Groen SSB-10E Installation Manual

IMPORTANT INFORMATION I KEEP FOR OPERATOR I IMPORTANT INFORMATION
INSTALLATION INSTRUCTIONS FOR GROEN CASTER KITS
Part No. 150528, Rev. A
Eclipse Braising Pans (Models BPM or BPP – G or E)
Steamers (Models VRC, SSB or HY)
Combo Ovens (Models CC-10 or C/2 – G or E)
OPERATORS AND INSTALLING TECHNICIANS
SHOULD READ, UNDERSTAND AND FOLLOW
WARNINGS AND INSTRUCTIONS IN THIS MANUAL
GROEN CASTER KIT
Table of Contents
Page
Eclipse Braising Pans (Models BPM or BPP – G or E) 2
Steamers (Models VRC, SSB or HY) 4
Combo Ovens (Models CC-10 or C/2 – G or E) 7
TS-9 Stands (for table top units - Kettle Models TDB, TDH, 9 Braising Pan Model TD/FPC or Cooker Mixer TDB; TA/2)
This Restraining Device Must Always Be Connected
When the Appliance with Casters is in Service
Disconnect Then Reconnect
Only For Maintenance
This restraining device is required for all units with casters or per one of the following standards:
1. UL/ANSI 197
2. ANSI Z83.11/ CSA 1.8
1
GROEN CASTER KIT
INSTALLATION INSTRUCTIONS
FOR GROEN CASTER KIT (Groen Part #146354)
ECLIPSE BRAISING PANS
WARNING:
1. WHEN INSTALLING ON A GAS BRAISING PAN, THESE CASTERS MUST BE INSTALLED WITH A GROEN GAS QUICK DISCONNECT SUPPLY KIT (GROEN PART #140144) OR A GAS HOSE WITH MAXIMUM LENGTH THAT IS LONGER THAN THE RESTRAINING CABLE.
2. WHEN INSTALLING ON AN ELECTRIC BRAISING PAN, CONDUIT MUST BE LONGER THAN THE RESTRAINING CABLE.
LENGTH OF FLEXIBLE
INSTALLATION PROCEDURE
1. Raise the braising pan about 8”above the ground.
2. Unscrew and remove the factory installed bullet feet.
3. Screw in casters into place.
4. Level the braising pan front to back and left to right by adjusting the casters accordingly.
Figure 1
-
5. Anchor the restraining cable bracket to a secure structure. One of the preferred locations is on the concrete floor using anchor bolts (not provided) as shown in Figure 1.
2
GROEN CASTER KIT
Figure 2
Figure 3
6. Install label (Groen Part #084286) as shown in Figure 2.
Figure 4
7. Install clasp of restraining cable to hole in braising pan frame as shown in figure 3.
8. Completed assembly should look as shown in Figure 4.
9. After installation pull out the braising pan to fully stretch the cable and verify that the gas hose or electrical conduit are not under tension or stretched.
3
Loading...
+ 8 hidden pages