke systemet medmindre alle kort, frontplader, sidepaneler og bagpaneler er på plads.
78-18350-02
Cisco Catalyst 4900M Switch Installation Guide
B-23
Page 98
Translated Safety Warnings
Appendix B Compliance Information and Translated Safety Warnings
Cisco Catalyst 4900M Switch Installation Guide
B-24
78-18350-02
Page 99
Appendix B Compliance Information and Translated Safety Warnings
Statement 1030—Equipment Installation
Translated Safety Warnings
Warning
Waarschuwing
Varoitus
Attention
Warnung
Avvertenza
Advarsel
Aviso
Only trained and qualified personnel should be allowed to install, replace, or service
equipment.
this
Deze apparatuur mag alleen worden geïnstalleerd, vervangen of hersteld door bevoegd geschoold
personeel.
Tämän laitteen saa asentaa, vaihtaa tai huoltaa ainoastaan koulutettu ja laitteen tunteva
henkilökunta.
Il est vivement recommandé de confier l'installation, le remplacement et la maintenance de ces équipements à des personnels qualifiés et expérimentés.
Das Installieren, Ersetzen oder Bedienen dieser Ausrüstung sollte nur geschultem, qualifiziertem Personal gestattet werden.
Questo apparato può essere installato, sostituito o mantenuto unicamente da un personale competente.
Bare opplært og kvalifisert personell skal foreta installasjoner, utskiftninger eller service på
utstyret.
dette
Apenas pessoal treinado e qualificado deve ser autorizado a instalar, substituir ou fazer a revisão deste equipamento.
¡Advertencia!
Varning!
78-18350-02
Solamente el personal calificado debe instalar, reemplazar o utilizar este equipo.
Endast utbildad och kvalificerad personal bör få tillåtelse att installera, byta ut eller reparera denna
utrustning.
Cisco Catalyst 4900M Switch Installation Guide
B-25
Page 100
Translated Safety Warnings
Appendix B Compliance Information and Translated Safety Warnings
Aviso
Advarsel
Somente uma equipe treinada e qualificada tem permissão para instalar, substituir ou dar manutenção a este equipamento.
Kun uddannede personer må installere, udskifte komponenter i eller servicere dette udstyr.
Cisco Catalyst 4900M Switch Installation Guide
B-26
78-18350-02