! Qualified personnel must complete all work.
! Do not apply power to the Type II Vipros 358 King until an A.E.S.I. (Amada Engineering and Service
Incorporated) Engineer is present and has instructed you to do so.
! Not all information required to install the Type II Vipros 358 King is included with this document. Specific details
for proper installation are found in the document Type II Vipros 358 King with Fanuc 18P User Pre-installationGuide available at the Amada America Internet web site at http://www.amada.com/.
! Considerable effort has been made to ensure that this manual is free of inaccuracies and omissions. However,
as we are constantly improving our product, some of the data contained herein may be out of date. Please
check our Internet site, http://www.amada.com/, for the latest release of this document.
Print Date 02/16/2001 Revision 4. 0This document availabl e on t he World Wide Web at http:// www.amada.com/supportPage 2 of 10
Planning the Location of the Type II Vipros 358 King......................................................................................................................4
Plan View - Type II Vipros 358 King............................................................................................................................................5
Plan View - Type II Vipros 358 King (shown with optional standard conveyors)..........................................................................6
Plan View - Type II Vipros 358 King (shown with optional standard conveyors and MP1225 Loader)........................................7
End View - Type II Vipros 358 King.............................................................................................................................................8
Elevation View - Type II Vipros 358 King.....................................................................................................................................9
Planning the Location of the Typ e II Vipros 358 King
The following diagrams provide the details for positioning the Type II Vipros 358 King.
" No obstacles are allowed in the worksheet travel area and the ceiling must be at least 40" above the Type II Vipros 358 King.
" All of the recommended maintenance areas should be used, but at a minimum the doors of the NC unit must be able to be
opened. Any reduction of the listed maintenance areas may increase time and expense of installation and maintenance.
" The Type II Vipros 358 King machine and control must be protected from direct sunlight or other heat sources. Direct
exposure to direct heating sources such as infrared heaters have been shown to affect punch and die alignment.
" The positioning of the SBC EX5.5 Chiller is very flexible.
Print Date 02/16/2001 Revision 4. 0This document availabl e on t he World Wide Web at http:// www.amada.com/supportPage 4 of 10
Air Flow
Under normal operating conditions the Chiller may be placed against walls as shown.
For maintenance purposes access to all sides may be required.
60" overhead clearence required.
Chiller may be located up to 50ft from Hydraulic Unit.
Chiller is not designed for outdoor placement.
Print Date 02/16/2001 Revision 4. 0This document availabl e on t he World Wide Web at http:// www.amada.com/supportPage 10 of 10