Vipros 2510 Wit h Fanuc 18P Control Layout Drawings ©Amada America Inc.
Vipros 2510 With Fanuc 18P Control
Layout Drawings
Amada America I nc.
7025 Firestone Blvd. Buena Park CA. 90621 Phone: (714) 739 2111
Email info@amada.com
Print Date 01/17/2001 Revision 4. 0 This document availabl e on t he World W i de Web at http:/ /www.amada.com Page 1 of 10
Page 2
Vipros 2510 Wit h Fanuc 18P Control Layout Drawings ©Amada America Inc.
Warning
! Qualified personnel must complete all work. ! Do not apply power to the Vipros 2510 until an A.E.S.I. (Amada Engineering and
Service Incorporated) Engineer is present and has instructed you to do so.
! Not all information required to install the Vipros 2510 is included with this document.
Specific details for proper installation are found in the document Vipros 2510 With 18P Control Pre-installation Guide available at the Amada America Internet web site at http://www.amada.com/.
! Considerable effort has been made to ensure that this manual is free of
inaccuracies and omissions. However, as we are constantly improving our product, some of the data contained herein may be out of date. Please check our Internet site, http://www.amada.com/, for the latest release of this document.
Print Date 01/17/2001 Revision 4. 0 This document availabl e on t he World W i de Web at http:/ /www.amada.com Page 2 of 10
Page 3
Vipros 2510 Wit h Fanuc 18P Control Layout Drawings ©Amada America Inc.
Contents
Planning the Location of the Vipros 2510 ......................................................................................................... 4
Plan View - Vipros 2510 King ................................................................................................... ..................... 5
Plan View - Vipros 2510 King (shown with optional V255hs Conveyor)........................................................ 6
Plan View - Vipros 2510 King (shown with optional V255hs Conveyor and MP1225 Loader)....................... 7
End View - Vipros 2510 King......................................................................................................................... 8
Elevation View - Vipros 2510 King................................................................................................................ 9
Chiller Placement........................................................................................................................................ 10
Print Date 01/17/2001 Revision 4. 0 This document availabl e on t he World W i de Web at http:/ /www.amada.com Page 3 of 10
Page 4
Vipros 2510 Wit h Fanuc 18P Control Layout Drawings ©Amada America Inc.
Planning the Location o f th e Vipros 2510
The following diagrams provide the details for positioning the Vipros 2510.
" No obstacles are allowed in the worksheet travel area and the ceiling must be at least 40" above the Vipros 2510. " All of the recommended maintenance areas should be used, but at a minimum the doors of the NC unit must be able to be
opened. Any reduction of the listed maintenance areas may increase time and expense of installation and maintenance.
" The Vipros 2510 machine and control must be protected from direct sunlight or other heat sources. Direct exposure to direct
heating sources such as infrared heaters have been shown to affect punch and die alignment.
" The positioning of the SBC EX3.0 Chiller is very flexible
Print Date 01/17/2001 Revision 4. 0 This document availabl e on t he World W i de Web at http:/ /www.amada.com Page 4 of 10
Page 5
Vipros 2510 Wit h Fanuc 18P Control Layout Drawings ©Amada America Inc.
50
C
t
(
)
57"
0"
g
Plan View - Vipros 2510 King
Electrical Requirements
Vipros 2510 King
E1
230 / 460 / 3 / 60 ±10%, 22 kVA
56 amps @ 230 / 3 / 60 VAC 28 amps @ 460 / 3 / 60 VAC
E2
SBC EX3.0 Chiller 230 or 460 / 3 / 60 ±10%, 15 kVA
38 amps @ 230 / 3 / 60 VAC 19 amps @ 460 / 3 / 60 VAC
Compressed Air Requirements
P1
Vipros 2510
Operator Control Station
80 psi @ 8.8 ft3/min.
hiller Uni
Actual location variable
7"
"
Vipros 2510 King
Y-axis
th
" material
" Work Area
08" Machine len
338" Recommended Safety / Maintenance area 40" from all components
" Maximum travel area
Optional Material
Support Required
Track 200
Punch Center
Hydraulic Unit
P1
E1
Vipros 2510
Centerline
98.425" to X axis origin
393.70" Maximum Travel Area 196.85" Material
202" Machine Width
474" Recomended Safety / Maintenance Area 40" from all components
101" to edge of table
Optional Material
Support Required
12" 12" 12"
Scale
Print Date 01/17/2001 Revision 4. 0 This document availabl e on t he World W i de Web at http:/ /www.amada.com Page 5 of 10
Page 6
Vipros 2510 Wit h Fanuc 18P Control Layout Drawings ©Amada America Inc.
g
l
E3
50
C
t
(
)
57"
"
g
Plan View - Vipros 2510 King
Electrical Requirements
Vipros 2510 King
E1
230 / 460 / 3 / 60 ±10%, 22 kVA
56 amps @ 230 / 3 / 60 VAC 28 amps @ 460 / 3 / 60 VAC
E2
SBC EX3.0 Chiller 230 or 460 / 3 / 60 ±10%, 15 kVA
38 amps @ 230 / 3 / 60 VAC 19 amps @ 460 / 3 / 60 VAC
E3
V255hs Conveyor
208 - 230 / 460 / 3 / 60 ±10%, .8 kVA
2.1 amps @ 208 / 3 / 60 VAC
2.0 amps @ 230 / 3 / 60 VAC
1.0 amps @ 460 / 3 / 60 VAC
Compressed Air Requirements
P1
Vipros 2510
Operator Control Station
80 psi @ 8.8 ft3/min.
Y-axis 0
th
" material
" Work Area
08" Machine len
338" Recommended Safety / Maintenance area 40" from all components
" Maximum travel area
Optional Material
Support Required
(shown with optional V255hs Conveyor)
Access required this area for slu
remova
45"
hiller Uni
Actual location variable
Track 200
Punch Center
7"
"
Hydraulic Unit
1"
V255hs Conveyor
Vipros 2510 King
P1
Optional Material
Support Required
E1
12" 12" 12"
Scale
Vipros 2510
Centerline
98.425" to X axis origin
393.70" Maximum Travel Area 196.85" Material
474" Recomended Safety / Maintenance Area 40" from all components
202" Machine Width
101" to edge of table
Print Date 01/17/2001 Revision 4. 0 This document availabl e on t he World W i de Web at http:/ /www.amada.com Page 6 of 10
Page 7
Vipros 2510 Wit h Fanuc 18P Control Layout Drawings ©Amada America Inc.
l
E3
50
C
t
(
)
57"
"
g
Plan View - Vipros 2510 King
Electrical Requirements
Vipros 2510 King
E1
230 / 460 / 3 / 60 ±10%, 22 kVA
56 amps @ 230 / 3 / 60 VAC 28 amps @ 460 / 3 / 60 VAC
E2
SBC EX3.0 Chiller 230 or 460 / 3 / 60 ±10%, 15 kVA
38 amps @ 230 / 3 / 60 VAC 19 amps @ 460 / 3 / 60 VAC
E3
V255hs Conveyor
208 - 230 / 460 / 3 / 60 ±10%, .8 kVA
2.1 amps @ 208 / 3 / 60 VAC
2.0 amps @ 230 / 3 / 60 VAC
1.0 amps @ 460 / 3 / 60 VAC
E4
MP1225 Loader 200 / 3 / 60 ±10%, 10 Kva
To operate at 230 / 460 VAC a step up transformer is required with the following service is required 29 amps @ 200 / 3 / 60 VAC 26 amps @ 230 / 3 / 60 VAC 13 amps @ 460 / 3 / 60 VAC
Compressed Air Requirements
P1
Vipros 2510
P2
MP1225 Loader
Operator Control Station
80 psi @ 8.8 ft3/min. 75 psi @ 31.8 ft3/min.
Y-axis 0
th
" material
" Work Area
08" Machine len
338" Recommended Safety / Maintenance area 40" from all components
" Maximum travel area
Optional Material
Support Required
(shown with optional V255hs Conveyor and MP1225 Loader)
Access required this area for slug remova
45"
1"
V255hs Conveyor
Xformer MP1225
E4
P2
Vipros 2510 King
Optional Material
Support Required
P1
Track 200
Punch Center
hiller Uni
Actual location variable
7"
"
Hydraulic Unit
68"122"
190" Loader Length
MP1225 Loader
Access for
E1
Vipros 2510
Centerline
98.425" to X axis origin 101" to edge of table
102" to edge of Loader
202" Machine Width
393.70" Maximum Travel Area 196.85" Material
520" Recomended Safety / Maintenance Area 40" from all components
244" to edge of Loader
344" Vipros 2510 King MP1225 assembly width
material loading / unloading
required in this area
142" Loader Width
12" 12" 12"
Scale
Print Date 01/17/2001 Revision 4. 0 This document availabl e on t he World W i de Web at http:/ /www.amada.com Page 7 of 10
Page 8
Vipros 2510 Wit h Fanuc 18P Control Layout Drawings ©Amada America Inc.
End View - Vipros 2510 King
201.60"
100.80"100.80"
Table in
Shipping Position
Material
Pass Line*
Floor Line
29.53"
19.67"
126.00" Shipping Width
*Material Pass Line varies between
37.20" and 40.95" as a function of machine mounting method and installed options
12" 12"12"
Scale
Print Date 01/17/2001 Revision 4. 0 This document availabl e on t he World W i de Web at http:/ /www.amada.com Page 8 of 10
Page 9
Vipros 2510 Wit h Fanuc 18P Control Layout Drawings ©Amada America Inc.
Elevation View - Vipros 2510 King
Punch
Throat
Depth
17.33"
52.13"
10.60"
Center
Turret
Center
50.00"
Y-Axis
Load
Position
33.27"
15.93"
17.93"
8.08"
26.53"
115.60"
168.67"
208.27"
80.00"
Material
Pass Line*
26.53"
13.80"
*Material Pass Line varies between
37.20" and 40.95" as a function of machine mounting method and installed options
12"
Scale
86.33"
Floor Line
12"12"
Print Date 01/17/2001 Revision 4. 0 This document availabl e on t he World W i de Web at http:/ /www.amada.com Page 9 of 10
Page 10
Vipros 2510 Wit h Fanuc 18P Control Layout Drawings ©Amada America Inc.
Chiller Placement
The Chiller Location is flexible and position shown is for
6"
reference only. Under normal operation the chiller may be placed against walls as shown. For maintenance access to all sides may be required.
Electrical Power
15 Kva
48.87"
Air
Flow
36.90"
6"
Supplied 15 ft Water Hose
Operator Panel
Print Date 01/17/2001 Revision 4. 0 This document availabl e on t he World W i de Web at http:/ /www.amada.com Page 10 of 10