Cluster Pad Assembly, ANSI / UL
Envelope 1, drawout upto 2000A
Cluster pad assemblies are supplied with the
Entelliguard breaker.
M12 Hardware
M12 Hardware
80 Nm Torque
80 Nm Torque
M12 Spring
M12 Spring
Washer
Washer
Cluster Pad
Cluster Pad
assembly
assembly
Fig A. Envelope 1, Cluster pad assembly
(Upto 2000 Amperes, drawout)
Envelope Size
Envelope 1
Cluster pad
Catalog #
GBB120TBD
Table 1 Cluster
ad catalog numbers
M12 Plain
M12 Plain
Washer
Washer
Nut plate
Nut plate
DEH-41450 Installation Instructions
EntelliGuard ® G Circuit Breaker
Accessories
Cluster pad Assembly
Cluster pad Assembly mounting Procedure:
1. Turn the breaker off and discharge the closing springs
by depressing the OFF and ON buttons in the
sequence OFF-ON-OFF. Verify that the breaker OFFON indicator shows OFF on a green background and
that the charge indicator shows DISCHARGE on a
white background. If installing in a draw-out type
breaker remove breaker from adaptor (cassette)
before continuing
2. Assemble the Cluster pad assembly on the breaker
top & bottom rear terminals & orient them as shown
in Fig A.
3. Tightened the cluster pad assemblies on bottom & top
breaker terminals with torque of 80Nm (59 ft-lbs) as
shown in fig A.
WARNING: Before installing any accessories, turn the
breaker OFF, disconnect it from all voltage sources,
and discharge the closing spings.
AVERTISSEMENT: Avant d’installer tout accessoire,
mettre le disjoncteur en position OFF, le déconnecter
de toute tension d’alimentation, et décharger les
resorts d’armement
Fig B. Envelope 1 Cluster pad assembly, Side View
1
These instructions do not purport to cover all details or variations in equipment nor, to provide contingency to be met in connection
with installation, operation, or maintenance. Should further information be desired, or should particular problems arise which are not
covered sufficiently for the purchaser’s purposes, the matter should be referred to GE.