GE EV Charging Station User Manual 1 of 86
Page 2
g EV Charging StationUser Manual & Installation Instructions
CONTENTS
1 Important Safety and Grounding Instructions ................................................................................................................................... 3
1.1 Safety and Compliance ....................................................................................................................................................................... 3
2.1 Before Installing ...................................................................................................................................................................................... 4
2.9.1 RFID .......................................................................................................................................................................................................... 33
2.9.4 Service Door ........................................................................................................................................................................................ 44
3 User Manual ..................................................................................................................................................................................................... 46
3.2 Basic User Instructions..................................................................................................................................................................... 47
3.3 Technical Data ..................................................................................................................................................................................... 51
4.3.2 Prepare Service Laptop or PC ..................................................................................................................................................... 59
4.3.3 EVSE Configuration Server Interface ....................................................................................................................................... 61
4.4 Recommended Network Designs for RFID Authentication ............................................................................................ 67
4.5 Setup without RFID Authentication ............................................................................................................................................ 82
4.6 Reset Controller to Factory Default ............................................................................................................................................ 83
g EV Charging StationUser Manual & Installation Instructions
1 Important Safety and Grounding Instructions
1.1 Safety and Compliance
WARNING:
Read all the instructions before using this product.
This device should be supervised when used around children.
Do not put fingers into the electric vehicle connector.
Do not use this product if the flexible power cord or EV cable are frayed, have broken insulation, or
any other signs of damage.
Do not use this product if the enclosure or the EV connector are broken, cracked, open, or show any
other indication of damage.
This document provides instructions for installation of EV Charging Station products listed in Table 11
in Section 3.3, and should not be used for any other product. Before installing the EVSE (Electric
Vehicle Supply Equipment), you should review this manual carefully and consult with a licensed
contractor, licensed electrician, or trained installation expert to ensure compliance with local building
codes, climate conditions, safety standards and state and local electrical codes.
The EVSE should be installed only by a licensed contractor, and/or a licensed electrician in accordance
with all applicable state, local and national electrical codes and standards. The EVSE should be
inspected by a qualified installer prior to initial use. Under no circumstances will compliance with the
information in this manual relieve the user of his/her responsibility to comply with all applicable codes
or safety standards.
1.2 Grounding Instructions
The EVSE must be connected to a grounded, metal, permanent wiring system, or an equipment
grounding conductor. This should be run with circuit conductors and connected to the equipment
grounding bar or lead on the EVSE. Connections to the EVSE shall comply with all applicable electrical
codes and ordinances.
GE EV Charging Station User Manual 3 of 86
Page 4
g EV Charging StationUser Manual & Installation Instructions
SCREW SIZE
TORQUE
TORQUE TOL.
6-32 UNC
13 in-lb
+/- 2 in-lb
10-32 UNF
30 in-lb
+/- 5 in-lb
1/4-20 UNC
53 in-lb
+/- 7 in-lb
1/2-13 UNC
48 in-lb
+/- 7 in-lb
M6 x 1 LIGUIDTIGHT FITTING
30 in-lb
+/- 5 in-lb
FUSE BLOCK LUGS, 8 AWG
40 in-lb
+/- 5 in-lb
FUSE BLOCK LUGS, 6 AWG
45 in-lb
+/- 5 in-lb
GROUND TERM. SCREWS, 14-10 AWG
34 in-lb
+/- 5 in-lb
GROUND TERM. SCREWS, 8 AWG
38 in-lb
+/- 5 in-lb
3/4" LOCKNUT
HAND TIGHT + 1/4 TURN
n/a
2 Installation Instruction
2.1 Before Installing
Before any installation work is performed, study all drawings furnished by the supplier for the
particular installation.
These include arrangement drawings (front, end, and plan views), connections to the equipment that
may be required to meet any local codes (such as mats, screens, or railings) is not furnished.
2.2 Safety Requirements
Eye protection with appropriate glasses (especially when using the electrical drill).
In the installation be sure to not connect directly to power distribution network cables without
additional protection.
Ensure that at all times when working, no power is connected.
Use appropriate tools for each function.
2.3 Installation Overview and Specifications
This document describes how to install any EVSE charging station family.
It includes step-by-step instructions for installing the body assembly for the following stations:
To ensure that the EVSE is installed per Americans with Disabilities Act (ADA) Standards for Accessible
Design guidelines, refer to code of federal regulations document 28 CFR Part 36, sections 4.2 (Space
Allowance and Reach Ranges) and 4.4 (Protruding Objects).
EVSE Torque Specification Table
GE EV Charging Station User Manual 4 of 86
- Table 1 -
Page 5
g EV Charging StationUser Manual & Installation Instructions
Type
Characteristics
Slotted Screwdriver
3/16” or ¼”
Phillips Screwdriver
#2
Socket
Socket sizes: 7/16”, ¾”
Electric Drill
Used in the wall mounted and pole mounted installations
Wire stripper, hammer, and wall anchors
ITEM
DESCRIPTION
QTY
1
Kiosk Pedestal Unit
1
2
Base Mounting Assembly
1
3
Kiosk Skirting
1
4
Base Mounting Template, NEMA 3R
1 5 Hex Nut, ½” SS
12 6 Star Washer, External Tooth, ½” SS
8
WARNING: Make sure power to the EVSE is
disconnected before performing any task
Tools
- Table 2 -
Field cable size: Single Pedestal, Wall Mount and Pole Mount:
Cu:8 AWG, minimum 75 C wire Al: 6 AWG, minimum 75 C wire
Double Pedestal:
Cu: 8 AWG, minimum 90 C wire
Al: 6 AWG, minimum 90 C wire
2.4 Pedestal
Bill of materials
GE EV Charging Station User Manual 5 of 86
- Table 3 -
Page 6
g EV Charging StationUser Manual & Installation Instructions
Item 5 & 6
Item 1
Item 3
Item 4
Item 2
Procedure
Figure 1: Exploded pedestal base assembly
GE EV Charging Station User Manual 6 of 86
Page 7
g EV Charging StationUser Manual & Installation Instructions
CONDUIT
MOUNTING TEMPLATE
BASE MOUNTING
CONCRETE
Figure 2
WARNING: Make sure power to the EVSE is
disconnected before performing any task
Figure 3
Locate area for pedestal location.
Install two conduits, one for power, and one for communication (if required). Allow approximately 5”
length for each conduit above the concrete level as shown in Figure 4. Cut as necessary to final
dimensions. Route power conduit and communication conduit through the center of the hole in the
mounting template, appropriately.
Install base mounting assembly plate securely over conduits with mounting template and four 1/2-13
nuts.
GE EV Charging Station User Manual 7 of 86
Page 8
g EV Charging StationUser Manual & Installation Instructions
Figure 4
5.50
BASE MOUNTING ASSEMBLY – DURING CONCRETE POUR. ALLOW MIN. 5” CONDUIT LENGTH
ABOVE CONCRETE FLOOR LEVEL
Adjust (4) ½-13 nuts to position height as shown in Figure 4.
Pour concrete to level shown in Figure 4. Do not cover the ½-13 nuts with concrete. Remove
mounting template from threaded rods, after concrete has cured. Do not remove the ½-13 nuts as
they are used for leveling the skirt.
GE EV Charging Station User Manual 8 of 86
Page 9
g EV Charging StationUser Manual & Installation Instructions
½-13 NUT, AND
STAR WASHER
KIOSK
CONDUIT
Figure 5
PEDESTAL SKIRT INSTALLATION, AFTER CONCRETE POUR
Install ½-13 nuts and star washers after lowering skirt over matching threaded rods over the ½-13
nuts. Use the bottom ½-13 nuts for leveling the skirt. Fasten nuts and skirt assembly to concrete
base, as shown in Figure 5. Torque nuts per specification Table 1
GE EV Charging Station User Manual 9 of 86
Page 10
g EV Charging StationUser Manual & Installation Instructions
½-13 NUT AND ½”
STAR WASHER
CONCRETE LEVEL
Figure 6
Figure 7
Open the door by pressing the round button on the door latch. Insert the Kiosk from top and install ½13 nuts and star washers after lowering skirt over matching threaded rods as shown in the Figures 6
and 7.
Torque all the nuts as per the torque specification in Table 1 (recommended tool: 3/8” drive quick
release ratchet & 13/16 socket).
Connect L1 and L2 to the fuse block and ground wire to the ground bar shown in Figure 8.
IMPORTANT: EV Charging Station is rated for 208-240V power only. The EVSE must be connected to a
grounded, metal, permanent wiring system, or an equipment grounding conductor. This should be run
with circuit conductors and connected to the equipment grounding bar or lead on the EVSE.
Connections to the EVSE shall comply with all applicable electrical codes and ordinances.
In case of RFID sensor, the communication cable is connected to the Ethernet connector on the
controller as shown in Figure 9.
GE EV Charging Station User Manual 10 of 86
Page 11
g EV Charging StationUser Manual & Installation Instructions
Fuse Block
Incoming Power
Ground Bar
Ground Bar
Fuse Block
Incoming Power Cables
Connect at Bottom
Terminals of Fuse Block
Ground Wire Connects to
Ground Bars
Figure 8 : Power Wire and Ground Wire Connections for Pedestal
GE EV Charging Station User Manual 11 of 86
Page 12
g EV Charging StationUser Manual & Installation Instructions
ITEM
DESCRIPTION
QTY
1
Kiosk Pedestal Unit
1 2 Base Mounting Assembly
1 3 Kiosk Skirting
1
4
Base Mounting Template,
NEMA 3R
1
5
Hex Nut, ½” SS
12
6
Star Washer, External
Tooth, ½” SS
8
Figure 9 : Ethernet Connection to Controller for Pedestal
2.5 Double Pedestal (Back to Back)
Bill of materials
GE EV Charging Station User Manual 12 of 86
- Table 4 -
Page 13
g EV Charging StationUser Manual & Installation Instructions
Item 5 & 6
Item 1
Item 3
Item 4
Item 2
Procedure
Figure 10: Exploded double pedestal base assembly
GE EV Charging Station User Manual 13 of 86
Page 14
g EV Charging StationUser Manual & Installation Instructions
WARNING: Make sure power to the EVSE is
disconnected before performing any task
CONDUIT
MOUNTING TEMPLATE
BASE MOUNTING
CONCRETE
Figure 11
Figure 12
Locate area forpedestallocation
Locate area for double pedestal location.
Install conduits for power wire and communication wire (if required). Allow approximately 5” length for
each conduit above the concrete level as shown in Figure 13. Cut as necessary to final dimensions.
Route power conduit and communication conduit through the center of the hole in the mounting
template, appropriately.
Install base mounting assembly plate securely over conduits with mounting template and four 1/2-13
nuts.
GE EV Charging Station User Manual 14 of 86
Page 15
g EV Charging StationUser Manual & Installation Instructions
Figure 13
5.50
BASE MOUNTING ASSEMBLY – DURING CONCRETE POUR. ALLOW MIN. 5” CONDUIT LENGTH
ABOVE CONCRETE FLOOR LEVEL
Adjust (4) ½-13 nuts to position height as shown in Figure 13.
Pour concrete to level shown in Figure 13. Do not cover the ½-13 nuts with concrete. Remove
mounting template from threaded rods after concrete has cured. Do not remove ½-13 nuts as they
are used for leveling the skirt.
GE EV Charging Station User Manual 15 of 86
Page 16
g EV Charging StationUser Manual & Installation Instructions
½-13 NUT, AND
STAR WASHER
KIOSK SKIRT
CONDUIT
Figure 14
DOUBLE PEDESTAL SKIRT INSTALLATION, AFTER
DOUBLE PEDESTAL SKIRT INSTALLATION, AFTER CONCRETE POUR
Install ½-13 nuts and star washers after lowering skirt over matching threaded rods over the ½-13
nuts. Use the bottom ½-13 nuts for leveling the skirt. Fasten nuts and skirt assembly to concrete
base, as shown in Figure 14. Torque nuts per specification Table 1.
GE EV Charging Station User Manual 16 of 86
Page 17
g EV Charging StationUser Manual & Installation Instructions
CONCRETE
LEVEL
Figure 15
Figure 16
½-13 NUT AND ½”
STAR WASHER
Open the door by pressing the round button on the door latch. Insert the Kiosk from top and install ½13 nuts and star washers after lowering skirt over matching threaded rods as shown in Figures 15
and 16.
Torque all the nuts as per the torque specification in Table 1 (recommended tool: 3/8” drive quick release ratchet and 13/16” socket)
Connect L1 and L2 of circuit 1 and 2 to the fuse block lugs 1 and 2 respectively. Connect ground wire
of circuit 1 and 2 to the ground bar 1 and 2 respectively as shown in Figure 17.
IMPORTANT: EV Charging Station is rated for 208-240V power only. The EVSE must be connected to a
grounded, metal, permanent wiring system, or an equipment grounding conductor. This should be run
with circuit conductors and connected to the equipment grounding bar or lead on the EVSE.
Connections to the EVSE shall comply with all applicable electrical codes and ordinances.
In case of RFID sensor, the communication cable is connected to the Ethernet connector on controller
1 and 2 as shown in Figure 18.
GE EV Charging Station User Manual 17 of 86
Page 18
g EV Charging StationUser Manual & Installation Instructions
Incoming Power
Ground Bars
Fuse Blocks
Ground Bar 2
Fuse Block 2
Incoming Power Cables
Connect at Bottom
Terminals of Fuse Blocks
Ground Wires Connect to
Ground Bars
Fuse Block 1
Ground Bar 1
Figure 17 : Power Wire and Ground Wire Connections for Double Pedestal
GE EV Charging Station User Manual 18 of 86
Page 19
g EV Charging StationUser Manual & Installation Instructions
ITEM
DESCRIPTION
CHARACTERISTICS
QTY
1
Kiosk Unit
Wall mounted
enclosure
1
2
Wall Bracket Assembly
(4) ¼”-20 Weld
Stud
1
3
Hex. Nuts ¼”-20
Zinc Plated Steel
4
4
Sealing Washer, ¼” dia.
Seals ¼” studs
4
5
Conduit Hub, ¾”
Attach to ¾”
conduits/enclosure
2
Figure 18: Ethernet Connection to Controller for Double Pedestal
Controller 1
Controller 2
WARNING: Make sure power to the EVSE is
disconnected before performing any task
2.6 Wall-Mounted
Bill of materials
- Table 5 -
Procedure
Drill 6 holes in the wall as illustrated in Figure 19. Use the supplied wall-mounting bracket to ensure
correct alignment. The height of the bottom hole from the floor should be between 19” to 25” to
GE EV Charging Station User Manual 19 of 86
Page 20
g EV Charging StationUser Manual & Installation Instructions
Figure 19: Wall-Mount Bracket Holes
Figure 20: Wall-Mount Bracket
Min: 19”
Max: 25”
ensure meet UL and American Disability Act compliance. This will ensure the critical height shown in
Figure 21.
IMPORTANT: Exercise extreme caution when drilling holes in the wall. Make sure there are no electrical
cables.
Fasten the wall bracket to the wall. Refer to Table 6 for recommended wall mounting fasteners.
Supply two ¾” conduits (one for power cable and other one for communication cable) as per bracket
drawing dimensions and connect supplied ¾” conduit hubs to conduits. If the communication cable
and the corresponding conduit is not used, cover the hole with supplied NEMA 3R knockout plugs.
Optionally, the power wire can be run through the bottom of the enclosure. See page 24.
GE EV Charging Station User Manual 20 of 86
Page 21
g EV Charging StationUser Manual & Installation Instructions
MIN: 18”
MAX: 24”
Figure 21: Wall Mount Installation, Critical Dimension
GE EV Charging Station User Manual 21 of 86
Page 22
g EV Charging StationUser Manual & Installation Instructions
Wall Mount EVSE Mounting Fasteners
Fastener Type
Supplier
Part Number
Qty
Application
Image
3/8" x 1-7/8" Concrete Anchor
McMaster-Carr
96892A258
6
Concrete Wall
Pre-drill hole dia. 3/8"
3/8" x 1-3/4" Concrete Hex Screw
Tapcon
LDT38134
6
Concrete Wall
Pre-drill hole dia. 5/16"
3/8" x 2" Hex Head Lag Bolt
McMaster-Carr
95526A525
3
Stud Wall
Pre-drill hole dia. 3/8" Hardwood
(into wood stud)
Pre-drill hole dia. 1/4" Softwood
Hollow Wall Anchor
Cobra Anchors
TripleGrip
6
Drywall
Pre-drill hole dia. 3/8"
(into sheetrock)
GE EV Charging Station User Manual 22 of 86
- Table 6 –
Page 23
g EV Charging StationUser Manual & Installation Instructions
WALL-MOUNT UNIT
¼-20 HEX NUT, ¼:
SEALING WASHER
SLEEVE STUD ANCHOR WITH
HEX NUT
WALL-MOUNT BRACKET
¾” CONDUIT HUB
(2) ¾” CONDUITS
The cables must extend 16” to 24” above the wall surface, or according to local codes.
Pull L1, L2 and ground wire into the enclosure assembly through the conduit hub. Similarly pull the
communication cable into the enclosure assembly through the second conduit.
IMPORTANT: EV Charging Station is rated for 208-240V power only. The EVSE must be connected to a
grounded, metal, permanent wiring system, or an equipment grounding conductor. This should be run
with circuit conductors and connected to the equipment grounding bar or lead on the EVSE.
Connections to the EVSE shall comply with all applicable electrical codes and ordinances.
Install the enclosure on the wall-mounting bracket. Insert the threaded portion of the conduit hub into
the hole of the enclosure. Fasten the conduit hub using the nut. Fasten the enclosure to the wallmounting bracket using the self-sealing washers and nuts from inside the enclosure as indicated in
Figure 22.
Torque all the nuts as per the torque specification in Table 1.
Connect L1, L2 to the fuse block and ground wire to the ground bar shown in Figure 23.
GE EV Charging Station User Manual 23 of 86
Figure 22: Wall-Mount Installation, Exploded View
Page 24
g EV Charging StationUser Manual & Installation Instructions
Ground Bar
Fuse Block
Incoming Power Cables
Connect at Terminals of
Fuse Block
Ground Wire Connects to
Ground Bar
Figure 23: Power Wire and Ground Wire Connections for Wall Mount
In case of RFID sensor, the communication cable is connected to the Ethernet connector on the
controller, just like the pedestal as shown in Figure 9.
Field wiring entry from bottom:
If this option is preferred, remove the two knockouts at the bottom of the enclosure and fill in the
unused cable holes on the back of the enclosure using the spare NEMA 3R knockout plugs provided.
See Figure 24. Assemble the supplied conduit hub in the bottom and make the conduit arrangement.
GE EV Charging Station User Manual 24 of 86
Page 25
g EV Charging StationUser Manual & Installation Instructions
ITEM
DESCRIPTION
CHARACTERISTICS
QTY
1
Kiosk Unit
Pole-Mounted
1
2
Pole-bracket Assembly
Bracket & ¾” Banding
1
3
Band Clamp
¾” Stainless Steel Clamp
2 4 Hex. Nuts ¼-20
Supplied with EVSE unit
4
5
Sealing Washers, ¼”
Seals ¼” studs
4
6
Conduit Hub, ¾”
Attach to ¾” conduits/enclosure
2
7
Conduit Nipple
(Installer supplied)
¾” pipe size, 1.05”OD, NPTXNPT
threaded both ends Nipple. Example:
Metallic - McMaster Carr part
7727K225 or similar suitable plastic
conduit nipple
g EV Charging StationUser Manual & Installation Instructions
WARNING: Make sure power to the EVSE is
disconnected before performing any task
Figure 25: Pole mount drilling dimension
Procedure
IMPORTANT: Possible pole diameters for these EVSE units are 8” to 12”.
Drill two holes of diameter 1 1/8” on the pole in the location shown in Figure 25. One hole is to bring
the power cables and the other for communication cable into the enclosure. If the communication
cable and the corresponding conduit is not used, cover the hole in the enclosure with the supplied
NEMA 3R knockout plug and do not drill the corresponding hole in the pole. The height of the holes
from the floor should be from 20” to 25” as shown in Figure 25 to meet UL and American Disability Act
compliance. This ensures the critical height shown in Figure 26.
IMPORTANT: Exercise extreme caution when drilling holes in the wall. Make sure there are no electrical
cables.
GE EV Charging Station User Manual 26 of 86
Page 27
g EV Charging StationUser Manual & Installation Instructions
Figure 26: Pole Mount Installation, Critical Dimension
Optionally, the power wire can be run through the bottom of the enclosure. See page 29.
Insert the threaded portion of the conduit hub into the enclosure hole and fasten the conduit hub
using the nut. Connect ¾” conduit nipple (Installer supplied) with minimum 3” length up to 4” length to
the conduit hub.
Align the mounting bracket to the pole, ensuring the coupler opening in the bracket is centered over
the hole in the pole bracket assembly as shown in Figure 27.
Strap the pole bracket assembly to the pole by supplied ¾” by 0.030” stainless steel banding as
shown in the Figure 27.
IMPORTANT: You must use a high tension-banding tool to install bands.
(GE Part no: EVPMBAND)
GE EV Charging Station User Manual 27 of 86
Page 28
g EV Charging StationUser Manual & Installation Instructions
Figure 27 : Mounting bracket alighnment to the holes
The cables must extend 16” to 24” above the pole surface, or according to local codes.
Pull L1, L2 and ground wire into the enclosure assembly through the conduit hub. Similarly pull the
communication cable into the enclosure assembly through the second conduit.
Install the Kiosk pole mounted unit, using the nuts and sealing washers as shown in Figure 28.
Torque all the nuts as per the torque specification in Table 1.
GE EV Charging Station User Manual 28 of 86
Page 29
g EV Charging StationUser Manual & Installation Instructions
Figure 28: Pole-Mount Installation, Exploded View
IMPORTANT: EV Charging Station is rated for 208-240V power only. The EVSE must be connected to a
grounded, metal, permanent wiring system, or an equipment grounding conductor. This should be run
with circuit conductors and connected to the equipment grounding bar or lead on the EVSE.
Connections to the EVSE shall comply with all applicable electrical codes and ordinances.
Connect L1, L2 to the fuse block and ground wire to the ground bar shown in Figure 23.
In case of RFID sensor, the communication cable is connected to the Ethernet connector on the
controller, just like the pedestal as shown in Figure 9.
Field wiring entry from bottom:
If this option is preferred, remove the two knockouts at the bottom of the enclosure and fill in the
unused cable holes on the back of the enclosure using the spare NEMA 3R knockout plugs provided.
See Figure 30. Assemble the supplied conduit hub in the bottom and make the conduit arrangement.
GE EV Charging Station User Manual 29 of 86
Page 30
g EV Charging StationUser Manual & Installation Instructions
Figure 29: Pole-Mount Conduit Using Side Fittings
Installations
Figure 30: Alternate Pole-Mount Conduit Installation Using
Bottom Knockouts
CONDUIT HUB
PLUG
GE EV Charging Station User Manual 30 of 86
Page 31
g EV Charging StationUser Manual & Installation Instructions
Ordering Number
Description
EVRP01
RFID enrollment reader CM5321CL USB –
13.45MHz
EVRP02
RFID enrollment reader CM5325CL USB –
125kHz
EVRP03
RFID enrollment reader RP40 USB - universal
EV100CD
CD with standalone SW EV100
EVRCW50
Pack of 10 white RIFD cards
EVRCG50
Pack of 10 GE US RFID cards
EVPMBAND
Pole mount strap installation kit
2.8 Accessory Kits
The EV Charging Station offers the following accessory kits:
- Table 8 -
2.9 Replacement Kits
The EV Charging Station offers the following replacement kits:
GE EV Charging Station User Manual 31 of 86
Page 32
g EV Charging StationUser Manual & Installation Instructions
Wire harness replacement kit - EVSE OUTDOOR DOUBLE PEDESTAL - WITH RFID
EVDSLBL01
Pack of labels
EVDSMAN01
EVSE User Manual and Installation instruction
- Table 9 -
The following replacement kits can be installed by the customer: RFID (EVDRR01) (except for double
pedestal), VFD (EVDSVFD01) (except for double pedestal), holding socket inlet (EVDSSK01) (except for
double pedestal) and service door (EVDSDR01 and EVDSDR02). Instructions for the installation of these
kits are provided in the following sections.
The remaining kits should be installed by a trained GE technician.
GE EV Charging Station User Manual 32 of 86
Page 33
g EV Charging StationUser Manual & Installation Instructions
Figure 31: Metal plate, outside view
WARNING: Make sure power to the EVSE is
disconnected before performing any task
2.9.1 RFID
This section describes how to install the RFID hardware for Pedestal, Wall Mounted and Pole Mounted
EVSE units only. For the Back to Back EVSE unit RFID upgrade, contact a GE representative by
calling 1-800-GE1STOP.
If your unit already has RFID and you are replacing it, first remove the old RFID unit, then follow the
instructions starting with Figure 33.
If your EVSE unit does not already have an RFID reader, open the service door and the remove the
metal plate and gasket (located below the VFD) shown in Figure 31 and 32.
GE EV Charging Station User Manual 33 of 86
Page 34
g EV Charging StationUser Manual & Installation Instructions
Figure 32: Metal plate, inside view
Figure 33: RFID mounting plate, outside view
Next, attach the RFID mounting plate to the outside of the EVSE enclosure as shown in Figure 33 and
34, using the hardware provided with RFID.
GE EV Charging Station User Manual 34 of 86
Page 35
g EV Charging StationUser Manual & Installation Instructions
Figure 34: RFID mounting plate, inside view
Figure 35: RFID cable
Slide the RFID cable through the open hole as shown in Figure 35, and attach the RFID to its mounting
plate as shown in Figure 36 using the tamper-proof screw provided.
GE EV Charging Station User Manual 35 of 86
Page 36
g EV Charging StationUser Manual & Installation Instructions
Figure 36: RFID tamper-proof screw
Slide the threaded gland and seal over the RFID cable from the inside of the enclosure and screw it into the
threaded hole. Then slide the RFID gland nut over the cable and screw it over the seal and threaded gland.
Refer to Figure 37 and 38 below.
GE EV Charging Station User Manual 36 of 86
Page 37
g EV Charging StationUser Manual & Installation Instructions
Figure 37: RFID gland assembly
Figure 38: RFID gland assembly
GE EV Charging Station User Manual 37 of 86
Page 38
g EV Charging StationUser Manual & Installation Instructions
Figure 39: RFID Phoenix Connector
Figure 40: RFID wiring
Secure the individual wires in the RFID cable inside the provided Phoenix connector, as shown in
Figures 39 and 40.
Attach the Phoenix connector to the controller in its designated location, as shown in Figure 41 and
42. Make sure to press the Phoenix collector fully into the female socket.
GE EV Charging Station User Manual 38 of 86
Page 39
g EV Charging StationUser Manual & Installation Instructions
Figure 41: RFID Connection Location
Figure 42: RFID Connection Location
GE EV Charging Station User Manual 39 of 86
Page 40
g EV Charging StationUser Manual & Installation Instructions
Figure 43: Harness Connection to VFD
WARNING: Make sure power to the EVSE is
disconnected before performing any task
Once the hardware installation is complete, refer to the software installation guide provided with the
RFID package.
2.9.2 VFD
This section describes how to install the VFD for Pedestal, Wall Mounted and Pole Mounted EVSE units
only. For the Back to Back EVSE unit VFD replacement, contact a GE representative by calling 1-
800-GE1STOP.
Open the service door and remove the VFD wire harness from the VFD as shown in Figure 43.
If RFID has been provided, remove the RFID wire harness from the socket on the controller as shown
in Figures 41 and 42.
Next, remove the VFD/RFID mounting assembly by removing the eight 10/32” nuts as shown in Figure
44.
GE EV Charging Station User Manual 40 of 86
Page 41
g EV Charging StationUser Manual & Installation Instructions
Figure 44: 3 of 8 10/32” mounting nuts diplayed
Remove the RFID unit (or the metal plate and gasket if no RFID has been provided) from the VFID
mounting assembly as described in Section 2.9.1.
Install the new VFD/RFID mounting assembly, shown in Figure 45 and Figure 46.
GE EV Charging Station User Manual 41 of 86
Page 42
g EV Charging StationUser Manual & Installation Instructions
Figure 45: VFD/RFID mounting plate, front view
Figure 46: VFD/RFID mounting plate, back view
WARNING: Make sure power to the EVSE is
disconnected before performing any task
Re-attach the RFID unit or metal plate as described in Section 2.9.1.
2.9.3 Holding Socket
This section describes how to install the holding socket for Pedestal, Wall Mounted and Pole Mounted
EVSE units only. For the Back to Back EVSE unit holding socket replacement, contact a GE
representative by calling 1-800-GE1STOP.
Open the service door and unplug the holding socket Phoenix connector from the controller as shown
in Figure 47. Remove the holding socket wire from this Phoenix connector. The wire can be removed
from the Phoenix connector by pressing in the small orange button on the connector, as shown in
Figure 47.
GE EV Charging Station User Manual 42 of 86
Page 43
g EV Charging StationUser Manual & Installation Instructions
Figure 47: Holding Socket Phoenix Connection
Figure 48: Holding Socket Tamper-Proof Screws
Remove the holding socket by unscrewing the four tamper-proof placement screws on the front face
of the EVSE enclosure, shown in Figure 48.
GE EV Charging Station User Manual 43 of 86
Page 44
g EV Charging StationUser Manual & Installation Instructions
Figure 49: Door Ground Connection
WARNING: Make sure power to the EVSE is
disconnected before performing any task
After the old holding socket is removed, insert the replacement holding socket and tighten the
placement screws.
Re-connect the holding socket wire to the Phoenix connector, and re-connect the Phoenix connector
to the controller.
2.9.4 Service Door
Remove the service door.
Remove the door ground wire from door ground stud, shown in Figure 49.
Insert the new door and replace the ground wire to the door ground stud.
GE EV Charging Station User Manual 44 of 86
Page 45
g EV Charging StationUser Manual & Installation Instructions
Figure 50: EVSE Wiring Diagram
2.10 Wiring Diagram
The wiring diagram shown in Figure 50 is applicable for all NEMA EVSE units and is included as a
reference.
GE EV Charging Station User Manual 45 of 86
Page 46
g EV Charging StationUser Manual & Installation Instructions
3 User Manual
3.1 Receiving
Upon receipt of shipment, examine the package for damage that may have been sustained in transit.
If the shipping container must be opened outdoors, take proper precautions to prevent the entrance
of moisture.
While unpacking, examine the product for broken, bent, or loose parts or other damage. If damage
from shipment is evident, file a damage claim with the transportation company and notify the nearest
sales office.
GE EV Charging Station User Manual 46 of 86
Page 47
g EV Charging StationUser Manual & Installation Instructions
Status Indicator
Vacuum Fluorescent Display (VFD)
RFID Reader
SAE J1772 compliant connector
Charging Cord
3.2 Basic User Instructions
Status Indicator:
The status indicator at the top of the EVSE displays the state of the EVSE. The key to the colors
displayed on the status indicator is shown on a label directly right of the EVSE handle. The EVSE can
display the following different colors:
Green (SOLID): EVSE available for charging
BLINKING Green: EV connected, but not energized (charging is finished or vehicle not ready for charging)
Amber (SOLID): EV charging and connector energized
Red (SOLID): Fault EVSE
GE EV Charging Station User Manual 47 of 86
Figure 51 : EVSE Basic Features
Page 48
g EV Charging StationUser Manual & Installation Instructions
Figure 52: EVSE while idle
Vacuum Fluorescent Display (VFD):
The VFD serves to prompt the user to do certain things, such as connect to vehicle or return plug to
socket. It also displays useful information such as charging time and fault information.
RFID Reader
The RFID is responsible for maintaining and processing authorization of users for the EV Charging
Station, and is available as an option.
When the RFID is idle, the RFID LED is red.
When the access card is waved in from of the RFID reader, it blinks green and beeps for 250 ms. See
Figure 53 below.
GE EV Charging Station User Manual 48 of 86
Page 49
g EV Charging StationUser Manual & Installation Instructions
Figure 53: EVSE during card swipe
After the access card is swiped, the RFID LED returns to red until authorization is successful.
Once authorized, the RFID LED will return to green until the transaction is ended when the vehicle is
disconnected.
If authorization is denied, the RFID LED remains red and the VFD will display the “denied” message.
Connecting to a Vehicle: Before connecting the EVSE to a vehicle, make sure the status indicator at
the top of the EVSE is SOLID GREEN. The VFD should prompt the user to remove plug from socket and
connect to vehicle. If the EVSE is displaying RED, then do not use the EVSE and contact GE technical
support for assistance.
If the EVSE status indicator is SOLID GREEN, then
1.When the EVSE handle is seated in the EVSE holder, press and hold the button on the EVSE handle
and pull away from the EVSE holder until it is fully removed. The VFD should prompt the user to
connect cable to vehicle.
2.Press and hold the button on the EVSE handle and insert into the vehicle’s inlet socket. Release the
button on the EVSE handle when fully connected to the vehicle inlet socket.
Once the EVSE handle is connected to the vehicle, the status indicator will turn BLINKING GREEN or
AMBER. BLINKING GREEN indicates that the vehicle is connected, but not ready to charge.
GE EV Charging Station User Manual 49 of 86
Page 50
g EV Charging StationUser Manual & Installation Instructions
AMBER indicates that the vehicle is charging. While charging, the VFD will display the amount of
charging time elapsed and total energy drawn.
Disconnect from Vehicle:
The EVSE can be disconnected from the vehicle at any time.
• Press and hold the button on top of the EVSE handle and pull the EVSE handle away from the
vehicle inlet socket. The VFD will prompt to replace the handle to the EVSE holder.
• Replace the EVSE handle on the holder by pressing and holding the button the EVSE handle.
Release the button when the EVSE handle is fully connected to the EVSE holder.
• The EVSE status indicator will return to SOLID GREEN once the EVSE handle has been removed
from the vehicle inlet and replaced to EVSE holder.
Faults:
When the status indicator has turned RED, the EVSE is indicating a fault. There are four types of faults
that can occur:
1. Ground Fault
2. Contactor closed when not charging Fault
3. Self-Test Fault
4. Overvoltage/Undervoltage Faults
5. Overload fault
Ground fault:
The EVSE can detect the presence of ground faults with a threshold of 15 – 20 mA during the charging
cycle. Once a ground fault is detected, the EVSE will stop charging the vehicle and the status indicator
will indicate RED. If the EVSE continues to detect ground faults and the vehicle remains plugged in,
the EVSE will attempt to restart charging after 15 minutes. If 4 such attempts to restart charging have
occurred, the EVSE will lockout the station. The lockout will prevent any vehicle from being charged
until the plug has been disconnected from the vehicle. It is highly recommended that service
personnel examine the EV (electric vehicle) and/or the EVSE cable to determine the cause of the
multiple faults before re-energizing.
If a ground fault is present immediately after the EVSE begins charging, the EVSE will stop charging
and immediately lockout the station. The lockout will prevent any vehicle from being charged until
the plug has been disconnected from the vehicle.
Contactor closed when not charging Fault:
The EVSE internally monitors itself to ensure that the EVSE is only supplying power to the EVSE handle
when it is in a charging cycle. If the EVSE is supplying power to the EVSE handle in a non-charge cycle
(status indicator is GREEN or FLASHING GREEN), the EVSE will lockout and the status indicator will
indicate RED. The lockout will prevent any vehicle from being charged until power has been cycled on
the EVSE.
Self-Test Fault:
GE EV Charging Station User Manual 50 of 86
Page 51
g EV Charging StationUser Manual & Installation Instructions
The EVSE internally monitors its operating performance. If there is a failure of its performance, the
status indicator on the EVSE will indicate RED and lockout.
Overvoltage/Undervoltage Faults:
The EVSE monitors line voltage and cuts power to the EV if the voltage goes out of range. After 1
minute the EVSE rechecks the voltage and will automatically re-enable charging if the voltage comes
back within acceptable range. The status indicator will turn RED as long as charging is interrupted.
Overload Fault:
The EVSE monitors the current being drawn by the EV. If this current exceeds the capability of the
EVSE fuse, charging will be interrupted and the status indicator will show turn RED. This fault can be
cleared by disconnecting from the EV.
3.3 Technical Data
The GE EV Charging Station has features which provide a robust and reliable solution for the needs of
EV charging infrastructure.
LED light to display charger status
Option for a Radio Frequency Identification (RFID) reader: users will gain charging authorization by
swiping RFID cards in front of the readers
Ethernet network offered for RFID authorization service
RFID software application registers usage of the EV Charging Station, enabling data collection,
and will also monitor status of communication between RFID and EVSE
Vacuum Fluorescent Display (VFD) screen showing greetings, instructions and charging station
messages
Nuisance tripping avoidance and auto re-closure
Vehicle ground monitoring circuit
Single phase metering, displayed on VFD
GE EV Charging Station User Manual 51 of 86
Page 52
g EV Charging StationUser Manual & Installation Instructions
SAE Compliant
Level II per J1772
Vehicle Interface
SAE J1772 EV connector
Cable Length
20’ cable
AC Max Charging Power Output**
7.2 kW (240VAC @ 30A)
Voltage and Current Rating
208-240VAC @ 30A
AC Power Input
208-240VAC requiring only Line 1, Line 2 and Earth ground
Short Circuit Rating
5kA @ 240 VAC
Recommended Service Panel
Breaker
Pole, Wall, Single Pedestal: 2-pole 40A breaker on dedicated circuit
Double Pedestal: (Qty. 2) 2-pole 40A breaker on dedicated circuit
Ground Fault Protection
Internal 20mA CCID with auto-re-closure, does not require a GFCI
in service panel
Cold Load Start
Random start up between 0 and 15 minutes
Local Area Network
CAT5 Ethernet
Network Communication Protocol
TCP/IP
Network Security
GE recommends that network be VPN and Firewall protected
Metering Accuracy
2% accurate on voltage and current; 4% accurate on power and
energy
RFID Reader
ISO15693 compliant
Display Screen
Vacuum Fluorescent Display
Standby Power
5W typ.
Indoor Ventilation
Signal provided to turn on facility fans
Outdoor Rated
Enclosure NEMA 3R
Safety Compliance
UL 2231, UL 2251, UL 2594, cUL 2231, cUL 2594, NEC 625, SAE
J1772
Surge Protection
6kV @ 3000A
EMI Compliance
FCC Part 15 Class A
Operating Temperature
-30C to +50C ambient
Operating Humidity
Up to 95% non-condensing
Approximate Shipping Weights
Single Pedestal: 120 lb
Single Pedestal: 160 lb
Pole: 75 lb
Wall: 75 lb
Dimensions
Single Pedestal: 57.6”H x 18.4”W x 20.9”D
Double Pedestal: 57.6”H x 18.4”W x 28”D
Wall: 31.5”H x 14.9”W x 11.2”D
Pole: 31.5”H x 14.9”W x 11.2”D
Technical Characteristics
- Table 10 -
**The maximum power consumption is determined by EVSE. The actual power consumption is
determined by EV.
GE EV Charging Station User Manual 52 of 86
Page 53
g EV Charging StationUser Manual & Installation Instructions
Type
Enclosure
Output
No. of
Connectors
Single Phase
Integrated
Meter
RFID
Cat #
Single
Pedestal
NEMA 3R
208-240V 30A 1
phase
1
Yes
No
EVSN3
Yes
EVSRN3
Double
Pedestal
NEMA 3R
208-240V 30A 1
phase
2
Yes
No
EVDN3
Yes
EVDRN3
Pole
NEMA 3R
208-240V 30A 1
phase
1
Yes
No
EVPN3
Yes
EVPRN3
Wall
NEMA 3R
208-240V 30A 1
phase
1
Yes
No
EVWN3
Yes
EVWRN3
Family Catalog
- Table 11 -
3.4 Additional Considerations
Physical Security
Physical security is a necessary consideration in any installation of this type. There should be physical
controls to reduce the probability of a malicious entity’s chances of gaining access to any area of the
system. Network, maintenance access and power connections should be secured with strong
physical controls, i.e. all connections behind an access panel or door with a keyed lock to limit access.
This door or access panel should be strong (metal as a suggestion) and the lock should be of a type
that is not commonly available to the general public.
All wiring should be enclosed in conduit meeting the local electrical and communications building
codes. And all conduits should firmly attach to the secured “box” where communications would be
terminated within the Charging Station.
3.5 EVSE Controller Settings
3.5.1 Configuration Switch Settings
Using the configuration dip-switch S6, the controller can be placed into the desired operational mode.
GE EV Charging Station User Manual 53 of 86
Page 54
g EV Charging StationUser Manual & Installation Instructions
S6 -Configuration
Dip Switch
Ethernet
GE EV Charging Station User Manual 54 of 86
Figure 54: EVSE Controller
The configuration dip switch has positions 1 thru 8. Switches 1 to 4 are set and locked by the
manufacturer, and switch 5 is reserved for future use. Switches 6, 7 and 8 are set at installation of the
EVSE into its operational environment.
Page 55
g EV Charging StationUser Manual & Installation Instructions
1 2 3 4 5 6 7
8
Factory
setting
Factory
setting
Factory
setting
Factory
setting
reserved
Language settings
Config.
server
CLOSED
CLOSED
CLOSED
OPEN
CLOSED
OPEN *)
OPEN *)
CLOSE **)
6 position
7 position
No Display or Set Language Via Config. Server
Close
Close
Spanish
Close
Open
French
Open
Close
English
Open
Open
Pushed down on “number”
side is the CLOSED position
Figure 55: Dip Switch Settings
(This picture depicts an example of all CLOSED dip switch positions. For correct settings, refer to below
tables)
The default settings per SKU are given in below table:
*) Language Settings
**) Configuration Server
CLOSE = Normal operation
OPEN = Configuration server
3.5.2 Display fault messages
EVSE controller is capable of providing a full range of Fault troubleshooting options. When the
controller experiences a fault it will display the brief fault description message as well as the specific
fault code on the display.
Fault codes:
0x00000001
Fault indicating that the unit has experienced a ground fault and is waiting the required amount of
time (15 minutes) before it attempts to reclose the main contactor, clear the fault and continue
charging.
0x00000002
Fault indicating that the controller has experienced the maximum allowed number of ground faults
for a charge cycle.. To reset this fault simply disconnect the EVSE plug from the vehicle, and wait for at
least 30 seconds.
GE EV Charging Station User Manual 55 of 86
Page 56
g EV Charging StationUser Manual & Installation Instructions
0x00000004
Fault indicating that the unit has experienced a Ground fault CT test failure, either during the powerup self-test or during charge cycle initialization self-test. Check the ground fault CT (current
transformer), connections or the EVSE controller. Disconnecting from the vehicle will clear this fault. If
it persists repeatedly the ground fault CT and EVSE controller circuit need to be checked.
0x00000008
Fault indicates that the EVSE controller has detected that the vehicle is drawing excessive current
during the charge cycle so it has interrupted charging. To clear this fault, disconnect the EVSE plug
from the vehicle.
0x00000010
Fault indicating that the unit E-stop jumper (J14 or J14A) is not installed. Check/install connector J14
or J14A on the controller.
0x00000020
Unit has failed a Pilot Diode self-test required per the SAEJ1772 / IEC 61851 standard. This is a feature
which prevents tampering with the controller and the interlock connector. To clear this fault,
disconnect from the vehicle and repeat. If fault persists, there is likely a problem with the vehicle’s
pilot interface.
0x00000040
Indicates an illegal Pilot transition state detected by the controller from the vehicle. This condition will
automatically clear when the pilot returns to an appropriate state. Note: some vehicles may not
comply with the SAE J1772 / IEC 61851 standard and go directly from state A to state C. To
accommodate charging of such vehicles, use the non-SAE compliant configuration setting on the
configuration menu (see Section 3.4.4 NON-SAEJ1772 configuration).
0x00000080
Controller has experienced 0V state feedback from the Vehicle which is an illegal state and it indicates
an error from the vehicle. The fault will clear upon disconnection from the vehicle.
0x00000100
Controller has experienced an unknown Pilot voltage level during power up which is not compliant to
the SAEJ1772 / IEC 61851 standard. This fault can only be cleared by cycling power to the EVSE. If this
error persists, the EVSE needs to be serviced.
0x00000200
Controller is not detecting feedback from the Main contactor Aux. Connections at J11. Check for
connections per the System level wiring diagram or a hardware fault with the contactor or the
controller. This fault is cleared by disconnection of the EVSE plug from the vehicle.
0x00000400
Indicates an incorrect hardware configuration. Ensure that the controller is placed in the correct
desired configuration using the Dip Switch (S6) and properly installed into the system. This fault can
only be cleared by cycling power to the EVSE.
GE EV Charging Station User Manual 56 of 86
Page 57
g EV Charging StationUser Manual & Installation Instructions
0x00001000
Controller has detected that the contactor is still in Closed state after the controller issued a
command to open the contactor. Check the Main contactor, system wiring or the controller. This fault
can only be cleared by cycling power to the EVSE. With power removed, examine the contactor, the
auxiliary feedback circuits, and the connections at J11.
0x00004000
Non-volatile memory (NVM) is used to store configuration settings and data which needs to be
retained during power outages. The controller has detected an issue with NVM. Cycle power to the
EVSE controller to attempt fault recovery. If fault persist, redefine the configuration settings by
running the configuration server. Call service if repeating configuration set up does not clear the
fault.”
0x00008000
Controller has detected an Over voltage condition at the input supply voltage which exceeds the
allowed range for EV charging. Recovery is automatic when the voltage returns to an appropriate
range. There is a one minute delay before reclosing to prevent the possibility of contactor chattering
for unstable line voltage conditions.
0x00010000
Controller has detected an Under voltage condition at the input supply voltage which is below the
allowed range for EV charging. Recovery is automatic when the voltage returns to an appropriate
range. There is a one minute delay before reclosing to prevent the possibility of contactor chattering
for unstable line voltage conditions.
0x00040000
Controller has detected an out of range ambient temperature condition. To clear this fault the power
must be removed and reapplied to the EVSE. If this error persists, the EVSE needs to be serviced.
0x00080000
Controller has detected an internal operation error and will require servicing. To clear this fault the AC
voltage must be removed and reapplied to repeat the test. Repeated occurrence of this fault indicates
need for a replacement control board.
0x00200000
The controller contains an IC (integrated circuit) which stores the globally unique MAC address which
is required for the Ethernet operations. If the controller is not able to read this address it will set this
fault. To clear and reattempt to read the MAC address, power to the EVSE must be removed and
reapplied. Repeated occurrence of this fault indicates need for a replacement control board.
GE EV Charging Station User Manual 57 of 86
Page 58
g EV Charging StationUser Manual & Installation Instructions
4 Network Setup Instructions
This chapter details design recommendations for a GE EV Charging Station Network Infrastructure.
Network setup is required for installations that use RFID authentication. It is not required for EVSE that
do not use RFID authentication.
This section of the installation document covers the options for connecting the charging stations with
a PC hosting the EV100 GE EV Charging Station Manager Application software.
4.1 Definitions and Terms
Certain terms are used throughout this chapter; in order to avoid misinterpretation, several of the
more commonly used terms are defined below.
oCS: Charging Station. These are individual units that provide electrical charging services to
vehicle at a time. (Double pedestal provides charging to two)
oHost System/Host PC: The PC that runs the GE EV Charging Station Manager Application to
manage authorization and collect data from the Charging Stations.
oFirewall: A network security device that provides controlled access between two or more
network segments, denying anything except approved communications between the various
network segments.
oDMZ: Demilitarized Zone. An isolated network segment attached to a separate connection point
on a firewall. This segment is then granted specific access to or from any other “Zone” to
control who/what can connect INTO the DMZ or what the system or systems within the DMZ
can connect OUT to.
oSwitch: A network device that provides multiple connection points for attaching devices to an
individual segment of a communications network. For the purpose of this document, they are
Ethernet network switches.
o NIC: Network Interface Card. A PC card with an RJ45 port that provides Ethernet connectivity.
o Service laptop or PC: A laptop or PC used to configure individual EVSE stations via direct
Ethernet connection (use a cross-connected cable)
4.2 Firewall and Security Considerations
o Firewall.
Any firewall used to provide isolation from the charging station network to any other network should,
at a minimum, provide “Statefull Packet Inspection”.
Anything less would not provide acceptable security and protection. SOHO firewalls are available
that provide this capability but there are some which do not.
GE EV Charging Station User Manual 58 of 86
Page 59
g EV Charging StationUser Manual & Installation Instructions
Any firewall used for a DMZ environment should be a business class system (i.e. Cisco ASA,
Checkpoint, SonicWall, etc) and provide a true DMZ capability. Typical SOHO firewalls do NOT
provide true DMZ capabilities.
GE supports the use of the Cisco ASA5505 firewall and provides settings for its use in this scenario.
o Physical Security.
Physical security is a necessary consideration in any installation of this type. There should be
physical controls to reduce the probability of a malicious entity’s chances of gaining access to any
area of the system.
Network, maintenance access and power connections should be secured with strong physical
controls, i.e. all connections behind an access panel or door with a keyed lock to limit access. This
door or access panel should be strong (metal as a suggestion) and the lock should be of a type that
is not commonly available to the general public.
All wiring should be enclosed in conduit meeting the local electrical and communications building
codes. And all conduits should firmly attach to the secured “box” where communications would be
terminated within the Charging Station.
4.3 Controller Configuration
4.3.1 Introduction
The Configuration Server Interface is used to make modifications to the network settings and to
certain operation parameters of the charging station controller. The controller will boot into a default
configuration. The network defaults will need to be changed in order to accommodate the decisions
in choosing the stand-alone or fire-walled configuration and to avoid conflicts with the installation of
subsequent controllers.
Each EVSE needs to be configured individually using a service PC or laptop during the installation and
setup of the controllers.
4.3.2 Prepare Service Laptop or PC
In order to set up your service laptop or PC, make sure you have full Windows Administrator rights.
Disable any firewalls and all other Ethernet and WiFi connections for the duration of the setup.
Make sure no EVSE is connected or at least not powered during these setup changes.
Then follow these steps to configure your TCP/IP settings for communication with the EVSE during
setup.
After the setup, you may want to set them back to your normal settings by undoing the same steps,
enable WiFi connections and firewalls.
1. Open the network settings by going to Start > Control Panel > Network connections.
GE EV Charging Station User Manual 59 of 86
Page 60
g EV Charging StationUser Manual & Installation Instructions
Right click, select
“Properties”
Figure 56
Figure 57
2. Right Click on Local Area Network and select to open the properties Window
3. Scroll through the protocols used by the local area connection to find the Internet Protocol
(TCP/IP). Select this protocol by clicking on it and then click on the Properties button to open
the window that will allow you to set the IP address and Subnet mask.
Figure 58: TCP/IP settings on the test PC
GE EV Charging Station User Manual 60 of 86
Page 61
g EV Charging StationUser Manual & Installation Instructions
IP Address
192.168.2.19
Subnet Mask
255.255.255.0
Default Gateway
Leave Blank
*Note:
Proxy Settings
In Internet Explorer, open “Tools”>”Internet Options”, click on “Connections” tab and then
“LAN Settings”:
Enable “Use automatic configuration script”.
Disable “Automatically detect settings” and “Use a proxy server for your LAN” as shown.
Figure 59: LAN settings
4. Click the Radio button to “Use the following IP Address” and then enter both the IP address
and Subnet mask as shown.
5. Click OK and Close both properties windows to save your settings
4.3.3 EVSE Configuration Server Interface
This paragraph describes how to access the EVSE controller Configuration Server Interface and which
settings can be made.
In a networked environment, each EVSE needs to be configured according to the instructions given in
this document, and depending on the type of network chosen.
CAUTION: when manipulating the EVSE, always make sure the power to the EVSE is switched
off before coming close or touching any parts of the interior.
To configure each individual EVSE
GE EV Charging Station User Manual 61 of 86
1. Switch off EVSE main Circuit Breaker (Removing power from the EVSE). Connect the Ethernet
test cable to the EVSE controller Ethernet port J1 and the other end to the service laptop
Ethernet connector.
Page 62
g EV Charging StationUser Manual & Installation Instructions
Ethernet Connector J1
S6 - Configuration
Figure 60: EVSE Controller
2. It is recommended to use a crossed Ethernet cable for direct connectivity between the EVSE
and the service laptop or PC.
GE EV Charging Station User Manual 62 of 86
Page 63
g EV Charging StationUser Manual & Installation Instructions
Note: Should the EVSE in question previously have been assigned a different default
EVSE IP address, enter here that IP address.
Note: If you have forgotten the IP address of this EVSE, reset the controller.
Check if the Status is
“Connected”
Figure 61
3. With the power removed, change the position of switch 8 on the S6 to:
Switch 8 – Open (Configuration server interface)
Keep the other switches in their original position.
This Dip-Switch configuration will enable the maintenance interface used during the initial
installation of the EVSE.
4. Switch on EVSE main Circuit Breaker to power up the EVSE in configuration mode
a. As long as the Ethernet connection is not active, the EVSE’s light is red.
b. As soon as the Ethernet connection is established, You should see the EVSE’s light
continuously go through a sequence of colors (green – yellow – red), each for 5 seconds to
indicate that the unit is in configuration mode.
Note that as long as the Ethernet connection is not active, the EVSE’s light is red.
5. Make sure the service laptop or PC has been configured as explained in a previous chapter.
6. Check that the LAN connection is established to the service laptop or PC (Status “Connected”)
7. On the service PC or laptop, open a browser window and type in the address bar the following
address and press enter: http:// 192.168.2.2
GE EV Charging Station User Manual 63 of 86
Page 64
g EV Charging StationUser Manual & Installation Instructions
7. The Controller will invoke the following page:
Figure 62: Configuration Server Entry Screen
8. Pressing the Enter Configuration button, the following page will load:
GE EV Charging Station User Manual 64 of 86
Page 65
g EV Charging StationUser Manual & Installation Instructions
Note: The default values normally need not be
changed if the EVSE in question is used in a nonRFID authentication mode.
Figure 63: Configuration server page with factory default values
GE EV Charging Station User Manual 65 of 86
Page 66
g EV Charging StationUser Manual & Installation Instructions
9. In the EVSE configuration page modify settings as required.
The correct settings depend on the chosen network architecture and are described in a later
chapter in detail.
There are 3 options for configuration:
No RFID Authentication (default)
RFID authentication in standalone network (see later chapter)
After the desired settings were configured click on “Save”. The following page will load:
RFID authentication in firewalled network (see later chapter)
Figure 64: Configuration Server Confirmation Page
10. Close the browser page and remove power to the EVSE controller.
11. Change the position of the S6 Dip-switch back to: Switch 8- Closed (Normal operation)
Keep the other switches in their previous positions.
This Dip-Switch configuration will enable the normal operation of the EVSE controller after powered
up.
GE EV Charging Station User Manual 66 of 86
Page 67
g EV Charging StationUser Manual & Installation Instructions
4.4 Recommended Network Designs for RFID Authentication
It is strongly recommended using one of below network settings, as those are providing necessary
security levels for the Charging Station System network and other parts of the network.
4.4.1 Option 1: Stand-alone Network Configuration
In this design the charging station network and its associated host system are not connected to the
customer network at all. Optional remote service access to the host system is via a dial-up modem
only.
This provides the greatest protection to the customer network, as there is no communication
between the customer network and the charging station network.
Host Application PC
Cat 5 Network Cables
Ethernet Switch
Optional Modem (for remote service only, otherwise not required)
Card reader, accessory from GE catalogue # EVRP01 (Note: only GE enrollment
readers work with this application)
EVSE Controller Settings
Follow the instructions in the Controller Configuration section to set up each individual EVSE
according to the following settings:
GE EV Charging Station User Manual 67 of 86
Page 68
g EV Charging StationUser Manual & Installation Instructions
Note: It is recommended to keep track of the different IP settings for each EVSE by
recording them on the form found on the final page of this document.
Action
required !
Action
required !
Action
required !
EVSE IP
On initial power up the EVSE IP address will default to 192.168.2.2 This must be changed to an
appropriate address based on the network configuration. Failure to change the IP address
setting will impact the ability to bring up subsequent charging stations on the network due to
IP address collisions.
Assign IP addresses to the charging stations beginning with 192.168.2.22.
As additional charging stations are added increment the last octet, so that they are numbered
in consecutive numbers. (192.168.2.22, 192.168.2.23, 192.168.2.24, and so on).
All of the charging stations will use the same subnet mask 255.255.255.0 with the default
gateway setting as 0.0.0.0 (blank).
Subnet Mask
Set the Subnet Mask to 255.255.255.0
Default Gateway
Fan wired with contactor
EVSE owners with indoor installations who want to charge vehicles that require facility fans to
be turned on must run signal connections to terminals 4 and 5 of the Power Terminal Block
(PTB) . The EVSE owner must follow electrical codes to ensure that proper ventilation is
allocated for their facility.
Set the gateway to 0.0.0.0 (blank)
Non-compliant SAEJ1772 behavior
Some earlier EV models equipped with a retrofit kit have a Pilot signal feedback that does not
comply with the SAE-J1772 / IEC 61851 standard. By default, this option is not enabled. Should
there be cars with retrofit kits to use this EVSE, check this box.
After a power loss enable a random delay before charging resumes
If there is a large number of EVSE on a local feed, consider setting this box to enable a gradual
increase in load on resumption of power.
Require Authorization for charging.
RFID authentication requires this check box to be checked on all EVSE in the network.
GE EV Charging Station User Manual 68 of 86
Page 69
g EV Charging StationUser Manual & Installation Instructions
Note: The port number on all EVSE in the network must match the port number defined
during the EV100 Software installation.
Note:In the case of any modification of the “Require authentication for charging”
status, or after a reset or replacement of the controller, the Station ID must be modified
to a new ID not previously used on this network to avoid transaction data to be lost.
Action
required !
Action
required !
Host IP address.
By default, the IP address is set to 192.168.2.19. Unless there is a collision with another setup, it
is recommended to keep this host address.
Should this address change, the network PC will need to be configured accordingly in the
TCP/IP settings, as explained later below.
TCP Host Port & TCP Source Port.
Change the value to 9500 for both the Host and Source Port to match the default value of the
EV100 Application SW. Unless there is a collision by using this Port on the host PC, it is
recommended to configure the EV100 application to use port 9500 (by default) and all EVSE in
the network to also use port 9500 (factory default is 9000).
Enable DHCP
Keep this option disabled at any time.
Allow charging if communication is not established
By default, this option is not selected. Checking this box will modify the behavior of the EVSE in
the case of network loss:
If unchecked, the EVSE will not allow charging of a car in the case of network communication
failure between the EVSE and the Host PC.
If checked, the EVSE will allow charging of a car despite of a network communication failure.
Station ID information
Fill in the Station ID information to distinguish EVSE from each other in the EV100 Application. It
is important to give each EVSE a unique ID.
IDs will appear in the EV100 Application in the format “1-12-9” (e.g. Locality ID = 1, Facility ID =
12, Unit number = 9).
GE EV Charging Station User Manual 69 of 86
Page 70
g EV Charging StationUser Manual & Installation Instructions
Note: The Station ID information is how the EV100 application distinguishes between
stations in the same network. Make sure you assign different values to each EVSE.
Note:In the case of any modification of the “Require authentication for charging”
status, or after a reset or replacement of the controller, the Station ID must be modified
to a new ID not previously used on this network to avoid transaction data to be lost.
Figure 66
After the desired settings were configured click on “Save”.
Repeat this procedure for all EVSE in the network.
Host PC Settings
In order to set up your Host PC, make sure you have full Windows Administrator rights.
Disable any firewalls and all other Ethernet and WiFi connections on this PC.
Then follow these steps to configure your TCP/IP settings for communication with the EVSE during
setup.
The NIC on the host PC should be connected to the Charging Station Network Ethernet Switch.
GE EV Charging Station User Manual 70 of 86
Page 71
g EV Charging StationUser Manual & Installation Instructions
To configure the network settings on a PC running Windows XP or Windows 7, press the Start button
and open the Control Panel. Select the Network Connections applet.
Figure 67: Network Connections
This displays the connections currently found on the PC. Select the icon for the Local Area
Connection and double click to open the properties for this NIC.
Figure 68: LAN Network Connection
Scroll through the protocols used by the local area connection to find the Internet Protocol (TCP/IP).
Select this protocol by clicking on it and then click on the Properties button to open the window that
will allow you to set the IP address and Subnet mask.
GE EV Charging Station User Manual 71 of 86
Page 72
g EV Charging StationUser Manual & Installation Instructions
Host IP Address
192.168.2.19
Host Subnet Mask
255.255.255.0
Host Default Gateway
Leave Blank
Note: Reboot PC to finalize with the configuration.
Note: The IP address above must match the Host IP address entered in the
configuration page of all connected EVSE. By default, this is 192.168.2.19.
Figure 69: Network Settings Option 1 (See the Configuration Server Interface section)
Click the Radio button to “Use the following IP Address” and then enter both the IP address and
Subnet mask as shown.
Set the Ethernet IP address, Subnet Mask, and Default Gateway to the following settings:
Click on OK and close both windows to save your settings.
GE EV Charging Station User Manual 72 of 86
Page 73
g EV Charging StationUser Manual & Installation Instructions
4.4.2 Option 2: Charging Station Network isolated from Customer Network with Host
System in a DMZ.
In this design, the charging stations are isolated from the customer network and the host system is
within a DMZ providing isolation from BOTH the Charging Station Network AND the Customer
Network. This minimizes the risks of someone compromising the charging station network or the
host system and using either to compromise or gain access to the customer network.
The host system is within a DMZ providing isolation from both the charging station network and the
customer network and communicates with the charging stations via a rule or access control list
entry which allows communications between ONLY the host system and the charging stations. A
rule or rules would be established to permit specific systems on the customer network to access the
host system.
Figure 70: Network Setup Option 2 –Networked Configuration with DMZ
This provides greater protection and isolation than the previous designs in this document. It’s not
perfect as the charging stations need to initiate some of the communications to the host system, so
a rule or ACL will have to be in place on the firewall to allow this communications. But it also isolates
that communications from the customer network. A properly configured firewall will provide greatly
enhanced protection to the customer network.
Required Components:
Host Application PC
Cat 5 Network Cables
Ethernet Switch
ASA5505 security plus firewall
Card reader, accessory from GE catalogue # EVRP01 (Note: only GE enrollment
readers work with this application)
GE EV Charging Station User Manual 73 of 86
Page 74
g EV Charging StationUser Manual & Installation Instructions
EVSE IP Address
172.25.0.xx
EVSE Subnet Mask
255.255.255.0
EVSE Default Gateway
172.25.0.1
EVSE IP Address
172.26.0.xx
EVSE Subnet Mask
255.255.255.0
EVSE Default Gateway
172.26.0.1
Note: It is recommended to keep track of the different IP settings for each EVSE by
recording them on the form found on the final page of this document.
Action
required !
EVSE Controller Settings
Follow the instructions in the Controller Configuration section to set up each individual EVSE
according to the following settings:
EVSE IP
On initial power up the EVSE IP address will default to 192.168.2.2 This must be changed to an
appropriate address based on the network configuration. Failure to change the IP address
setting will impact the ability to bring up subsequent charging stations on the network due to
IP address collisions.
Check with the local network administrator to determine which address ranges are currently in
use at the site.
It is necessary to select ranges for the charging stations that are distinct from those currently
in use to avoid IP address conflicts.
If the 172.25.x.x. range is not in use the following settings should be implemented.
Set the EVSE Ethernet IP address, Subnet Mask, and Default Gateway to the following settings:
Assign IP addresses to the charging stations beginning with 172.25.0.12. As additional charging
stations are added increment the last octet, so that they are numbered in consecutive
numbers starting from 12. (Examples: 172.25.0.12, 172.25.0.13, 172.25.0.14, and so on).
All of the charging stations will use the same subnet mask 255.255.255.0 with the default
gateway set to 172.25.0.1
Alternatively, if that range is in use, on the assumption that the 172.26.0.x. range is available
use these alternate settings:
This alternate setting will require the assignment of IP addresses to the charging stations
beginning with 172.26.0.12 As additional charging stations are added increment the last octet,
so that they are numbered as for example: 172.26.0.12, 172.26.0.13, 172.26.0.14, and so on. All
of the charging stations will use the same subnet mask 255.255.255.0 with the default gateway
set to 172.26.0.1.
Subnet Mask
See above
GE EV Charging Station User Manual 74 of 86
Page 75
g EV Charging StationUser Manual & Installation Instructions
Note: Make sure the Host PC is configured according to the same IP address settings as
entered in the EVSE configuration server page.
Note:In the case of any modification of the “Require authentication for charging”
status, or after a reset or replacement of the controller, the Station ID must be modified
to a new ID not previously used on this network to avoid transaction data to be lost.
Action
required !
Action
required !
Action
required !
Default Gateway
Fan wired with contactor
EVSE owners with indoor installations who want to charge vehicles that require facility fans to
be turned on must run signal connections to terminals 4 and 5 of the Power Terminal Block
(PTB). The EVSE owner must follow electrical codes to ensure that proper ventilation is
allocated for their facility.
See above
Non-compliant SAEJ1772 behavior
Some earlier EV models equipped with a retrofit kit have a Pilot signal feedback that does not
comply with the SAE-J1772 / IEC 61851 standard. By default, this option is not enabled. Should
there be cars with retrofit kits to use this EVSE, check this box.
After a power loss enable a random delay before charging resumes
If there is a large number of EVSE on a local feed, consider setting this box to enable a gradual
increase in load on resumption of power.
Require Authorization for charging.
RFID authentication requires this check box to be checked on all EVSE in the network.
Host IP address
By default, the IP address is set to 192.168.2.19, and needs to be changed to one of the
following options, depending on which address range to use:
- 172.25.1.100 in case of the EVSE IP range being 172.25.0.xx
- 172.26.1.100 in case of the EVSE IP range being 172.26.0.xx
TCP Host Port & TCP Source Port.
Change the value to 9500 for both the Host and Source Port to match the default value fo the
EV100 Application SW. Unless there is a collision by using this Port on the host PC, it is
GE EV Charging Station User Manual 75 of 86
Page 76
g EV Charging StationUser Manual & Installation Instructions
Note: The Station ID information is how the EV100 application distinguishes between
stations in the same network. Make sure you assign different values to each EVSE.
Note: The port number on all EVSE in the network must match the port number defined
during the EV100 Software installation.
Note:In the case of any modification of the “Require authentication for charging”
status, or after a reset or replacement of the controller, the Station ID must be modified
to a new ID not previously used on this network to avoid transaction data to be lost.
Action
required !
recommended to configure the EV100 application to use port 9500 (by default) and all EVSE in
the network to also use port 9500 (factory default is 9000).
Enable DHCP
Keep this option disabled at any time.
Allow charging if communication is not established
By default, this option is not selected. Checking this box will modify the behavior of the EVSE in
the case of network loss:
If unchecked, the EVSE will not allow charging of a car in the case of network communication
failure between the EVSE and the Host PC.
If checked, the EVSE will allow charging of a car despite of a network communication failure.
Station ID information
Fill in the Station ID information to distinguish EVSE from each other in the EV100 Application. It
is important to give each EVSE a unique ID.
IDs will appear in the EV100 Application in the format “1-12-9” (e.g. Locality ID = 1, Facility ID =
12, Unit number = 9).
After the desired settings were configured click on “Save”.
Repeat this procedure for all EVSE in the network.
GE EV Charging Station User Manual 76 of 86
Page 77
g EV Charging StationUser Manual & Installation Instructions
Figure 71
Host PC Settings:
In order to set up your Host PC, make sure you have full Windows Administrator rights.
Disable any firewalls and all other Ethernet and WiFi connections on this PC.
Then follow these steps to configure your TCP/IP settings for communication with the EVSE.
The NIC on the host PC should be connected to the ASA5505 firewall port number 0/6. A network
cable connects port 0/0 on the firewall to port 1 on the Charging Station Network Ethernet Switch.
To configure the network settings on a PC running Windows XP Press the Start button and open the
Control Panel. Select the Network Connections applet.
Figure 72: Network Connections
GE EV Charging Station User Manual 77 of 86
Page 78
g EV Charging StationUser Manual & Installation Instructions
This displays the connections currently found on the PC. Select the icon for the Local Area
Connection and double click to open the properties for this NIC.
Figure 73: LAN Network Connection
Scroll through the protocols used by the local area connection to find the Internet Protocol (TCP/IP).
Select this protocol by clicking on it and then click on the Properties button to open the window that
will allow you to set the IP address and Subnet mask.
Figure 74: Network Settings Option 2 (See the Configuration Server Interface section)
Click the Radio button to “Use the following IP Address” and then enter both the IP address and
Subnet mask as shown.
GE EV Charging Station User Manual 78 of 86
Page 79
g EV Charging StationUser Manual & Installation Instructions
IP Address
172.25.1.100
Subnet Mask
255.255.255.0
Default Gateway
172.25.1.1
IP Address
172.26.1.100
Subnet Mask
255.255.255.0
Default Gateway
172.26.1.1
Note: Reboot PC to finalize the configuration
Note: Make sure the Host PC is configured according to the same IP address settings as
entered in the EVSE configuration server page.
Note: Make sure the switch is always powered and connected to the Host PC. In case of
a direct connection from the EVSE to a Host PC without interposed Ethernet switch, the
EVSE needs to be powered each time the Host PC is powered up, or the listener service is
manually restarted.
Action
required !
Depending on the choice of IP address range above for the configuration of the EVSEs in the
network, set the Ethernet IP address, Subnet Mask, and Default Gateway to the corresponding
settings:
or
Click on OK and close both windows to save your settings.
4.4.3 Install EV100 RFID Host Application Software.
After the controller configuration of all EVSE and the host PC’s TCP/IP setups have been completed,
the Host Application EV100 for RFID authentication needs to be installed.
GE strongly recommends using a clean PC with a fresh Windows XP or Windows 7 installation only,
to avoid any interference with other installed software.
In order to install EV100 application, make sure you have full Windows Administrator rights
The detailed installation steps are defined in the manual provided with the application on CD 1.
“EV100 – GE EV Charging Station Manager Application”.
For trouble shooting, please also refer to that manual.
1. Power up the network switch and keep it connected to the Host PC at all times during the SW
installation and subsequent operation.
GE EV Charging Station User Manual 79 of 86
Page 80
g EV Charging StationUser Manual & Installation Instructions
Figure 75
2. Install the SW
It is strongly recommended to install the SW in the default location.
- Insert CD 1 of the EV100 Application into the CD ROM and launch setup.exe
- Follow instructions and keep default Port settings of 3306
- Once finished with CD 1, insert CD 2 of the EV100 Application and launch setup.exe
- Follow instructions and keep default port settings at 9500 (unless another port has been set up in
the individual EVSE stations on the configuration server page)
- Add optional field descriptions for user identification, such as phone number, e-mail address, etc.
which shall be stored alongside the RFID identifier.
- Driver Attributes Menu - - Software Driver Menu -
- User Attributes Menu - - Software User Menu -
4.4.4 Setup Validation
After the successful installation of the EVSE network and EV100 Software, validate the installation by
following these steps:
1. Check that the EV100 Listener Service is running
GE EV Charging Station User Manual 80 of 86
Page 81
g EV Charging StationUser Manual & Installation Instructions
Note: If the keyboard is set to French or Belgium keep the CAPSLOCK ON during card ID
registration. Should the output of the reader in the text field include characters other than 09 and A-F, set the keyboard settings of Windows to “US English”.
Note: ”Users” are user accounts for the EV100 application with associated login and
password. “Drivers” are EV drivers and are enrolled for usage of the EVSE infrastructure
and identify themselves with RFID cards.
Note: A change of the Host PC IP address while the listener service is running requires a
restart of the listener service or a reboot of the host PC. For detail instructions reach out
to User Manual document included on CD 1.
2. Launch the EV100 Application
Start the EV100 Application and log in. Default login is “admin” and the password “admin”.
You should now see the stations appear in the list with a green status after at most 5 min.
After at most 5min, all EVSE in the network should appear in the list. Check that all EVSE are present
and listed with their correctly configured Station ID.
Should one of the EVSE not appear in the list, power that station down and up again.
Click on “Home” to refresh the screen at any time.
3. Enroll drivers
In order to enroll new drivers, follow these steps or detail instructions included in the Help>Add
driver section
- Plug in the enrollment card reader (accessory from GE, cat # EVRP01) into the USB port
- Wait for the USB driver installation to successfully complete
- Click on “Add” to open the Add New Driver dialog box
- Click on “OK” then hold the RFID card of the new user in front of the enrolment reader for a
few seconds. You should see a change in the LED on the reader itself and a hexadecimal
number appear in the text field.
- Fill in the remaining information.
- Add more drivers to the list. For more information, refer to the SW user manual or the help
file.
- You can close the application EV100, but keep the host PC connected and up and running at
all times for the RFID authentication to work.
4. Check driver registration
Any driver with a registered RFID card can now use the connected EVSE.
GE EV Charging Station User Manual 81 of 86
Page 82
g EV Charging StationUser Manual & Installation Instructions
Note: For authentication to work, keep the host PC connected and up and running at all
times.
Note: It is recommended to keep track of
the different IP settings for each EVSE by
recording them on the form found on the
final page of this document.
To activate charging, hold the RFID card in front of the reader for 2-3 seconds. Upon successful
authentication of that card, the reader LED will turn green after another small delay of 2-3
seconds.
4.5 Setup without RFID Authentication
Some EVSE models are not equipped with an RFID reader and are not meant to be set up in a network
environment. Even models with RFID can be used in a non-authentication mode. In both cases, the
EVSE controller settings do not need to be modified from the default values.
In order to disable the RFID authentication function from a previous networked setup, it is
recommended to either reset the EVSE controller as explained in a later chapter, or to reset the values
on the EVSE controller following the steps described in the Configuration Server Interface section, and
set the parameters as shown.
After the desired settings were configured click on “Save”.
Figure 76: Factory Default values
GE EV Charging Station User Manual 82 of 86
Page 83
g EV Charging StationUser Manual & Installation Instructions
Note: It is recommended to keep track of the different IP settings for each EVSE by
recording them on the form found on the final page of this document.
Figure 77
4.6 Reset Controller to Factory Default
Should you have inadvertently changed to a non-default IP setting and cannot remember the IP
settings, or simply reverse to default configuration for other reasons, you can reset the controller to
the factory default values by following these steps.
Follow the instructions below to reset the controller settings:
1. Switch off EVSE main breaker to remove power to the controller.
2. Short connector J21 pins 1, 2 and 3 with a conductive connector.
3. Switch on EVSE main breaker to supply power to the controller.
4. After a few seconds switch off EVSE main breaker to remove power to the controller.
5. Remove short from connector J21.
6. Switch on EVSE main breaker to supply power to the controller.,
7. Reconfigure as desired via EVSE controller configuration server interface. See description in an
earlier chapter.
GE EV Charging Station User Manual 83 of 86
Page 84
g EV Charging StationUser Manual & Installation Instructions
Note: In the case of a network installation with RFID authentication, after a reset of the
controller, the Station ID must be modified to a new ID not previously used on this
network to avoid transaction data to be lost.
4.7 Trouble Shooting Guide
For assistance with EVSE troubleshooting, please refer to the following website:
www.geindustrial.com/evsupport
GE EV Charging Station User Manual 84 of 86
Page 85
g EV Charging StationUser Manual & Installation Instructions
EVSE Settings for ID __________________________________
Locality: ________________________________________________
Facility: _________________________________________________
Unit Number: ____________________________________________
Print one page for each EVSE and keep this record in a safe location or inside the corresponding EVSE.
GE EV Charging Station User Manual 85 of 86
Page 86
g EV Charging StationUser Manual & Installation Instructions
* SAVE THESE INSTRUCTIONS*
The instructions do not purport to cover all details or variations in equipment nor to provide for every
possible contingency to be met in connection with installation, operation or maintenance. Should
further information be desired or should particular problems arise which are not covered sufficiently
for the purchaser’s purposes, the matter should be referred to the GE company.
GE Industrial Solutions
41 Woodford Ave.
Plainville, CT 06062
www.geindustrial.com
DEH-44160
GE EV Charging Station User Manual 86 of 86
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.