Owner’s Manual
Using the
Ducted Evaporative Air Conditioning
with Your
Manual Control
Operating, Installation & Maintenance
Please keep this important manual in a safe place. It is the owner’s responsibility to ensure that
regular maintenance is carried out on this Ducted Evaporative Air Conditioner. Failure to do so will
void all guarantees beyond statutory and legal requirements.
www.climatetechnologies.com.au
PNE2002 Series Control
Manual Comfort Control
Notes
Introduction
Congratulations on your choice
We are delighted you have chosen an air conditioning product from
Climate Technologies to cool your home. It’s an air conditioner we’re
very proud of. Designed and made in Australia by Climate
Technologies, a 100% Australian owned company, it contains the
latest advances in Fresh Air Conditioning technology in a stylish,
attractive cabinet.
Climate Technologies is constantly researching and developing improved product
features and therefore reserves the right to change specifications without notice.
E.&O.E.
PNE2002 Series Control
Page 2
Manual Comfort Control
Notes
INTRODUCTION ................................................................................................2
CONGRATULATIONS ON YOUR CHOICE ......................................................................... 2
DUCTED EVAPORATIVE AIR CONDITIONING ...............................................5
INTRODUCTION .......................................................................................................... 6
NIT OPERATION ....................................................................................................... 6
U
Exhaust...............................................................................................................................................6
Bleed-off .............................................................................................................................................7
OPERATING THE CONTROLS ......................................................................... 8
CONTROL FUNCTIONS ................................................................................................ 8
Using the Fan Mode............................................................................................................................8
Using the Cool Mode ..........................................................................................................................8
Pre-Cool.............................................................................................................................................. 8
CONTROL INSTALLATION & SETUP ..............................................................9
INSTALLING THE CONTROL ......................................................................................... 9
Before Starting....................................................................................................................................9
Installation...........................................................................................................................................9
S
ETTING UP THE CONTROL ...................................................................................... 10
Setting Minimum Fan Speed.............................................................................................................10
Setting Maximum Fan Speed............................................................................................................10
Setting up the Dump Valve (Where Fitted) ....................................................................................... 10
ROBLEM SOLVING .................................................................................................. 11
P
OMMISSIONING CHECK LIST.................................................................................... 12
C
General ............................................................................................................................................. 12
Unit - Ducted Evaporative Air Conditioner ........................................................................................ 12
Ductwork...........................................................................................................................................13
Site.................................................................................................................................................... 13
Customer Hand Over........................................................................................................................13
DUCTED EVAPORATIVE AIR CONDITIONER MAINTENANCE ...................14
GENERAL ................................................................................................................ 14
F
ILTER PADS ........................................................................................................... 14
ATER TANK ........................................................................................................... 14
W
ATER LEVEL / FLOAT VALVE................................................................................... 15
W
OTOR AND FAN...................................................................................................... 15
M
E
LECTRICAL............................................................................................................. 15
B
LEED OFF.............................................................................................................. 15
UMP ...................................................................................................................... 15
P
W
ATER DISTRIBUTION .............................................................................................. 15
WARRANTY.....................................................................................................16
WARRANTY STATEMENT........................................................................................... 16
Conditions And Exclusions ...............................................................................................................16
W
ARRANTY ON REPLACEMENTS PARTS. ................................................................... 17
ERIOD OF WARRANTY – YEARS .............................................................................. 17
P
P
ROOF OF PURCHASE ............................................................................................. 18
D
EALER / PRODUCT INFORMATION ............................................................................ 18
SERVICE.......................................................................................................... 19
PNE2002 Series Control
Page 3
Manual Comfort Control
Ducted Evaporative Air Conditioning
Introduction
Your ducted evaporative air conditioner is engineered to meet the rigors of our harsh Australian
environment. Operated and maintained in accordance with this manual, it will provide you with years
of quiet, cool and environmentally friendly operation. Please take the time to read this manual.
The principal of your unit is to introduce fresh air, which is washed through the filter pads to provided
cool fresh air. The air is exhausted taking with it any heat loading on the home.
Unit Operation
Exhaust
It is essential for successful operation of evaporative air-conditioning that there be sufficient exhaust
openings in the area to be ventilated. Open doors and windows will usually provide this.
The minimum exhaust opening should be as per the table guide set out below. It is recommended
that ceiling vents or exhaust fans be used where there is any doubt about there being sufficient
exhaust area available. Ceiling exhaust fans or ceiling vents should have a capacity equivalent to
that of the air conditioner.
MODEL MINIMUM EXHAUST
AREA
Small 0.85 m²
Medium 1.19 m² to 1.48 m²
PNE2002 Series Control
Large 2.02 m²
Page 6