3/8 X 43mm BOL T
3/8 X 50mm BOL T
3/8 X 67mm BOL T
3/8 X 70mm BOL T
3/8 X 73mm BOL T
3/8 X 117mm BOL T
3/8” LOW HEIGHT LOCK NUT
3/8” SAE WASHER
3/8” RH WASHER
BLACK RH CAP
WHITE RH CAP
PLA TINUM RH CAP
PULLEY BRACKET
FLOA TING PULLEY CABLE
BACK P AD SUPPORT
QTY
4
2
3
1
4
9
15
34
30
5
25
25
1
1
1
T ools Required for Assembly
* 9/16” wrench
* Ratchet with 9/16” socket
* Metric Allen wrench set
Bolt Length Ruler
NOTE: BOL T LENGTH IS MEASURED FROM THE UNDERSIDE OF THE HEAD OF THE BOLT .
BOLT LENGTH
0
1/21/21/21/21/21/2
102030405060708090100110120130140150
1
23456
3
49 3/8 X 25mm BOL T
50 3/8 X 32mm BOL T
99 3/8 X 43mm BOL T
51
105
65
3/8” LOW
HEIGHT LOCK
NUT
106
66
3/8” SAE
WASHER
52 3/8 X 43mm BOL T W/NYLOCK
100 3/8 X 50mm BOL T
53
54 3/8 X 61mm BOL T
101 3/8 X 67mm BOL T
55
64
3/8” BLACK
SAE W ASHER
68
69
109
108
RH CAP
(WHITE/PLATINUM/BLACK)
107
67
RH
WASHER
102 3/8 X 70mm BOL T
56
103 3/8 X 73mm BOL T
57
104 3/8 X 117mm BOL T
4
58 3/8 X 90mm BOL T
59 3/8 X 97mm BOL T
60 3/8 X 106mm BOL T
61 3/8 X 164mm BOL T
62 3/8 X 25mm BUTTON HEAD BOL T
46
96
1/2”
FLANGE SP ACER
63 3/8 X 76mm BUTTON HEAD BOL T
22 1/2 X 3” SHOULDER BOLT
97
1-1/2”
FLANGE SP ACER
48
3/4”
FLANGE SP ACER
44
1”
FLANGE SP ACER
5
14
10
65
67
66
3/8 X 97mm 59
69
FIGURE 1
STEP 1:
• LOOSELY assemble the LA T/LOW FRAME (14) to the T OWER BASE (10) using four RH CAPS (69), two 3/8 X 97mm BOL TS (59),
four 3/8” SAE W ASHERS (66), four 3/8” RH W ASHERS (67) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIGURE 1.
0
1/21/21/21/21/21/2
102030405060708090100110120130140150
1
23456
6
65
85
67
66
104 3/8 X 117mm
69
10
FIGURE 2
STEP 2:
• LOOSELY assemble the LEG PRESS FRAME (85) to the TOWER BASE (10) using four RH CAPS (69), two 3/8 X 1 17mm BOL TS
(104), four 3/8” SAE W ASHERS (66), four 3/8” RH WASHERS (67) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIGURE 2. (NOTE: The two 3/8 X 117mm BOLTS (104) for this step are in the LEG PRESS hardwar e bag.)
7
65
9
REMOVE CAP BEFORE ASSEMBL Y!
67
66
59 3/8 X 97mm
69
10
FIGURE 3
STEP 3:
• LOOSELY assemble the TOWER UPRIGHT (9) to the TOWER BASE (10) using four RH CAPS (69), two 3/8 X 97mm BOL TS (59),
four 3/8” SAE W ASHERS (66), four 3/8” RH W ASHERS (67) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIGURE 3.
(NOTE: REPLACE CAP AFTER ASSEMBL Y .)
0
1/21/21/21/21/21/2
102030405060708090100110120130140150
1
23456
8
10
85
55 3/8 X 67mm
65
67
66
58 3/8 X 90mm
69
8
104 3/8 X 117mm
FIGURE 4
STEP 4:
• LOOSEL Y assemble the MUL TI PRESS FRAME (8) to the LEG PRESS FRAME (85) using eight RH CAPS (69), two 3/8 X 1 17mm BOL TS
(104), two 3/8 X 67mm BOL TS (55), eight 3/8” SAE WASHERS (66), eight 3/8” RH W ASHERS (67) and four 3/8” LOW HEIGHT LOCK
NUTS (65) as shown in FIGURE 4. (NOTE: The two 3/8 X 1 17mm BOL TS (104) for this step are in the LEG PRESS hardware bag.)
• LOOSELY assemble the MUL TI PRESS FRAME (8) to TOWER BASE (10) using four RH CAPS (69), two 3/8 X 90mm BOLTS (58),
four 3/8” SAE W ASHERS (66), four 3/8” RH W ASHERS (67) and two 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIGURE 4.
9
STEP 5:
• Insert two GUIDE RODS (33) through the
SHROUD SUPPORT BRACKET (16) and into
the TOWER BASE (10) as shown on FIGURE
5.
• (NOTE: Lubricate GUIDE RODS (33) with
silicon or teflon spray available at most
hardware stores.)
FIGURE 5
39
• Slide two 3/4 X 2” WEIGHT STACK CUSHIONS (32) down over the GUIDE RODS (33)
as shown in FIGURE 5.
• Using EXTREME CARE slide all twenty
WEIGHT PLATES (34) down over the GUIDE
RODS (33) on to the WEIGHT STACK CUSHIONS (32). Make sure that the WEIGHT
PLATES (34) are all facing as shown.
• Slide the HEAD PLATE ASSEMBLY (36) down
over the GUIDE RODS (33) onto the weight
stack as shown in FIGURE 5.
• Slide two 13/16” SHAFT COLLARS (39)
over the GUIDE RODS (33) as shown in
FIGURE 5.
• Apply WEIGHT STACK LABELS (74) to
WEIGHT PLA TES (34) and HEAD PLATE (36)
as shown in FIGURE 5. Begin with number one
at the HEAD PLATE (36) with larger numbers
in consecutive order towards bottom of weight
stack.
• Repeat STEP 5 to assemble two more weight
stacks to the TOWER BASE (10).
33
36
34
74
32
16
10
10
11
33
15
FIGURE 6
STEP 6:
• CAREFULLY slide three SHROUD BRACKETS (15) over all the GUIDE RODS (33) as shown in FIGURE 6.
• CAREFULLY assemble the LAT/LOW BOOM (11) over all the GUIDE RODS (33) as shown in FIGURE 6.
0
1/21/21/21/21/21/2
102030405060708090100110120130140150
1
23456
11
FIGURE 7
14
11
57 3/8 X 73mm
3/8 X 90mm 58
9
67
66
69
65
STEP 7:
• LOOSELY assemble the LAT/LOW BOOM (11) to the LAT/LOW FRAME (14) and the TOWER UPRIGHT (9) using seven RH
CAPS (69), two 3/8 X 73mm BOL TS (57), two 3/8 X 90mm BOL TS (58), seven 3/8” SAE WASHERS (66), seven 3/8” RH W ASHERS
(67) and three 3/8” LOW HEIGHT LOCK NUTS (65) as shown in FIGURE 7.
69
3/8 X 90mm 58
66
67
11
65
15
39
TIGHTEN!
FIGURE 8
STEP 8:
• SECUREL Y assemble the three SHROUD BRACKETS (15) to the LAT/LOW BOOM (11) using six RH CAPS (69), six 3/8 X 90mm
BOL TS (58), twelve 3/8” SAE WASHERS (66), six 3/8” RH W ASHERS (67) and six 3/8” LOW HEIGHT LOCK NUTS (65) as shown
in FIGURE 8. (NOTE: Use RH W ASHERS and RH CAPS on top only .)
• Slide the 13/16” SHAFT COLLARS (39) up against the SHROUD BRACKETS (15) and SECURELY tighten the set screws on
the SHAFT COLLARS (39). See FIGURE 8.
12
LUBRICATION NOTE:
When finished assembling the W eight Stack, open the lube Pack provided
with this unit and apply a thin film of Lubricant around the first 2 to 3
inches of each Guide Rod above the Head Plate Assembly . After the
cables are installed, use of the machine will spread the lubricant over the
length of the Guide Rods and into the Head Plate
Assemblies bushings
TIGHTEN!
TIGHTEN!
FIGURE 9
STEP 9:
• Securely tighten all loose frame connections made to this point, then proceed to snap RH CAPS
(69) over the RH WASHERS (67) on all tightened connections.
0
1/21/21/21/21/21/2
102030405060708090100110120130140150
1
23456
13
Loading...
+ 29 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.