AP7902 and AP7911 are Switched Rack Power Distribution Units (Rack PDUs) that distribute power to
devices in the rack. The user can turn on, turn off, or recycle power back to the individually controlled
outlets. The Rack PDUs also have a sensor that measures the current being used by the Rack PDUs and
their attached devices. The Rack PDUs can be monitored through Web, Telnet, SNMP, or InfraStruXure
Manager interfaces.
AP7902
AP7911
Bank 1 — Eight NEMA 5-20 outlets
20A circuit breaker for Bank 1
20A circuit breaker for Bank 2
Display interface
Bank 2 — Eight NEMA 5-20 outlets
NEMA L5-30 plug with a 12-foot power cord
Bank 1 — Eight IEC 320 C13 outlets
15A circuit breaker for Bank 1
15A circuit breaker for Bank 2
Display interface
Bank 2 — Eight IEC 320 C13 outlets
NEMA L6-30 plug with a 12-foot power cord
Switched Rack PDU Installation and Quick Start1
Product Description and Inventory
Additional
documentation
Inventory
The Rack PDU User’s Guide and the Rack PDU Addendum are available
on the supplied CD and on the APC Web site: www.apc.com.
The User’s Guide (.\doc\eng\usrguide.pdf) contains additional
information about the following topics related to the Rack PDU:
• Management interfaces
• User accounts
• Customizing setup
•Security
The Addendum (.\doc\eng\addendum.pdf) contains additional
information about the following topics:
• The Management Card Wizard
• Configuration utilities
• File transfers
The Rack PDU is shipped with the following items:
QuantityItem
Receiving inspection
Please recycle
1Configuration cable (940-0144)
1Cord retention tray (with 4 flat-head screws and
16 wire ties)
2Mounting brackets (with 8 flat-head screws)
4Rubber feet
1APC Switched Rack PDU Utility CD
1Warranty registration card
Inspect the package and contents for shipping damage, and make sure
that all parts were sent. Report any damage immediately to the shipping
agent, and report missing contents, damage, or other problems
immediately to APC or your APC reseller.
The shipping materials are recyclable. Please save them for
later use, or dispose of them appropriately.
InfraStruXure-certified
This product is certified for use in InfraStruXure systems. The
Configuration section, beginning on page 7, does not apply to Rack
PDUs that are part of InfraStruXure systems managed by an
InfraStruXure Manager.
2Switched Rack PDU Installation and Quick Start
How to Install the Rack PDU
Installation guidelines
Attach the cord
retention tray
• For a Rack PDU installed in an enclosed communications rack, the
recommended maximum ambient temperature is 45° C (113º F).
• Install the Rack PDU so that it does not reduce the air flow
required for safe operation of the equipment.
• Install the Rack PDU so that there is an even mechanical load.
• Follow the nameplate ratings when connecting equipment to the
supply circuit. Avoid overloading the circuits, which could affect
over-circuit protection and supply wiring.
• Maintain reliable earthing of the Rack PDU, especially supplyconnections that do not directly connect to the branch circuit.
• Install the Rack PDU so that the power plug is accessible to be
disconnected for service.
Attach the cord retention tray to the Rack PDU, using four flat-head
screws (provided) per tray.
Additional cord
retention tray (optional)
Mount an additional cord retention tray to secure cords
from the top bank of outlets. Purchase additional tray kits
Note
Attach a second cord retention tray to the PDU, with the cord retainers
facing down.
Switched Rack PDU Installation and Quick Start3
from APC (AP9569).
How to Install the Rack PDU
Attach cords to the tray
Attach a cord to the tray by looping the cord and securing it to the tray,
using a wire tie (provided). Cords from both banks of outlets may be
secured to the bottom tray, or you may attach an additional tray (shown
on the preceding page) to secure cords from the top bank of outlets.
Make sure the cords that are attached to the upper tray do not interfere
with the operation of the circuit breakers.
Each cord must be secured to the tray so that you can unplug
it from the Rack PDU without removing the wire tie.
Note
Mounting optionsYou can install the Rack PDU in one of two ways: flush with the rack, or
recessed to allow the use of the cord retention bracket. To mount the
Rack Rack PDU horizontally in a NetShelter
®
or any other standard
EIA-310 rack or enclosure:
1. Attach the mounting brackets to the Rack PDU, using the flat-head
screws (provided).
Some enclosures may require you to recess the Rack
PDU so that the back doors of the enclosure will close
Note
when other devices are plugged in to the Rack PDU.
For placement flush-to-rack: use four flat-head screws (provided)
for each bracket.
4Switched Rack PDU Installation and Quick Start
Loading...
+ 18 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.